Science Centre South Update
3/02/2010
Overview� Introduction
� South Project Status
� Phasing and Interface Element� Phasing and Interface Element
� Construction Look ahead
� Science Masterplan
� Queries/ Questions
South Project Status
Project Status
Project Status� Decanting of A2
• A1 and CSCB Operation
• A3 Operation� Enabling Works:
• Complete September 2009� Main Contract:
• Appointment of John Paul Construction
• Phase 1: Start on site January 2010
A2 element)� Substantial Completion:
• Phase 1: December 2010� Appointment of John Paul Construction
• Site Setup January
• Substructure and Superstructure February–September
• External Façade March-August
• Fit-Out April-November
• Phase 1 complete December
• Lobby Area complete by February 2011� Impact on current activities
• Daily operation of School
• Sensitive equipment
• Teaching Laboratory activities
• Works to front of CSCB
• Noise and Dust
• Fire Alarm
Phasing & Interfacing Elements � Lobby Area
� Existing Office Areas & Signature wall
� Lifts
� Storage � Storage
� Access to Building
� Lifts
� Bridge connection to Hub
� Works to Hub building
� Temporary Stairs
G
R
O
U
N
D
3/02/2010 Science Centre South
F
L
O
O
R
F
I
R
S
T
F
L
O
O
R
S
E
C
O
N
D
F
L
O
O
R
T
H
I
R
D
F
L
O
O
R
Construction Look AheadFebruary/March 2010
� Creation of temporary access to A3
� Removal of Link Bridge
� Works to front of CSCB to facilitate drainage
� Demolition works in A2
February/May 2010
� Works to lobby area and lifts
� Superstructure of new build.
� Weather sealing of building