SDR installation by ZTETRANSCRIPT
SDR Site Installation Standards For Telenor Vega Swap Project(V1.0)
Zhongxing Telecom Pakistan(Pvt.) LTD
20120912
QA Team
Telenor Vega Project
Contents
• Installation of SDR, Rectifier, Battery and IDU
• Fixing of brackets, ODU, RRU with PIMDC
• Cabling, grounding and labeling
• View and neatness of site
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Installation of new U steel
3
• All new U steels should be installed firmly on old U steel as per design drawings.
• Base angle should be connected to inner side of new U steel with two bolts, and clipped old U steel with one bolt tightly.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Installation of SDR and Rectifier Cabinets
4
• Installation of SDR and rectifier cabinets as per design drawings.
• Length of GI flexible pipe for the cable should be at least 6 inch under the SDR/Rectifier cabinet
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Installation of SDR, Rectifier, Battery for macro site
5
• All ancient equipments should be swapped by SDR, rectifier and battery for macro site,
• All equipment bases should be installed on new U steel in line.
• Each rack of equipment shall be installed firmly and reliably in position as per design drawings.
• Ensure equipment door can be opened/closed freely after neighbor rack installation.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Installation of SDR for distributed site
6
• Ancient BTS should be swapped by SDR for distributed site.
• SDR base should be installed on new U steel in line with old equipment.
• Rack of SDR shall be installed firmly and reliably in position as per design drawings.
• Ensure SDR door can be opened/closed freely after the rack installation .
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Installation of MW IDU
7
• IDU of NEC should be fixed firmly with 4 screws in old rectifier cabinet for distributed site.
• IDU of NEC should be fixed firmly with 4 screws in ZTE rectifier cabinet for macro site.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Contents
• Installation of SDR, Rectifier, Battery and IDU
• Fixing of brackets, ODU, RRU with PIMDC
• Cabling, grounding and labeling
• View and neatness of site
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Fixing of ODU brackets, ODU
9
• ODU brackets should be fixed firmly with 4 U bolts on main material of tower in position as per design drawings.
• ODU of NEC should be fixed firmly on the ODU brackets in position as per design drawings.
• Plain washer, spring washer, nuts can not be missing.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Fixing of ODU brackets, ODU
10
• The brackets of ODUs on the tower should be mounted reliably and fully with flat washer, spring washer and twin nuts orderly according to engineering design drawing.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Fixing of ODU Side strut at Tower
11
• Horizontal suspension support should be installed for MW an antenna over 1.2m. This horizontal suspension support must be installed along the antenna.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Fixing of RRU brackets, RRU with PIMDC
12
• RRU brackets should be fixed firmly with 4 U bolts on main material of tower in position as per design drawings.
• RRU with PIMDC should be fixed firmly on the RRU brackets in position as per design drawings.
• Plain washer, spring washer, nuts can not be missing.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Fixing of RRU brackets, RRU with PIMDC
13
• RRU brackets should be fixed firmly with 4 U bolts on main material of tower in position as per design drawings.
• RRU with PIMDC should be fixed firmly on the RRU brackets in position as per design drawings.
• Plain washer, spring washer, nuts can not be missing.
Telenor Vega Project
Contents
• Installation of SDR, Rectifier, Battery and IDU
• Fixing of brackets, ODU, RRU with PIMDC
• Cabling, grounding and labeling
• View and neatness of site
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Cabling of RRU, PIMDC
15
• Ground cable of RRU/MW dish should be separately connected to bus bar, if no bus bar is available within 5m then should be grounded reliably with main brace of tower through c-clamp for angular tower.
• For tubular tower, C- clamp should be connected to the RRU/MW mount.
• Grounding cable should be connected from RRU to PIMDC ,then from PIMDC to tower via C-clamp
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Cabling, grounding and labeling of RRU
16
• All connectors of RRU should be wrapped from the bottom up as per 1 layer of insulating tape + 3 layers of waterproof insulating plaster + 3 layer of insulating tape.
• Ground cable of RRU/PIMDC/MW dish should be separately connected to bus bar, if no bus bar is available within 5m then should be grounded with main material of tower through c-clamp.
• All labels for outdoor site must be ZTE private outdoor plastic labels, with the labels 200mm away from the RRU.
R8860E
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Cabling, grounding and labeling of RRU, PIMDC
17
PIMDC R8882 • All connectors of RRU should be wrapped from the bottom up as per 1 layer of insulating tape + 3 layers of waterproof insulating plaster + 3 layer of insulating tape.
• Ground cable of RRU/PIMDC/MW dish should be separately connected to bus bar, if no bus bar is available within 5m then should be grounded reliably with main brace of tower through C-clamp.
