school buildngs design with pedagogic and sustainable approach

43
For more information, please visit our website: www.ccdprog.com SCHOOLS SELECTED PROJECTS

Upload: davide-bedogni

Post on 28-Jan-2018

360 views

Category:

Engineering


2 download

TRANSCRIPT

For more information, please visit our website: www.ccdprog.com

SCHOOLS SELECTED PROJECTS

CCDP is an engineering company based in Reggio Emilia, dates back to 1977 and today the second

generation of professionals is involved in it..

The Company covers all sectors of activity, from the smaller to the larger design scale, for both

public and private clients:

• urban planning; town planning schemes (PRG), strategic and structural planning (PSC),

municipal operative plans (POC)

• small scale urban planning (master plans, detailed area plans, both residential and

industrial, renewal/regeneration plans)

• infrastructures (roads and infrastructure works…)

• engineering (earthquake proof structures, both civil and industrial)

• architecture (residential, commercial, office, industrial, health and education, culture,

leisure and sport)

• interior design (private houses, retail, commercial spaces)

• building services design (hydrothermal systems, mechanical, electrical, fire prevention)

• worksite supervision, accounting, technical-administrative testing, health and safety

supervision

• energy saving, energy performance certification, alternative and renewable energies

The Company is comprised of 14 members and a variable number of internal and external

partners, arranged in 5 working groups. The strong multidisciplinarity and interdisciplinarity and

the coordination among the members in all the work in progress phases of the commissions, allow

the CCDP to manage them all independently, without external support, permitting our clients to

have one exclusive partner. This allows CCDP also to become an efficient support for external firms

e public administrations in managing important commissions or major public works. The internal

tecnical and procedural control system is granted by the Quality and Environmental Management

System certifications in compliance with UNI EN ISO 9001 and Uni EN ISO 14001.

Historically deeply rooted in the territory, in the last few years CCDP has extended his activities to

collaborations with internationally reknown architects, for urban scale interventions (Masterplan

Ex Reggiane Plant Site (RE) with prof. Dennis Frenchman - M.I.T. Boston, arch. Andreas Kipar - Land

and arch. Aimaro Isola), architectural design (Creative Center Casalgrande Padana with Studio

Cerri & Associati) and competitions (New Lugano Soccer Stadium with Fojab Arkitekter, Steer

Davies Gleave and Iotti+Pavarani Architetti), experience culminated in 2011 designing in very close

contact with arch. Kengo Kuma the «Ceramic Cloud» monument, the documentation

center/ceramic museum of the Casalgrande Padana and the works of renovation with expansion

of the «Diana» Nursery School, by now well-known worldwide thanks to the «Reggio Children»

Foundation. In 2015 the collaboration with arch. Daniel Libeskind has led to the realization of the

«Ceramic Crown» monument. The company works has been documented through publication in

professional magazines and in many exhibition held in different italian institutions and has been

awarded in national and international competitions.

COMPANY PROFILE

RECENT COLLABORATIONS

arch. Kengo Kuma(Kengo Kuma & Associates – Tokio)

arch. Aimaro e Saverio Isola(Isolarchitetti – Torino)

arch. Andreas Kipar(LAND – Milano)

arch. Emilio Ambasz(Ambasz & Associates – New York)

arch. Dennis Frenchman(M.I.T. Boston)

arch. Alessandro Colombo(Studio Cerri & Associati - Milano)

arch. Daniel Libeskind(Studio Libeskind – New York)

RECENT AWARDS

2009 1° Place, Sustainabiliy Award 2009 – from BIOECOLAB (Modena), category “New Construction”

Private House in Sassuolo (Modena, Italy)

2009 1° Place, International Architecture Competition for Urban Regeneration and

Architectural design for «Ex Fonderie Riunite»

D.A.S.T. Design, Arte, Scienze, Tecnologia (Modena)

2009 4° Place, International Architecture Competition for the New Parma Province Headquarter

Environment, Agricolture, and Innovation palace in Parma

2008 1° Place, Environment and Inovation Award

Organized by INBAR National Bioarchitecture Institute, category “Designers”

Urban Plan Parco Ottavi (Reggio Emilia)

2007 1° Place, Sustainabilty Award 2007 – organized by BIOECOLAB (Modena), category “Urban design”

Urban Plan Parco Ottavi (Reggio Emilia)

2007 1° Place, International Competition «Grand Prix» VII Edition

Edificio direzionale e commerciale Volo (Reggio Emilia)

2007 2009 2015

CCDP FOR SCHOOLS

CCDP’s attitude for school design consist not only thinking about structure and all process design, but deeper thinkingits pedagogic function, to educate through spaces suitable for children, and make they as active part of school design.This according with Reggio Approach, who make child at the centre of active education with all his “one-hundredlanguages”. CCDP is also strongly motivate with all concern sustainable architecture and low-energy building, accordingwith its own environmental certification.

