Minutes of 50th SOAP Meeting held on 29.03.2019. Page 1
SSLLDDCC
MMIINNUUTTEESS OOFF 5500tthh
MMEEEETTIINNGG OOFF SSOOAAPP
HHEELLDD OONN 2299..0033..22001199
Minutes of 50th SOAP Meeting held on 29.03.2019. Page 2
Minutes of 50th meeting of Sub Committee for Operation and Protection
(SOAP) held at SLDC, Raipur on 29.03.2019.
The 50th meeting of Chhattisgarh State Operation and Protection Sub
Committee of SGCC was held on 29th March 2019 at SLDC Conference Hall.
The list of participants is enclosed in Annexure-I.
Shri. A. K. Shrivastava, CE (SLDC) welcomed all the participants of 50th SOAP meeting.
Item no. 1 Confirmation of minutes:
No comments have been received from any office. Therefore
minutes of 49th SOAP meeting is hereby confirmed.
Sub Committee agreed and noted.
Item no. 2 Review of system operation during the month of February -
2019:
Presentation and the performance of Thermal Stations and
Transmission System by SLDC, is enclosed in Annexure-II.
Sub Committee noted.
Item no. 3 State Energy Account (SEA) Data:
It was requested to the O/o ED (Revenue) CSPDCL to submit
consumer wise EHV sales/consumptions (in MU) for the month of
February -2019 which was submitted to this office a day later.
However the high Transmission loss for August, September and
October 2018 is yet to be investigated.S E o/o ED (S/s:O&M)
Raipur has been requested for rechecking the energy meter
readings once again.
Minutes of 50th SOAP Meeting held on 29.03.2019. Page 3
Item no. 4 Outage planning for the month of May 2019 & June 2019:
Outage planning of Transmission feeders, Power transformers for
the month May 2019 & June 2019, submitted by O/o ED (S/s:
O&M) CSPTCL Raipur is enclosed in Annexure III. Sub Committee agreed and noted.
Item no.5. Status of FGMO { Free Governor Mode Operation } in
thermal units as on 28.03.2019:
It was requested to the representatives from CSPGCL to provide
primary response of the generators for the below given events.
Event-33 Event-34 Event-35
NR-1400 NR-960 NR-900
16-01-19 12:26:00 23-01-19 06:37:10 05-02-19 11:57:10
49.97 Hz 49.96 Hz 50.13 Hz
49.92 Hz 49.92 Hz 50.16 Hz
-0.05 -0.04 0.03
Item no.6. Details of new transmission lines, transformer or any other
transmission elements to be charged in May 2019 & June
2019:
The representative from O/o CE (S/s: O&M) CSPTCL has
intimated the following list of new Transmission elments likely to
be charged in April 2019, May 2019 & June 2019.
Minutes of 50th SOAP Meeting held on 29.03.2019. Page 4
R
e
p
r
e
s
e
n
T
T
h
e
r
e
p
r
e
sentative from O/o ED (S/s: O&M) Raipur, CSPTCL and O/o CE
(S/s: O&M) Bilaspur, CSPTCL were requested to provide single
line diagram of newly charged sub-stations along with feeder
names at 33 KV end also. Further it was also requested to
arrange telemetry of these new stations already
commissioned in past months, as early as possible. In case of
any delay in commissioning of RTU the data from other sub-
station may at least be provided so that the newly commissioned
S/s may be monitored effectively.
Sub Committee noted.
S.
No
Name of
S/stn
Details of equipments &
lines to be commissioned Remark
1 220 KV S/s
Bhatapara
160 MVA, 220/132 KV
Xmer
Expected to be
charged in May
2019.
2 220 KV S/s
Suhela
160 MVA, 220/132 KV
Xmer
Expected to be
charged in May
2019.
3 220 KV S/s
Paraswani
1. 132 KV feeder bay
for Paraswani-
Mahasamund Ckt-II.
2. 132 KV feeder
bay for Paraswani-
Rajim Ckt-II.
Expected to be
charged in April
2019.
