seattle parks - high point park sales representative€¦ · 13 zzpm0616 2 square coated deck...
TRANSCRIPT
POST & COMPONENT ROTOMOLD PLASTIC SHEET PLASTIC ECO-ARMOR
ROPE , BOULDERS & SHADE
17-2118F.NPE
Equipment ManufacturerSales RepresentativeSeattle Parks - High Point ParkSeattle, WA
Note: All custom designs and artwork are conceptualand could change upon final design and order. An additionalturn-around time should be expected when order is placed. Anypanel graphics shown can be designed specifically to meet thecustomers needs.
POST & COMPONENT ROTOMOLD PLASTIC SHEET PLASTIC ECO-ARMOR
ROPE , BOULDERS & SHADE
17-2118F.NPE
Equipment ManufacturerSales RepresentativeSeattle Parks - High Point ParkSeattle, WA
Note: All custom designs and artwork are conceptualand could change upon final design and order. An additionalturn-around time should be expected when order is placed. Anypanel graphics shown can be designed specifically to meet thecustomers needs.
POST & COMPONENT ROTOMOLD PLASTIC SHEET PLASTIC ECO-ARMOR
ROPE , BOULDERS & SHADE
17-2118F.NPE
Equipment ManufacturerSales RepresentativeSeattle Parks - High Point ParkSeattle, WA
Note: All custom designs and artwork are conceptualand could change upon final design and order. An additionalturn-around time should be expected when order is placed. Anypanel graphics shown can be designed specifically to meet thecustomers needs.
POST & COMPONENT ROTOMOLD PLASTIC SHEET PLASTIC ECO-ARMOR
ROPE , BOULDERS & SHADE
17-2118F.NPE
Equipment ManufacturerSales RepresentativeSeattle Parks - High Point ParkSeattle, WA
Note: All custom designs and artwork are conceptualand could change upon final design and order. An additionalturn-around time should be expected when order is placed. Anypanel graphics shown can be designed specifically to meet thecustomers needs.
ZZYY7649CUSTOM 10' 5" ODARCH SWING W/8' ARCHADD-A-BAY2 TOT SEATSACCESSIBLE SEATBELT SEAT
+76
+71
360° SLITHERSLIDE
PLAYWOODHEX ROOF
6' ARCH BRIDGE
ANYWHERESEAT
* (2) POSTS MAYNEED TO BEINSTALLED DEEPERPER SLOPE
SLIDEPOLE
BERMSLITHERSLIDE
35 DEGREESLOPE NEEDEDFOR BEDWAY
5-12 STRUCTURE
2-5 STRUCTURE
SURFACINGNEEDEDAT EXIT 36"
48"
48"
*108"
60"
108"108"48"
108"48"
CUSTOM ROPE NETHILL CLIMBER
5-12 STRUCTURE
PUPTENT
GLIDESLIDE
SPIRALCLIMBER
BEANSTALKCLIMBER
MEDIUM AND SMALLUNITY STEPPERS
UNITY CANOPYZZXX0187
CORRUGATEDSLANTED ROOF
TRANSFERSTATION
WITH STEP
6'
10'-2"
6'-1"
6'-2"
6'-7"
6'-1"
6'
6'-4"
12'-7"
13'-8"
13'-2"
POSTMOUNTBELLS
CORRUGATEDSLANTED ROOF
RIBBONCLIMBER
PIPEWALLBARRIER
10' ARCH BRIDGE
5' ELEVATIONCHANGE
SLITHERSLIDE
INCLINEDCLIFF HANGER
74'-4"
46'-9"
37'-7"
7'
AREA: 1,550 Sq. Ft.PERIMETER: 148 Ft.
AREA: 3,486 Sq. Ft.PERIMETER: 229 Ft.
