Page 1: Scanned by CamScanner€¦ · Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units as on 28.01.2019: It was apprised in the meeting that WRLDC is computing

Scanned by CamScanner

Page 2: Scanned by CamScanner€¦ · Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units as on 28.01.2019: It was apprised in the meeting that WRLDC is computing

Minutes of 49th SOAP Meeting held on 28.01.2019. Page 1

SSLLDDCC

MMIINNUUTTEESS OOFF 4499tthh

MMEEEETTIINNGG OOFF SSOOAAPP

HHEELLDD OONN 2288..0011..22001199

Page 3: Scanned by CamScanner€¦ · Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units as on 28.01.2019: It was apprised in the meeting that WRLDC is computing

Minutes of 49th SOAP Meeting held on 28.01.2019. Page 2

Minutes of 49th meeting of Sub Committee for Operation and Protection

(SOAP) held at SLDC, Raipur on 28.01.2019.

The 49th meeting of Chhattisgarh State Operation and Protection Sub

Committee of SGCC was held on 28th January 2019 at SLDC Conference Hall.

The list of participants is enclosed in Annexure-I.

Shri. A. K. Shrivastava, CE (SLDC) welcomed all the participants of 49th SOAP meeting.

Item no. 1 Confirmation of minutes:

No comments have been received from any office. Therefore

minutes of 48th SOAP meeting is hereby confirmed.

Sub Committee agreed and noted.

Item no. 2 Review of system operation during the month of December -

2018:

Presentation and the performance of Thermal Stations and

Transmission System by SLDC, is enclosed in Annexure-II.

Sub Committee noted.

Item no. 3 State Energy Account (SEA) Data:

The desired data of December-2018 from O/o ED (Revenue)

CSPDCL and O/o ED (S/s: O&M) Raipur, CSPTCL was submitted

with revisions. However the high Transmission loss for August,

September and October 2018 is yet to be investigated.

Item no. 4 Outage planning for the month of March 2019 & April 2019:

Outage planning of Transmission feeders, Power transformers for

the month March 2019 & April 2019, submitted by O/o ED (S/s:

O&M) CSPTCL Raipur is enclosed in Annexure III. Sub Committee agreed and noted.

Page 4: Scanned by CamScanner€¦ · Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units as on 28.01.2019: It was apprised in the meeting that WRLDC is computing

Minutes of 49th SOAP Meeting held on 28.01.2019. Page 3

Item no.5. Status of FGMO { Free Governor Mode Operation } in

thermal units as on 28.01.2019:

It was apprised in the meeting that WRLDC is computing primary

frequency response of ISGS generators for various grid events and

informing generators to fine tune their governors whose response

was inadequate. As per latest amendments of IEGC, third party

independent agencies selected by RLDC may conduct periodic

checkups of primary frequency response of generators at regular

intervals. The cost of such tests shall be recovered by the RLDCs or

SLDCs from the Generators.

Item no.6. Details of new transmission lines, transformer or any other

transmission elements to be charged in March 2019 & April

2019:

The representative from O/o CE (S/s: O&M) CSPTCL has

intimated the following list of new substation and transformers

likely to be charged in March 2019 & April 2019.

S.

No

Name of

S/stn

Details of equipments &

lines to be commissioned Remark

1 220 KV S/s

Bhatapara

160 MVA, 220/132 KV

Xmer

Expected to be

charged in March

2019.

2 220 KV S/s

Suhela

160 MVA, 220/132 KV

Xmer

Expected to be

charged in March

2019.

3

132 KV S/s

Urla

Sector-A

40 MVA, 132/33 KV Xmer

Expected to be

charged in April

2019.

Page 5: Scanned by CamScanner€¦ · Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units as on 28.01.2019: It was apprised in the meeting that WRLDC is computing

Minutes of 49th SOAP Meeting held on 28.01.2019. Page 4

R

e

presentatives from O/o ED (S/s: O&M) Raipur, CSPTCL and O/o

CE (S/s: O&M) Bilaspur, CSPTCL were requested to provide single

line diagram of newly charged sub-stations along with feeder

names at 33 KV end also. Further it was also requested to arrange

telemetry of these new stations already commissioned in past

months, as early as possible. In case of any delay in

commissioning of RTU the data from other sub-station may at

least be provided so that the newly commissioned S/s may be

monitored effectively.