4 132 KV S/s
Kurud
02 No. 33 KV additional
Bay
Expected to be
charged in April
2019.
5 132 KV S/s
Kuhera
02 No. 33 KV additional
Bay
Expected to be
charged in April
2019.
Minutes of 50th SOAP Meeting held on 29.03.2019. Page 5
Item No.7. Review of AUFLS settings.
It was apprised to all the representatives during the meeting that
National Power committee (NPC) in its 8th meeting dated 30th
November 2018 has revised AUFLS settings by 0.2 Hz each (MoM
of 8th NPC at Annexure 8.10).
Vide T.O. letter no. 2038 dated 20.03.2019, it is requested to O/o
ED (S/s: O&M), CSPTCL, Raipur and O/o C.E. (S/s: O&M),
CSPTCL, Bilaspur to execute and intimate the changes of AUFLS
scheme on priority by the end of March 2019.
The settings of under frequency relays in respect of all 33 KV
feeders under AUFLS scheme under the jurisdiction of MRT Dn.
CSPTCL Bhilai have been revised during 26.03.2019 to
01.04.2019, as per their intimation to O/o CE(SLDC) vide letter
no. 10-71/MRT/7 Bhilai, dated 02.04.2019.
It is again requested to O/o ED (S/s: O&M), CSPTCL, Raipur and
O/o C.E. (S/s: O&M), CSPTCL, Bilaspur to execute and intimate
the changes in settings of under frequency relays in respect of all
33 KV feeders under AUFLS scheme under the jurisdiction of
other MRT offices other than Bhilai on priority basis.
Existing Stages of AUFLS scheme
Revised Stages of AUFLS scheme
49.2 49.4
49.0 49.2
48.8 49.0
48.6 48.8
Minutes of 50th SOAP Meeting held on 29.03.2019. Page 6
Item No.8. Furnishing of relay settings in the prescribed formats for
maintaining relay setting database.
It was apprised to all the representatives during the meeting that
as per the Hon"ble CERC's order dated 22.02.2014, RPCs are
required to maintain the relay settings of the respective regions.
In this regard, WRPC has desired the data of relay settings in the
prescribed formats for maintaining relay setting database.
The non receipt of data was discussed during the 135th PCM
meeting held on 26.02.2019.
Vide T.O. letter no. 2367 dated 26.03.2019, it is requested to O/o
ED (S/s: O&M), CSPTCL, Raipur , ED (Gen) DSPMTPS, CSPGCL,
Korba East , O/o C.E. (S/s: O&M), CSPTCL, Bilaspur, CE (Gen)
HTPS, CSPGCL, Korba West, CE (Gen) KTPS, CSPGCL, Korba East,
CE (Gen) ABVTPS, CSPGCL, Marwa to submit the desired the data
of relay settings in the prescribed formats for
maintaining relay setting database at the earliest, so that the
same can be sent to WRPC.
The relay settings of 400 kV, 220 kV & 132 kV S/s under jurisdiction
of MRT Dn-I CSPTCL Raipur has been submitted to O/o CE(SLDC)
vide letter no. 10-61/MRT-I/RPR/36
Raipur, Dated: 11/04/2019.
Data from all S/s of CSPTCL have been received through mail
It is again requested to all Generating stations to submit the relay
settings of their end on priority basis. GCC Raipur may collect
from all stations and submit to SLDC at the earliest as WRPC is
pressing hard for this data.
Item No.9. High Voltage Issue.
The representatives from the concerned offices were apprised
about the issue of high voltage persisting at 400 KV S/s Korba
West, 400 KV S/s Marwa & 400 KV S/s Raita. In the last OCCM
Minutes of 50th SOAP Meeting held on 29.03.2019. Page 7
WRLDC has shown concern about the same and requested to
maintain the voltage within limit.
Item No.10. Consequences of Implementation of 4th amendment of DSM
regulation w.e.f. 01.01.19.
The representatives of all the companies were apprised about the
Consequences and problems faced by the system operator in
Implementing 4th amendment of DSM regulation w.e.f. 01.01.19.
