Minutes of 49th SOAP Meeting held on 28.01.2019. Page 1
SSLLDDCC
MMIINNUUTTEESS OOFF 4499tthh
MMEEEETTIINNGG OOFF SSOOAAPP
HHEELLDD OONN 2288..0011..22001199
Minutes of 49th SOAP Meeting held on 28.01.2019. Page 2
Minutes of 49th meeting of Sub Committee for Operation and Protection
(SOAP) held at SLDC, Raipur on 28.01.2019.
The 49th meeting of Chhattisgarh State Operation and Protection Sub
Committee of SGCC was held on 28th January 2019 at SLDC Conference Hall.
The list of participants is enclosed in Annexure-I.
Shri. A. K. Shrivastava, CE (SLDC) welcomed all the participants of 49th SOAP meeting.
Item no. 1 Confirmation of minutes:
No comments have been received from any office. Therefore
minutes of 48th SOAP meeting is hereby confirmed.
Sub Committee agreed and noted.
Item no. 2 Review of system operation during the month of December -
2018:
Presentation and the performance of Thermal Stations and
Transmission System by SLDC, is enclosed in Annexure-II.
Sub Committee noted.
Item no. 3 State Energy Account (SEA) Data:
The desired data of December-2018 from O/o ED (Revenue)
CSPDCL and O/o ED (S/s: O&M) Raipur, CSPTCL was submitted
with revisions. However the high Transmission loss for August,
September and October 2018 is yet to be investigated.
Item no. 4 Outage planning for the month of March 2019 & April 2019:
Outage planning of Transmission feeders, Power transformers for
the month March 2019 & April 2019, submitted by O/o ED (S/s:
O&M) CSPTCL Raipur is enclosed in Annexure III. Sub Committee agreed and noted.
Minutes of 49th SOAP Meeting held on 28.01.2019. Page 3
Item no.5. Status of FGMO { Free Governor Mode Operation } in
thermal units as on 28.01.2019:
It was apprised in the meeting that WRLDC is computing primary
frequency response of ISGS generators for various grid events and
informing generators to fine tune their governors whose response
was inadequate. As per latest amendments of IEGC, third party
independent agencies selected by RLDC may conduct periodic
checkups of primary frequency response of generators at regular
intervals. The cost of such tests shall be recovered by the RLDCs or
SLDCs from the Generators.
Item no.6. Details of new transmission lines, transformer or any other
transmission elements to be charged in March 2019 & April
2019:
The representative from O/o CE (S/s: O&M) CSPTCL has
intimated the following list of new substation and transformers
likely to be charged in March 2019 & April 2019.
S.
No
Name of
S/stn
Details of equipments &
lines to be commissioned Remark
1 220 KV S/s
Bhatapara
160 MVA, 220/132 KV
Xmer
Expected to be
charged in March
2019.
2 220 KV S/s
Suhela
160 MVA, 220/132 KV
Xmer
Expected to be
charged in March
2019.
3
132 KV S/s
Urla
Sector-A
40 MVA, 132/33 KV Xmer
Expected to be
charged in April
2019.
Minutes of 49th SOAP Meeting held on 28.01.2019. Page 4
R
e
presentatives from O/o ED (S/s: O&M) Raipur, CSPTCL and O/o
CE (S/s: O&M) Bilaspur, CSPTCL were requested to provide single
line diagram of newly charged sub-stations along with feeder
names at 33 KV end also. Further it was also requested to arrange
telemetry of these new stations already commissioned in past
months, as early as possible. In case of any delay in
commissioning of RTU the data from other sub-station may at
least be provided so that the newly commissioned S/s may be
monitored effectively.
Sub Committee noted.
Item No. 7. High Voltage at 400 KV Bhatpara and Raita S/s:
It was intimated to all the representatives of SOAP that in the 515th
OCCM held in Mumbai on 19.01.2019, the issue of high voltage at
400 KV PGCIL Bhatapara and 400 KV Raita was included in the
agenda point 6.3 of WRLDC.
In case of both stations, MVAR flows was observed from LV to
HV side causing further increase in voltages at 400 kV substations
and above.
In this regard WRLDC has advised to
Take up with concerned S/S to reduce MVAR flow from LV side to HV side by switching off capacitors.
To switch on all Bus/Reactors and Line/Reactors. To absorb maximum VARs at all generating stations.
4 132 KV S/s
Kurud
02 No. 33 KV additional
Bay
Expected to be
charged in April
2019.
