scheduling maintaining and adjusting labor distribution … scheduling presentation.pdf · to be...

37
SCHEDULING, MAINTAINING, AND ADJUSTING LABOR DISTRIBUTION (LD) ON SPONSORED PROJECTS (G OR Z A WARD PREFIX)

Upload: others

Post on 24-Jan-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

SCHEDULING, MAINTAINING, AND ADJUSTING LABORDISTRIBUTION (LD) ONSPONSORED PROJECTS(G OR Z AWARD PREFIX)

Page 2: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

Salaries and wages represent the vast majority (>80%) of the University’s expenses against sponsored activities.  The Integrated System’s Labor Distribution Module is the primary tool used for labor cost accounting and reporting.

Page 3: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

A Labor Schedule is a collection of charging instructions that specify how labor costs should be distributed for an employee and assignment.  The Integrated System Labor Scheduling module imports labor cost information from the Human Resources System and distributes it across funding sources. 

Page 4: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

Sponsored Research activities are externally funded programs under which the Institution is obligated to perform a defined scope of work according to specific terms and conditions within budgetary limitations.  In fiscal year 2014, sponsored research made up 19.4% of the $1.45 Billionannual academic division operating budget.  In contrast, state general funds contributed just 10% to the operating budget.  

Source:  2014 Budget Summary

Page 5: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

‐It is important to understand the difference between types of awards‐Cost Reimbursable: the sponsor reimburses the institution after expenses are incurred.  UVA “draws down” or invoices funds at regular intervals based on expenditures.  OSP invoices.  Project is BUDGETED up front with awarded amount.  This is NOT CASHEvent Paid Reimbursement – the sponsor reimburses the institution when specific milestone events or other deliverables are achieved. OSP invoices except for clinical trials/contingent paid/sample testing award types

Page 6: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

‐Award TypesAt Risk Prelim or Extension‐Where work is being done in the absence of a signed agreement.  This allows for expenses to be captured where they belong while the paperwork catches up. Contract, Clinical Trials – Since the amount of the award is unknown (depends on # patients) budgets are not loaded. Dept. usually invoices.  Payment is always in arrears, deficits are normal and allowable.Fixed Price or Advance Payment – The amount the sponsor is going to pay is established in advance.  Usually there is not a requirement to return unspent balances to the sponsor.  These are usually CASH.

Page 7: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

• To understand how labor scheduling impacts managing and reporting on sponsored research at UVA

• To understand how labor scheduling impacts managing and reporting on sponsored research at UVA

1

• To give LD Schedulers and other decision makers a set of guidelines and examples of best practices 

• To give LD Schedulers and other decision makers a set of guidelines and examples of best practices 

2

• To empower LD Schedulers to obtain the necessary information to make the right decisions when setting up labor schedules 

• To empower LD Schedulers to obtain the necessary information to make the right decisions when setting up labor schedules 

3

Overview and Objectives

Page 8: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

Life Cycle of a Grant

Proposal Submission

(Office of Grants &

Contracts)

Receipt of Funding

(OSP)

Use of Funding

Closeout Process

Proposal Development(Department/School Level)

Page 9: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest
Page 10: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

Labor Scheduling Impacts

ReportsPayrollCommitted Effort

Direct Charged

Paid for by the sponsor

Labor Distribution Schedule

Salary Encumbrances/Forecasting

Monthly Reconciliation 

Reports

Reports to SponsorsCost 

SharedPaid for by the institution Effort Reports

Page 11: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

Receipt of Funding/Use of Funding

Receive the Notice of

Award and PTAO

Schedule Labor and

Monitor schedules MONTHLY

Labor Scheduling Process

Determine WHO is to be scheduled, for HOW MUCH and for HOW

LONG

Page 12: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

Who’s WhoRole Responsibility

The Principal Investigator

• Ensures that labor costs are incurred for the intended purpose of the grant/contract, and in accordance with sponsor requirements and University policies and procedures.  

• Communicates with administrators to establish accurate and timely LD schedules for themselves and all supervised employees. 

