The US Nuclear Navy: Eradicating Human Error
Domenic Alcaro, LT, USN, Ret
Schneider Electric
Schneider Electric 2- Division - Name – Date
Agenda
●Engineering Plant Overview●Picking the Right People●Training the Right People●Procedures-Zero Deviation Allowed●Policies●System Design●War Stories●Cool Pictures●Non-Military Applications
Schneider Electric 3- Division - Name – Date
The Nuclear Submarine
Schneider Electric 4- Division - Name – Date
Engineering Plant Overview(Each plant below made up of multiple, smaller, complex subsystems)
●Reactor Plant●Steam Plant●Electrical Plant●Hydraulic Plant●Cooling Plants●Fresh Water Make-Up Plants●Multiple Auxiliary Plants (I.e., High Pressure Air, Low Pressure Air, Refuse Removal, etc.)
●Etc…(and this is just the back half of the sub)
Schneider Electric 5- Division - Name – Date
Picking the Right People
●The Infamous Admiral Rickover, “Father of the Nuclear Navy”
●Technical Competency Screening●Leadership Screening●Psychological Screening (claustrophobia is rarely an issue)
●Reliability and “Quality of Character” Screening – The PRP, Personnel Reliability Program
●Applied to both Officer and Enlisted Ranks
Schneider Electric 6- Division - Name – Date
Training the Right People:Prior to Arriving On Board
●Nuclear Power School
●Nuclear Prototype Training
●General Submarine Training
●If time permits, other Navy Schools
Schneider Electric 7- Division - Name – Date
Training the Right People:After Arriving On Board
●Qualification Cards (Qual Cards)●General Submarine Qual Cards●Individual Watch Station Qual Cards
●Under Instruction (UI) Watches (the RIGHT way to do OJT)
●Extensive Testing (Written and Oral)●On Board Continuing Training Program●Off Ship Navy Schools●Drills, Drills, Drills (Drill Coordinator is an actual assigned position)
Schneider Electric 8- Division - Name – Date
Procedures
●Only with permission of CO can procedures be violated – this mentality is religion
●All procedures are always conducted with a checklist in front of you, even if you have memorized them
Schneider Electric 9- Division - Name – Date
Procedures - Emergency
●Emergency Procedures●To quickly bring plant to a stable condition●Immediate Actions (these actions for EVERY Emergency Procedure must be flawlessly memorized by every watch stander)
●Supplementary Actions
Schneider Electric 10- Division - Name – Date
Procedures - Operating
●Operating Procedures●To carry out the day to day functions of the boat●I.e., Reactor Startup, Shifting the Electric Plant, Warming up the Main Engines
Schneider Electric 11- Division - Name – Date
Maintenance Procedures
●The PMS (Planned Maintenance System)●Daily, weekly, bi-weekly, monthly, bi-monthly, quarterly, semi-
annually, annually, bi-annually, every 3, 5, 10 years, etc.●Approvals and Notifications●Status Boards●Complete “re-commissioning” required for some equipment after
every maintenance procedure●Audits
●Some General Maintenance Practices●The Tag-Out System●The Valve Positioning Checklist●Electrical Safety Procedures
Schneider Electric 12- Division - Name – Date
The Tag-Out System
●Tag-Out Form always filled out first●Filled out and signed by 2 individuals●Presented to Officer-In-Charge with schematic of system affected for 3rd individual verification
●Yellow and Red Tags●“Hang Tags, Position Valves”●Some rules apply, i.e., “high energy” systems require 2 valve isolation and an electrical system must be completely deenergized whenever feasible
Schneider Electric 13- Division - Name – Date
The Valve Positioning Checklist (some examples)
●Check for Tags●Check the VPI (Valve Positioning Indicator)●Always check in the shut direction first●Partially position the valve and check for appropriate
system response●Fully position the valve and check for appropriate system
response●When opening valve, go to fully open, then back off ¼ to ½
turn●When shutting (not “closing!”) valve, torque as appropriate
using calibrated wrench●And the list goes on
Schneider Electric 14- Division - Name – Date
Electrical Safety Procedures (some examples)
●Completely deenergize and tag-out as much as possible
●Electrical safety area with rubber mats●Completely remove all metal●Minimize skin exposure and don electrical safety gloves
●Use only tools made “electrically safe”●Test for voltage first●Rope around waist and CPR training
Schneider Electric 15- Division - Name – Date
Policies
●Use of Common Language●I.e., port and starboard, shut vs. close, etc.●Avoid acronyms (even though Navy is full of them)
●Repeat Backs●Mandatory – no exceptions
Schneider Electric 16- Division - Name – Date
Policies (continued)
●Status Boards●All major systems status manually updated via grease pencils and status boards
●Use of Logs and Trending
●Meticulous Record Keeping
●Tool and Meter Calibration Programs
Schneider Electric 17- Division - Name – Date
Policies (continued)