**********
Annexure-I
S.No. Participants Designation Office Name Mobile No E-mail ID
1 Shri.A.K.Shrivastava CE O/o CE(SLDC), CSPTCL 9827177466 [email protected]
2 Shri H.K Deota SE (LD) O/o ED(S/s:O&M),Raipur, CSPTCL 9893150920 [email protected]
3 Shri.Y.K.Rao SE O/o CE(SLDC), CSPTCL 9826518820 [email protected]
4 Shri.G.K.Mandavi SE O/o CE(S/s:O&M), CSPTCL [email protected] ,
5 Shri. R.H.Vashmarey SE O/o ED(O&M), CSPGCL 94242331668 [email protected]
6 Shri.R.Arvind SE O/o ED(O&M:Gen),CSPGCL9452224086 ,
7 Shri. Virendra Kumar EE O/o CE(P&P), CSPTCL 9630545071 [email protected]
8 Shri. Manoj Verma EE O/o CE(P&P), CSPTCL 9424298275 [email protected]
9 Shri. R.K Arora EE O/o ED(Revenue), CSPDCL 9907103809 [email protected]
10 Shri.K.K.Bajaj EE O/o ED(O&M:Gen),CSPGCL 9424228869 [email protected]
11 Shri.G.P.Singh AE O/o CE(SLDC), CSPTCL [email protected] ,
12 Shri.Sourabh Pandey AE O/o ED(S/s:O&M),Raipur, CSPTCL [email protected] ,
13 Shri. Rupendra Ku. Dewangan AE O/o ED(O&M:Gen),GCC,CSPGCL 7587101893 [email protected]
14 Shri. Dinesh Ku. Dewangan AE O/o CE(Eff),DSPM TPS,CSPGCL 9713465949 [email protected]
15 Ms. Namita Vibha Lakra AE O/o CE(SLDC), CSPTCL 8435002692 [email protected]
16 Ms. Juvena Gomes AE O/o SE(Back-up SLDC), CSPTCL 9827495849 [email protected]
17 Shri.Prem Kumar Jaiswal AE O/o CE(SLDC), CSPTCL 8982611767 [email protected]
List of participants attended the 50th SOAP (Sub-committee of Operation & Protection) Meeting.
16/04/2019
1
STATE LOAD DISPATCH CENTRE
RAIPUR CHHATTISGARH
50thSOAP MEETING
29.03.2019
1.1 PERFORMANCE OF STATE GENERATING STATIONS THERMAL & HYDEL GENERATING STATIONS :
Generation (in MU)PLANT AVAILABILITY FACTOR
PAF (in %)
PLANT LOAD FACTOR
PLF (in %)
Generator Capacity FEB-19Prog. from
Apr-18
Annual
Target as
per
CSERC
norms
FEB-19
Prog.
from
Apr-18
Annual
Target as
per CSERC
norms
FEB-19
Prog.
from
Apr-18
Annual
Target
as per
CSERC
norms
KTPS 240 MW
{2X120}115.77 1406.29 1537.38 73.60 59.74
60%- PH2
70%- PH371.78 51.51 66.76
DSPM500 MW
{2X250}285.00 3514.81 3723.00 89.37 93.16 85.00 84.82 87.69 85.00
HTPS 840 MW
{4X210}424.80 5096.27 5472.94 78.10 77.92 74.38 75.26 75.69 74.38
KWB
Extn
500 MW
{1X500}304.54 3645.82 3723.00 90.63 90.96 85.00 91.52 91.77 85.00
MARWA
1000
MW
{2X500}308.76 5943.446 6701.40 46.28 73.94 76.5 45.94 74.14 76.5
THERMAL3080
MW1438.88 19606.63 21902.32 --- --- --- 69.52 76.90 80.00
BANGO
HPS
120 MW
{3X40} 7.67 232.20 --- --- --- --- --- --- ---
16/04/2019
2
1.2 PERFORMANCE OF STATE GENERATING STATIONS
Generating
Station Capacity
Auxiliary Consumption (in %)
No. of Forced Outage
FEB-19Progressive from Apr-18
Annual Target as
per CSERC norms
FEB-19Tube
LeakageProgressive from
Apr-18
KTPS240 MW { 2X120} 10.74 12.78 11.25 5 2 70
DSPM500 MW {2X250}
7.931 8.00 9.00 2 1 15
HTPS840 MW {4X210} 9.46 9.42 9.70 10 4 58
KWB Extn.