• Provides notification of the need for any modification to the labor schedule

• Complies with Sponsor requirements regarding any significant reductions (normally > 25%) in effort on sponsored activities

• Informs other key personnel on the project, particularly those in other departments, of the receipt of the award.

Research Administrator/Fiscal Contact/Labor Distribution Specialist

Chair/Division Head

• Communicates with the Principal Investigator regarding the scheduling of salaries on sponsored projects.  

• Establishes proper/timely labor distribution schedules for persons in your organization supported from sponsored activities to ensure appropriate allocations of salary costs. 

• Adjusts labor schedules in a timely fashion in support of accuracy in salary allocations.

• Maintains effective practices in proper and timely scheduling of LD

Page 13: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

Labor Scheduling Steps…………1) Upon receipt of a notice of award (NOA) and PTAO creation, the 

PI communicates to the appropriate business unit employee the names and amount of effort of all personnel assigned to the project, making any adjustments necessary to accommodate their effort on other projects. The proposal budget is a good launching point for this discussion.

2) Determine the scheduled start dates for each employee to be scheduled.  The scheduled start date can be the first day of the sponsored activity, but if the person will be starting on a sponsored activity after the project start date, the scheduled start date is when the person’s effort actually begins.  

(Payroll start and end dates should not normally be used for ongoing labor schedules, i.e. 25‐JUL‐2012 to 24‐JUL‐2013. It is usually more accurate to use Award start and end dates, i.e. 01‐JUL‐2012 to 30‐JUN‐2016.)

Page 14: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

3.  Determine the Schedule End Date(Sounds easy, right?)

• Where possible, to minimize the number of entries that have to be made in Labor Distribution, an individual’s labor should be scheduled for the longest period possible that does not exceed the award/project end date in the Integrated System, since the system is set up to automatically generate the proper encumbrances

• If it is known that the person’s effort on a project is limited to a predetermined period of time, the LS end date should be set to the date that the PI has determined that the person’s work on the project will end.  For example, a data analyst could be brought in for a period of three months to analyze data generated from experiments.  That data analyst would be scheduled starting on the first day of work on the project and ending three months later.

Page 15: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

Take advantage of the Automatic System 

Cut‐offs• Any segment of the PTA 

Project End Date Task End Date Award End Date, OR 

• Labor Encumbrance End Date (LEED), OR

• The Labor Schedule, OR• The individual’s appointment end date (HR)

For Sponsored Projects (G and Z awards),  the Integrated System automatically stops encumbering salary on the EARLIEST date of the following:

Page 16: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest
Page 17: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

Scheduling Steps cont………..4) The responsible business unit schedules the data using the Labor 

Distribution Module in accordance with IS Labor Schedule Specialist procedures. 

5) Any changes in effort requiring modification of Labor Distribution should be communicated in writing to the responsible administrator in the business unit by the PI. Changes may include, but are not limited to:

• Reassignment of work/project changes• Changes in level of effort• Budget modification

6) In order to encourage proactive sharing of information, both the PI and the Labor Schedule Specialist should communicate initial effort distributions as well as any modification with the Effort Reporting Coordinator.  Delayed adjustments to effort reporting can result in the need for extensive justification and additional documentation.

Page 18: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

Employee labor schedules are maintained by the Employee Assignment Organization.  This is true even if the employee is working for a faculty member on a project or in space owned by a different Organization. Regardless of who owns the award, the LD 

schedule should use the ORG of the employee.

For each person in a department or unit, a determination must be made on allocation of 

100% of their salary. For persons who are not paid from sponsored research project (i.e. Departmental 

Administrators), it is allowable for salaries to go to an Organizational Default Account.  However, everyone 

who has salary coming from sponsored research must have an LD schedule to allocate 100% of their salary to 

the correct PTAO.

Page 19: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

Special Considerations and Examples

Delays or Gaps in Research Funding

Clinical Faculty with UVA UPG pay

Working with Salaries in Excess of NIH Salary Cap

Clinical Trials

Page 20: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

DELAYS OR GAPS IN RESEARCH FUNDING

PREFERRED **The use of preliminary/at‐risk PTAOs is encouraged forsituations where official award confirmation is anticipated but not yetreceived and research effort (LD) is being expended.