Sub Committee noted.

Item No. 7. High Voltage at 400 KV Bhatpara and Raita S/s:

It was intimated to all the representatives of SOAP that in the 515th

OCCM held in Mumbai on 19.01.2019, the issue of high voltage at

400 KV PGCIL Bhatapara and 400 KV Raita was included in the

agenda point 6.3 of WRLDC.

In case of both stations, MVAR flows was observed from LV to

HV side causing further increase in voltages at 400 kV substations

and above.

In this regard WRLDC has advised to

Take up with concerned S/S to reduce MVAR flow from LV side to HV side by switching off capacitors.

To switch on all Bus/Reactors and Line/Reactors. To absorb maximum VARs at all generating stations.

4 132 KV S/s

Kurud

02 No. 33 KV additional

Bay

Expected to be

charged in April

2019.

5 132 KV S/s

Kuhera

02 No. 33 KV additional

Bay

Expected to be

charged in April

2019.

Page 6: Scanned by CamScanner€¦ · Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units as on 28.01.2019: It was apprised in the meeting that WRLDC is computing

Minutes of 49th SOAP Meeting held on 28.01.2019. Page 5

It was asked to keep the Bus voltage at generating end not more

than 405 KV at low demand period specially night hours. The data

of MVAR is also to be Validated starting from 400 KV stations. All

concerned officials may please be asked to cooperate with SLDC

for data Validation.

To avoid equipment failure due to persisting over voltage all

stations are requested to adhere to the above practices advised by

WRLDC.

**********

Page 7: Scanned by CamScanner€¦ · Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units as on 28.01.2019: It was apprised in the meeting that WRLDC is computing

Annexure-I

S.No. Participants Designation Office Name Mobile No E-mail ID

1 Shri.A.K.Shrivastava CE O/o CE(SLDC), CSPTCL 9827177466 [email protected]

2 Smt. Sharda Sonwani Addl. CE O/o CE(SLDC), CSPTCL [email protected] ,

[email protected]

3 Shri.J.K.Vaidya SE O/o ED(O&M), CSPGCL 9425382836 [email protected]

4 Shri.Y.K.Rao SE O/o CE(SLDC), CSPTCL 9826518820 [email protected]

5 Shri. R.H.Vashmarey SE O/o ED(O&M), CSPGCL 94242331668 [email protected]

6 Shri.Ajay Singh SE O/o CE (RA&PM) CSPDCL 9893193646 [email protected]

7 Shri.R.Arvind SE O/o ED(O&M:Gen),CSPGCL9452224086 ,

[email protected]

8 Shri.Sanjay Choudhary EE O/o SE(Backup SLDC), CSPTCL 9340197611 [email protected],

9 Shri.K.K.Bajaj EE O/o ED(O&M:Gen),CSPGCL 9424228869 [email protected]

10 Shri.Suchendra Uike EE O/o ED(SLDC), CSPTCL 9685554777 [email protected]

11 Smt. Veena Narang EE O/o CE(S/s:O&M), CSPTCL 9713990560 [email protected]

12 Shri.Sourabh Pandey AE O/o CE(S/s:O&M), CSPTCL [email protected] ,

[email protected]

13 Ms. Namita Vibha Lakra AE O/o CE(SLDC), CSPTCL 8435002692 [email protected]

List of participants attended the 49th SOAP (Sub-committee of Operation & Protection) Meeting.

Page 8: Scanned by CamScanner€¦ · Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units as on 28.01.2019: It was apprised in the meeting that WRLDC is computing

23/02/2019

1

STATE LOAD DISPATCH CENTRE

RAIPUR CHHATTISGARH

49thSOAP MEETING

28.01.2019

AGENDA

1. Confirmation of minutes.

2. Review of system operation during the month of December-2018, by SLDC.

3. State Energy Account (SEA) Data.

4. Outage planning for the month of March 2019 & April 2019.

5. Status of FGMO/RGMO in thermal units as on 28.01.2018.

6. Details of new transmission lines, transformer or any othertransmission elements to be charged in March 2019 & April2019.

