Chapter 2:Chapter 2:The Project Management and The Project Management and

Information Technology ContextInformation Technology Context

Information Technology Project Information Technology Project Management,Management,Fifth EditionFifth Edition

Page 2: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

2

Projects Cannot Be Run in Isolation

Projects must operate in a broad organizational environment

Project managers need to use systems thinkingTaking a holistic view of carrying out projects within the

context of the organizationSenior managers must make sure projects

continue to support current business needs

Page 3: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

3

A Systems View of Project ManagementA systems approach emerged in the 1950s to

describe a more analytical approach to management and problem solvingManagement must see how projects relate to the whole

orgnaizationThree parts include:

Systems philosophy: an overall model for thinking about things as systems

Systems analysis: problem-solving approachSystems management: address business, technological,

and organizational issues before making changes to systems

Page 4: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

4

Media SnapshotThe Press Association Ltd, the largest news agency in the

United Kingdom, hired a consulting firm to help turn things around after management noticed its profit margins were sliding The organization’s rapid growth rate and acquisition of several news

organizations help extend its reach throughout the country but these disparate groups were not sharing work processes and technologies causing high operating costs

The consultants suggested using a holistic view and a top-down strategy to make sure projects supported key business goalsEverything must be seen as being connected in order for

organization change to be accomplished They also suggested releasing short-term results to accrue

benefits on an incremental basis and reviewing projects on a regular basis to ensure strategic alignment

Page 5: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

5

Opening Case AnalysisTom Walters did not use a systems approach –

the IT department did all of the planningHe did not address many of the organizational

issues involved in such a complex projectHe did not clearly define the business,

technological and organizational issues associated with the project

He did not involve the stakeholders which led to his being blindsided by the problems raised at the meeting

Page 6: Schwalbe 02PM&IT

Three Sphere Model for Systems Management of Laptop Project

Information Technology Project Management, Fifth Edition, Copyright 2007

6

Page 7: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

7Understanding OrganizationsStructural frame: Focuses on roles and responsibilities, coordination and control. Organization charts help define this frame.

Human resources frame: Focuses on providing harmony between needs of the organization and needs of people.

Political frame: Assumes organizations are coalitions composed of varied individuals and interest groups. Conflict and power are key issues.

Symbolic frame: Focuses on symbols and meanings related to events. Was it good the CEO came to the kickoff meeting? Culture is important, particularly in international projects.

Page 8: Schwalbe 02PM&IT

What Went Wrong? Many enterprise resource planning (ERP) projects fail due to

organizational issues, not technical issues. For example, Sobey’s Canadian grocery store chain abandoned its two-year, $90 million ERP system due to organizational problems.

As Dalhousie University Associate Professor Sunny Marche states, “The problem of building an integrated system that can accommodate different people is a very serious challenge. You can’t divorce technology from the sociocultural issues. They have an equal role.”

People in different parts of the company had different terms for various items. People had their daily work to do and did not want to take the required time to get

the new system to work

Sobey’s ERP system shut down for five days and employees were scrambling to stock potentially empty shelves in several stores for weeks. The system failure cost Sobey’s more than $90 million and caused shareholders to take an 82-cent after-tax hit per share.*

*Hoare, Eva. “Software hardships,” The Herald, Halifax, Nova Scotia (2001).

Information Technology Project Management, Fifth Edition, Copyright 2007

8

Page 9: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

9

Organizational StructuresRelated to political and structural framesThree basic organization structures

Functional: functional managers report to the CEOProject: program managers report to the CEOMatrix: middle ground between functional and project

structures; personnel often report to two or more bosses; structure can be weak, balanced, or strong matrix

Page 10: Schwalbe 02PM&IT

Functional, Project, and Matrix Organizational Structures

Information Technology Project Management, Fifth Edition, Copyright 2007

10

Page 11: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

11Organizational Structure Influences on Projects

Project Characteristics

Organizational Structure Type

Functional Matrix Project Weak

Matrix Balanced

Matrix Strong Matrix

Project manager’s authority

Little or none Limited Low to Moderate

Moderate to high

High to almost total

Percent of performing organization’s personnel assigned full-time to project work

Virtually none 0-25% 15-60% 50-95% 85-100%

Who controls the project budget

Functional manager

Functional manager

Mixed Project manager

Project manager

Project manager’s role

Part-time Part-time Full-time Full-time Full-time

Common title for project manager’s role

Project Coordinator/

Project Leader

Project Coordinator/

Project Leader

Project Manager/

Project Officer

Project Manager/ Program Manager

Project Manager/ Program Manager

Project management administrative staff

Part-time Part-time Part-time Full-time Full-time

PMBOK Guide, 2000, 19, and PMBOK Guide 2004, 28.

