sdp 3g sr telok air tawar 2
TRANSCRIPT
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
1/41
3G SITE DESIGN PACKAGE
SEBERANG PERAI UTARA
NORTHERN
NWXXXX
TELOK AIR TAWAR 2
PULAU PINANG
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
2/41
SITE ID : NWXXXX
SITE NAME :
SITE CONFIGURATION : 1+1+1
FREQ. BAND : 3G
CELCOM (M) BHD
NORTHERN REGION
SITE DESIGN PACKAGE
Prepared by ;
TELOK AIR TAWAR 2
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
3/41
SITE ID : NWXXXX
SITE NAME : TELOK AIR TAWAR 2
SITE CONFIGURATION : 1+1+1
CELCOM (M) BHD
NORTHERN REGION
Site Information
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
4/41
SITE ID : NWXXXX
SITE NAME : TELOK AIR TAWAR 2
SITE CONFIGURATION : 1+1+1
CELCOM (M) BHD
NORTHERN REGION
RF Design
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
5/41
SITE ID : NWXXXX
SITE NAME : TELOK AIR TAWAR 2
SITE CONFIGURATION : 1+1+1
CELCOM (M) BHD
NORTHERN REGION
Existing 2G Information
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
6/41
SITE ID : NWXXXX
SITE NAME : TELOK AIR TAWAR 2
SITE CONFIGURATION : 1+1+1
CELCOM (M) BHD
NORTHERN REGION
New 3G Information
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
7/41
SITE ID : NWXXXX
SITE NAME : TELOK AIR TAWAR 2
SITE CONFIGURATION : 1+1+1
CELCOM (M) BHD
NORTHERN REGION
Site Picture
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
8/41
SITE ID : NWXXXX
SITE NAME : TELOK AIR TAWAR 2
SITE CONFIGURATION : 1+1+1
CELCOM (M) BHD
NORTHERN REGION
Installation Plan
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
9/41
SITE ID : NWXXXX
SITE NAME : TELOK AIR TAWAR 2
SITE CONFIGURATION : 1+1+1
NORTHERN REGION
Mobile Checklist / BOQ
CELCOM (M) BHD
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
10/41
SITE ID : NWXXXX
SITE NAME : TELOK AIR TAWAR 2
SITE CONFIGURATION : 1+1+1
CELCOM (M) BHD
NORTHERN REGION
CME BOQ
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
11/41
SITE ID : NWXXXX
SITE NAME : TELOK AIR TAWAR 2
SITE CONFIGURATION : 1+1+1
NORTHERN REGION
Transmission Checklist
CELCOM (M) BHD
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
12/41
SITE ID : NWXXXX
SITE NAME : TELOK AIR TAWAR 2
SITE CONFIGURATION : 1+1+1
Site Management Unit
CELCOM (M) BHD
NORTHERN REGION
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
13/41
CELCOM (M) BHD 1 Site Information
NORTHERN REGION
PULAU PINANG 2 RF Design
3 Existing 2G Information
4 New 3G Information
5 Site Picture
6 Mobile Checklist / BOQ
7 Installation Plan
NWXXXX 8 Transmission Check List
TELOK AIR TAWAR 2 9 CME BOQ
1+1+1 10 Site Management Unit
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
14/41
Site Approval
Survey Date : 16 Jun 2007
Project: Celcom 3G Phase 2, Northern Region, Malaysia
Celcom (M) Bhd.
Site: NWXXXX TELOK AIR TAWAR 2
Prepared by
Name Mohd Nizam Mohd Noor (019-3160900)
Company I-Convergence Sdn Bhd
Verified by
Name
Approved by
Name
Department
Approved by
Name
Department
Approved by
Name
Department
SDP APPROVAL
Mobile Access Planning, Group Network Date
Date
Date
CME, Group Network Date
Transmission, Group Network Date
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
15/41
Site Informations
Survey Date : 16 Jun 2007
Project: Celcom 3G Phase 2, Northern Region, Malaysia
Celcom (M) Bhd.