Page 9: Scanned by CamScanner€¦ · Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units as on 28.01.2019: It was apprised in the meeting that WRLDC is computing

23/02/2019

2

AGENDA-1:

Review of system operation during the month December- 2018, by SLDC.

1.1 PERFORMANCE OF STATE GENERATING STATIONS

THERMAL & HYDEL GENERATING STATIONS :

Generation (in MU)PLANT AVAILABILITY FACTOR

PAF (in %)

PLANT LOAD FACTOR

PLF (in %)

Generator Capacity DEC-18Prog. from

Apr-18

Annual

Target as

per

CSERC

norms

DEC-18

Prog.

from

Apr-18

Annual

Target as

per CSERC

norms

DEC-18

Prog.

from

Apr-18

Annual

Target

as per

CSERC

norms

KTPS 240 MW

{2X120}81.78 1186.47 1537.38 45.190 58.61

60%- PH2

70%- PH345.80 49.63 66.76

DSPM500 MW

{2X250}342.51 3026.60 3723.00 100.00 97.58 85.00 92.074 91.72 85.00

HTPS 840 MW

{4X210}392.48 4205.13 5472.94 63.78 77.96 74.38 62.80 75.85 74.38

KWB

Extn

500 MW

{1X500}357.65 3012.12 3723.00 96.84 92.05 85.00 96.145 91.28 85.00

MARWA

1000

MW

{2X500}556.37 5357.58 6701.40 74.47 80.95 76.5 74.782 81.176 76.5

THERMAL3080

MW1730.80 16787.91 21902.32 --- --- --- 75.531 79.434 80.00

BANGO

HPS

120 MW

{3X40} 3.01 217.06 --- --- --- --- --- --- ---

Page 10: Scanned by CamScanner€¦ · Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units as on 28.01.2019: It was apprised in the meeting that WRLDC is computing

23/02/2019

3

1.2 PERFORMANCE OF STATE GENERATING STATIONS

Generating

Station Capacity

Auxiliary Consumption (in %)

No. of Forced Outage

DEC-18Progressive from Apr-18

Annual Target as

per CSERC norms

DEC-18Tube

LeakageProgressive from

Apr-18

KTPS240 MW { 2X120} 12.29 13.05 11.25 1 1 63

DSPM500 MW {2X250} 7.762 7.97 9.00 0 0 13

HTPS840 MW {4X210} 9.43 9.44 9.70 4 4 42

KWB Extn.

500 MW {1X500} 4.826 4.79 5.25 3 0 14

MARWA1000 MW {2X500} 5.774 5.41 5.25 9 2 39

THERMAL 3080 MW 7.109 7.31 --- 17 7 171

BANGO120 MW {3X40} 1.56 0.288 --- --- --- ---

1.3 Frequency ParticularsFrequency status during NOV-18 , DEC-18 & DEC-17 (As per WRLDC)

Other Frequency parameters during the month of DEC - 2018.

Frequency Range NOV-18 DEC-18 DEC-17

IEGC band % of time % of time % of time

Between 49.90 & 50.05 Hz

79.87 77.03 73.86

< 49.90 Hz 10.92 12.68 12.86

> 50.05 Hz 09.21 10.29 13.28

Frequency Status Frequency {Hz}

Time { h:mm:ss}

Date

Average Freq. 49.97 -- --

Max Instantaneous Freq.

50.25 02.12.2018 06:01

Min Instantaneous Freq.