Page 12: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

12

Organizational Structure Project managers have the most authority in a pure project

organizational structure and the least in a pure functional structure A project leader in a functional organization who requires strong

support from several different functional areas, should ask for top management sponsorship The sponsor should solicit support from all relevant functional managers to

ensure that they cooperate and that qualified people are available to work as needed

Even though PMs have the most authority in the project organizational structure, this is often inefficient for the company as a whole Assigning full-time staff to the project an lead to underutilization and/or

misallocation of resources A full-time technical writer that has no work on a particular day is a wasted

resource Using a systems approach might lead the PM to suggest hiring an independent

contractor to do the writing instead of using a full-time employee, thus saving money

Page 13: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

13

Organizational CultureJust as an organization’s structure affects its ability to

manage, so does an organization’s culture. Organizational culture is a set of shared assumptions,

values, and behaviors that characterize the functioning of an organization

Many experts believe the underlying causes of many companies’ problems are not the structure or staff, but the culture

Even within one organization, one department’s culture may be different from another department’s culture (technology vs. finance)

Some cultures make it easier to manage projects

Page 14: Schwalbe 02PM&IT

Ten Characteristics of Organizational Culture1

Member identity*Group emphasis*People focusUnit integration*Control

Risk tolerance*Reward criteria*Conflict tolerance*Means-ends

orientationOpen-systems focus*

1 as per Stephen P. Robbins*Project work is most successful in an organizational culture where these items are strong/high and other items are balanced

14

Information Technology Project Management, Fifth Edition, Copyright 2007

Page 15: Schwalbe 02PM&IT

Ten Characteristics of Organizational Culture1. Member identity: The degree to which employees identify with

the organization as a whole rather than with their type of job or profession. A PM or team member might feel more dedicated to his or her

company or project team than to their job or profession, or they might not have any loyalty to a particular company or team.

An organizational culture where employees identify more with the whole organization are more conducive to a good project culture.

2. Group emphasis: The degree to which work activities are organized around groups or teams, rather than individuals. An organizational culture that emphasizes group work is best for

managing projects.

15

Information Technology Project Management, Fifth Edition, Copyright 2007

Page 16: Schwalbe 02PM&IT

Ten Characteristics of Organizational Culture

3. People focus: The degree to which management’s decisions take into account the effect of outcomes on people within the organization. A PM might assign tasks to certain people without considering their

individual needs, or the PM might know each person very well and focus on individual needs when assigning work or making other decisions.

Good PMs often balance the needs of individuals and the organization.

4. Unit integration: The degree to which units or departments within an organization are encouraged to coordinate with each other. Most PMs strive for strong unit integration to deliver a successful product,

service, or result. An organizational culture with strong unit integration makes the project

manager’s job easier.

5. Control: The degree to which rules, policies, and direct supervision are used to oversee and control employee behavior. Experienced PMs know it is often best to balance the degree of control to

get good project results.

16

Information Technology Project Management, Fifth Edition, Copyright 2007

Page 17: Schwalbe 02PM&IT

Ten Characteristics of Organizational Culture

6. Risk tolerance: The degree to which employees are encouraged to be aggressive, innovative, and risk seeking. An organizational culture with a higher risk tolerance is often best

for project management since projects often involve new technologies, ideas, and processes.

7. Reward criteria: The degree to which rewards, such as promotions and salary increases, are allocated according to employee performance rather than seniority, favoritism, or other non-performance factors. Project managers and their teams often perform best when rewards are

based mostly on performance. 8. Conflict Tolerance: The degree to which employees are encouraged

to air conflicts and criticism openly. It is very important for all project stakeholders to have good

communications, so it is best to work in an organization where people feel comfortable discussing conflict openly.

17

Information Technology Project Management, Fifth Edition, Copyright 2007

Page 18: Schwalbe 02PM&IT

Ten Characteristics of Organizational Culture

9. Means-ends orientation: The degree to which management focuses on outcomes rather than on techniques and processes used to achieve results. An organization with a balanced approach in this area is often best

for project work.

10. Open-systems focus: The degree to which the organization monitors and responds to changes in the external environment. Projects are part of a larger organizational environment, so it is

best to have a strong open-systems focus.