• All labels for outdoor site must be ZTE private outdoor plastic labels, with the labels 200mm away from the RRU.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Connecting power & dry contact cables in RRU with PIMDC
18
• Connect the A-end of the power cable to the Device Side on the PIMDC: connect the blue cable to -48V port and connect the black cable to -48VRTN port. Connect the white and blue dry contact cables to the Alarm ports.
• Connect the B-end of the power cable to the PWR port of the RRU, and then tighten it fully.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Waterproofing of Outdoor Jumper Cable
19
• Spiral-wrap one layer of insulating adhesive tape: After the feeder is connected, spiral-wrap one-layer insulating adhesive tape around the connector with 50% overlapping, ensuring that an excess of 10 mm insulating adhesive tape is reserved at the tail of the connector. Remember that you must apply proper force while spiral-wrapping the insulating tape.
• Spiral-wrap three layers of waterproof adhesive tape: Stretch the waterproof adhesive tape two times as long as its original length. Use approximately 50 cm waterproof adhesive tape for each connector. Spiral-wrap three-layer waterproof adhesive tape around the connector in the direction that you tighten the feeder. This can protect the feeder from being loosened during the spiral-wrapping process. Smooth over the waterproof adhesive tape by applying proper force to secure it on the feeder.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Cabling and labeling of jumper connected to GSM antenna
20
• The jumper connector to GSM antenna should be wrapped from the bottom up as per 1 layer of insulating tape + 3 layers of waterproof insulating plaster + 3 layer of insulating tape.
• Near the connector of a jumper and an antenna, the jumper should keep straight for 300mm.
• Extra jumper should be routed in S shape • All labels for outdoor site must be ZTE
private outdoor plastic labels, with the labels 200mm away from the bottom of antenna.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Cabling of optical fibers
21
• The power cable is bundled and laid separately from signal cables and tail fibers with a spacing of more than 3cm in between. No crossing or overlapping or inter-twist is allowed.
• Extra Optical fiber to be coiled properly for each sector and placed on top of horizontal ladder in series sector wise.
• For Optical fiber connectivity from FS to RSU use the rack specified channel for routing between 2 racks
Lack of blue cable
Fiber routing hole
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Cabling of optical fibers
22
• The power cable is bundled and laid separately from signal cables and tail fibers with a spacing of more than 3cm in between. No crossing or overlapping or inter-twist is allowed.
• For ZXSDR BS8700 use right side of rack to route the Optical fibers as on left side there is main power and main grounding path
• All the cables should be properly tie up on cable tray inside cabinet
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Cabling of optical fibers
23
• The optical fibers are connected to the correct sectors.
• The bends of optical fibers should be smooth and consistent, with the bending radius at least 20 times that of the fiber external diameter.
• Optical fibers should not inter-twist or wring when they are laid.
• Outdoor optical fibers should be bundled with a proper tightness to prevent the cables moving flexibly in the ties.
• Fiber in the cabinet should be laid and covered with protective flexible pipe.
• All labels for must be ZTE private outdoor plastic labels.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Cabling of optical fibers
24
• The power cable is bundled and laid separately from signal cables and tail fibers with a spacing of more than 3cm in between. No crossing or overlapping or inter-twist is allowed.
• Extra Optical fiber to be coiled properly for each sector and placed on top of horizontal ladder in series sector wise.
• Outdoor optical fibers should be bundled with a proper tightness to prevent the cables moving flexibly in the ties.
S1-OPR
S2-OPR
S3-OPR
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Outdoor Labeling of ODU,Dish IF and Grounding Cables
25
• The connectors of each IF cable should be labeled to indicate the IF cable length and the Tx/Rx routing direction.
• ODU, Dish,Groundig and IF cables should be labeled at both end at 20mm
• Metallic label should be used on outdoor IF cable
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
IF Cable Laying
26
• Before connecting ODU, leave more than 5m IF cable as the margin. The IF cable should be wired orderly and good-looking, without intersection, bending, or damage, and fastened with fixing ties at regular intervals of 1-1.5m.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
IF, Power ,grounding cable ,IDU and circuit breaker labeling
27
• Proper labeling should be done on IF, Grounding, Power Cables, IDU, Modems and Circuit Breakers as per approved standards
• Proper Sleeve/Tapping should be done on IF connectors , Grounding connectors and Power cables.
• Link Budget should be installed for each link in proper position and standard size.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Routing and colors of power cable & grounding cable
28
• New AC cable should be properly routed to the intake box. The buried portion should be at least 9” below ground in PVC conduit.
AC cable without PVC
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Cabling & labeling of DC cables between SDR and REC
29
• The power cable should be connected by copper lug to the connecting terminal of rectifier and SDR, and then fixed with nuts to ensure sound contact.