49.67 16.12.2018 09:17

Page 11: Scanned by CamScanner€¦ · Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units as on 28.01.2019: It was apprised in the meeting that WRLDC is computing

23/02/2019

4

1.4 Demand Pattern.

NOVEMBER-18 DECEMBER-18 DECEMBER-17% Change

compared to previous year

Max. Demand Met

4030 MW02.11.2018

18:00

3627 MW06.12.18

18:00

3409 MW28-12-2017

18:156%

Max. Unrestricted

Demand at the time of Max. Demand Met

4034 MW3632 MW

3408 MW 7%

Min. Demand Met

2530MW08.11.2018

14:30

1784 MW18.12.18

03:00

2302 MW04-12-2017

02:15-23%

Max. Unrestricted

Demand

4034 MW02.11.2018

18:00

3632 MW6.12.1818:00

3408 MW28-12-2017

18:157%

2700

2800

2900

3000

3100

3200

3300

3400

3500

3600

3700

3800

3900

4000

4100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

MW

Date

Daily Max Demand met in the month of Nov-18 , Dec-18 & Dec-17. MAX 3627 MW on 06.12.2018 at 18:00 hrs. Average increase 6 % compared to last year

NOV-

2018

DEC-

2017

DEC-

2018

3627 MW on

06.12.18 at

18:00 Hrs.

4030 MW on

02.1118 at

18:00 Hrs

3409 MW on

28.12.17 at

18:15 HrsDEMAND

DROPPED DUE

TO WIDE

SPREAD RAIN

Page 12: Scanned by CamScanner€¦ · Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units as on 28.01.2019: It was apprised in the meeting that WRLDC is computing

23/02/2019

5

1700

1900

2100

2300

2500

2700

2900

3100

3300

3500

3700

MW

Date

Daywise Min and Max Demand met in the month of Dec-18, [ Difference : Max 1374 MW on 18.12.18 & Min 792 MW on 17.12.18 ]

792 MW

1374 MW

DEMAND

DROPPED DUE

TO WIDE

SPREAD RAIN

2700

2900

3100

3300

3500

3700

MW

Date

Daywise Maximum Resrticted Vs Unrestricted Demand in the month of Dec-18,

UNRESTRICTED

DEMAND

RESTRICTED

DEMAND

Page 13: Scanned by CamScanner€¦ · Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units as on 28.01.2019: It was apprised in the meeting that WRLDC is computing

23/02/2019

6

Availability during Monthly Peak Demand Met: (3627 MW on 06-12-2018 at 18:00 hrs)

MW %

CSPGCL Thermal (Ex Bus)

2421 67%

CSPGCL Hydel 79 2%

CPP/IPP's (STOA+PPA) Injection + Inter state STOA

38 1%

Other Injection (Biomass) 71 2%

CS Share including BSP share in NSPCL

1160[1033+127.40]

32%

Net Import (+) / Export (-) -202 -6%

OD(+) / UD(-) 59 2%

Demand Met (MW) 3627

CSPGCL Thermal 242167%

CSPGCL Hydel792%

CPP/IPP's (STOA+PPA) Injection + Inter state STOA

381%

Other Injection (Biomass)712%

CS Share including BSP share in NSPCL

116032%

Net Import(+) / Export (-)-202-5%

OD(+) / UD(-) 592%

Availability at the time of monthly peak demand.3627 MW on 6.12.2018 at 18:00 Hrs.

Page 14: Scanned by CamScanner€¦ · Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units as on 28.01.2019: It was apprised in the meeting that WRLDC is computing

23/02/2019

7

Total Import at the time of Max Demand

Met69844%

Total Export at the time of Max Demand

Met-900-56%

Import & Export at the time of Monthly Peak Demand.3627 MW on 6.12.2018 at 18:00 Hrs.

1.6 LOAD SHEDDING

Load Shedding during December-2018:

Load Shedding Duration (in HH:MM)

Equivalent Load Relief

(in MU/Day)

Max Load Shedding

Done.