Site: NWXXXX TELOK AIR TAWAR 2
1.0
1.1 Site Location and Access
GPS Position
Latitude: 05-29-27.6
Longitude : 100-22-47.9
Altitude : 70m
1.2 Address : Telok Air Tawar
Seberang Perai Utara
Pulau Pinang.
SITE INFORMATIONS
T e l o k A i r T a w a r 2T e l o k A i r T a w a r 2T e l o k A i r T a w a r 2T e l o k A i r T a w a r 2T e l o k A i r T a w a r 2T e l o k A i r T a w a r 2T e l o k A i r T a w a r 2T e l o k A i r T a w a r 2T e l o k A i r T a w a r 2
P D GP D GP D G
P D G
P D G
P D GP D GP D G
P D G
B E N G G A L I B E N G G A L I B E N G G A L I
B E N G G A L I
B E N G G A L I
B E N G G A L I B E N G G A L I B E N G G A L I B E N G G A L I
P M T G . B E R A HP M T G . B E R A HP M T G . B E R A H
P M T G . B E R A H
P M T G . B E R A H
P M T G . B E R A HP M T G . B E R A HP M T G . B E R A H
P M T G . B E R A H
P M T G . B E N U A NP M T G . B E N U A NP M T G . B E N U A N
P M T G . B E N U A N
P M T G . B E N U A N
P M T G . B E N U A NP M T G . B E N U A NP M T G . B E N U A N
P M T G . B E N U A N
P E K A N D A R A TP E K A N D A R A TP E K A N D A R A T
P E K A N D A R A T
P E K A N D A R A T
P E K A N D A R A TP E K A N D A R A TP E K A N D A R A T
P E K A N D A R A T
B A G A N B E L A TB A G A N B E L A TB A G A N B E L A TB A G A N B E L A TB A G A N B E L A TB A G A N B E L A TB A G A N B E L A TB A G A N B E L A TB A G A N B E L A T
B A G A NB A G A NB A G A NB A G A NB A G A NB A G A NB A G A NB A G A NB A G A N
T A M B A N GT A M B A N GT A M B A N GT A M B A N GT A M B A N GT A M B A N GT A M B A N GT A M B A N GT A M B A N G
K G . S E T O LK G . S E T O LK G . S E T O LK G . S E T O LK G . S E T O LK G . S E T O LK G . S E T O LK G . S E T O LK G . S E T O L
P M T G . K A N C U TP M T G . K A N C U TP M T G . K A N C U TP M T G . K A N C U TP M T G . K A N C U TP M T G . K A N C U TP M T G . K A N C U TP M T G . K A N C U TP M T G . K A N C U T
T I Y I M U K I MT I Y I M U K I MT I Y I M U K I M
T I Y I M U K I M
T I Y I M U K I M
T I Y I M U K I MT I Y I M U K I MT I Y I M U K I MT I Y I M U K I M
K G . B A H A R UK G . B A H A R UK G . B A H A R UK G . B A H A R UK G . B A H A R UK G . B A H A R UK G . B A H A R UK G . B A H A R UK G . B A H A R U
K G . S E L AR U N GK G . S E L AR U N GK G . S E L AR U N GK G . S E L A R U N GK G . S E L A R U N GK G . S E L A R U N GK G . S E L A R U N GK G . S E L A R U N GK G . S E L A R U N G
G AJ A HG AJ A HG AJ A HG A J A HG A J A HG AJ AHG AJ AHG AJ AHG A J A H
P M T G .P M T G .P M T G .P M T G .P M T G .P M T G .P M T G .P M T G .P M T G .
T O K G E L A M T O K G E L A M T O K G E L A M T O K G E L A M T O K G E L A M T O K G E L A M T O K G E L A M T O K G E L A M T O K G E L A M
K G .K G .K G .K G .K G .K G .K G .K G .K G .
G E L U N G B U B UG E L U N G B U B UG E L U N G B U B UG E L U N G B U B UG E L U N G B U B UG E L U N G B U B UG E L U N G B U B UG E L U N G B U B UG E L U N G B U B U
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
16/41
Site Informations
Survey Date : 16 Jun 2007
Project: Celcom 3G Phase 2, Northern Region, Malaysia
Celcom (M) Bhd.