In instances where requesting a preliminary/at‐risk PTAEO is not feasible (including circumstances when documentation is not available, etc.), departmental overhead or other non‐grant funded PTAOs should be used for initial labor distribution until 

NOAs are received.  These labor distributions should be retroactively adjusted back onto the project when it becomes active.  Salaries 

should never be scheduled to another sponsored activity as a temporary measure.

Page 21: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

CLINICAL FACULTY WITH UPG PAY

The UVA University Physicians Group (UPG) portion of a faculty member’s Institutional Base Salary is not paid through the University Labor Distribution System and must be tracked separately for clinical faculty.  It still counts as part of their IBS 

and towards their total University Effort.

Page 22: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

SALARIES IN EXCESS OF THE NIH SALARY CAP

To calculate the maximum percentage of labor that should be entered into the Labor Distribution module:

Committed Effort Percentage x Current NIH Salary Capdivided by UVA Compensation ONLY 

(REMOVE any UVA UPG pay from denominator)*****************************************

Note:  The NIH salary cap only applies to NIH or other federal awards that explicitly impose it.  If the sponsor 

does not impose the cap it should not be applied unless permission has been obtained to cost share the 

salary

Page 23: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

CLINICAL TRIALS

Labor should be scheduled on clinical trials according to the effort expended, beginning when the effort commences, 

NOT necessarily when patient enrollment begins.Since budgets are loaded when money is received, clinical   trial accounts will often run deficits.  This is expected, but 

accounts must be monitored closely.As with other forms of grant funding, effort devoted

to clinical trials should be paid for by the sponsor and not cost shared by other funding sources.  

Page 24: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

MONTHLY MAINTENANCEOF LABOR SCHEDULES

Page 25: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

Review of Labor Schedules by Assignment Organization• At the beginning of each month and before the first payroll 

for the month runs, log onto Discoverer and run the following report:

LD_Labor Schedule Hierarchy Report: Labor Schedule with end dates tab (middle tab)  Please note that this report is formatted to print on legal sized paper.

• Select your ORG code in the Assignment Organization field from LOV (report will not run properly if ORG number is hand‐keyed).  

• Click OK to run report.

Page 26: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

From Menu at top of page select Format: Conditional Format.  Click New Conditional Format……..From the Item pull‐down menu select: UVA_LD_Labor_Sched_Asg_Org.Schedule_End_Date <=Last Day of Current Month (select from Calendar).  Click OK

Click OK on the Conditional Format Screen

Employees with a Schedule End Date in the Current month will have a RED highlightEmployees whose Labor Schedule expired in the previous month will have a Schedule Type of S (Suspense)

Page 27: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

For anyone with a PTAO ending in the current month, a determination will need to bemade on how to extend the LD schedule. If the project in question is being continuedor renewed, and the person’s effort on the project will continue, then schedule theperson to the end of the new end date. If the project in question is ending, then adetermination will need to be made as to where the person’s effort should be directed,and the new PTAO added. This decision is made by Principal Investigators forthemselves and for the people under their supervision.

Page 28: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

GUIDELINES ON ENTERINGDISTRIBUTION

ADJUSTMENTS

Page 29: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

Labor Distribution Adjustments Examples of circumstances that require

LD adjustment:• Delays in funding resulted in charges being 

initially directed to a non‐sponsored account

• The Principal Investigator discovers an error during a monthly account reconciliation review

• The Principal Investigator or other personnel on the project change their effort and there is a delay in the communication of this change, or it is communicated after the current period payroll cutoff dates.

• Another department notifies an employee’s home department that he/she should have been scheduled on their project(s).

• During the effort certification process, the certifier realizes that payroll does not accurately reflect effort.

Sometimes the distribution of payroll will need to be adjusted after it has been processed.  Corrections to previously posted payroll should be made as soon as possible after the need for 

the adjustment is identified.  Delays in 

submission of adjustments of over 90 days require OSP permission, and may result in disallowance of those charges on sponsored program accounts.