●Watches●Pre-watch plant tours●Turnover procedures
●Checks and Balances inserted into everything
●Self-Audits●Internal and External Inspections
●ORSE
Schneider Electric 18- Division - Name – Date
Policies (continued)
●Lessons Learned and Incident Reports●Formalized program
●Shared Knowledge●Mandatory
●Manuals Update System●Very meticulous system for ensuring manual revisions and changes were always made correctly and on time
Schneider Electric 19- Division - Name – Date
System Design●First and foremost, the entire sub is “pre-engineered” so that system compatibility is ensured
●Alarms and Indicators●Interlocks and Redundancy everywhere●The Importance of Standardization
●Every class (I.e., Los Angeles, Ohio, Seawolf, etc.) of sub is virtually identical
●Personnel from one sub can transfer to another sub with little to no additional training
●Labeling, color coding, general procedures all identical regardless of type of sub
Schneider Electric 20- Division - Name – Date
The Irony of Human Error●Goal is to remove the “error” in “human error,” not the “human”
●Reliance on People●This one is important●Although much needs to be put in place to take out
human error, having the human in the process is critical to success (“can’t live with ‘em, can’t live without ‘em”)
●No machine can reason like a human●Saving lives means making hard decisions
Schneider Electric 21- Division - Name – Date
War Stories (some relevant, some funny, some interesting)
●Hurried Maintenance and the Blackout
●The Bubbler Boy
●The USS Greenville
●A Friendly Encounter
●Fast Water Pick-Up
●The Pipe and the COB
Schneider Electric 22- Division - Name – Date
The Result
●The US Nuclear Navy has never had a nuclear incident in over 50 years of operating nuclear ships and submarines at sea
Schneider Electric 23- Division - Name – Date
The Nuclear Propulsion Plant Operator
Tough Minded, Skeptical, Sometimes Even Cantankerous, But Always Technically Competent,
ALWAYS THINKING – What If?
A SPECIAL BREED. He Makes the Difference Between Safe and Effective Operation and
Unacceptable Risk.
Schneider Electric 24- Division - Name – Date
Now for the Big Question:
What, if any, of these concepts can or should be applied to
commercial data center facilities?
Schneider Electric 25- Division - Name – Date
Commercial Reality
●Cannot train for too long without contributing to bottom line
●Cannot force individuals to “follow orders”
●Cannot discipline in the same way
●Some HR issues are handled differently
Schneider Electric 26- Division - Name – Date
But, we can…●Provide Leadership
● Instill desire to perform at one’s top potential● Hire the best
●Utilize Non-Deviation Procedural Compliance● SOP’s for normal operating procedures● EOP’s for emergency procedure (easily accessible and memorized)● MOP’s for maintenance and other procedures● Change control process for all procedures● Maintain status boards● Methodical documentation of maintenance● Etc.
●Train When Possible● Schools● OJT● Perform drills
●Share Knowledge●These are just some examples, challenge yourself as to what else
might apply● Idea is to apply risk mitigation whenever possible
Schneider Electric 27- Division - Name – Date
Cool Pictures…
Schneider Electric 28- Division - Name – Date
Schneider Electric 29- Division - Name – Date
Schneider Electric 30- Division - Name – Date
Schneider Electric 31- Division - Name – Date
Schneider Electric 32- Division - Name – Date
Schneider Electric 33- Division - Name – Date
Schneider Electric 34- Division - Name – Date
Schneider Electric 35- Division - Name – Date
Schneider Electric 36- Division - Name – Date
Schneider Electric 37- Division - Name – Date
Schneider Electric 38- Division - Name – Date
Schneider Electric 39- Division - Name – Date
Schneider Electric 40- Division - Name – Date
Schneider Electric 41- Division - Name – Date
Schneider Electric 42- Division - Name – Date
Schneider Electric 43- Division - Name – Date
Schneider Electric 44- Division - Name – Date
Schneider Electric 45- Division - Name – Date
Schneider Electric 46- Division - Name – Date
Schneider Electric 47- Division - Name – Date
Schneider Electric 48- Division - Name – Date
Schneider Electric 49- Division - Name – Date
Schneider Electric 50- Division - Name – Date
Schneider Electric 51- Division - Name – Date
Schneider Electric 52- Division - Name – Date
Schneider Electric 53- Division - Name – Date
Schneider Electric 54- Division - Name – Date
Schneider Electric 55- Division - Name – Date
Schneider Electric 56- Division - Name – Date
Schneider Electric 57- Division - Name – Date
Schneider Electric 58- Division - Name – Date
Schneider Electric 59- Division - Name – Date
Schneider Electric 60- Division - Name – Date
Schneider Electric 61- Division - Name – Date
Schneider Electric 62- Division - Name – Date
Schneider Electric 63- Division - Name – Date
QuestionsAnd