Site: NWXXXX TELOK AIR TAWAR 2
1.3 Site Details (Existing)
Type of Site : Land Cabin
Height of Building : -
Equipment Location : Cabin
Cabin Dimension : 3630mm x 3030mm
Air Conditioning : 2 unit
Cable Ladder : YesLightning Protection : Yes
Type of Structure : 3 legged Tubular
Boom Height : -
Type of terrain : Flat
Access road : Tar/ Concrete
Distance to main road : 15m
Crane needed : N
Site Access Information : From exit Sg Dua, turn left to Mak Mandin, go straight until traffic
light. Turn left to Telok Air Tawar. The site located at left hand side.
1.4 Contact Information
Celcom : Mizazuddin Bin Muhiyuddin
Telephone No. : 04-3973030 ext 1009
Fax No. : 04-3974040
Mobile No. : 019-5713060
Contractor Name : Mohd Nizam Mohd Noor
Telephone No. :
Fax No. :
Mobile No. : 019-3160900
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
17/41
a
b
c
d
a
a
b √
c
a
b
c
d
e
f
Tripod 6mtr
GI Pipe 2 mtr
Aesthetic Pole
Maximum Load (A)
Maximum Module
CPS Source
Rectifier -48V Data
Equipment Power Source
AC Power Supply Data
Land Cabin
Land Outdoor
Rooftop Cabin
Tower
TNB
3 Phase AC
SBC
Genset
Single Phase AC
Rectifier +24V
DELTA Model
√ Rectifier -48V
Free DC Breaker (32A)
√ NoYes
Merlin Gerin
NoYesFree DB Space For Additional Breaker
Free DC Breaker (60A)
√
Free DC Breaker (32A)
Current Module
Free DC Breaker (60A)
Current Load (A)
Free DB Space for Additional Breaker
DC Breaker Type
Specify
Site ID
Site Name
NWXXXX
TELOK AIR TAWAR 2
H-Boom
X-Pol Bracket Antenna Mounting
Antenna Type Model & Part
CodeDualband 900/UMTS
Feeder Clamp
√
√
7/8”
2 in 1
Feeder Type
Horizon Micro
2206 2102
2302
Type Of BTS
2308
√
Horizon OD
4
2G Vendor
E1 Status
Celcom
Available
Alcatel
3
E1 Type
E1 Owner TM Maxis Digi
MBO1
Ericsson
MBI3
M4M
Motorola
MBO3
2202
MOBILE INFORMATION
MBI5
√
√ Yes
√ Yes
Plinth
Structure
Fiber Optic
TX INFORMATION
Structure Height 45
Lease Line
Room Reno
No
No
√ YesMGB Space Available
√ MicroWave
2106
Horizon ID
Utilise Free
a
Shelter Type
V-PoleX-Pole
NoFeeder Through Available
meters
Cabin Size
Room Reno Size
Plinth Size
√
GI Pipe Boom
Special Bracket
Cabin
Shelter
1 5/8”
3 in 1
√
Maxis
TM
2
√
CME INFORMATION
Power Supply
Space Available
Type Of Structure
√
Room Reno Rooftop
Roof top Outdoor
Guyed Mast
GI Pipe 6mtr
Monopole
Mini Structure
1
Type Of Site
√
GENERAL INFORMATION
√
Site Owner
Celcom
Digi
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
18/41
1
a
b
a
b
c
d
e
a
2
3
a
b
c Type
d
e
REMARKS:
New (mtr)
New (mtr)
New (qty)
Additional Feeder Through (Qty)
Extend Existing(m)
Upgrade CPS System
Upgrade AC System
Cabin
Plinth New
Antenna Mounting New
Change Existing
Extend
Structure
TX ADDITONAL REQUIREMENTS
Refer to Tx BQ
MOBILE INSTALLATION METHODOLOGY
Swap 2G Eqpt. Rearrange EqptEquipment
Equipment Mobilization
Lorry Crane
45 tonne
Day
20 tonne
Special crane
Night
Specific Day
ADDITIONAL REQUIREMENTS FOR 3G IMPLEMENTATION
Cable Ladder (Outdoor)
Cable Gantry
No
Crane Requirements
Crane Access
Specific Times
Open Roofing
Manpower
Special Tools/ Requirements
Qty
Specify
Antenna 2G
New Upgrade DB
Change to X-Pole
Add Module (Qty) Change Breaker (A) 20amp to
32amp
Permit Requirements Yes
Change To Triband
Relocate Existing
MGB
Power Supply
CME ADDITONAL REQUIREMENTS
TNB Genset
Shelter
Change to Dual Band UMTS/1800Change to 1800 wideband
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
19/41
Site Requirements
Survey Date : 16 Jun 2007
Project: Celcom 3G Phase 2, Northern Region, Malaysia
Celcom (M) Bhd.
