schedule

8
Schedule and Planning Scott Harrand

Upload: scott-harrand

Post on 08-Jan-2017

78 views

Category:

Education


0 download

TRANSCRIPT

Page 1: Schedule

Schedule and PlanningScott Harrand

Page 2: Schedule

Week 1Day One: Developing a schedule for the following five weeks

of production work. Working on a logo for my campaign foundation, by looking at existing logos and planning from this inspiration, and then beginning on the actual logo production. Potentially produce a few ideas for logos.

Day Two: Continue to work on the logo, either the planning or actual idea production. If the logos are finished and a logo has been decided upon, then begin to plan and develop the overall campaign idea into detail.

Day Three: Continue planning and developing upon the overall idea for the campaign, solidifying a certain idea and planning how I will proceed with it. Write down my ideas and look at existing products and ideas to compare to.

Page 3: Schedule

Week 2Day One: Continue to plan my overall idea and specify

the details of it. Begin to look at pre-existing products from other campaigns, especially campaigns linked to my own, and begin to plan and design the products I may use.

Day Two: Continue planning on products for the campaign. Potentially create a mood board of pre-existing products, or things that serve as inspiration for the product ideas.

Day Three: Finalize the designs for the campaign products and specify what designs I will intend to go with for the campaign.

Page 4: Schedule

Week 3Day One: Beginning to work on the actual production of the

campaign, which is most likely to consist of a poster series spanning several different posters, perhaps somewhere in the figure of about five posters. They may each take a fair bit of time. Today I will be working on my first poster.

Day Two: I will most likely be continuing to work on my first poster at this point, as I will want to get it to a good quality. Some resources from the first poster may be re-used in following posters, which means this poster will take longer than the rest.

Day Three: Optimistically I will have finished my first poster at this point, and I may potentially begin on my second one, but I may not have a great deal of time to get too far into it’s development.

Page 5: Schedule

Week 4Day One: I will either begin or continue to work on my

second poster at this point, potentially reusing some resources such as general bordering and text and slogans used in the first poster, but much of it will be new content that will need to be produced.

Day Two: I will continue to work on my second poster at this point, but I will aim to finish it before the end of the day, at which point I will begin on my third poster.

Day Three: I will continue to work on my third poster. I am unlikely to finish it in this day but I will aim to get as much work done as I can.

Page 6: Schedule

Week 5Day One: Continuing to work on my third poster, I

will aim to finish it in a timely fashion during this day, and have as much time as possible to work through the fourth poster.

Day Two: I will continue to work on my fourth poster today, and hopefully split my time between finishing the fourth poster and beginning on the fifth.

Day Three: I will aim to finish my fifth and most likely final poster in this time, using the relatively short lesson time as effectively as I can to create a good quality poster.

Page 7: Schedule

ResourcesComputer: Adobe Photoshop, Microsoft

Powerpoint, Internet (Google Chrome)

Page 8: Schedule

Contingency PlanI have tried to give myself a large space of time

for doing a lot of my tasks so I hope that it will leave me with some spare room with which to work on anything that may be left over.