65'-8"
MEDIUM AND SMALLUNITY STEPPERS
ACCESSGATE
PIPEWALLBARRIER (deck)CHINNING BAR
(ground)
PIPEWALLBARRIER
25'-7"
20'-5"
6'-9"
7'
BPaper Size
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
DATE:
SCALE:PROJECT NO:
FALL HEIGHT:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
ASTM F1487-CPSC #325
SEA
TTLE
PA
RK
S - H
IGH
PO
INT
PAR
KSE
ATTL
E, W
A
17-2118F.NPE 3/32"=1'-0"
MICHAEL BORDNER
12-OCT-17
36'-2" x 35'-6" x 16'
See Dwg
See Dwg See Dwg
9 Ft.
98+ 5-12 & 2-5
11
Northwest Playground Equipment, Inc.345 NW Dogwood
P.O. Box 2410Issaquah, WA 98027
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 13
7
9
10
4
10
3
5
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 3
2
3
1
1
1
1
1
108"108"
48"
108"48"
TREE HOUSEDOORWAY
POST MOUNTSTEERING WHEEL
CONTAINED PIPEWALL
CLIFFHANGER
SILOCLIMBER
PIPE WALL
SLITHERSLIDE
UPPERSILO CLIMBER
ARCH BRIDGE
SCAVENGERHUNT PANEL
360° SPIRAL
PIPE WALLWITH LOWERTELESCOPE
HEX ROOF
BUBBLE
SLIDE
PANEL
PLAYWOOD
CONTAINED PIPEWALL
48" DECK LEVEL 108" DECK LEVELGROUND LEVEL
PIPE WALL
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
NOTES:
1) This tower detail is a diagram of theindividual level layouts of the towerportion of your play structure,showing the detailed componentlayout of each level.
2) This tower detail is not to scale andis meant for reference purposesonly. It should not be used inobtaining accurate measurementsfor any of the equipment shownunless otherwise noted on thedrawing.
3) This design configuration is theproperty of this firm and PlayworldSystemsâ and may not bereproduced or used in any mannerwithout the expressed writtenconsent of this firm and PlayworldSystemsâ.
TOWER DETAIL:
SEA
TTLE
PA
RK
S - H
IGH
PO
INT
PAR
KSE
ATTL
E, W
A
17-2118F NOT TO SCALE
MICHAEL BORDNER
12-OCT-17
Detail 1
Northwest Playground Equipment, Inc.345 NW Dogwood
P.O. Box 2410Issaquah, WA 98027
Posts
ZZCH0216 41 3.5in OD x 144in SWAGED STEEL POST
ZZPM0006 22 5in OD X 96in STEEL POST W/ RIVETED CAP
ZZPM0026 13 5in OD X 132in STEEL POST W/ RIVETED CAP
ZZPM0128 54 5in OD x 192in STEEL POST W/RIVETED CAP
ZZPM0229 45 5in OD x 152in SWAGED STEEL POST
ZZPM0277 66 5in OD x 213in SWAGED STEEL POST
Decks & Kick Plates
ZZCH0616 17 SQUARE COATED DECK ASSEMBLY
ZZPM0616 28 SQUARE COATED DECK ASSEMBLY
ZZPM0617 39 TRIANGULAR COATED DECK ASSEMBLY
ZZPM0618 310 1/2 HEX COATED DECK ASSEMBLY
ZZUN2290 511 COATED DECK TO DECK CONNECTION KIT
ADA Items
ZZCH2008 112 TRANSFER STATION w/BARRIERS (36in DECK)
ZZPM2027 113 TRANSFER STATION (48in DECK)
ZZUN2019 214 APPROACH STEP FOR TRANSFER STATION
Slides
ZZCH3127 115 GLIDE SLIDE (36in DECK)
