schedule - daily schedule

3
SATURDAY SUNDAY MONDAY TUESDAY SATURDAY 08:00 Prepare for the shoot by charging the D5200 DLSR, and making sure my portable light has it's power. This includes an equipment check so I have my script and story board to refer to, and a tripod for camera stabalisation. Prepare for the shoot by charging the D5200 DLSR, and making sure my portable light has it's power. This includes an equipment check so I have my script and story board to refer to, and a tripod for camera stabalisation. Prepare for the sound recording by finding a sound proofed room and a high quality microphone. 08:30 Meet with my main actor Luke and leave for the first location shoot, at sharpness. This will also be the time that I ensure my actor is fully aware of my plan for the day . Drive me and my actor to the woodland location accessible by the quarry. A short walk with the equipment will take us to the camp location where the protagonist will sharpe nis stick and attempt to light a fire. In school, I will use myself and a friend to record a voice over for the part of the script when the audience can hear two psychologists as the simluation gets distorted. Ensure that my location permissions are still valid, and Prepare for the shoot by charging the D5200 DLSR, and making sure my portable light has it's power. This includes an equipment check so I have my script and story board to refer to, and a tripod for camera stabalisation. 09:00 Arrive on location and take my equipment to places that I had found in my location scouting. Begin my getting getting important shots that will be physically involved in the title, such as the macro shot of sharpening the stick. I will use a faster frame rate for this shot incase I want to slow it down in post. 1.8 aperture for an extreme shallow focus. Compress and upload the sound footage to google drive so I can access it from home, ready for editing. PRODUCTION SCHEDUL

Upload: harry-swaine

Post on 17-Feb-2016

16 views

Category:

Documents


3 download

DESCRIPTION

h

TRANSCRIPT

Page 1: Schedule - Daily Schedule

SATURDAY SUNDAY MONDAY TUESDAY SATURDAY

08:00

Prepare for the shoot bycharging the D5200DLSR, and making suremy portable light has it'spower. This includes anequipment check so Ihave my script and storyboard to refer to, and atripod for camerastabalisation.

Prepare for the shoot bycharging the D5200DLSR, and making suremy portable light has it'spower. This includes anequipment check so Ihave my script and storyboard to refer to, and atripod for camerastabalisation.

Prepare for the soundrecording by finding asound proofed room anda high qualitymicrophone.

08:30

Meet with my main actorLuke and leave for thefirst location shoot, atsharpness. This will alsobe the time that I ensuremy actor is fully aware ofmy plan for the day .

Drive me and my actorto the woodland locationaccessible by the quarry.A short walk with theequipment will take us tothe camp location wherethe protagonist willsharpe nis stick andattempt to light a fire.

In school, I will usemyself and a friend torecord a voice over forthe part of the scriptwhen the audience canhear two psychologistsas the simluation getsdistorted.

Ensure that my locationpermissions are stillvalid, and Prepare forthe shoot by chargingthe D5200 DLSR, andmaking sure my portablelight has it's power. Thisincludes an equipmentcheck so I have myscript and story board torefer to, and a tripod forcamera stabalisation.

09:00Arrive on location andtake my equipment toplaces that I had foundin my location scouting.

Begin my getting gettingimportant shots that willbe physically involved inthe title, such as themacro shot ofsharpening the stick. Iwill use a faster framerate for this shot incase Iwant to slow it down inpost. 1.8 aperture for anextreme shallow focus.

Compress and uploadthe sound footage togoogle drive so I canaccess it from home,ready for editing.

PRODUCTION SCHEDUL

Page 2: Schedule - Daily Schedule

09:30

Reherse the scenesfrom the different pointson my storyboard, as Iwon't be filmingchronologically in orderto save time.

Create a focus pull effectfor the directors name,where the protagonistwalks out of the shot sothe text in post can beoverlayed on an out offocus background.

Collect the medicalprops I need from thescience technicians inschool(blunt needle)

Travel to location ofsurgery or hospital andmeet with main actor

10:30

Begin filming with thefirst shot being the wideangle of the actorwalking across thescreen.

Film a sequence thatinvolves the protagonistattempting to light a fire,but no footage of the fireactually lit, due to legalreasons and for curiosityfor the audience.

film and establishingshot from the oustide ofthe building, this willinvolve a long shot andan over shoulder midshot

11:30

The second sequence inthis location is currentlygoing to be sparefootage, to act as a fillerif I dont aquire enoughfootage from anotherlocation. This involvesgeneric shots such assearching for loot aoundthe dockyard, with closeups of the desperateprotagonist.

Give my actor a brieftutorial on how to usethe d5200, as I will befilming but for one shot, Iam required to be in thescene wearing a mask.

In a private room awayfrom other people, I willfilm the close up of aneedle entering thepatients arm, and to hidethe fact that the needleactually isn't entering hisarm, another shot of aclose up of the actorsface will be cut to.

12:00 Lunch break

13:00

After the break, I willfocus on the importantshot of when The actorawakens in the location,so he will sit up intofocus, but I will have tomake sure for continuitypurposes that there areno people or movingvehicles in the area, as itis meant to be a lonelyenvironment.

Lunch break and createfake pile of wood toshow development oftime.

13:30Pack up my equipmentand travel to my housein order to set up .

Page 3: Schedule - Daily Schedule

14:00

Arrive at home and setup lighting foir thepsycgologist scene,along with the mise enscene( chair and tablewith glass of water)

Film the shot where themasked manappears(me) from a povof the actor.

14:30

ter a sound check withthe shotgun microphone,start to film the interviewwith a combination ofmidshots a close ups sothe sound quality staysthe highest possible.

15:00

End the day with thequick shot of theprotagonist taking sometablets and looking athimself in the mirror.

When at home, I willneed to re order tofootage that I havefilmed, along with theaudio recording, in orderto create thechronological sotrywithin Sony vegasediting software.