    Schedule % Complete

    Schedule % Complete is one of the many percent completes you have in Primavera P6 and we’re going

    to have a complete look at what it is and how it is calculated. Two important products of maintaining

    schedules are planned progress and actual progress of a given time; you want to know how much you’vedone so far and compare it with how much you were supposed to do so far, in order to reach project

    targets.

    The first thing to mention is that Schedule % Complete deals with planned progress. As a result, it is

    calculated based on the Project Baseline and the Data Date; it has nothing to do with the current

    schedule.

    The second thing is that this field is calculated differently for Activities than for WBS Elements. This is the

    source of the most common problems people have with this field.

    Schedule % Complete for Activities

     And now, let’s start the story with how Schedule % Complete is calculated for Activities. It’s simple; just

    take a look at the following figure.

  • 8/13/2019 Schedule % Complete Concept

    2/7

    When the

    the Basel

    what perc

     Activity S

     

    Schedul e

    [ Basel i n

    The follo

     And that’

    costs, etc

    1. D

    2. A

    3. A

     

    Data Date i

    ine Finish da

    entage of th

    hedule % C

      % Compl et

    e Start] )

    ing diagram

    all for the a

    . For Activitie

    ata Date

    ctivity’s Bas

    ctivity’s Bas

     earlier than

    a, Schedule

    Baseline du

    mplete:

    ( Act ) = (

    shows the S

    tivities; it ha

    s, Schedule

    line Start

    line Finish

    he Baseline

    % Complete

    ration is pas

    [ Dat a Dat e]

    hedule % C

     nothing to d

     Complete i

    Start date, S

    is 100%. Oth

    ed by the Da

      – [ Basel i

    mplete of a

    o with the cu

    s strictly calc

    hedule % C

    erwise, Sche

    ta Date. Her 

    ne St art ] )

    ingle Activit

    rrent schedul

    ulated based

    mplete is ze

    dule % Com

    ’s a formula

    / ( [ Basel

     for different

    e, the resour 

     on:

    ro, when it’s

    lete would s

    to calculate

    i ne Fi ni sh

    Data Dates:

    e curves, th

    fter

    ow

    ] –

  • 8/13/2019 Schedule % Complete Concept

    3/7

    Schedule % Complete for WBS Elements

     And now, the story of how Schedule % Complete is calculated for WBS Elements. Let’s start by reviewing

    2 possible scenarios:

    Scenario 1

    How are these calculations possible? The Sample WBS Element has three Activities, they all have

    Schedule % Completes greater than zero, but the value for Sample WBS Element is 0! Before I reveal the

    answer, here’s a contrasting scenario.

    Scenario 2

    In this scenario, the Sample WBS Element has three Activities with Schedule % Completes less than

    50%, but the Schedule % Complete of the WBS Element is 75%.

    What is going on here? How is Schedule % Complete calculated in each scenario?

     A WBS Element’s Schedule % Complete is calculated in a completely different way. You might expect it

    to be the rollup value of the underlying Activities (a weighted average for example). But, as in scenario 2,

    the three Activity values which are all less than 50% could never have a weighted average more than

    50%.

     As you saw before, the Schedule % Complete of the Activities is time-based. However Schedule %

    Complete for WBS Elements is:

    1. Depended project costs and…

    2. Does not factor in any Activities’ Schedule % Complete values

  • 8/13/2019 Schedule % Complete Concept

    4/7

    How Sch

    When yo

    Resource

    (but you

    planned f 

    cost of th

    The Sche

    Date to th

    dule % Co

     assign reso

     assignment

    ay apply a

    r each day

    WBS Elem

    dule % Com

    e Total Base

    plete is Calc

    urces and ex

    hours and co

    esource Cur 

    f the Activity.

    nt will be cal

    lete of the

    line Cost.

    ulated for W

    penses to ac

    sts are, by d

    ve to alter thi

     These costs

    culated auto

    BS Element

    S Elements

    ivities, each

    fault, spread

    s). Oracle Pr 

     are aggrega

    atically.

    will be the ra

    activity will r 

     uniformly ov

    imavera will

    ted to the W

    tio of the Bas

    ceive a calcu

    er the durati

    how you ho

    S level, and

    eline Costs

    lated Total C

    n of the acti

     costs are th

    the time-pha

    efore the Da

    ost.

    ity

    en

    sed

    a

  • 8/13/2019 Schedule % Complete Concept

    5/7

     

    In the world of Earned Value, the costs before the Data Date are called the Planned Value, or PV for

    short (Also called BCWS – Budgeted Cost of Work Scheduled). The total baseline cost is called Budget

     At Completion or BAC for short. We can now formulate the calculation of Schedule % Complete for WBS

    Elements as:

    Schedul e % Compl et ed (WBS) = PV / BAC

    Please have this in mind that all the mentioned parameters are derived from baseline and not from

    current schedule; the WBS bar shown in these figures is the baseline schedule of the WBS Element and

    the costs are the baseline costs of the WBS Element.

    The following diagram shows Schedule % Complete of a sample WBS Element for different Data Dates:

  • 8/13/2019 Schedule % Complete Concept

    6/7

    The abov

    following:

    1. D

    2. B

    3. T

    To summ

    based on

    e description

    ata Date

    aseline Cost

    otal Baseline

    arize, Sched

    costs.

    s show that t

     before the

    Costs (BAC)

    le % Compl

    e Schedule

    ata Date (P

     

    te for Activiti

     Complete

    )

    es is based

    of the WBS

    n time, whil

    lements dep

     its value for

    end on the

    WBS Eleme ts is

  • 8/13/2019 Schedule % Complete Concept

    7/7

    Pulling S

    The follo

    different

    hedule % C

    ing diagram

    ata Dates.

    mplete toge

    shows Sche

    ther for WB

    ule % Comp

     and Activiti

    lete of a sam

    s

    ple WBS Element with tw Activities in