5 132 KV S/s
Kuhera
02 No. 33 KV additional
Bay
Expected to be
charged in April
2019.
Minutes of 49th SOAP Meeting held on 28.01.2019. Page 5
It was asked to keep the Bus voltage at generating end not more
than 405 KV at low demand period specially night hours. The data
of MVAR is also to be Validated starting from 400 KV stations. All
concerned officials may please be asked to cooperate with SLDC
for data Validation.
To avoid equipment failure due to persisting over voltage all
stations are requested to adhere to the above practices advised by
WRLDC.
**********
Annexure-I
S.No. Participants Designation Office Name Mobile No E-mail ID
1 Shri.A.K.Shrivastava CE O/o CE(SLDC), CSPTCL 9827177466 [email protected]
2 Smt. Sharda Sonwani Addl. CE O/o CE(SLDC), CSPTCL [email protected] ,
3 Shri.J.K.Vaidya SE O/o ED(O&M), CSPGCL 9425382836 [email protected]
4 Shri.Y.K.Rao SE O/o CE(SLDC), CSPTCL 9826518820 [email protected]
5 Shri. R.H.Vashmarey SE O/o ED(O&M), CSPGCL 94242331668 [email protected]
6 Shri.Ajay Singh SE O/o CE (RA&PM) CSPDCL 9893193646 [email protected]
7 Shri.R.Arvind SE O/o ED(O&M:Gen),CSPGCL9452224086 ,
8 Shri.Sanjay Choudhary EE O/o SE(Backup SLDC), CSPTCL 9340197611 [email protected],
9 Shri.K.K.Bajaj EE O/o ED(O&M:Gen),CSPGCL 9424228869 [email protected]
10 Shri.Suchendra Uike EE O/o ED(SLDC), CSPTCL 9685554777 [email protected]
11 Smt. Veena Narang EE O/o CE(S/s:O&M), CSPTCL 9713990560 [email protected]
12 Shri.Sourabh Pandey AE O/o CE(S/s:O&M), CSPTCL [email protected] ,
13 Ms. Namita Vibha Lakra AE O/o CE(SLDC), CSPTCL 8435002692 [email protected]
List of participants attended the 49th SOAP (Sub-committee of Operation & Protection) Meeting.
23/02/2019
1
STATE LOAD DISPATCH CENTRE
RAIPUR CHHATTISGARH
49thSOAP MEETING
28.01.2019
AGENDA
1. Confirmation of minutes.
2. Review of system operation during the month of December-2018, by SLDC.
3. State Energy Account (SEA) Data.
4. Outage planning for the month of March 2019 & April 2019.
5. Status of FGMO/RGMO in thermal units as on 28.01.2018.
6. Details of new transmission lines, transformer or any othertransmission elements to be charged in March 2019 & April2019.
23/02/2019
2
AGENDA-1:
Review of system operation during the month December- 2018, by SLDC.
1.1 PERFORMANCE OF STATE GENERATING STATIONS
THERMAL & HYDEL GENERATING STATIONS :
Generation (in MU)PLANT AVAILABILITY FACTOR
PAF (in %)
PLANT LOAD FACTOR
PLF (in %)
Generator Capacity DEC-18Prog. from
Apr-18
Annual
Target as
per
CSERC
norms
DEC-18
Prog.
from
Apr-18
Annual
Target as
per CSERC
norms
DEC-18
Prog.
from
Apr-18
Annual
Target
as per
CSERC
norms
KTPS 240 MW
{2X120}81.78 1186.47 1537.38 45.190 58.61
60%- PH2
70%- PH345.80 49.63 66.76
DSPM500 MW
{2X250}342.51 3026.60 3723.00 100.00 97.58 85.00 92.074 91.72 85.00
HTPS 840 MW
{4X210}392.48 4205.13 5472.94 63.78 77.96 74.38 62.80 75.85 74.38
KWB
Extn
500 MW
{1X500}357.65 3012.12 3723.00 96.84 92.05 85.00 96.145 91.28 85.00
MARWA
1000
MW
{2X500}556.37 5357.58 6701.40 74.47 80.95 76.5 74.782 81.176 76.5
THERMAL3080
MW1730.80 16787.91 21902.32 --- --- --- 75.531 79.434 80.00
BANGO
HPS
120 MW
{3X40} 3.01 217.06 --- --- --- --- --- --- ---
23/02/2019
3
1.2 PERFORMANCE OF STATE GENERATING STATIONS
Generating
Station Capacity
Auxiliary Consumption (in %)
No. of Forced Outage
DEC-18Progressive from Apr-18
Annual Target as
per CSERC norms
DEC-18Tube
LeakageProgressive from
Apr-18
KTPS240 MW { 2X120} 12.29 13.05 11.25 1 1 63
DSPM500 MW {2X250} 7.762 7.97 9.00 0 0 13
HTPS840 MW {4X210} 9.43 9.44 9.70 4 4 42
KWB Extn.