Site: NWXXXX TELOK AIR TAWAR 2
2.0
2.1 Exiting Equipment
Existing Equipment Type
No Of Cabinet
Configuration
Comments : Remain existing
2.2 Exi sting A ntenna Data 2G
Make
Height AGL (m)
Gain (dBi)
Antenna Band
Polarization
Comments : Dualband antenna
2.3 Feeder Data 2G
Total no. of feeders (pcs)
Type of feeders
Feeder lengths (m) Tx
Rx
TOTAL
Comments :
2.4 Antenna Support Detail
Type of antenna support : Special BracketNo. of H-Boom : -
No. of G.I. Pipe : 3
Length of G.I. Pipes (m) : 3
Comments :
EXISTING 2G
900/UMTS
Andrew DBXLH-6565C
Cell 3
45
Andrew DBXLH-6565C
Cell 1
Andrew DBXLH-6565C
Cell 2
45
342
171
17.1
45
Cell 3 TOTAL
2 6
900/UMTS
114 114 114
57 57 57
57 57
7/8"
57 171
7/8"7/8"
17.1
900/UMTS
+-45 +-45+-45
17.1
2
Cell 1 Cell 2
2
Ericsson RBS 2206
1
2+2+2
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
20/41
Site Name:
Site ID :
Existing 2G Site Name:
Existing 2G Site ID:
Co-locate Operator: Cluster No:
Version:
Lat (N-WGS 84- Decimal):
Long (E-WGS 84-Decimal):
BTS room Type: BTS Type:
BTS Configuration:
Transmission Type on site:
Cell Site RF Configuration
Cell ID
An tenn a Heigh t (mid. o f ant )
An tenn a Direc tion (d eg)
Electrical Tilt
Mech. Tilt
Cable Length (m)
Cable Type (inch)
Technical Site Survey Report (Existing Antenna System Locations)
TELOK AIR TAWAR 2 Survey Date: 16/06/2007
Sector 3
05-29-27.6
100-22-47.9 70
Sector 1
Others:
Sector 1 :
Phase:
Ams l(m):
Sector 2
Kg Bagan Dalam residential area, Apartment.
Sector 2 :
Sector 3 :
Kg Bagan Belat residential area, Sekolah Kebangsaan Bagan.
Kg Bagan Belat residential area, Apartment.
Comment/ Problem:
Structure type3 Legged Tubular
Tower
3 3
Special Bracket
Height (m)
Special Bracket
Mount
Type Special Bracket
3
No of Pole/ Tripod 1 1 1
57 57
3 Legged Tubular
Tower
3 Legged Tubular
Tower
0 0 0
7/8" 7/8" 7/8"
0 0 0
57
45 45 45
20° 160° 320°
Ant enna Type Model Number
Beam width (deg) 65 65 65
DBXLH-6565C-VTMDBXLH-6565C-VTM
2+2+2
Cabin Ericsson RBS 2206
Ericsson
DBXLH-6565C-VTM
NWXXXX Area: Seberang Jaya
N/A
2
NWXXXX Building Height(m): -
TELOK AIR TAWAR 2 Structure Height(m): 45m
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
21/41
Site Requirements
Survey Date : 16 Jun 2007
Project: Celcom 3G Phase 2, Northern Region, Malaysia
Celcom (M) Bhd.