World famous pedagogist Loris Malaguzzi is the father of the founder and former president of CCDP, Architect AntonioMalaguzzi, died in 2014. Now CCDP architects and engineers carry on the focus on school architecture.

In 1994, Loris Malaguzzi and a commitment of a group of local citizens, founded Reggio Children – International Centerfor the Defense and Promotion of the Rights and Potentials of All Children, a mixed public-private company with the aimto manage the educational and cultural exchange initiatives that had been taking place for many years between themunicipal early childhood institutions of Reggio Emilia and a large number of educators and researchers from around theworld.

Reggio Children participates in research projects with companies operating in various areas (architectural design,pedagogical-management proposals, teacher training for early childhood services for children from birth to 6 years old,design of lines of furnishings and environments for children..).

The company aims and purposes are inspired by the contents and values of the educational experience of the MunicipalInfant-toddler Centers and Preschools of Reggio Emilia, and its mission is to carry out experimental research, to promoteand disseminate high quality education worldwide. International recognition of this experience and collaborativeinitiatives with many countries have led to the creation of an important international network, currently comprising thirty-two countries.

The system includes the newly established Reggio Children – Loris Malaguzzi Center International Foundation, whichfocuses on research, study, and development aimed at high quality education for all, along with Reggio Children srl and theInfant-toddler Centers and Preschools – Istituzione of the Municipality of Reggio Emilia. Reggio Children’s headquarters arelocated in the Loris Malaguzzi International Center. Inaugurated in 2006 and completed in 2011, the Center is supportedby the Municipality of Reggio Emilia, Infant-toddler Centers and Preschools, Reggio Children, and the Friends of ReggioChildren Association, which now all converge in the newly established Foundation.

"A school needs to be a place for all children, not based on the idea that they're all the same, but that they're all different.“Loris Malaguzzi

SCHOOL BUILDINGS - SELECTED PROJECTS

Primary school - 5 classes and junior high school - 3 classes, Sant’Ilario d’Enza, Reggio Emilia

Nursery school renovation, Luzzara, Reggio Emilia

COMPETITIONS

School complex Astana, KazakhstanSchool complex: kindergarten, nursery school, primary schooland junior high school Lido Adriano, Ravenna

Junior high school Vicchio, Florence

Public spaces and neighborhood services: square, civic centre, kindergarten and nursery school Rome

School complex: kindergarten, nursery school - 9 classes, primary school - 15 classes + gym, junior high school – 9 classes + gym Cernusco sul Naviglio, Milan

School complex: nursery school - 4 sezioni, full time kindergarten – 3 classes and part time kindergarten – 3 classes Guastalla, Reggio Emilia

Kindergarten - 6 classe Guastalla, Reggio Emilia

COMPLETED OR UNDER CONSTRUCTION WORKS

Renovation and expansion of nursery school “Diana” NurserySchool, Reggio Emilia, in association with arch. Kengo Kuma &Associates

Nursery school - 6 classes + school canteen, Albinea, ReggioEmilia

Nursery school - 6 classes, part of a new school complex, Viadana, Mantova

Nursery school - 9 classes, Formigine, Modena

School complex: nursery school - 6 classes, primary school - 10 classes and gym, Scandiano, Reggio Emilia

Renovation ex goods yard building: nursery school - 1 classCastelnovo di Sotto, Reggio Emilia

Renovation and expansion of a nursery school – 3 classes, Praticello di Gattatico, Reggio Emilia

