Building Information Model in Design Scandinavian Rail Development Laura Järvinen 16.4.2013

Upload: russell-publishing

Post on 06-May-2015

471 views

Category:

Technology


1 download

TRANSCRIPT

Page 1: Scandinavian Rail Development 2013 - Laura Järvinen

Building Information Model in Design

Scandinavian Rail Development

Laura Järvinen

16.4.2013

Page 2: Scandinavian Rail Development 2013 - Laura Järvinen

Contents

Building Information Model

Case Jorvas

Page 3: Scandinavian Rail Development 2013 - Laura Järvinen

3 <Päivämäärä>, <tekijä>

16.4.2013, Building Information Model in Design, Järvinen

What is Building Information Model (BIM)?

Building information model combines all the design information to a database in 3D for machine automation in construction

•Increases productivity

• information model contains:

- Terrain model

-Ground soil model

-Structures and systems

-Map and geographical information

-Other material

Page 4: Scandinavian Rail Development 2013 - Laura Järvinen

4 <Päivämäärä>, <tekijä>

16.4.2013, Building Information Model in Design, Järvinen

What is Building Information Model (BIM)?

•Traditional phase-oriented project

intelligent services project exploiting the whole life-cycle and

all parts, actors and activities

VR Group 2011

Page 5: Scandinavian Rail Development 2013 - Laura Järvinen

5 <Päivämäärä>, <tekijä>

16.4.2013, Building Information Model in Design, Järvinen

Vision in Finland

From 2014 big infrastructure managers buy only

model-based services, which will be exploited

in all phases of the project starting from design

phase and continuing to maintenance period

Signed by Infra FINBIM members 2010

Page 6: Scandinavian Rail Development 2013 - Laura Järvinen

Case Jorvas

Page 7: Scandinavian Rail Development 2013 - Laura Järvinen

7 <Päivämäärä>, <tekijä>

16.4.2013, Building Information Model in Design, Järvinen

Jorvas station

Page 8: Scandinavian Rail Development 2013 - Laura Järvinen

8 <Päivämäärä>, <tekijä>

16.4.2013, Building Information Model in Design, Järvinen

General scheme

Page 9: Scandinavian Rail Development 2013 - Laura Järvinen

9 <Päivämäärä>, <tekijä>

16.4.2013, Building Information Model in Design, Järvinen

Jorvas building information model

• Pilot project, where building information model was to be exploited

- tender phase

- design phase

- in construction phase

• Part of TUKEFIN (productivity in Finland)

• Project targets of the Finnish Transport Agency (FTA):

- Cheap total price

- Design work is easy to visualize and understandable

- Design work fulfils the requirements given by FTA

- Design work contains no mistakes

Page 10: Scandinavian Rail Development 2013 - Laura Järvinen

10 <Päivämäärä>, <tekijä>

16.4.2013, Building Information Model in Design, Järvinen

Tender phase

• Tender evaluation

- Customer satisfaction 20%

- Work in design phase 30%

- No mistakes 20%

- Price 30%

Page 11: Scandinavian Rail Development 2013 - Laura Järvinen

11 <Päivämäärä>, <tekijä>

16.4.2013, Building Information Model in Design, Järvinen

Evaluation of the work in the design phase

• Tender evaluation was done according to specific evaluation model taking into account:

1. Basic information

2. Use and completeness of the model

3. Geometrical model

4. Compliance / Standards

5. Information delivery

6. Knowledge

7. Process description

8. Roles

9. Innovative approach

Page 12: Scandinavian Rail Development 2013 - Laura Järvinen

12 <Päivämäärä>, <tekijä>

16.4.2013, Building Information Model in Design, Järvinen

Building information model in the tender phase

Basic information mainly from general scheme

• Streets

• Basic map

• Laser scanning

• Bridges

• Platforms

• Electrification masts

• Buildings

• Area borders

For the tender phase model was added

• Tracks

• Missing streets and walkways

• Borders of the railway area

• Drainage

Page 13: Scandinavian Rail Development 2013 - Laura Järvinen

13 <Päivämäärä>, <tekijä>

16.4.2013, Building Information Model in Design, Järvinen

Building information model in the tender phase

Page 14: Scandinavian Rail Development 2013 - Laura Järvinen

14 <Päivämäärä>, <tekijä>

16.4.2013, Building Information Model in Design, Järvinen

Using the model during design work

Page 15: Scandinavian Rail Development 2013 - Laura Järvinen

15 <Päivämäärä>, <tekijä>

16.4.2013, Building Information Model in Design, Järvinen

Using the model during design work

• Desicion of the location of the underpass

• Connecting streets and walkways

• Additional information

• Walkway types

• Location of the platform changed

• Coordinate system changed

Page 16: Scandinavian Rail Development 2013 - Laura Järvinen

16 <Päivämäärä>, <tekijä>

16.4.2013, Building Information Model in Design, Järvinen

Using the model during design work

• Model coordinator collects the combination model

• Used in meetings

• Model visible in the FTA extranet

• Model description

• Model visualizing the design for public

Page 17: Scandinavian Rail Development 2013 - Laura Järvinen

pp.kk.2012, Esityksen nimi, Etunimi Sukunimi #

New underpass

Page 18: Scandinavian Rail Development 2013 - Laura Järvinen

pp.kk.2012, Esityksen nimi, Etunimi Sukunimi #

New high platforms

Page 19: Scandinavian Rail Development 2013 - Laura Järvinen

pp.kk.2012, Esityksen nimi, Etunimi Sukunimi #

Staircases from the street bridge to platforms

Page 20: Scandinavian Rail Development 2013 - Laura Järvinen

pp.kk.2012, Esityksen nimi, Etunimi Sukunimi #

New parking areas on both sides of the railway

Page 21: Scandinavian Rail Development 2013 - Laura Järvinen

pp.kk.2012, Esityksen nimi, Etunimi Sukunimi #

Bicycle and motorcycle parking with shelters

Page 22: Scandinavian Rail Development 2013 - Laura Järvinen

pp.kk.2012, Esityksen nimi, Etunimi Sukunimi #

New shelters on platforms

Page 23: Scandinavian Rail Development 2013 - Laura Järvinen

pp.kk.2012, Esityksen nimi, Etunimi Sukunimi #

New light traffic connections from parking areas to platforms

Page 24: Scandinavian Rail Development 2013 - Laura Järvinen

pp.kk.2012, Esityksen nimi, Etunimi Sukunimi #

New light traffic connection from Old Jorvas Street to platforms

Page 25: Scandinavian Rail Development 2013 - Laura Järvinen

pp.kk.2012, Esityksen nimi, Etunimi Sukunimi #

New lighting on the platforms, parking areas and light traffic ways

Page 26: Scandinavian Rail Development 2013 - Laura Järvinen

pp.kk.2012, Esityksen nimi, Etunimi Sukunimi #

New lighting on the platforms, parking areas and light traffic ways

Page 27: Scandinavian Rail Development 2013 - Laura Järvinen

pp.kk.2012, Esityksen nimi, Etunimi Sukunimi #

New lighting on the platforms, parking areas and light traffic ways

Page 28: Scandinavian Rail Development 2013 - Laura Järvinen

pp.kk.2012, Esityksen nimi, Etunimi Sukunimi #

New electrification masts on platforms

Page 29: Scandinavian Rail Development 2013 - Laura Järvinen

29 <Päivämäärä>, <tekijä>

16.4.2013, Building Information Model in Design, Järvinen

Guidelines and requirements

• FTA’s Infra-model guidelines for making waystructure implementation model

• Infra 2011 CAD design system requirements

• InfraRYL structure identification guidelines

• Specific guidelines for railway structure model identification

• Guidelines for bridge information models

• Applicable parts of norwegian guidelines about information models

Page 30: Scandinavian Rail Development 2013 - Laura Järvinen

30 <Päivämäärä>, <tekijä>

16.4.2013, Building Information Model in Design, Järvinen

Finished information model given to customer

• Original format of the design program

• Open standard IM2/LandXML-format

• Finished coordination model and visualization model as VM viewing package

• Files attached to coordination model

• Model description

Page 31: Scandinavian Rail Development 2013 - Laura Järvinen

31 <Päivämäärä>, <tekijä>

16.4.2013, Building Information Model in Design, Järvinen

Final model

Page 32: Scandinavian Rail Development 2013 - Laura Järvinen

32 <Päivämäärä>, <tekijä>

16.4.2013, Building Information Model in Design, Järvinen

Comments and experiences

• Good in visualising the final design

• Less paper

• Easy to detect the mistakes, e.g. in the sizes of the structures

• Possible to check the compliance between different design work

• Design may be too detailed in the detailed design phase

• Information is not lost during the design

• Does not replace totally 2D design (?)

• Good tool, not purpose itself

• Requires more work (= more expensive) during design phase

• Requires detailed information in the beginning (e.g. laser scanning)

• How final building information model will be updated and exploited after design is finished?

• Building information model database?

• Easy to obtain amount of construction materials