Site: NWXXXX TELOK AIR TAWAR 2
3.0
3.1 Feeder Data
Total no. of feeders (pcs)
Type of feeders
Feeder lengths (m)
Comments :
3.2 CABLING
Cable required
Comments :
3.3 Antenna Support Detail
Type of antenna support : Existing Boom
No. of H-Boom : -No. of G.I. Pipe : -
Length of G.I. Pipes (m) : -
Other Special Bracket :
Comments : This site use dualband antennas 900/UMTS
58
58
116 348TOTAL 116116
58
Cable Lug / 35mm
Length Needed
6m
1 5/8" 1 5/8"1 5/8"
2 62
Cell 1
2
Cell 3Cell 2 TOTAL
174
Rx 58 174
58
58
Tx
NEW SITE REQUIREMENTS
8m
DDF to DF Coax / 3C 2.5V Siemen Male 6m
Node B to MGB Grounding / 35mm
Cable Cable type / s ize Connec tor t ype / si ze
Node B E1 to DF Coax / 3C 2.5V -
Node B to Breaker Grounding / 35mm Cable Lug / 35mm 8m
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
22/41
Site Requirements
Survey Date : 16 Jun 2007
Project: Celcom 3G Phase 2, Northern Region, Malaysia
Celcom (M) Bhd.
Site: NWXXXX TELOK AIR TAWAR 2
3.4 OTHERS
Comments :
3.5 POWER SUPPLY SYSTEM
Rectifier
Make Link Model Vout Iout
Battery Installed : Everexceed
Capacity : 12V 100Ah X 8
Banks : 2
Type / Model : ST-12230
Comments :
Breaker
Used: 5
Required:
Used:
Free:
Required: 1
Free: 11
-
No
No
Yes
No
No
No
Capacity
Yes
400A54.5
Lightning Protection
CommentExisting Required
Yes No
BTS Location Cabin No
Cable Inlet
AC Ear th ing Busbar Yes
DC Earthing Busbar Yes
MGB Yes
Delta HDS 3000
Cable Ladder
Cabin Size 3630mm X 3030mm
Plinth Size -
-
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
23/41
Site Name:
Site ID :
Existing 2G Site Name:
Existing 2G Site ID:
Co-locate Operator: Cluster No:
Version:
Lat (N-WGS 84- Decimal):
Long (E-WGS 84-Decimal):
Node B room Type: Node B Type:
Node B Configuration:
Transmission Type on site:
Cell Site RF Configuration
Ant enna Heigh t (mid. of ant )
Ant enna Direc tion (deg)
Electrical Tilt
Mech. Tilt
Cable Length (m)
Cable Type (inch)
MHA (Y/N)
05-29-27.6
100-22-47.9
Others:
Sector 2 :Kg Bagan Dalam residential area, Apartment.
Sector 3 :
Kg Bagan Belat residential area, Sekolah Kebangsaan Bagan.
Comment/ Problem:
Sector 1 :
Kg Bagan Belat residential area, Apartment.
1
Y Y Y
Special Bracket
Height (m) 3 3 3Mount
Type Special Bracket Special Bracket
No of Pole/ Tripod 1 1
Structure type3 Legged Tubular
Tower
3 Legged Tubular
Tower
3 Legged Tubular
Tower
58 58 58
1 5/8" 1 5/8" 1 5/8"
2 2 2
0 0 0
45 45 45
20° 160° 320°
DBXLH-6565C-VTM
Beam width (deg) 65 65 65 Ant enna Type
Model Number DBXLH-6565C-VTM DBXLH-6565C-VTM
Existing Existing Existing
Sector 1 Sector 2 Sector 3
1+1+1
Ericsson
Ams l(m): 70
Cabin Huawei 3812E
Phase: 2
NWXXXX Area: Seberang Jaya
N/A
NWXXXX Building Height(m): -
TELOK AIR TAWAR 2 Structure Height(m): 45
Technical Site Survey Report (Proposed Antenna Location)
TELOK AIR TAWAR 2 Survey Date: 16/06/2007
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
24/41
SECTORIAL RF VIEW
Sector 1 20° degree
Sector 2 160° degree
Sector 3 320° degree
NEW SITE RF PHOTO
Apartment
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
25/41
PANORAMIC VIEW
View at 0°
View at 40°
View at 80°
NEW SITE RF PHOTO
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
26/41
PANORAMIC VIEW
View at 120°
View at 160°
View at 200°
NEW SITE RF PHOTO
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
27/41
PANORAMIC VIEW
View at 240°
View at 280°
View at 320°
NEW SITE RF PHOTO
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
28/41
Existing Site Pictures
Survey Date : 16 Jun 2007
Si te: NWXXXX TELOK AIR TAWAR 2
Photo 1 : Site View
SITE PICTURES
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
29/41
Existing Site Pictures
Survey Date : 16 Jun 2007
Si te: NWXXXX TELOK AIR TAWAR 2
SITE PICTURES
Photo 2: Dualband 900/UMTS Antenna Location.
