Top results
nerc tpl-001-4 standard overview attachment k quarter 3 stakeholder’s meeting september 29, 2016 1 overview areas • background • new nerc tpl standard • 2016 tpl…
the mro subject matter expert team is an industry stakeholder group which includes subject matter experts from mro member organizations in various technical areas. any materials,…
southwest power pool, inc. model development published on april 19, 2018 by spp staff integrated transmission planning manual revision history date or version number author…
standard tpl-001-0.1 — system performance under normal conditions adopted by nerc board of trustees: october 29, 2008 page 1 of 5 effective date: may 13, 2009 a. introduction…
* nerc tpl changes impacting transmission planners and planning coordinator (ercot) implementation date jan 1, 2015 in general the changes modify planning models, steady-state…
standard tpl-001-01 — system performance under normal conditions adopted by nerc board of trustees: october 29 2008 page 1 of 5 effective date: may 13 2009 a introduction…
mapping document project 2015-10 single points of failure tpl-001 standard: tpl-001-5 requirement in approved standard translation to new standard or other action description…
consideration of comments tpl table 1 order – project 2010-11 the tpl table 1 order drafting team thanks all commenters who submitted comments on the revision of tpl-002…
new reliability standard – nerc tpl-007-1 november 9, 2017 usa.siemens.com/digitalgridunrestricted © siemens industry, inc. 2017 page 2 unrestricted © siemens industry,…
agenda -tpl standards workshop sponsored by nerc pc âjune 3, 2008 1. nerc antitrust compliance guidelines 2. opening remarks and introductions 3. workshop objectives 4.…
tpl-001-5 — transmission system planning performance requirements page 1 of 31 a introduction 1 title: transmission system planning performance requirements 2 number: tpl-001-5…
open distribution copyright © 2018 north american transmission forum. not for sale or commercial use. all rights reserved. disclaimer this document was created by the north…
spp 2012 tpl dynamic s tab i l i ty s tudy december 31, 2012 engineering special studies & engineering support approved by transmission working group: december 19, 2012…
spp 2017 tpl-001-4 planning assessment scope compliance and advanced studies spp 2017 tpl-001-4 planning assessment scope 1 revision history date or version number author…
wecc-0100 posting 5 tpl-001-wecc-crt-3 - clean wecc criterion â tpl-001-wecc-crt-3 transmission system planning performance posting 5 december 18, 2015 through january 18,…
draft tpl-007-1 project 2013-03 geomagnetic disturbance gmd mitigation standard drafting team industry webinar june 26 2014 reliability accountability2 • summary of changes…
spp 2016 tpl-001-4 short circuit p l a n n i n g a s s e s s m e n t s c o p e engineering twg approved on 2232016 spp 2016 tpl-001-4 short circuit planning assessment scope…
agenda -tpl standards workshop sponsored by nerc pc –june 3, nerc antitrust compliance guidelines 2.opening remarks and introductions 3.workshop objectives 4.background…
s p p 2 0 1 5 t p l - 0 0 1 - 4 s h o r t c i r c u i t p l a n n i n g a s s e s s m e n t f o r u p p e r m i s s o u r i z o n e e n t i t i e s 12302015 spp engineering…
spp rto compliance forum tpl-001-4 jason terhune 501-688-8261 jterhune@spporg 1 mailto:jterhune@spporg tpl standards have been consolidated 2 tpl-001-4 tpl-001-01 tpl-002-0b…