sct testbeam: report & plans gareth moorhead (with thanks to lars eklund for being there for me)...
DESCRIPTION
G.F.Moorhead SCT Testbeam Update June 2003, SCT Uppsala Testbeam May - June 2003 Participants Sophie Chouridou, Bettina Mikulec - CERN Yohsei Iwata, Akiko Imoto - Hiroshima University Ryuichi Takashima - Kyoto University of Education Christian Ketterer - Freiburg Allan Clark, Mariane Mangin-Brinet, Shulamit Moed - Geneva Tom Atkinson, Gareth Moorhead - Melbourne Reisaburo Tanaka, Youji Tomeda - Okayama University Peter Kodys - Prague Charles University Stan Bentvelsen, Thijs Cornelissen, Sandra Muijs - NIKHEF Paul Dervan - Sheffield Jose Enrique Garcia Navaro, Sergio Gonzalez, Marcel Vos - IFIC Valencia Apologies to anyone forgottenTRANSCRIPT
SCT Testbeam: report & plans
Gareth Moorhead(with thanks to Lars Eklund
for being there for me)
Uppsala 13 June 2003
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala
Contents• Report on the recent beamtest 19 May to 02 June
(most details to follow in Jose & Sergio's talk)
• Next beamtest: August - September 2003– Dates not yet final due to SPS proton run extension
• 2004: Inner Detector Common Run– Advance warning
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala
Testbeam May - June 2003
Participants
Sophie Chouridou, Bettina Mikulec - CERNYohsei Iwata, Akiko Imoto - Hiroshima UniversityRyuichi Takashima - Kyoto University of EducationChristian Ketterer - FreiburgAllan Clark, Mariane Mangin-Brinet, Shulamit Moed - GenevaTom Atkinson, Gareth Moorhead - MelbourneReisaburo Tanaka, Youji Tomeda - Okayama UniversityPeter Kodys - Prague Charles UniversityStan Bentvelsen, Thijs Cornelissen, Sandra Muijs - NIKHEFPaul Dervan - SheffieldJose Enrique Garcia Navaro, Sergio Gonzalez, Marcel Vos - IFIC Valencia
Apologies to anyone forgotten
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala
Testbeam May - June 2003
Schedule: 12 May - 05 June
Mon
Tue
WE
d Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
12 / 5
13 / 5
14 / 5
15 / 5
16 / 5
17 / 5
18 / 5
19 / 5
20 / 5
21 / 5
22 / 5
23 / 5
24 / 5
25 / 5
26 / 5
27 / 5
28 / 5
29 / 5
30 / 5
31 / 5
01 / 6
02 / 6
03 / 6
04 / 6
05 / 6
Pre-characterisation in Irrad. Lab. (Christian)
Installation at H8 & in-situ characterisation
Beam tuning (Adrian Fabrice - Many thanks)
Normal beam
SCT priority
25ns beam
MDT & TGC priority - 1st Level Trigger tests
SCT, PIX, TRT, TileCal also running
Post-characterisation
Installation at H8
De-installation
(Abbreviated from the original plan due to the PS startup problems and subsequent SPS "beam scrubbing" run)
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala
Testbeam May - June 2003
Schedule
Two periods:
• 3 days of SCT priority with normal beam, 4.8 s spill length- Random trigger => TDC cut 10ns/25ns as usual (40% efficiency)
• 7 days of 25ns beam, multiple users, 2.6 s spill length (fewer events / spill)- Synchronous trigger => No TDC cut (all events in time - we hope !)- Included 1 day of SCT priority for magnet & material studies which excluded other users
Multi-user periods worked reasonably well.
Pixels relocated to NA45 (upstream position) to reduce conflicts
Opportunities to use Magnet or low momentum beam were very limited
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala
Testbeam May - June 2003
Modules
Module Type Irradiated ? Comment
20220330200003 Barrel FULL; 10 Oct 2002 Irradiated unpowered, unbiased
20220170200153 Barrel FULL; 10 Oct 2002 Irradiated unpowered, unbiased20220170200010 Barrel No Large Negative Offset on 1 chip 20220170200447 Barrel No (goes to irrad) Large Gain Spread on 2 chips20220040200018 Barrel No (goes to irrad) Anchor; Large Oscillation module K5_312 Endcap Outer FULL K5_503 Endcap Outer FULL K5_504 Endcap Outer FULL K5_310 Endcap Outer HALF K5_303 Endcap Outer HALF k5_306 Endcap Middle No MPI/Prague
20220130000002 Endcap Outer No Geneva/CERN Pre-qualification module
• 3 Barrel modules with anomalies - two will go after to Irradiation, and then Beamtest again in September
• 2 Barrels irradiated unpowered & unbiased
• 5 Irradiated endcaps - individual performance & also tracking study using 3 fully irradiated modules
• 1 pristine "Pre-qualification" outer endcap for comparison, plus a middle for interest
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala
Testbeam May - June 2003
Program
• One module as anchor (efficiency reference at 1 fC, 150 V), barrel 00010
• Standard performance studies at several positions across modules
• Threshold scans (Qthr) at bias combinations:Irradiated: 350 V, 500 V, 400 VUnirradiated: 150 V, 300 V, 200 V
• Bias scans (Vdet) at thresholds: 0.9 fC, 1.0 fC, 1.1 fC, 1.2 fC, 1.5 fC
... then the fun stuff ...
• Relative timing adjustment (signal cable length): all modules +/- approx 3 ns
• Synchronous beam (25ns) timing scan - efficiency versus trigger cable delay
• Tracking studies at 180 GeV/c, magnet 0 A, 2500 A, 5000 A (~ 0, 0.8, 1.6 T)
• Low momentum multiple scattering study : 50, 20, 10 GeV/c pions
• Target studies, 10 mm Tungsten target immediately upstream of modules to look GEANT4 simulation
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala
Comments...
• SCTLV3 gave many problems... too many dead channels; several channels failed in service during the ~ 3 week continuous use
• The two barrel modules irradiated unpowered & unbiased wereoperated at Vcc = 3.8 V as no useful performance could be found atVcc = 3.5 V
• Noise in H8 (12 modules in proximity, no metal cover plates etc.) ~100 - 300 electrons worse than lab., as previously experienced
• Details, including all standard characterisations in lab., and beforeand after at H8, can be found at: http://atlas.web.cern.ch/Atlas/GROUPS/INNER_DETECTOR/SCT/tbMay2003/
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala
Next beamtest : September 2003• Currently scheduled:
– SCT main or co-user run 28 Aug to 2 Sep– ATLAS Common DAQ run 3 to 8 Aug
• However, the Research Board has approved 2 week extension to compensate for the time lost due to the beam scrubbing run
• Likely but not certain we will have ~ 2 weeks in September including the Common DAQ run
• Program: - Standard studies of the modules irradiated during this year, including the Large Gain Spread barrel- Common DAQ run ... minimal port of existing Mustard/Slog readout to ATLAS DAQ-1 to participate in common triggers
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala
2004• Last planned year of SPS beamtest• Emphasis on ATLAS Integration testing
– Common DAQ– Common clock & triggers >>> common events– Tests of Level 1 Trigger– Dataflow (ROD s-links to ROS etc.)– Event Filter – Offline software - reconstruction etc.
• Within this context, the Inner Detector is planning a combined Pixel / SCT / TRT common run
.... Now in early discussion phase - please contact Gareth if interested in following developments.