In Groups Feeders 36:49 0.059 288 MW on 22.12.18 at

9:00 to 10:00 Hrs

In Industrial feeders 1:16 0.0024

TOTAL 38:05 1.89

Page 15: Scanned by CamScanner€¦ · Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units as on 28.01.2019: It was apprised in the meeting that WRLDC is computing

23/02/2019

8

Power Cuts / Load shedding : CHHATTISGARH ( DECEMBER : 2018 )

Date

Hour 1st

2nd

3rd

4th

5th

6th

7th

8th

9th

10th

11th

12th

13th

14th

15th

16th

17th

18th

19th

20th

21st

22nd

23rd

24th

25th

26th

27th

28th

29th

30th

31th

1:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

3:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

4:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

6:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

7:00 0 0 0 0 0 137 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 135 0 0 0 0 0 0 0 0 0

8:00 0 0 0 0 0 89 0 0 0 0 0 0 0 0 0 0 0 0 0 0 63 109 0 0 0 0 0 0 0 0 0

9:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 288 0 0 0 0 0 0 0 0 0

10:00 0 0 0 0 0 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 288 0 0 0 0 0 0 0 0 0

11:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 223 0 0 0 0 0 0 0 0 0

12:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

13:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 90 0 0 0 0 0 0 0 0 0

14:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

15:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Power Cuts / Load shedding : CHHATTISGARH (DECEMBER : 2018 )

Date

Hour

1st

2nd

3rd

4th

5th

6th

7th

8th

9th

10th

11th

12th

13th

14th

15th

16th

17th

18th

19th

20th

21st

22nd

23rd

24th

25th

26th

27th

28th

29th

30th

31th

16:00 0 0 0 0 0 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

17:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

18:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

19:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

20:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

21:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

22:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

23:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

24:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

AVG

(MW)0 0 0 0 0 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 47 0 0 0 0 0 0 0 0 0

MAX

(MW)0 0 0 0 0 137 0 0 0 0 0 0 0 0 0 0 0 0 0 0 63 288 0 0 0 0 0 0 0 0 0

MIN

(MW)0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 16: Scanned by CamScanner€¦ · Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units as on 28.01.2019: It was apprised in the meeting that WRLDC is computing

23/02/2019

9

1.7 - SOLAR POWER INJECTION (At 132 KV)

M/s Acme [30 MW]

M/s Azure [3X10 MW]

M/s Parampujya[2X50 MW]

Total

APR-18 MU 4.33 4.25 20.10 28.68

MAY-18 MU 4.49 4.23 21.17 29.90

JUN-18 MU 4.01 3.72 18.51 26.25

JUL-18 MU 2.40 2.68 13.57 18.65

AUG-18 MU 2.43 2.31 11.98 16.72

SEP-18 MU 3.37 3.79 18.15 25.31

OCT-18 MU 4.39 4.53 21.22 30.14

NOV-18 MU 4.22 4.09 19.67 28.00

DEC-18 MU 3.52 3.58 17.59 24.68

Page 17: Scanned by CamScanner€¦ · Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units as on 28.01.2019: It was apprised in the meeting that WRLDC is computing

Annexure III

Maintenance / Shutdown programme of Transmission Elements for the month of March-2019.

Date Time Date Time

Routine Maintenance

1 400400 KV Transfer Bus Coupler

(Bay No. 407) at 400 KV switchyard Marwa.

06.03.2019 8:30 07.03.2019 17:30 Continuous

1. Annual Testing of Relays, CT, Circuit Breaker and CVT.2. Cleaning and

Terminal tightness of CT JB, Breaker Mar. Box., and control & relay panel3.

General Checking, Cleaning & lubrication of operating mechanism of

Circuit Breaker & Isolators.

CSPTCL

2 400400 KV Bus Coupler (Bay No.

405) at 400 KV switchyard Marwa.

27.03.2019 8:30 29.03.2019 17:30 Continuous

1. Annual Testing of Relays, CT, Circuit Breaker and CVT.2. Cleaning and

Terminal tightness of CT JB, Breaker Mar. Box., and control & relay panel3.

General Checking, Cleaning & lubrication of operating mechanism of

Circuit Breaker & Isolators.

CSPTCL

3 220220 KV PGCIL Ckt-I at 220 KV

S/s Raigarh.25.03.2019 10:00 25.03.2019 17:00 Daily For installation of metering CT CSPTCL

AgencyS.No KV Lines/ ICT Particulars From To Daily /

Continuous Reason