Primary school - 10 classes + gym, Salvaterra, Reggio Emilia

Nursery school - 2 classes + kindergarten – 1 class, Scandiano, Reggio Emilia

School gym, Novi di Modena, Modena

Nursery school, primary school and junior high school, Camposanto, Modena

Primary school - 15 classes Valsamoggia, Bologna

Primary school expansion, Massenzatico, Reggio Emilia

COMPLETED OR UNDER CONSTRUCTION WORKS

RENOVATION AND EXPANSION

“DIANA” NURSERY SCHOOL

place

Reggio Emilia

client

Reggio Children Foundation

architectural services

schematic design in association with

arch. Kengo Kuma & Associates

date

ongoing

In 1991 the american magazine Newsweek

awarded the Scuola Diana (Infant-Toddler PreSchool in

Reggio Emilia) as one of the best 10 schools in the world.

NURSERY SCHOOL 6 CLASSES + SCHOOL CANTEEN

place

Albinea (RE)

client

Municipality of Albinea (Reggio Emilia)

architectural services

schematic design, design development,

construction documents, structural and plant design

gross floor area

2.100 sq. m. (including arcades)

cost

Nursery school 1.470.000 euro

School canteen 540.000 euro

date

2000-2003

place

Cicognara-Cogozzo, Viadana (MN)

client

Municipality of Viadana (Mantova)

architectural services

schematic design

Floor area

3500 sq. m.

date

2003-2004

SCHOOL COMPLEX: NURSERY SCHOOL - 6 CLASSES, PRIMARY SCHOOL - 10 CLASSES + SCHOOL GYM

NURSERY SCHOOL - 6 CLASSES

gross floor area2.140 sq. m. (including arcades)

cost2.079.407 euro

date2003-2006

NURSERY SCHOOL - 9 CLASSES

place

Formigine (MO)

client

Municipality of Formigine (Modena)

architectural services

schematic design, design development,

construction documents,

Structural design, operations management

gross floor area

3.071 sq. m. (including arcades)

cost

2.152.000 euro

date

1999-2001

SCHOOL COMPLEX:NURSERY SCHOOL - 6 CLASSES, PRIMARY SCHOOL - 10 CLASSES + SCHOOL GYM

place

Scandiano (RE)

client

Municipality of Scandiano

architectural services

schematic design, design development, construction documents, strucural and plant design, operations management, health and safety supervision

gross floor area

nursery school 2322 sq. m. (including arcades)

primary school 2866 sq. m. (including arcades)

gym 1900 sq. m.

Total 7088 sq. m.

cost

nursery school 1.700.000 europrimary school 1.400.000 eurogym 750.000 euroTotal 3.850.000 euro

date

2004

NURSERY SCHOOL

ELEMENTARY SCHOOL + GYM

place

Castelnovo di Sotto (RE)

clientMunicipality of Castelnovo di Sotto (Reggio Emilia)

architectural services

schematic design, design development, construction documentsstructural and plant design

floor area

190 sq. m.

date

1996

RENOVATION EX GOODS YARD BUILDING

NURSERY SCHOOL -1 CLASS

RENOVATION AND EXPANSION

NURSERY SCHOOL - 3 CLASSES

place

Praticello di Gattatico (RE)

client

Municipality of Gattatico (Reggio Emilia)

architectural services

Schematic design, design development, construction documents,

Structural design, operations management

floor area

expansion 194 sq. m.

date

2001-2003

PRIMARY SCHOOL10 CLASSES + GYM

location

Salvaterra (RE)

client

Municipality of Casalgrande, Reggio Emilia

architectural services

schematic design, design development, construction documents, operations management, assistance to the technical -administrative testing, settlement, construction bookkeeping, health and safety supervision

gross floor areaprimary school 1712 sq m (colonnades included)

gym 891 sq m

Total 2603 sq m

costprimary school 1.360.000 eurogym 670.000 euro

Total 2.030.000 euro

date

2001-2003

NURSERY SCHOOL - 2 SECTIONS + KINDERGARTEN

place

Scandiano (RE)

client

Municipality of Scandiano (Reggio Emilia)

architectural services

schematic design, design development, construction documents,

gross floor area

770 sq m

date

2008 Construction documents phase, building permit obtained

SCHOOL GYM

place

Novi di Modena (MO)

client

Municipality of Novi di Modena, MODENA

architectural services

design development, construction documents,

operations management

gross floor area

1.350 sq m

cost

1.944.707 euro

date

2011-2012

energy consuption

< 8 kWh/cu m/year

The main gym on the ground floor

The main gym

The small gym on the second floor

NURSERY SCHOOL, PRIMARY SCHOOL AND JUNIOR HIGH SCHOOL

place

Camposanto (MO)

client

Emilia Romagna region – Commissioner Delegate to the Emergency - Earthquake 2012

architectural services

design development, construction documents, system and

structures design

floor area

2.260 sq. m.