500 MW {1X500} 5.13 4.85 5.25 3 0 19
MARWA1000 MW {2X500} 5.75 5.56 5.25 0 0 42
THERMAL 3080 MW 7.55 7.39 --- 20 7 204
BANGO120 MW {3X40} 0.61 0.311 --- --- --- ---
1.3 Frequency ParticularsFrequency status during JAN-19, FEB-19 & FEB-18 (As per WRLDC)
Other Frequency parameters during the month of FEB-19
.
Frequency Range JAN-19 FEB-19 FEB-18
IEGC band % of time % of time % of time
Between 49.90 & 50.05 Hz
70.26 70.73 80.25
< 49.90 Hz 10.69 7.01 9.69
> 50.05 Hz 19.06 22.26 10.06
Frequency Status Frequency {Hz}
Time { h:mm:ss}
Date
Average Freq. 50.00 -- --
Max Instantaneous Freq.
50.27 06:03 27.02.2019
Min Instantaneous Freq.
49.68 12:42 01.02.2019
16/04/2019
3
1.4 Demand Pattern.
JANUARY-19 FEBRUARY-19 FEBRUARY-18% Change
compared to previous year
Max. Demand Met
3858 MW17.01.2019
18:15
4133 MW28.02.19
18:45
3655 MW28.02.2018
18:4513%
Max. Unrestricted
Demand at the time of Max. Demand Met
3861 MW4134 MW
3663 MW 13%
Min. Demand Met
2017 MW26.01.2019
04:15
2174 MW15.02.19
22:15
1704 MW11.02.2018
18:0028%
Max. Unrestricted
Demand
3949 MW22.01.2019
9:00
4248 MW24.02.19
18:30
3663 MW28.02.2018
18:4516%
Availability during Monthly Peak Demand Met: (4133 MW on 28-02-2019 at 18:45 hrs)
MW %
CSPGCL Thermal (Ex Bus)
2044 49%
CSPGCL Hydel 45 1%
Injection (Solar,Biomass,unscheduled
power,open access,small hydro)158 4%
CS Share including BSP share in NSPCL
1451 35%
Net Import (+) / Export (-) 383 9%
OD(+) / UD(-) 52 1%
Demand Met (MW) 4133
16/04/2019
4
2800
2900
3000
3100
3200
3300
3400
3500
3600
3700
3800
3900
4000
4100
4200
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
MW
Date
Daily Max Demand met in the month of Jan-19 ,Feb-19 & Feb-18. MAX 4133 MW on 28.02.2019 at 18:45 hrs. Average increase 13 % compared to last year
JAN-
2019
FEB-
2018
FEB-
2019
4133 MW on
28.02.19 at
18:45 Hrs.
3858 MW on
17.01.19 at
18:15 Hrs
3655 MW on
28.02.18 at
18:45 Hrs
DEMAND DROPPED
DUE TO
WIDESPREAD
RAINFALL
2100
2300
2500
2700
2900
3100
3300
3500
3700
3900
4100
MW
Date
Daywise Min and Max Demand met in the month of Feb-19, [ Difference : Max 1873 MW on 15.02.19 & Min 638 MW on 23.02.19 ]
638MW
1873MW
DEMAND DROPPED
DUE TO
WIDESPREAD
RAINFALL
16/04/2019
5
3500
3600
3700
3800
3900
4000
4100
4200
4300
MW
Date
Daywise Maximum Resrticted Vs Unrestricted Demand in the month of Feb-19,
UNRESTRICTED
DEMAND
RESTRICTED
DEMAND
CSPGCL Thermal 204450%
CSPGCL Hydel451%
Injection (Solar,Biomass,unsc
heduled power,open
access,small hydro)1584%
CS Share including BSP share in NSPCL
145135%
Net Import(+) / Export (-)
3839%
OD(+) / UD(-) 521%
Availability at the time of monthly peak demand met.4133 MW on 28.02.2019 at 18:45 Hrs.