18

Information Technology Project Management, Fifth Edition, Copyright 2007

Page 19: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

19

Stakeholder ManagementProject managers must take time to identify,

understand, and manage relationships with all project stakeholders

Using the four frames of organizations can help meet stakeholder needs and expectationsSince organizations have limited resources,

projects affect top management, other functional managers and other project managers by using some of those resources

Senior executives/top management are very important stakeholders

Page 20: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

20

Opening Case AnalysisTom Walters focused on just a few internal project stakeholders

He did not involve the main customers of his project - the students – nor did he hold meetings with senior administration or faculty

At the faculty meeting, it became evident that there were many stakeholders Tom had excluded from his original plan

Structural frame – by looking at an organizational chart of the entire college he would have been able to see that his project would affect academic dept heads and members of different administrative areas

Human resource frame – tap his knowledge of the college and identify individuals who would most support or oppose his project

Political frame – consider the main interest group most affected by his project’s outcome

Symbolic frame – address what moving to a laptop environment would really mean to the college. He could have anticipated some of the opposition and solicited a strong endorsement from the college president or dean before talking to the faculty

Page 21: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

21The Importance of Top Management Commitment

Several studies have found that one of the key factors associated with virtually all project success is the commitment and support PMs receive

A senior manager, called a champion, acts as a key proponent for the projectMakes sure adequate resources are provided – money,

human resources, visibilityHelp PMs meet specific needs in a timely manner – realize

that unexpected problems can and will arise and support is needed to overcome them

As most IT projects cut across functional areas, assists in obtaining cooperation from people in other parts of the organization; fight political battles

Mentors and coaches PMs on leadership issues since most IT PMs are not experienced in management

Page 22: Schwalbe 02PM&IT

Best Practice IT governance addresses the authority and control for key IT

activities in organizations, including IT infrastructure, IT use, and project management

A lack of IT governance can be dangerous, as evidenced by three well-publicized IT project failures in Australia (Sydney Water’s customer relationship management system, the Royal Melbourne Institute of Technology’s academic management system, and One.Tel’s billing system)*Senior management had not ensured that prudent checks and balances

were in place to enable them to monitor either progress of the projects or the alignment and impact of the new systems on their business

Project level planning and control were absent or inadequate – project status reports to management were unrealistic, inaccurate and misleading

*Avison, David, Gregor, Shirley and Wilson, David, “Managerial IT Unconsciousness”, CACM, vol 49, No. 7, P.92

Information Technology Project Management, Fifth Edition, Copyright 2007

22

Page 23: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

23

Need for Organizational Commitment to Information Technology (IT)

If the organization has a negative attitude toward IT, it will be difficult for an IT project to succeed

Having a Chief Information Officer (CIO) at a high level in the organization helps IT projects

Assigning non-IT people to IT projects also encourages more commitment

Some CEOs take a strong leadership role in promoting the use of information technology in their organizations

Page 24: Schwalbe 02PM&IT

Need for Organizational Standards

Standards and guidelines help project managers be more effective

Senior management can encourage:The use of standard forms and software for project

managementThe development and use of guidelines for writing

project plans or providing status informationThe creation of a project management office or center

of excellence to help PMs achieve project goalsDevelopment of career paths for PMs and/or requiring

PMP certification

Information Technology Project Management, Fifth Edition, Copyright 2007

24

Page 25: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

25

Project Phases and the Project Life CycleA project life cycle is a collection of project

phases that defines:What work will be performed in each phaseWhat deliverables will be produced and whenWho is involved in each phase How management will control and approve work

produced in each phaseA deliverable is a product or service produced or

provided as part of a project

Page 26: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

26

More on Project PhasesIn early phases of a project life cycle:

Resource needs are usually lowestThe level of uncertainty (risk) is highestProject stakeholders have the greatest opportunity to

influence the projectIn middle phases of a project life cycle:

The certainty of completing a project improvesMore resources are needed

The final phase of a project life cycle focuses on:Ensuring that project requirements were metThe sponsor approves completion of the project

Page 27: Schwalbe 02PM&IT

Phases of the Traditional Project Life Cycle

27

27

Information Technology Project Management, Fifth Edition, Copyright 2007

Page 28: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

28Phases of the Traditional Project Life Cycle

Concept phase – managers briefly describe the project Develop a very high-level or summary plan for the project describing

the need for the project and basic underlying conceptsRough cost estimate is developed and an overview of the work

involved is createdA work breakdown structure (WBS) outlines project work by

decomposing the work activities into different levels of tasks The WBS is a deliverable-oriented document that defines the total scope of the

project

Tom Walters should have created a committee of faculty and staff to study the concept of increasing the use of technology on campus They might have developed a management plan that included an initial,

smaller project to investigate alternative ways of increasing the use of technology Prepare a report that studies what are similar campuses doing, surveys

students, staff and faculty and estimates the impact of using more technology on costs and enrollments.

Page 29: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

29Phases of the Traditional Project Life Cycle

Development phase – project team creates more detailed project management plans, a more accurate cost estimate and a more thorough WBSIf the concept phase suggested that laptops were one means

of increasing the use of technology on campus, then further study would be required in this phase to determine buy/lease, type of hardware and software, how much to charge students, how to handle training and maintenance, etc.