Page 30: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

LD Adjustment Steps…………1) Determine the start and end dates of the adjustment. Be sure 

that they fall within the active project dates.2) Determine the percentage or dollar amount that needs to be 

adjusted.  Be sure to account for UPG pay according to the formula provided in the LD scheduling procedure.

3) If another ORG provides a dollar amount instead of a percentage, verify that the amount you are given does not include fringes or F&A.

4) Always adjust the salary using the dates of the actual period the work was performed, even if it means you are required to get a retro. Do not load the LD into the most recent period(s). Otherwise, the effort report “Payroll” and “Calculated Effort” fields will not be correct for that effort reporting cycle.

Page 31: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

5) Moving salary dollars from one grant to another grant requires extra attention.  Keep in mind any sponsor thresholds for changes in effort of the PI or key personnel.  Ensure that the changes will reflect the actual effort expended across all projects and that the receiving project has adequate funds.  These types of moves require thorough justification and will be reviewed for allowability.

6) The LD adjustment batch comment should include:‐The default batch comment‐Reason for the transfer – if you are transferring salary onto a sponsored project, include the technological benefit to the recipient grant and/or the person’s role on that project; if transferring salary off the project, include the reason for the transfer.  Use the list of Reason Codes to reduce the amount of text that must be included.

Adjustment Steps continued…….

Page 32: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

7) Prior approval (retro approval number) is required• For adjustments over 90 days old from the date the payment 

was issued• If a generated effort report has moved beyond the ‘Pre‐

Review’ status into the hands of the Certifier8) Verify that your adjustment is correct and all comments are 

in place before the final submission.  As a reminder, the UVA naming convention to be used is School/Department prefix ‐ last name of employee you are entering the distribution adjustment for, first name or initial ‐ date entered, for example MDBIOC‐Smith,J‐05SEP2013.  Do not use wildcard characters such as < >” ‘ \ & as these will cause an error in the workflow process.

Adjustment Steps continued…….

Page 33: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

9) LD adjustments impacting sponsored projects ONLY (G and Z award/projects) trigger a workflow review process in the Integrated System.  

• OSP reviews LD adjustment batches daily creating a workflow for feedback to the creator of the batch,

• OSP will take one of the following actions via workflow notifications/email: a)Approve, b) Reject, or c) Return with Comments

Adjustment Steps continued…….

Page 34: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

• If Returned with Comments, the creator will be responsible for taking one of the following actions: a) Resubmit with added comments, or b) Finish (delete) the batch.  One of these two actions MUST be taken.  Failure to act on a returned batch places the salary dollars in a limbo status that is unreachable by anyone but the creator of the batch.  

• In order to add necessary details (reason code, employee role, etc.), click on the “Note” field at the bottom where “Response” is indicated.  Add the details and resubmit.

10) Follow up LD Adjustments with a corrected Labor Schedule where needed so that future LD adjustments are avoided.

Adjustment Steps continued…….

Page 35: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

Some (actual) examples of good LD Distribution 

Adjustment Justifications

• “The PI, Dr ___, instructed that his LD be adjusted in order to accurately reflect his effort towards a new project.”

• “The graduate student changed labs, and PI, Dr. ___ instructed the LD be adjusted to reflect change in project.”

Page 36: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

Some (actual) examples of NOT‐so‐good LD Distribution 

Adjustment Justifications

• “Charging LD to correct PTAO”• “Labor schedule was not set up correctly. We are fixing this.”

• “PI told dept to change the LD”Allocation and role not addressed• “The department isshort‐staffed and no one had time to schedule the labor”While this may be true, it is not anacceptable justification.

Page 37: SCHEDULING MAINTAINING AND ADJUSTING LABOR DISTRIBUTION … Scheduling Presentation.pdf · to be made in Labor Distribution, an individual’s labor should be scheduled for the longest

SUMMARY

Labor Scheduling is one of the most critical aspectsof managing grant dollars

Impacts everything from reporting to forecasting to effort reporting to basic science incentive pay

Get the information you need to do it rightIf you are having trouble getting correct information in a timely manner, tell someone

Keep on top of it, make changes as soon as you know about them and monitor regularly

Run reports and review schedules monthlyLabor suspense accounts should always be ‐0‐