16/04/2019
6
Total Import at the time of Max
Demand Met65971%
Total Export at the time of Max
Demand Met-275-29%
Import & Exportat the time of Monthly Peak Demand.4133 MW on 28.02.2019 at 18:45 Hrs
1.6 LOAD SHEDDING
Load Shedding during February-2019:
Load Shedding Duration (in HH:MM)
Equivalent Load Relief
(in MU/Day)
Max Load Shedding
Done.
In Groups Feeders 97:30 0.258
422 MW on 02.02.2019 at 9:00 Hrs
In Industrial feeders 1:34 0.002
TOTAL 99:04 0.26
16/04/2019
7
Power Cuts / Load shedding : CHHATTISGARH ( FEBRUARY : 2019 )
Date
Hour 1st
2nd
3rd
4th
5th
6th
7th
8th
9th
10th
11th
12th
13th
14th
15th
16th
17th
18th
19th
20th
21st
22n
d
23rd
24th
25th
26th
27th
28th
1:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 85 0 0 0 0 0 0 0 0 0
8:00 0 0 0 0 0 0 0 0 0 226 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 0 422 0 0 0 0 0 175 0 0 0 0 0 0 0 0 0 0 148 0 0 0 0 0 0 0 0 0
10:00 0 0 0 0 244 284 110 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 0 0 311 0 0 0 0 162 0 0 348 0 0 0 0 0 0 0 358 0 0 0 0 86 0 224 0 0
12:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 237 0 143 0 0 0 0 0 0 0
13:00 0 245 0 0 0 0 224 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 367 0 0
14:00 0 0 0 0 0 0 0 0 0 0 0 0 0 150 0 0 0 0 0 0 146 0 0 0 0 0 0 0
15:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 138 0 0 0 0 0 0
Power Cuts / Load shedding : CHHATTISGARH (FEBRUARY : 2019 )
Date
Hour
1st
2nd
3rd
4th
5th
6th
7th
8th
9th
10th
11th
12th
13th
14th
15th
16th
17th
18th
19th
20th
21st
22n
d
23rd
24th
25th
26th
27th
28th
16:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 163 0 0
17:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 236 0 0 0 0 0 0 0 0 0
18:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 34 0 0 0 0 176 0 0 0 0
19:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 34 0 0 0 0 325 0 0 0 0
20:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 170 0 0 0 0 0 0 0 0 0
21:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 229 0 0 0 129 0 0
22:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
23:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
24:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
AVG
(MW)0 28 13 0 10 12 14 14 0 9 14 0 0 6 0 0 0 0 54 0 12 15 0 24 0 37 0 0
MAX
(MW)0 422 311 0 244 284 224 175 0 226 348 0 0 150 0 0 0 0 358 0 146 229 0 325 0 367 0 0
MIN
(MW)0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
16/04/2019
8
1.7 - SOLAR POWER INJECTION (At 132 KV)
M/s Acme [30 MW]
M/s Azure [3X10 MW]
M/s Parampujya[2X50 MW]
Total
APR-18 MU 4.33 4.25 20.10 28.68
MAY-18 MU 4.49 4.23 21.17 29.90
JUN-18 MU 4.01 3.72 18.51 26.25
JUL-18 MU 2.40 2.68 13.57 18.65
AUG-18 MU 2.43 2.31 11.98 16.72
SEP-18 MU 3.37 3.79 18.15 25.31
OCT-18 MU 4.39 4.53 21.22 30.14
NOV-18 MU 4.22 4.09 19.67 28.00
DEC-18 MU 3.52 3.58 17.59 24.68
JAN-19 MU 4.15 4.05 19.81 28.01
FEB-19 MU 4.14 4.13 19.71 27.99
16/04/2019
9
16/04/2019
10
Date Time Date Time
Routine Maintenance
1 400
400 KV Raita-Marwa-I Line at 400 KV S/s
Raita as well as 400 KV Switchyard of
ABVTPS,Marwa end.