ZZPM3206 116 SLITHER SLIDE 2.0 ENTRANCE & EXIT
ZZPM3216 217 SLITHER SLIDE 2.0 BALCONY ENTRY/EXIT
ZZPM8070 118 SLIDING POLE (48in DECK)
ZZUN3207 119 SLITHER SLIDE 2.0 (STRAIGHT SECTION)
ZZUN3208 220 SLITHER SLIDE 2.0 (RIGHT SECTION)
ZZUN3209 121 SLITHER SLIDE 2.0 (LEFT SECTION)
ZZUN3218 322 SLITHER SLIDE 2.0 (LEFT 120° SECTION)
ZZUN3219 223 SLITHER SLIDE ROLLER SECTION
ZZUN3247 124 SLITHER SLIDE 2.0 SUPPORT LEG 5ft-6in
ZZUN3256 125 SLITHER SLIDE 2.0 SUPPORT LEG 2ft-6in
ZZUN3257 126 ORIGINS HILL SLIDE ANCHOR LEG (1ft)
Activity Panels
ZZPM4357 127 PIPEWALL WITH LOWER TELESCOPE
ZZPM4546 128 SCAVENGER HUNT (DECK LEVEL)
ZZPM4578 129 ANYWHERE SEAT
ZZPM4639 130 TREE HOUSE DOORWAY (GROUND LEVEL)
ZZPM4807 131 OVAL INSERT PANEL (DECK MOUNT)
ZZUN4796 132 OVAL BUBBLE PANEL INSERT
Barriers
ZZPM4090 633 CENTERLINE PIPE WALL BARRIER
ZZPM4288 134 ACCESS GATE
ZZPM4456 135 UPPER SILO CLIMBER EXTENDED BARRIER
ZZPM4740 136 CONTAINMENT PIPE WALL (HEX TOWER)
Climbers
Part No. Description
Design Number: 17-2118F - Bill Of Material
Seattle Parks - High Point Park
Ref.No. Quantity
Thursday, October 12, 2017 Page of1 2 Playworld.com
ZZCH8100 137 BEANSTALK CLIMBER (36in DECK)
ZZCH8140 138 SPIRAL CLIMBER (36in DECK)
ZZPM6987 139 INCLINED CLIFF HANGER (48in DECK)
ZZPM7940 140 UPPER SILO CLIMBER
ZZPM7950 141 SILO CLIMBER (48in DECK)
ZZPM8290 142 RIBBON CLIMBER (48in DECK)
Overhead Events
ZZPM5736 143 CHINNING/TURNING BAR
Balance
ZZUN7136 444 UNITY STEPPER - SMALL
ZZUN7137 345 UNITY STEPPER - MEDIUM
Bridges
ZZPM6590 146 6ft ARCH BRIDGE
ZZPM6635 147 10ft COATED ARCH BRIDGE
Audible Activities
ZZPM4556 148 7in BELL (POST MOUNT)
ZZPM4558 149 9in BELL (POST MOUNT)
Roofs & Arches
ZZCH9628 150 SLANT CORRUGATED ROOF
ZZPM9628 151 SLANTED CORRUGATED ROOF
Additional Tool & Maintenance Kits
ZZCHGUID 152 CHALLENGER GUIDELINES
ZZPMGUID 153 PLAYMAKER GUIDELINES
ZZUN9910 254 SURFACING WARNING LABEL KIT
ZZUN9930 255 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
Part No. Description
Design Number: 17-2118F - Bill Of Material
Seattle Parks - High Point Park
Ref.No. Quantity
Thursday, October 12, 2017 Page of2 2 Playworld.com
CertifiedZZXX01871 UNITY LARGE OVERHEAD CANOPY 1 608.08 1,212 13 9.50 0.84 1
CertifiedZZXX02612 BELT SEAT W/SILVER SHIELD 10ft TOP RAIL2 21.20 123 2 0.50 0.00 2
CertifiedZZXX02653 INFANT SEAT W/SILVER SHIELD FOR 8ft TOP RAIL
2 22.62 179 2 0.50 0.00 2
CertifiedZZXX03754 3-1/2in OD STEEL ARCH SWING 2-UNIT ADD-A-BAY
1 178.97 394 0 2.00 0.52 0
CertifiedZZXX04095 PUP TENT CLIMBER 1 319.31 1,832 6 5.00 0.12 1
CertifiedZZCH02166 3.5in OD x 144in SWAGED STEEL POST4 305.64 235 0 2.00 0.50 0