• DC cable of cabinet should be pasted printing label at 20mm away from the ends.
SDR REC No Label No Label
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Breaker distribution of SDR cabinet
30
• Connections to DCDB in SDR cabinet should be according to numbering 1, 2, …8, from left to right is defined as following.
a. Breaker slot 1, 2, 3… 6 : RRUs accordingly.
b. Breaker slot 7: BBU c. Breaker slot 8: Fan • DC cable of cabinet should be
pasted printing label at 20mm away from the ends.
• All the modules and cables without manufacture labels should be labeled.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Cabling & labeling of DC cables between SDR and PIMDC
31
• DC cable between SDR cabinet and PIMDC should be fixed private outdoor plastic labels at the end.
• The power cable layout should be in order and the turning points should be arc-shaped, with consistent bending radius over 50mm (no less than 20 times of the cable’s external diameter).
SDR REC PIMDC
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Grounding of DC cables between SDR and PIMDC
32
• DC cable between SDR cabinet and PIMDC should be fixed with private outdoor plastic labels at the end.
• DC cable between SDR cabinet and PIMDC should be grounded with ground clip to old bus bar the same as dismantled feeder cable grounding requirements.
• DC Ground clips should be wrapped from the bottom up as per 1 layer of insulating tape + 3 layers of waterproof insulating plaster + 3 layer of insulating tape with proper shape.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Grounding of IF Cables and BTS
33
• There should be no doubling on bus bar. If no space available then 2nd cable can be connected to other side of bolt only.
• Upon completion of work, all connections shall be checked for a firm and tight contact. Checking shall be done on bolts, screws, clamps, sleeve connectors, and all hardware pertaining to the bonding of various elements of the grounding network.
SDR
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Fiber and DC cables routing
34
• The power cable is bundled and laid separately from signal cables and tail fibers with a spacing of more than 3cm in between. No crossing or overlapping or inter-twist is allowed.
• The wiring is neat and uniform, cable outside of the cabinet is permitted to cross within 1m without winding and twisting.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Outdoor cables near cabinet
35
• Outdoor cables on equipment pad have G.I flexible pipe and clamps with proper distance of 200mm.
• GI Flexible pipe should be in accordance to the size of the cable
• Length of GI Flexible pipe should be at least 6 inch under the BTS/REC cabinet.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Outdoor cables near cabinet
36
• The protection GI Flexible should be tied with anti-cut protection.
• Silicon filling should be done at both the end of GI Flexible.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Cables Inlet and Outlet
37
• The cable-through holes of cabinet should be sealed properly.
• Use proper slot of Roxtec in accordance with the external diameter of cables
REC
SDR
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Fiber Protection and Jumpers Routing
38
• The cable-through holes of cabinet should be sealed properly.
• The cable connector in cabinet fixing reliably (especially jumper).
• The pigtail should not be over tight or intersection when layout, the couple pigtail should be tied with proper force in a neat manner
• The pigtails can move freely in the strap ring, right angle of pigtails turning is strictly forbidden.
• There should be no other cable pressing on the pigtail. The pigtail bending diameter should be larger than 80mm.
• The protection hose should be tied with anti-cut protection.
No Protection Tube on Fiber
Protection Tube on Fiber
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Labeling
39
• Power cables, grounding cables, E1 cables are labeled at both ends. These labels are pasted and marked neatly in the same position closely to 20mm away from
• All the modules and cables without manufacture labels should be labeled as per TP approved standard.
No Protection Tube on Fiber
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
Heat-Shrink Tube
40
• The copper terminal of cable is put up with a heat-shrink tube or wrapped with at least two layers of adhesive insulating tape.
No Protection Tube on Fiber
Heat Shrink Tubes
Heat Gun Not Used
Telenor Vega Project
Contents
• Installation of SDR, Rectifier, Battery and IDU
• Fixing of brackets, ODU, RRU with PIMDC
• Cabling, grounding and labeling
• View and neatness of site
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
View and neatness of the ground for distributed site
42
• The site should be clean and neat, and such sundries as waste packaging cases should be removed.
• The surplus materials such as excessive black outdoor ties, screws, and metal dross should be removed.
Removed!
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
View of the ground for macro site
43
• The site should be clean and neat, and such sundries as waste packaging cases should be removed.
• The surplus materials such as excessive black outdoor ties, screws, and metal dross should be removed.
> Telenor Vega Project
© ZTE Corporation. All rights reserved.
View of the tower for distributed site
44
• Zoom in the RRU installation status on the ground clearly.
• Zoom out the tower as site tag
www.zte.com.cn