.
Photo 3 : BTS location
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
30/41
Existing CME
Survey Date : 16 Jun 2007
Si te: NWXXXX TELOK AIR TAWAR 2
Photo 1 : Existing DB
Photo 2: Rectifier
SITE PICTURES
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
31/41
Existing CME
Survey Date : 16 Jun 2007
Si te: NWXXXX TELOK AIR TAWAR 2
SITE PICTURES
Photo 3: Breaker for Node B
Photo 4: Existing MGB.
at middle tower at top tower
inside cabin
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
32/41
Existing CME
Survey Date : 16 Jun 2007
Si te: NWXXXX TELOK AIR TAWAR 2
SITE PICTURES
Photo 5: Battery Bank.
Photo 6:Cable Ladder.
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
33/41
Existing Tx
Survey Date : 16 Jun 2007
Si te: NWXXXXTELOK AIR TAWAR 2
Photo 1 : Ericsson Microwave.
Tx Rack
SITE PICTURES
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
34/41
New Requirement
Survey Date : 16 Jun 2007
Si te: NWXXXX
Photo 1 : Node B location
Photo 2 : Proposed DDF and alarm box location (beside RBS2206)
SITE PICTURES
RBS 2206
BTS Alarm Box
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
35/41
New Requirement
Survey Date : 16 Jun 2007
Si te: NWXXXX
SITE PICTURES
Photo 3 : To modify existing feeder inlet to huawei standard feeder inlet.
Photo 4 : Cabin
To modify
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
36/41
New Requirement
Survey Date : 16 Jun 2007
Si te: NWXXXX
SITE PICTURES
Photo 5 : Entrance.
Photo 6 : Feeder route to antennas
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
37/41
New Requirement
Survey Date : 16 Jun 2007
Si te: NWXXXX
SITE PICTURES
Photo 7 : Top View
Photo 8 :To rearrange feeder due to limited space at top tower
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
38/41
BILL OF QUANTITY SITE NWXXXX
NO TYPE ITEMS ART NO. PACKING REQUEST SUPPLY
IRON WORK Fill in your requested item(s)
1 SPECIAL BRACKET SET
2 6m Tripod NA SET
3 6m BOOM N/A PC
4 WALL BRACKET N/A SET
POWER / RF CABLES & ACCESSORIES
1 Power Cable METER
2 METER
3 AC ARMOURED CABLE, 4CORE, 16mm AC.ARM.4C.16mm METER
4 PVC/PVC AC CABLE 5 CORE, BLACK, 10mm 5C/10mm METER
5 CABLE TIE 4" (WHITE) CBL. TIE -W-IND-4" PC
6 CABLE TIE 8" (WHITE) CBL. TIE -W-IND-8" PC
7 CABLE TIE 14" (WHITE) CBL. TIE -W-IND-14" PC
8 CABLE TIE 14" (BLACK) CBL. TIE -W-OUD-14" PC
9 7/8" COAXIAL CABLE EC5-50 METER
10 1/2" COAXIAL CABLE LDF4-50A METER
