second meeting of the ais-aim study group (montreal, 10-13 november 2009) ais-aimsg/2 ais to aim...

7
Second Meeting of the AIS-AIM Study Second Meeting of the AIS-AIM Study Group Group (Montreal, 10-13 November 2009) (Montreal, 10-13 November 2009) AIS-AIMSG/2 AIS-AIMSG/2 AIS to AIM Roadmap Document AIS to AIM Roadmap Document Jean-michel Galais Jean-michel Galais Technical Officer, Technical Officer, Aeronautical Information Unit Aeronautical Information Unit (MET/AIM) (MET/AIM)

Upload: antonio-ruiz

Post on 27-Mar-2015

222 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Second Meeting of the AIS-AIM Study Group (Montreal, 10-13 November 2009) AIS-AIMSG/2 AIS to AIM Roadmap Document Jean-michel Galais Jean-michel Galais

Second Meeting of the AIS-AIM Study GroupSecond Meeting of the AIS-AIM Study Group (Montreal, 10-13 November 2009)(Montreal, 10-13 November 2009)

AIS-AIMSG/2AIS-AIMSG/2

AIS to AIM Roadmap DocumentAIS to AIM Roadmap Document

Jean-michel GalaisJean-michel GalaisTechnical Officer, Aeronautical Technical Officer, Aeronautical Information Unit (MET/AIM)Information Unit (MET/AIM)

Page 2: Second Meeting of the AIS-AIM Study Group (Montreal, 10-13 November 2009) AIS-AIMSG/2 AIS to AIM Roadmap Document Jean-michel Galais Jean-michel Galais

From Draft to Edition 1From Draft to Edition 1

2

AIS-AIMSG/2AIS-AIMSG/2

– 2-4 Dec. 2008 AIS-AIMSG/1– 22 Jan. 2009 AIS-AIMSG 71 Comments – Regional Offices + Responses to State Letter– Translation in Spanish and Russian offered

from EUROCONTROL– 22/07 edition 1 available as a free electronic

publication on the ICAO AIM’s website;

Page 3: Second Meeting of the AIS-AIM Study Group (Montreal, 10-13 November 2009) AIS-AIMSG/2 AIS to AIM Roadmap Document Jean-michel Galais Jean-michel Galais

• Written in very general and concise form to allow States and International Organi-sations to refer to it but keeping their freedom of initiatives;

• Living document but not to be changed too often;

• Comments and Proposals…

AIS-AIMSG/2AIS-AIMSG/2

HighlightsHighlights

Page 4: Second Meeting of the AIS-AIM Study Group (Montreal, 10-13 November 2009) AIS-AIMSG/2 AIS to AIM Roadmap Document Jean-michel Galais Jean-michel Galais

Comments AIS-AIMSG/2AIS-AIMSG/2

Page 5: Second Meeting of the AIS-AIM Study Group (Montreal, 10-13 November 2009) AIS-AIMSG/2 AIS to AIM Roadmap Document Jean-michel Galais Jean-michel Galais

Data Pool

???? CNS

other model surveillancemodel

capacity,demand &

flowmodel

environmentmodelMET model

AI model

flight model

AOM DCB

AUOAO

CM TS

IM / SDM

ATM / ARO

ATM / ATFCM

MET

AIS - AIM

????

(ICAO) DomainResponsibility & IM Originators

Data Model Layer Data Layer

Business Layer Service Layer

Airspace Organisation & Management

Demand & Capacity Balancing

Airspace User Operations

Traffic Synchronisation

Conflict Management

Aerodrome Operations

Information Management / ATM Service Delivery Management

Comments AIS-AIMSG/2AIS-AIMSG/2

Page 6: Second Meeting of the AIS-AIM Study Group (Montreal, 10-13 November 2009) AIS-AIMSG/2 AIS to AIM Roadmap Document Jean-michel Galais Jean-michel Galais

Comments

• “AIM requires a clear separation of data/information, products and services (currently no reference to services is found in the document) as well as the involved interoperability aspects. “

• 1- Review the definition of AIM• 2- Include the definitions of terms in Amdt 37

AIS-AIMSG/2AIS-AIMSG/2

Page 7: Second Meeting of the AIS-AIM Study Group (Montreal, 10-13 November 2009) AIS-AIMSG/2 AIS to AIM Roadmap Document Jean-michel Galais Jean-michel Galais

Comments

• lack of understanding of what is or will be the official legal source of information / data ?

3 - Include a legal and institutional chapter

AIS-AIMSG/2AIS-AIMSG/2