sc ports update - se wind

20
SC Ports Update September 12, 2013 Patrick Moore South Carolina Ports Authority

Upload: others

Post on 07-Apr-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

SC Ports UpdateSeptember 12, 2013

Patrick MooreSouth Carolina Ports Authority

5 public terminals in Charleston Harbor.

2 container terminals.

1 container terminal under construction.

2 Breakbulk / Ro-Ro.

1 Cruise facility.

47-Feet of water in the entrance channel MLW.

45-Feet of water in the interior channel MLW.

Facilities Span Several Municipalities

3

5

Navy Base Terminal North Charleston, SC

Opening CY2019SCPA Investment: ~$800 Million

6

15

16

Draft12.04 m (39.5’)

Draft15.2 m (50’)

33.5m (110’)

12.8m (42’)

55m (180’)

18.3m (60’)

*Courtesy of Panama Canal Authority

Panama Canal is a Game Changer for the Port Industry

17

Charleston Harbor Post 45-Ft. Deepening Project

18

Maersk’s Triple-E18,000 TEU/1,312’ LOA

MSC Northern Justice8,440 TEU / 1090’ LOA

At dock in Charleston / May 12, 2010

19

Driving Change: Bigger Ships

SCPA and Wind Power- SCPA stands ready and willing to facilitate wind related goods movement.- Columbus Street Terminal is world class.- Georgetown opportunities and limitations.- Robust maritime industries and facilities. - Inland Port and Harbor Deepening are game

changers.- Land donation and Coalition participation.- Southeastern port prevalence should help deployment.