FORM 1-C : PROCEDURAL EVALUATION (SCREENING) FOR Environmental Performance Report and Management Plan (EPRMP-IEE
Limits)
Project Title : ___________________________________________________________________________Project Location:_________________________________________________________________________Project Proponent : __________________________________ ____________________________________ Address: ______________________________________________________________________________Tel.No. ____________ Fax No. _______ Contact Person : ______________________________________EIS Consultant :__________________________________._______________________________________Address: _______________________________________________________________________________Tel. No._____________ Fax: __________ Contact Person : ______________________________________Date Submitted for Screening : _____________________________________________________________Status of Application : ( ) Existing w/ previous ECC ECC # __________________ Issuing Office: ________________________
ECC Scope : ___________________________________________________________________________________________________________
( ) Existing w/o ECC but started implementation prior to 1982Date of Implementation : _____________________________________
( ) Existing w/o ECC but started implementation after to 1982Date of Implementation : ______________________________________
Project Group Based on Tresholds only:( ) Single, Group 2 in ECA ; Project Code _________________( ) Group IV / Co-located( ) Group V / Unclassified _______________________________
Project Size : Floor Area : _______________________________________________Lot Area : _______________________________________________Production/Storage Capacity ____________________________________
PSIC Code (based on DTI Registration) : ________________________________________Checklist of EPRMP Requirements
EPRMP Requirements
Page
Casehandler’s Evaluation
Acceptable?
Remarks
Project Fact SheetTABLE OF CONTENTSEXECUTIVE SUMMARY
o Brief Project Descriptiono Brief Summary of Project’s EIA Process o Brief description of the existing project vis-à-vis the proposed
expansion or changeso Summary on the EIA Findings on the Key Significant Impacts of
the Project and corresponding EMP highlightso Summary of the Environmental Monitoring Plan on the most
significant impacts and key measuresDRAFT MAIN EPRMP
1. BASIC PROJECT INFORMATION2. DESCRIPTION OF THE PROJECT’S EIA
PROCESS2.0 Terms of Reference of the EIA Study2.1 EIA Team (Proponent & Preparer Team members, module of
involvement, expertise)2.2 EIA Study Schedule2.3 EIA Study Area (project area up to extent of coverage of study)2.4 EIA Methodology (per module)2.5 EIA Public Participation (if any)
3. PROJECT DESCRIPTION
3.1 Basic Project Background and Information3.2 Project Rationale3.3 Complete project location (barangay, municipality, province, etc)
with geographic coordinates.3.4 Project Site Considerations3.5 Description of Project Phases & Activities3.6 Resource & Utility Requirements, Manpower, Cost3.7 Waste Generation & Built-in Management Measures
Screening for (Project Title/Proponent): ______________________________________
![Page 2: Screening Form for EPRMP](https://reader036.vdocuments.mx/reader036/viewer/2022082402/563db7d6550346aa9a8e6c21/html5/thumbnails/2.jpg)
1st 2nd 3rd 4th Screening
EPRMP Requirements
Page
Casehandler’s Evaluation
Acceptable?
Remarks
Summary of Comparison of the new and old projects
4. BASELINE ENVIRONMENTAL CONDITIONS FOR CRITICAL ENVIRONMENTAL PARAMETERS, IMPACT ASSESSMENT & MITIGATION (limit to relevant modules)4.0 The Land 4.1 The Water4.2 The Air4.3 The People
5. ENVIRONMENTAL PERFORMANCE BASED ON THE ORIGINAL ECC-COVERED ENVIRONMENTAL MANAGEMENT PLAN
5.1. Impact(s) Mitigation Plan (IMP)5.2. Environmental Monitoring Plan (EMoP) and other Monitoring
Modes 5.3. Information, Education and Communication (IEC) and Social
Development Program (SDP) or Community Assistance Program (CAP)
5.4. Environmental Risk Management and Emergency Response Programs (ERP)
5.5. Abandonment/Rehabilitation Programs5.6. Institutional Set-up5.7. Achievements/Awards and Outstanding Accomplishments on the
Environment6.0 ENVIRONMENTAL RISK ASSESSMENT 7.0 ENVIRONMENTAL RISK CATEGORIZATION
(PEMAPS)8.0 ENVIRONMENTAL MANAGEMENT PLAN (EMP)
FOR CURRENT PROJECT & PROPOSED MODIFICATION/ EXPANSION – including EMF and EGF
9.0 BIBLIOGRAPHY 10.0 ANNEXES
o Commitments or Agreementso Accountability Statements of Preparers & Proponento Photographs or plates of the project site, impact areas an affected
areas and communitieso Copy of Previous ECC (if any)o If w/ ECC, Copy of the latest Self Monitoring Report (EIA Module
Only) & SMR Evaluation Results by EMB (if any)
ACTION TAKEN: (Please check to indicate corresponding action taken) Document accepted; please submit _____ copies
EIARC Needed? ( ) Yes ( ) No Expertise Needed: __________________________Processing Fee : PhP 3,000 (Pay at EMB Cashier) Review Fund: Based on WFP (Pay at NRDC)
Document not accepted
O.R. No. Date
NOTED BY:
(signature over printed name) SCREENING OFFICER PURA VITA G. PEDROSA____ (signature over printed name) ___________________________ SCREENING OFFICE
Date
Screening for (Project Title/Proponent): ______________________________________
![Page 3: Screening Form for EPRMP](https://reader036.vdocuments.mx/reader036/viewer/2022082402/563db7d6550346aa9a8e6c21/html5/thumbnails/3.jpg)
1st 2nd 3rd 4th Screening
Screening for (Project Title/Proponent): ______________________________________