11 TX JUMPER CABLE (716M - 716M), 2 MTR F4A-PDMDM-2M PC
12 RX JUMPER CABLE (716M - NM), 2 MTR F4A-PNMDM-2M PC
EARTHING SYSTEM
1 COPPER BARE WIRE, 35MM, MULTI STRAND N/A METER
2 ANDREW CONNECTOR EARTHING KIT (INDOOR) 244495 PC
3 ANDREW FEEDER EARTHING KIT (OUTDOOR) SGL5-06B1 PC
CONNECTORS
1 RFS ANGLE ADAPTER N-TYPE (MALE TO FEMALE) 15852401 PC
2 H+S BNC CONN. (JACK FULL), 75 OHM, FOR RG59 21BNC-75-4-4 PC
3 RFS 7/16 FEMALE CONNECTOR FOR 7/8" CABLE 15570560 PC
4 H+S N-MALE CONNECTOR FOR 7/8" CABLE 11N-50-23-10 PC5 H+S N-MALE CONNECTOR FOR 1/2" CABLE 11N-50-12-10 PC
6 H+S TNC-MALE TO BNC FEMALE ADAPTOR 33-TNC-BNC50-1 PC
7 H+S N-MALE TO N-MALE ADAPTOR 32N-50-0-2 PC
8 RFS FEEDER COUPLING (SPLICER) 155 730 60 PC
MISCELLANEOUS ITEMS
1 AC TRUNKING, 2" X 2", ORANGE C/W ACCESS N/A PC
2 METAL CABLE TRAY, 4" X 1", H.D.G., C/W ACCESS N/A PC
3 CABLE LUG 35MM N/A PC
4 CABLE LUG 150MM N/A PC
5 C-CLAMP (C-TYPE) COMPRESSED FOR 35MM N/A PC
6 3M COOL SHRINK N/A PC
7 CABLE GLAND (FEEDER THROUGH) N/A PC
8 3M ELECTRICAL TAPE, SUPER 33+, 3/4 X 66' 6132 PC
9 3M ELECTRICAL PUTTY , SCOTCHFILL, 1 1/2" X 60" 15140 PC
10 FEEDER CLAMP (2 IN 1) N/A PC11 FEEDER CLAMP (3 IN 1) N/A PC
12 PVC TRUNKING (GREY), 4" X 2" X 1.8M 7 LENGTH
13 SYW RAWL PLUG (M6X450MM) PC
14 SYW RAWL PLUG (M12) with rod PC
15 SYW RAWL PLUG (M12) w/o rod PC
TOTAL COST (FOR INSURANCE PURPOSES)
Requester: _________________________ Checked By: _________________________
(SIGNED & STAMPED) (SIGNED & STAMPED)
TELOK AIR TAWAR 2
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
39/41
A. SITE DETAILS
TELOK AIR TAWAR 2
1 . X OWN TRANSMISSION SOLUTION
X MICROWAVE VSAT FIBER OPTIC
REMARKS
REMARKS :
2 . LEASED LINE
TM LEASED LINE POI/POP : . 2 E1
3 E1
REMARKS :
C . ADDITIONAL REQUIREMENT FOR TRANSMISSION SOLUTION.
1 . CME
TRM/TOC DC POWER SUPPLY ( Pls specify : )
TRIPOD SHELTER ( Pls specify : )
PLINTH DDF
REMARKS :
Prepared by,
E1 SHARING ( MAXIS / DIGI) POI/POP : .
SITE B
PENAGA
INSTALLED FREEUSED RESERVED
TK AIR TAWAR2
SITE A
SITE NAMESITE ID
RNC HOME
NODE B TYPE
TSS TRANSMISSION CHECKLIST FOR 3G
Isriadi Ngaliman 019-3116551
B . TRANSMISSION MEDIA FOR NODE-B CONNECTION.
REGIONSURVEY BY
SURVEY DATE
NORTHERNMOHD NIZAM NWXXXX
Verify by,
(Name, TX Region. HP num)
06/16/2007
INDOOR
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
40/41
-
8/19/2019 SDP 3G SR Telok Air Tawar 2
41/41