CertifiedZZPM00067 5in OD X 96in STEEL POST W/ RIVETED CAP2 108.42 163 0 2.00 0.26 0
CertifiedZZPM00268 5in OD X 132in STEEL POST W/ RIVETED CAP
1 74.21 108 0 1.00 0.12 0
CertifiedZZPM01289 5in OD x 192in STEEL POST W/RIVETED CAP5 531.55 768 0 5.00 0.60 0
CertifiedZZPM022910 5in OD x 152in SWAGED STEEL POST4 270.04 470 0 4.00 0.48 0
CertifiedZZPM027711 5in OD x 213in SWAGED STEEL POST6 678.06 1,035 0 6.00 0.72 0
CertifiedZZCH061612 SQUARE COATED DECK ASSEMBLY 1 54.86 174 3 1.00 0.00 0
CertifiedZZPM061613 SQUARE COATED DECK ASSEMBLY 2 180.72 441 8 2.00 0.00 0
CertifiedZZPM061714 TRIANGULAR COATED DECK ASSEMBLY3 139.20 508 6 3.00 0.00 0
CertifiedZZPM061815 1/2 HEX COATED DECK ASSEMBLY 3 335.46 1,060 15 4.50 0.00 0
CertifiedZZUN229016 COATED DECK TO DECK CONNECTION KIT5 1.45 19 0 2.50 0.00 0
CertifiedZZCH200817 TRANSFER STATION w/BARRIERS (36in DECK)
1 180.00 385 2 2.00 0.09 0
CertifiedZZPM202718 TRANSFER STATION (48in DECK)1 287.44 567 3 2.00 0.09 0
CertifiedZZUN201919 APPROACH STEP FOR TRANSFER STATION2 71.66 144 2 2.00 0.08 0
CertifiedZZCH312720 GLIDE SLIDE (36in DECK)1 99.73 374 2 2.00 0.03 1
CertifiedZZPM320621 SLITHER SLIDE 2.0 ENTRANCE & EXIT1 97.18 449 2 2.00 0.03 1
CertifiedZZPM321622 SLITHER SLIDE 2.0 BALCONY ENTRY/EXIT2 333.20 1,295 4 5.00 0.06 2
CertifiedZZPM807023 SLIDING POLE (48in DECK) 1 68.17 172 1 1.00 0.03 1
CertifiedZZUN320724 SLITHER SLIDE 2.0 (STRAIGHT SECTION)1 19.59 128 0 0.25 0.00 0
CertifiedZZUN320825 SLITHER SLIDE 2.0 (RIGHT SECTION)2 39.18 267 0 0.50 0.00 0
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 17-2118F - Compliance and Technical Data
Seattle Parks - High Point Park
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
Thursday, October 12, 2017 Page of1 4 Playworld.com
CertifiedZZUN320926 SLITHER SLIDE 2.0 (LEFT SECTION)1 19.59 134 0 0.25 0.00 0
CertifiedZZUN321827 SLITHER SLIDE 2.0 (LEFT 120° SECTION)3 125.04 695 0 0.75 0.00 0
CertifiedZZUN321928 SLITHER SLIDE ROLLER SECTION 2 67.60 944 0 0.50 0.00 0
CertifiedZZUN324729 SLITHER SLIDE 2.0 SUPPORT LEG 5ft-6in1 19.41 70 0 0.25 0.03 0
CertifiedZZUN325630 SLITHER SLIDE 2.0 SUPPORT LEG 2ft-6in1 12.81 59 0 0.25 0.03 0
CertifiedZZUN325731 ORIGINS HILL SLIDE ANCHOR LEG (1ft)1 10.32 53 0 0.25 0.03 0
CertifiedZZPM435732 PIPEWALL WITH LOWER TELESCOPE1 43.55 141 1 0.50 0.00 1
CertifiedZZPM454633 SCAVENGER HUNT (DECK LEVEL) 1 52.85 568 3 2.00 0.00 1
CertifiedZZPM457834 ANYWHERE SEAT 1 32.35 93 1 0.25 0.00 1
CertifiedZZPM463935 TREE HOUSE DOORWAY (GROUND LEVEL)1 36.51 353 2 0.50 0.00 1
CertifiedZZPM480736 OVAL INSERT PANEL (DECK MOUNT) 1 39.82 270 0 0.50 0.00 0
CertifiedZZUN479637 OVAL BUBBLE PANEL INSERT 1 5.87 114 0 0.50 0.00 0
