scandia wind southwest llc
DESCRIPTION
Scandia Wind Southwest LLC. Development of large scale windpower. Presentation for landowners Bovina May 8th 2009. Presentation overview. Who are we What we have done Why the Panhandle The challenges every developer face in the Panhandle The project The business model The way forward - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/1.jpg)
Scandia Wind Southwest LLC
Development of large scale windpower
Presentation for landowners
Bovina May 8th 2009
![Page 2: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/2.jpg)
Presentation overview
1. Who are we
2. What we have done
3. Why the Panhandle
4. The challenges every developer face in the Panhandle
5. The project
6. The business model
7. The way forward
1. Organize negotiating team
2. Tentative time frame for negotiations
3. Cost coverage
8. Q&A
21.04.23 2www.havgul.no
![Page 3: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/3.jpg)
The partners
Proposed Wind Farm Services
• Development
• Technical expertise
• Construction Financing
82 years aggregate wind energy experience
44 years aggregate wind energy experience
A member of the Havgul/ Alpha Wind/PWC alliance
Strong local committment
![Page 4: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/4.jpg)
Consultant Consortium
Proposed Wind Farm Services
• Development
• Technical expertise
• Construction Financing
Fredrikson & Byron
Legal
Hoffman & Brobst
Finance proformas
RNR Engineering
Grid consultant
Multiple financing sources
Development financingConstruction financingPermanent financing
Alpha Wind Energy
Technical support
Havgul clean energy
Project development
![Page 5: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/5.jpg)
HAVGUL Clean Energy AS• Wind power project development company, based in Oslo, Norway.
• The business concept is to develop wind power projects from greenfield or early phase development, to a stage where all required permits are in place, technical feasability studies are performed and the project can be realized on the international market.
• Financed by a large Swedish/US green investment fund
• Extend activities to include US, Poland and Sweden – and possibly other fast growing markets.
21.04.23www.havgul.no
5
Ketil Reed AasgaardPartner/Managing director
Harald DirdalPartner/Project director
Kalle HesstvedtPartner/Communication and PA
Emil ThorkildsenPartner/Legal director
![Page 6: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/6.jpg)
Track record
• Andmyran wind park, 160 MW
• The Havsul project, 1500 MW
• Kvitfjell, 200 MW
• Siragrunnen, 200 MW
• Havøygavlen, 40 MW
![Page 7: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/7.jpg)
Andmyran Wind Park
![Page 8: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/8.jpg)
The Havsul projects – Havsul I
![Page 9: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/9.jpg)
Alpha Wind Energy
Extensive experience from various parts of Wind Power Industry from– Project development– Wind measurements– WTG manufacturers technical support, group sales & marketing – Technical advisor to Danish Wind Turbine Owners Association.– Combined 82 years of Wind Power Experience– 7 employees currently, but expanding– Extensive use of partnerships and consultants.
9
![Page 10: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/10.jpg)
AWE Wind Farm development
• Land lease agreements• Site feasibility study• Wind metering & long term correlation of data• Wind turbine micro siting and optimization
– Includes complex terrain requiring CFD analysis• EIS including noise, visual, shadow study etc.• Site production estimations• Full project analysis, design and installation• Full bankable report in cooperation with a bank approved third party• Turbine selection and EPC contracting• Operational Management
10
![Page 11: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/11.jpg)
AWE Wind Farm development
11
![Page 12: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/12.jpg)
AWE, Current Wind metering locations
12
![Page 13: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/13.jpg)
AWE, Current Wind metering locations
13
![Page 14: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/14.jpg)
Why the Panhandle
1. Best wind conditions in Texas
2. Large areas of suitable land
3. General positive attitude among the land owners and the population in general
4. Perfectly located in the cross roads of the ERCOT, SPP and WECC grid areas
5. A region in need for new industries
21.04.23 14www.havgul.no
![Page 15: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/15.jpg)
Why the Panhandle
21.04.23 15www.havgul.no
![Page 16: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/16.jpg)
Transmission Expansion- Plans laid for specific transmission lines
- Dovetails with Scandia’s Phase II & Phase III strategies
![Page 17: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/17.jpg)
The challenges every developer faces
• The grid is a huge constraint in the ERCOT and SPP grid systems.• Large consumption in the south• Weak grid into the Panhandle• The Panhandle loop will only cover the projects already under planning
The strategy is as follows:
• Make the projects so large that they will attract new lines into the region• State of the art project documentation for financial closing
– Detailled wind assessment program– Very selective turbine choice– Bankable land lease agreements– Commercial business model where all owners have the same exit strategy
21.04.23 17www.havgul.no
![Page 18: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/18.jpg)
The project
21.04.23 18www.havgul.no
![Page 19: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/19.jpg)
Visualization of one site layout
21.04.23 www.havgul.no 19
![Page 20: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/20.jpg)
The business model
• Ownership in the project company– Land owners put in an exclusive right for the company to develop their
land– No payments to the land owner during the development phase– Payment at joint exit point– Estimate at least 10 times the payment for this model compared to a
standard option fee per acre payment assuming a 5 years development phase
• Royalty payments for each turbine placed on your land normal for the region beginning when the project is being built
21.04.23 20Take over by large utility(ies)
Development phase Operational phase
10% ownership in the development
Individual land lease agreement payments
![Page 21: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/21.jpg)
The way forward
• We suggest the land owners form a group of 3-5 people given the power of attorney to negotiate on the land owners behalf
• The group select a lawyer representing them in the negotiations
• We are willing to cover the lawyer costs up to an amount agreed upon between the parties
• We hope the total process should not last longer than 3 months
• When the agreement are finished negotiated, the negotiating group will present the agreement to the remaining land owners for signature.
21.04.23 21www.havgul.no
![Page 22: Scandia Wind Southwest LLC](https://reader035.vdocuments.mx/reader035/viewer/2022062222/5681513c550346895dbf542d/html5/thumbnails/22.jpg)
Q&A
21.04.23 22www.havgul.no