500 MW {1X500} 4.826 4.79 5.25 3 0 14
MARWA1000 MW {2X500} 5.774 5.41 5.25 9 2 39
THERMAL 3080 MW 7.109 7.31 --- 17 7 171
BANGO120 MW {3X40} 1.56 0.288 --- --- --- ---
1.3 Frequency ParticularsFrequency status during NOV-18 , DEC-18 & DEC-17 (As per WRLDC)
Other Frequency parameters during the month of DEC - 2018.
Frequency Range NOV-18 DEC-18 DEC-17
IEGC band % of time % of time % of time
Between 49.90 & 50.05 Hz
79.87 77.03 73.86
< 49.90 Hz 10.92 12.68 12.86
> 50.05 Hz 09.21 10.29 13.28
Frequency Status Frequency {Hz}
Time { h:mm:ss}
Date
Average Freq. 49.97 -- --
Max Instantaneous Freq.
50.25 02.12.2018 06:01
Min Instantaneous Freq.
49.67 16.12.2018 09:17
23/02/2019
4
1.4 Demand Pattern.
NOVEMBER-18 DECEMBER-18 DECEMBER-17% Change
compared to previous year
Max. Demand Met
4030 MW02.11.2018
18:00
3627 MW06.12.18
18:00
3409 MW28-12-2017
18:156%
Max. Unrestricted
Demand at the time of Max. Demand Met
4034 MW3632 MW
3408 MW 7%
Min. Demand Met
2530MW08.11.2018
14:30
1784 MW18.12.18
03:00
2302 MW04-12-2017
02:15-23%
Max. Unrestricted
Demand
4034 MW02.11.2018
18:00
3632 MW6.12.1818:00
3408 MW28-12-2017
18:157%
2700
2800
2900
3000
3100
3200
3300
3400
3500
3600
3700
3800
3900
4000
4100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
MW
Date
Daily Max Demand met in the month of Nov-18 , Dec-18 & Dec-17. MAX 3627 MW on 06.12.2018 at 18:00 hrs. Average increase 6 % compared to last year
NOV-
2018
DEC-
2017
DEC-
2018
3627 MW on
06.12.18 at
18:00 Hrs.
4030 MW on
02.1118 at
18:00 Hrs
3409 MW on
28.12.17 at
18:15 HrsDEMAND
DROPPED DUE
TO WIDE
SPREAD RAIN
23/02/2019
5
1700
1900
2100
2300
2500
2700
2900
3100
3300
3500
3700
MW
Date
Daywise Min and Max Demand met in the month of Dec-18, [ Difference : Max 1374 MW on 18.12.18 & Min 792 MW on 17.12.18 ]
792 MW
1374 MW
DEMAND
DROPPED DUE
TO WIDE
SPREAD RAIN
2700
2900
3100
3300
3500
3700
MW
Date
Daywise Maximum Resrticted Vs Unrestricted Demand in the month of Dec-18,
UNRESTRICTED
DEMAND
RESTRICTED
DEMAND
23/02/2019
6
Availability during Monthly Peak Demand Met: (3627 MW on 06-12-2018 at 18:00 hrs)
MW %
CSPGCL Thermal (Ex Bus)
2421 67%
CSPGCL Hydel 79 2%
CPP/IPP's (STOA+PPA) Injection + Inter state STOA
38 1%
Other Injection (Biomass) 71 2%
CS Share including BSP share in NSPCL
1160[1033+127.40]
32%
Net Import (+) / Export (-) -202 -6%
OD(+) / UD(-) 59 2%
Demand Met (MW) 3627
CSPGCL Thermal 242167%
CSPGCL Hydel792%
CPP/IPP's (STOA+PPA) Injection + Inter state STOA
381%
Other Injection (Biomass)712%
CS Share including BSP share in NSPCL
116032%
Net Import(+) / Export (-)-202-5%
OD(+) / UD(-) 592%
Availability at the time of monthly peak demand.3627 MW on 6.12.2018 at 18:00 Hrs.