CertifiedZZPM409038 CENTERLINE PIPE WALL BARRIER 6 223.32 567 0 3.00 0.00 0
CertifiedZZPM428839 ACCESS GATE 1 34.38 92 0 0.50 0.00 0
CertifiedZZPM445640 UPPER SILO CLIMBER EXTENDED BARRIER1 47.78 108 0 0.50 0.00 0
CertifiedZZPM474041 CONTAINMENT PIPE WALL (HEX TOWER)1 56.36 138 0 1.00 0.00 0
CertifiedZZCH810042 BEANSTALK CLIMBER (36in DECK)1 69.63 273 1 1.00 0.03 1
CertifiedZZCH814043 SPIRAL CLIMBER (36in DECK)1 79.83 182 2 1.00 0.03 1
CertifiedZZPM698744 INCLINED CLIFF HANGER (48in DECK)1 134.70 523 2 2.00 0.06 1
CertifiedZZPM794045 UPPER SILO CLIMBER 1 163.48 321 1 2.00 0.00 1
CertifiedZZPM795046 SILO CLIMBER (48in DECK) 1 77.70 159 2 1.50 0.07 1
CertifiedZZPM829047 RIBBON CLIMBER (48in DECK) 1 55.68 134 2 1.50 0.06 1
CertifiedZZPM573648 CHINNING/TURNING BAR 1 9.25 47 1 0.50 0.00 1
CertifiedZZUN713649 UNITY STEPPER - SMALL 4 119.88 276 4 4.00 0.52 4
CertifiedZZUN713750 UNITY STEPPER - MEDIUM 3 164.13 435 3 3.00 0.39 3
N/AZZPM659051 6ft ARCH BRIDGE 1 205.29 445 0 1.50 0.00 0
N/AZZPM663552 10ft COATED ARCH BRIDGE 1 353.27 858 0 2.00 0.00 0
CertifiedZZPM455653 7in BELL (POST MOUNT) 1 4.93 43 1 0.25 0.00 1
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 17-2118F - Compliance and Technical Data
Seattle Parks - High Point Park
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
Thursday, October 12, 2017 Page of2 4 Playworld.com
CertifiedZZPM455854 9in BELL (POST MOUNT) 1 6.53 47 1 0.25 0.00 1
CertifiedZZCH962855 SLANT CORRUGATED ROOF 1 233.87 600 0 1.50 0.00 0
CertifiedZZPM962856 SLANTED CORRUGATED ROOF 1 300.57 713 0 1.50 0.00 0
N/AZZCHGUID57 CHALLENGER GUIDELINES 1 0.00 1 0 0.25 0.00 0
N/AZZPMGUID58 PLAYMAKER GUIDELINES 1 0.00 1 0 0.25 0.00 0
CertifiedZZUN991059 SURFACING WARNING LABEL KIT 2 0.10 1 0 0.50 0.00 0
N/AZZUN993060 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
2 180
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 17-2118F - Compliance and Technical Data
Seattle Parks - High Point Park
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
1,253 2,340 22,137 98 103.25 5.827,832.34 31Totals:
22 Metric Tons1,053 Kg564 Kg3,524.55 Kg 4.42 m3
Thursday, October 12, 2017 Page of3 4 Playworld.com
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 17-2118F - Compliance and Technical Data
Seattle Parks - High Point Park
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
The lay-out for this custom playscape, design number 17-2118F, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
ASTM F1487
2010 ADA Standards for Accessible Design
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Thursday, October 12, 2017 Page of4 4 Playworld.com