If the concept phase suggested that laptops were not the way to go, the project would have been cancelled at that point thereby saving time and money

Page 30: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

30Phases of the Traditional Project Life Cycle

Implementation– project team creates a very accurate cost estimate, delivers the required work and provides performance reports to stakeholdersAcquire the hardware and software, install necessary

network equipment, deliver laptops to the students, create a process for collecting fees, provide training, etc.Faculty need to consider how to take advantage of the laptops,

security prepare for potential problems, admissions include this in recruiting brochures, etc.

Close-out – all the work is completed, customer acceptance of the entire project Project team should document their experiences on the projectSurvey students, faculty, administration on impact of technology

Page 31: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

31

Product Life CyclesProducts also have life cyclesThe Systems Development Life Cycle (SDLC) is a

framework for describing the phases involved in developing and maintaining information systems

Systems development projects can follow: Predictive life cycle: the scope of the project can be

clearly articulated and the schedule and cost can be predictedProject team spends a large portion of the project attempting to clarify

the requirements of the entire system and then producting a designUsers are often unable to see tangible reults in terms of working

software for an extended period

Page 32: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

32

Predictive Life Cycle ModelsProject team spends a large portion of the project attempting to

clarify the requirements of the entire system and then producing a design

Users are often unable to see tangible results in terms of working software for an extended period

Waterfall model: has well-defined, linear stages of systems development and support

Spiral model: shows that software is developed using an iterative or spiral approach rather than a linear approach

Incremental build model: provides for progressive development of operational software

Prototyping model: used for developing prototypes to clarify user requirements

Rapid Application Development (RAD) model: used to produce systems quickly without sacrificing quality

Page 33: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

33

Product Life CyclesAdaptive Software Development (ASD) life cycle:

requirements cannot be clearly expressed, projects are mission driven and component based, using time-based cycles to meet target datesDevelopment proceeds by creating components that

provide the functionality specified by the business group as these needs are discovered in a more free-form approach

Requirements are developed using an iterative approach and development is risk driven and change tolerant to address and incorporate rather than mitigate risks

Page 34: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

34

Product Life CyclesLarge IT projects are usually composed of several

smaller, more manageable projects, especially when there is a lot of uncertainty involvedSome aspect of project management need to occur

during each phase of the product life cycleSystems planning phase for a new information system can include

a project to hire an outside consulting firm to help identify and evaluate potential strategies for developing a particular business application

Implementation phase might include a project to hire outside programmers code part of the system

Close-out phase might include a project to develop and run several training sessions for users of the new application

Page 35: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

35The Importance of Project Phases and Management Reviews

A project should successfully pass through each of the project phases in order to continue on to the next

Management reviews, also called phase exits or kill points, should occur after each phase to evaluate the project’s progress, likely success, and continued compatibility with organizational goalsAt the end of the concept phase, the project team could have

presented information to the faculty, president and other staff members that described different options for increasing the use of technology, an analysis of what competing colleges were doing and results of a survey of local stakeholders’ opinions on the subject. Unfavorable results could have resulted in stopping the project at that point and not investing more time, effort and money.

Page 36: Schwalbe 02PM&IT

What Went Right?"The real improvement that I saw was in our ability toin the words of Thomas Edisonknow when to stop beating a dead horse.…Edison's key to success was that he failed fairly often; but as he said, he could recognize a dead horse before it started to smell...In information technology we ride dead horsesfailing projectsa long time before we give up. But what we are seeing now is that we are able to get off them; able to reduce cost overrun and time overrun. That's where the major impact came on the success rate.”*

Many organizations, like Huntington Bancshares, Inc., use an executive steering committee to help keep projects on track.

*Cabanis, Jeannette, "'A Major Impact': The Standish Group's Jim Johnson On Project Management and IT Project Success," PM Network, PMI, Sep.1998, p. 7

36

Information Technology Project Management, Fifth Edition, Copyright 2007

Page 37: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

37

The Context of IT ProjectsIT projects can be very diverse in terms of size,

complexity, products produced, application area, and resource requirements

IT project team members often have diverse backgrounds and skill sets

IT projects use diverse technologies that change rapidly; even within one technology area, people must be highly specialized

Page 38: Schwalbe 02PM&IT

Information Technology Project Management, Fifth Edition, Copyright 2007

38

Case Wrap-Up

Due to the concerns raised from many people at the meeting, the president directed that a broad-based committee be formed to investigate the technology issue and report back in a month.

Not surprisingly, the committee recommended to terminate the concept

Tom Walters learned the hard way about the need to pay more attention to the needs of the entire college before proceeding with future technology plans.