cost

1.800.000 euro

date

2012-2013

PRIMARY SCHOOL - 15 CLASSES (Zero Emission/Energy Building)

place

Monteveglio (BO)

client

Municipality of Valsamoggia, BOLOGNA

architectural services

construction documents, operations management

gross floor area3.115 sq m

cost

3,816,460 euro

date

2012-2014

energy consuption

< 10 kWh/sq m/year

PRIMARY SCHOOL EXPANSION

place

Massenzatico (RE)

client

Municipality of Reggio Emilia

architectural services

design development, construction documents

Floor area

350 sq. m.

cost

727.630 euro

date

2013-2014

PRIMARY SCHOOL - 5 CLASSES +JUNIOR HIGH SCHOOL - 3 CLASSES

place

Sant’Ilario d’Enza (RE)

client

Cooperativa «Don Pietro Margini»

architectural services

schematic design, design development, construction

documents, operations management, structures design

gross floor area

2.260 sq. m.

cost

1.800.000 euro

date

2014

PRIMARY SCHOOL RENOVATION

place

Villarotta di Luzzara (RE)

client

Municipality of Luzzara (Reggio Emilia)

architectural services

Schematic design, design development, construction

documents, operations management, health and safety

supervision

groos floor area

630 sq. m.

cost

203.000 euro

date

2014-2015

COMPETITIONS

SCHOOL CAMPUS

place

Astana, Kazakhstan

client

«School» Project, Kazakhstan Government

groos floor area

13.500 sq. m.

Cost

24.000.000 USD

date

2014

place

Lido Adriano (Ravenna)

client

Municipality of Ravenna

floor area

Kindergarten 1432 sq. m.

Nursery school 1471 sq. m.

Primary school 2663 sq. m.

Junior high school 1646 sq. m.

gym 1349 sq. m.

canteen 800 sq. m.

Total 11.311 sq. m.

date

2003

SCHOOL COMPLEX:KINDERGARTEN, NURSERY SCHOOL, PRIMARY SCHOOL AND JUNIOR HIGH SCHOOL

JUNIOR HIGH SCHOOL

place

Vicchio (FI)

client

Municipality of Vicchio (Firenze)

floor area

2523 sq. m.

date

2008

place

Rome

client

Municipality of Rome

date

2008

PUBLIC SPACES AND NEIGHBORHOOD SERVICES :SQUARE, CIVIC CENTRE, KINDERGARTEN AND NURSERY SCHOOL

place

Cernusco sul Naviglio (MI)

client

Municipality of Cernusco sul Naviglio (Milan)

Floor area

Nursery school 2.700 sq. m.

Primary school 3.000 sq. m.

Junior high school 1.800 sq. m.

Total 7.500 sq. m.

date

2010

SCHOOL COMPLEXNURSERY SCHOOL - 9 CLASSES, PRIMARY SCHOOL - 15 CLASSES + GYM, JUNIOR HIGH SCHOOL - 9 CLASSES + GYM

place

Guastalla (RE)

client

Municipality of Guastalla (Reggio Emilia)

floor area

Nursery school 730 sq. m.

Full time kindergarten

650 sq. m.

Part time kindergarten

580 sq. m.

Total 2.160 sq. m.

date

2009

SCHOOL COMPLEXNURSERY SCHOOL - 4 CLASSES, FULL TIME KINDERGARTEN - 3 CLASSES AND PART TIME KINDERGARTEN - 3 CLASSES

place

Guastalla (RE)

client

Municipality of Guastalla (Reggio Emilia)

floor area

1400 sq. m. (1600 sq. m. including arcades)

date

2014

KINDERGARTEN - 6 SECTIONS

Contacts

CCDP

Via Lombardia 7, 4124 Reggio Emilia

tel. +39 0522920460

fax +39 0522920794

[email protected] I www.ccdprog.com