DAVID PARR MEng CEng MICE MSc MAPM
Director
ROSS MCWHA MEng CEng MICE
Design Manager
PIANC
PRESENTATION
SEAFORTH PASSAGE
PORT OF LIVERPOOL
2
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
60 Million tonnes of cargo per annum
16,000 Shipping movements annually
UK’s Second largest port operator
MERSEY PORTS MASTER PLAN - 20 YEAR STRATEGY FOR GROWTH
3
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING RIVER MERSEY
LIVERPOOL
ROYAL SEAFORTH CONTAINER TERMINAL
GLADSTONE DOCK
SEAFORTH PASSAGE
SEAFORTH DOCK
Seaforth Docks constructed in early 1970’s
Impounded dock with access from Mersey via Gladstone Lock
ROYAL SEAFORTH DOCKS – LOCATION & HISTORY
4
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
RIVER MERSEY
ROYAL SEAFORTH DOCKS – LOCATION & HISTORY
SEAFORTH DOCK
RSCT
SEAFORTH PASSAGE
GLADSTONE LOCK
GLADSTONE DOCK
5
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
INTRODUCTION
STAGE 1 TENDER
STAGE 2 TENDER
ENABLING WORKS
CONTRACT
FINAL
PRICE
CONSTRUCTION CONTRACT
TENDER PROCESS & PROCUREMENT
6
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
ENABLING
CONTRACT
ASSET
CONDITION
SURVEY
INVESTIGATE
SERVICES AND
STRUCTURES
CHECK
CONDITION OF
EXISTING
SIPHON
GROUND
INVESTIGATION
STAKEHOLDER
CONSULTATION
FURTHER
DESIGN &
VALUE
ENGINEERING
SEAFORTH PASSAGE WIDENING ENABLING CONTRACT
7
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
40m
BACKGROUND –
Port of Liverpool – Royal Seaforth Container Terminal
40m
CONTRACT DETAILS
8
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
BACKGROUND –
Port of Liverpool – Royal Seaforth Container Terminal
20m 40m
CLIENT: PEEL PORTS
CONTRACT: NEC OPTION A
VALUE: £11M
PROGRAMME: NOVEMBER 2013 – AUGUST 2015
CONTRACT DETAILS
10
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
PHASE 1 – SECTOR GATE REMOVAL
PHASE 2 – SIPHON EXTENSION
PHASE 3 – SERVICES U TUBE
PHASE 4 – MAIN COMBI WALL
PHASE 5 – DEMOLITION
KEY PHASES
11
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
PHASE 1 –SECTOR GATE REMOVAL
SECTOR GATE
13
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
18m
30m
25m
PHASE 1 –SECTOR GATE REMOVAL
• TOTAL WEIGHT = 420T
• BURIED IN 11m OF SILT
• SILT REMOVED VIA AIRLIFT AND SILT PUMPS
14
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
Stage 2: Sector Gate Removal
PHASE 1 –SECTOR GATE REMOVAL
• 3D MODEL BUILT FROM RECORD DRAWINGS TO PLAN DEMOLITION
• GATE CUT AND REMOVED IN 6 SECTIONS RANGING FROM 40-160T
• BRONCO OXY CUTTING USED FOR MAJORITY OF CUTS
• FINAL CUTS COMPLETED REMOTELY USING SHAPED CHARGES
• TEMPORARY WORKS INSTALLED TO SECURE GATE
17
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
PHASE 2 – SIPHON EXTENSION
3m DIAMETER SEWER
SIPHON BELOW PASSAGE
18
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
PHASE 2 – SIPHON EXTENSION
20m EXTENSION AND TIE-INS
REQUIRED TO FACILITATE
INSTALLATION OF MAIN WALL
19
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
EXISTING SEAFORTH
PASSAGE SILL FLOOR
= - 6m CD
25
m
de
ep
PHASE 2 – SIPHON EXTENSION
EXISTING 3m DIAMETER SIPHON
NEW RC UPSHAFT
PROPOSED 3m DIAMETER EXTENSION
20
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
PHASE 2 – SIPHON EXTENSION
EXISTING RC DIAPHRAGM WALLS
TEMPORARY DIVERSION CHANNEL
COFFERDAM
22
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
PHASE 2 –SIPHON EXTENSION – LINER PIPE
23
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
PHASE 3 – SERVICES U TUBE
ROUTE OF EXISTING SERVICE
CULVERT AND LINK DUCT
UNDER PASSAGE
24
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
PHASE 3 – SERVICES U TUBE
PROPOSED U TUBE
DIVERSION ROUTE
25
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
PHASE 3 – SERVICES U TUBE
COMPLETED U TUBE
DIVERSION ROUTE
COMPLETION OF DIVERSION PERMITS
INSTALLATION OF MAIN WALL
26
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
63m Straight
Section
11m Western
Vertical Bend
12m Western
Vertical Riser
15m Eastern
Vertical Riser
9.5m Eastern
Horizontal Bend
11m Eastern
Vertical Bend
120m LONG
1020mm DIAMETER
TOTAL WEIGHT = 97.5T
PHASE 3 – SERVICES U TUBE
27
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
SERVICES WITHIN U-TUBE:
EXISTING NETWORK:
• 11kV HV RING
• FIBRE OPTIC/COMMS
• LV AND DOCK LEVELLER
• WATERMAIN
FUTURE PROVISION:
• 33kV HV RING
• ASSOCIATED FIBRE OPTICS AND COMMS
PHASE 3 – SERVICES U TUBE
28
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
PHASE 3 – SERVICES U TUBE
STAGE 1 PRE-FABRICATION ON WEST ALEXANDRA DOCK
WEST ALEXANDRA DOCK
SEAFORTH PASSAGE
29
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
U-Tube Fabrication and Installation Overview PHASE 3 – SERVICES U TUBE
STAGE 2 ROTATION THROUGH 90 DEGREES
Youtube Link: https://www.youtube.com/watch?v=SdDWgSNcN8M
30
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
U-Tube Fabrication and Installation Overview PHASE 3 – SERVICES U TUBE
STAGE 3 U TUBE POSITIONED
31
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
TRENCH EXCAVATED IN MARCH 2014
EXCAVATED EARLY TO UTILISE 200T
BACKHOE DREDGER – CAPABLE OF
EXCAVATING TO THE FULL 19m DEPTH
4000m3 OF MATERIAL REMOVED IN 3 DAYS
SILT FLOWED INTO TRENCH AS HARD
MATERIAL WAS EXCAVATED
PHASE 3 – SERVICES U TUBE
32
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
TRENCH EXCAVATED TO - 8.8m CD
PHASE 3 – SERVICES U TUBE TRENCH EXCAVATED MARCH 2014
33
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
PHASE 3 – SERVICES U TUBE
TRENCH SILTED TO - 6.0m CD
34
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
PHASE 4 – MAIN COMBI WALL
COMBI WALL
35
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
PHASE 4 – MAIN COMBI WALL
ANCHOR WALL
36
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
PHASE 4 – MAIN COMBI WALL
TIE RODS
39
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING
PHASE 5 – DEMOLITION
VOLUME TO BE REMOVED 20,000m3
EXISTING QUAY LEVEL + 13m CD
WATER LEVEL + 10m CD
CUT OFF LEVEL - 6.5m CD
COMPLETION SUMMER 2015
40
INTRODUCTION
ENABLING
DELIVERY
TENDER
SEAFORTH
PASSAGE
WIDENING