03.05.2019 8:00 04.05.2019 17:00 Continuous Annual Maintenance Programme. CSPTCL ---
2 400
400 KV Raita-Marwa-II Line at 400 KV S/s
Raita as well as 400 KV Switchyard of
ABVTPS,Marwa end.
08.05.2019 8:00 09.05.2019 17:00 Continuous Annual Maintenance Programme. CSPTCL ---
3 400400 KV Raita-Korba West Line at 400 KV
S/s Raita.13.05.2019 8:00 14.05.2019 17:00 Continuous Annual Maintenance Programme. CSPTCL ---
4 400400 KV Raita-Jagdalpur-II Line at 400 KV
S/s Raita.16.05.2019 8:00 16.05.2019 17:00 Daily Annual Maintenance Programme. CSPTCL ---
5 400 400 KV Bus-I at 400 KV S/s Raita. 21.05.2019 8:00 21.05.2019 17:00 Daily Annual Maintenance Programme. CSPTCL ---
6 400 400 KV Bus-II at 400 KV S/s Raita. 24.05.2019 8:00 24.05.2019 17:00 Daily Annual Maintenance Programme. CSPTCL ---
7 400400 KV Marwa-Khedamara feeder (Bay
No. 410) at 400 KV Switchyard of ABVTPS,Marwa
13.05.2019 8:30 14.05.2019 17:30 Continuous Annual Maintenance Programme. CSPGCL ---
8 400
400 KV Marwa-Korba west feeder (Bay
No. 411) at 400 KV Switchyard of ABVTPS,Marwa
16.05.2019 8:30 17.05.2019 17:30 Continuous Annual Maintenance Programme. CSPGCL ---
9 400400 KV Korba West (Extn)-Khedamara
Line (Bay No. 09) at 400 KV Switchyard at HTPS, Korba West.
06.05.2019 8:30 08.05.2019 17:30 Continuous
(1) Cleaning and Terminal
tightness of CTJB,Breaker
Mar.Box and control and relay
panel. (2) . Testing of
relays,CT,Circuit breaker and
CVT.
CSPGCL ---
10 400400 KV Korba West (Extn)-Marwa Line (Bay No. 11) at 400 KV Switchyard at
HTPS, Korba West.02.05.2019 8:30 04.05.2019 17:30 Continuous
(1) Cleaning and Terminal
tightness of CTJB,Breaker
Mar.Box and control and relay
panel. (2). Testing of
relays,CT,Circuit breaker and
CVT.
CSPGCL ---
11 220220 KV Suhela-Bhatapara(PGCIL) Ckt-I at
220 KV S/s Suhela.14.05.2019 8:00 14.05.2019 17:00 Daily Annual Maintenance Programme. CSPTCL ---
12 220220 KV Suhela-Bhatapara(PGCIL) Ckt-II at
220 KV S/s Suhela.16.05.2019 8:00 16.05.2019 17:00 Daily Annual Maintenance Programme. CSPTCL ---
B ICT
13 400315 MVA ICT -III at 400 KV S/s
Khedamara. 03.05.2019 8:00 04.05.2019 17:00 Continuous Annual Maintenance Programme. CSPTCL ---
14 400315 MVA ICT -II at 400 KV S/s
Khedamara. 07.05.2019 8:00 08.05.2019 17:00 Continuous Annual Maintenance Programme. CSPTCL ---
Annexure III
Agency Remarks
A
Maintenance / Shutdown programme of Transmission Elements for the month of May-2019.
S.No KV Lines/ ICT Particulars From To Daily /
Continuous Reason