23/02/2019
7
Total Import at the time of Max Demand
Met69844%
Total Export at the time of Max Demand
Met-900-56%
Import & Export at the time of Monthly Peak Demand.3627 MW on 6.12.2018 at 18:00 Hrs.
1.6 LOAD SHEDDING
Load Shedding during December-2018:
Load Shedding Duration (in HH:MM)
Equivalent Load Relief
(in MU/Day)
Max Load Shedding
Done.
In Groups Feeders 36:49 0.059 288 MW on 22.12.18 at
9:00 to 10:00 Hrs
In Industrial feeders 1:16 0.0024
TOTAL 38:05 1.89
23/02/2019
8
Power Cuts / Load shedding : CHHATTISGARH ( DECEMBER : 2018 )
Date
Hour 1st
2nd
3rd
4th
5th
6th
7th
8th
9th
10th
11th
12th
13th
14th
15th
16th
17th
18th
19th
20th
21st
22nd
23rd
24th
25th
26th
27th
28th
29th
30th
31th
1:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 0 0 0 0 0 137 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 135 0 0 0 0 0 0 0 0 0
8:00 0 0 0 0 0 89 0 0 0 0 0 0 0 0 0 0 0 0 0 0 63 109 0 0 0 0 0 0 0 0 0
9:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 288 0 0 0 0 0 0 0 0 0
10:00 0 0 0 0 0 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 288 0 0 0 0 0 0 0 0 0
11:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 223 0 0 0 0 0 0 0 0 0
12:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
13:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 90 0 0 0 0 0 0 0 0 0
14:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
15:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Power Cuts / Load shedding : CHHATTISGARH (DECEMBER : 2018 )
Date
Hour
1st
2nd
3rd
4th
5th
6th
7th
8th
9th
10th
11th
12th
13th
14th
15th
16th
17th
18th
19th
20th
21st
22nd
23rd
24th
25th
26th
27th
28th
29th
30th
31th
16:00 0 0 0 0 0 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
17:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
18:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
19:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
20:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
21:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
22:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
23:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
24:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
AVG
(MW)0 0 0 0 0 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 47 0 0 0 0 0 0 0 0 0
MAX
(MW)0 0 0 0 0 137 0 0 0 0 0 0 0 0 0 0 0 0 0 0 63 288 0 0 0 0 0 0 0 0 0
MIN
(MW)0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
23/02/2019
9
1.7 - SOLAR POWER INJECTION (At 132 KV)
M/s Acme [30 MW]
M/s Azure [3X10 MW]
M/s Parampujya[2X50 MW]
Total
APR-18 MU 4.33 4.25 20.10 28.68
MAY-18 MU 4.49 4.23 21.17 29.90
JUN-18 MU 4.01 3.72 18.51 26.25
JUL-18 MU 2.40 2.68 13.57 18.65
AUG-18 MU 2.43 2.31 11.98 16.72
SEP-18 MU 3.37 3.79 18.15 25.31
OCT-18 MU 4.39 4.53 21.22 30.14
NOV-18 MU 4.22 4.09 19.67 28.00
DEC-18 MU 3.52 3.58 17.59 24.68
Annexure III
Maintenance / Shutdown programme of Transmission Elements for the month of March-2019.
Date Time Date Time
Routine Maintenance
1 400400 KV Transfer Bus Coupler
(Bay No. 407) at 400 KV switchyard Marwa.
06.03.2019 8:30 07.03.2019 17:30 Continuous
1. Annual Testing of Relays, CT, Circuit Breaker and CVT.2. Cleaning and
Terminal tightness of CT JB, Breaker Mar. Box., and control & relay panel3.
General Checking, Cleaning & lubrication of operating mechanism of
Circuit Breaker & Isolators.
CSPTCL
2 400400 KV Bus Coupler (Bay No.
405) at 400 KV switchyard Marwa.
27.03.2019 8:30 29.03.2019 17:30 Continuous
1. Annual Testing of Relays, CT, Circuit Breaker and CVT.2. Cleaning and
Terminal tightness of CT JB, Breaker Mar. Box., and control & relay panel3.
General Checking, Cleaning & lubrication of operating mechanism of
Circuit Breaker & Isolators.
CSPTCL
3 220220 KV PGCIL Ckt-I at 220 KV
S/s Raigarh.25.03.2019 10:00 25.03.2019 17:00 Daily For installation of metering CT CSPTCL
AgencyS.No KV Lines/ ICT Particulars From To Daily /
Continuous Reason