sbs gems for gen-rp · 2018. 10. 30. · gmn / gen-rp preparedness review first uva gem layer (eel...

15
SBS GEMs For GEn-RP K. Gnanvo GMn / GEn-RP Preparedness Review, 10/30/2018

Upload: others

Post on 09-Feb-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • SBS GEMs For GEn-RP

    K. Gnanvo

    GMn / GEn-RP Preparedness Review, 10/30/2018

  • INFN GEM layer

    Stack of 3

    GEM

    mo

    du

    les (40

    ×5

    0 cm

    2)

    UVa GEM layer

    Stack of 4

    GEM

    module

    s(6

    0 ×

    50

    cm2)

    GMn / GEn-RP Preparedness Review

    SBS GEM Trackers for Gen-RP Experiment

    10/30/2018 2

    SBS GEM Trackers in Hadron Arm (2 INFN GEM + 10 UVa GEM layers)

    ▪ The Charge-Exchange (CE) Polarimeter: (2 INFN GEMs + 6 UVa GEMs)

    ⇨ 2 INFN GEM layers, common subframe to the central frame

    ⇨ 2 UVa GEM layers, common subframe to the central frame.

    ⇨ A Cu analyzer block.

    ⇨ 4 UVa GEM layers, common subframe to the central frame

    ▪ The Proton-Recoil (PR) Polarimeter: (4 UVa GEMs)

    ⇨ 2 Identical arms, 2 UVa GEM layers in each arm

    GEMs

    Cu AnalyzerCH Analyzer

  • GMn / GEn-RP Preparedness Review

    Status of UVa GEMs for SBS (EEL Clean Room 124)

    10/30/2018 3

    Trigger counters

    First GEM layer with 4 modules

    BigBite Rear GEM Tracker

    DAQ, HV & LV Rack

    Storage shelves with 33 UVa GEM modules

    8 out of 10 SBS GEM layers

    ▪ 37 Modules for 9 SBS GEM layers already in store at JLab (EEL Clean Room 124)

    ▪ Additional 7 modules (+ spares) for 2 remaining layers to be shipped to JLab in the coming weeks (~November 2018)

    ▪ 2 INFN SBS GEM layers to be assembled / tested in Testlab CL after 4 INFN BB GEMs installed in BB in TED (Summer 2019 )

  • GMn / GEn-RP Preparedness Review

    First UVa GEM Layer (EEL Clean Room 124)

    10/30/2018 4

    DAQ, HV & LV RackClose view on the HDMI cable trails

    ▪ Complete assembly of the first layer

    ⇨ Full cabling of the HDMIs, (digital and analog MPDs, and LV)

    ⇨ HV cables and N2 Gas flowing through the chambers

    ⇨ Preliminary HV test done last week

    ⇨ First cosmic test run on the assembly table

    ⇨ start this week

    ▪ To do:

    ⇨ Complete the on-table cosmic test run in a month

    ⇨ Dec. 2018: Move this first layer in the cosmic stand

    ⇨ People: K. Gnanvo, S. Jian, T. Cao

  • ▪ Design of the cosmic test stand for 6 layers is completed

    ⇨ Main Cosmic stand: Commissioning of up to 6 UVa GEM layers

    ⇨ Lightweight on-wheel installation frame: To move single layer into the main frame

    ⇨ Design is completed and had been approved by JLab structural engineer (Whit Seay)

    ⇨ Unistrut beam to optimize cost / simplicity / robustness of the structure

    GMn / GEn-RP Preparedness Review

    UVa GEMs Cosmic Stand Setup (EEL Clean Room 124)

    10/30/2018 5

    DAQ, HV & LV Rack

    Cosmic Stand with GEM layers

    Lightweight Frame

    ▪ To Do list:

    ⇨ Nov. 2018 –Dec. 2018: Procurement of the parts and assembly of the frames

    ⇨ Dec. 2018: Move first UVa GEM layer on the cosmic stand and Start cosmic data

    ⇨ People: K. Gnanvo, S. Jian, T. Cao

  • GMn / GEn-RP Preparedness Review

    SBS GEMs Support Frames

    10/30/2018 6

    ▪ Design nearly completed, to be finalized in Dec 2018

    (J. Annand & D. Hamilton)

    ▪ Design & Construction under JLab engineering group

    (Robin Wines’s talk)

    ▪ Tentative timeline for the GEM layers integration (see

    next slides)

  • GMn / GEn-RP Preparedness Review

    SBS GEMs Gas System

    10/30/2018 7

    Premixed Ar/CO2: 70/30

    ▪ Estimated flow rate: (4 to 8) L / h / module ⇨ 200 l to 400 l /hour More details from

    Jack’s talk

  • GMn / GEn-RP Preparedness Review

    SBS GEM Readout Electronics

    10/30/2018 8

    • 128 analog ch / APV25 ASIC

    • 3.4 ms trigger latency (analog pipeline)

    • Capable of sampling signal at 40 MHz

    • Multiplexed analog output (100 kHz readout rate)

    MPD(INFN)

    Channels APV25 MPDs

    UVa GEMs 113000 880 70

    INFN GEMs 14000 108 8

    MPD Main Block

    Arriga GX FPGA128 MB DDR2-RAMFirmware V4.0 (74% resources):

    # FIR Filter (16 param)# Zero Suppression# Common mode and pedestal subtraction# Remote config, # ≈2 ns trigger time resolution

    MPD-SSP Interface

    SSP-Protocol

    Aurora Protocol

    MPD-VME Interface

    VME-Protocols

    2eSST

    2eVME

    VME32 …

    VXS

    OpticalFiber

    SSP

    VME Master(Intel SBC)

    VME (64x)

    Currently running cosmic test/ JLab (VME mode)

    SSP mode in Rear GEM cosmic test

  • GMn / GEn-RP Preparedness Review

    SBS/BigBite Electronics setup

    10/30/2018 9

    SBS GEMs Electronic Hut

  • GMn / GEn-RP Preparedness Review

    SBS GEM Electronics - components

    10/30/2018 10

    Item Status

    996 FE boards (880 for UVa GEMs, 108 for INFN GEMs) 124xBCKs, PPIn hand: UVa (10 UVa GEM layers) – INFN (all 2 INFN GEM layers) MK committed to provide for the 11th UVa Layer (100 APVs, need 88)

    78 MPDs (70 for Uva GEMs & 8 for INFN GEMs)In hand: UVa (10 UVa GEM layers) – INFN (all 2 INFN GEM layers) MK committed to provide for the 11th UVa Layer (10 MPDs, need 7)

    4 SSP modules (together with BB GEM readout)3 in hand: 2 with UVa, 1 with Paolo (Italy) 1 more to be identified / borrowed (Alex)

    TI – Trigger supervisor Currently used in cosmic

    Master VME (for SSP and TI) To be identified

    Trigger / clock fan-out (78 channels)JLab custom boards (under production) - Enough for 2 x 128 channels (clock/trigger)

    4 VME64x / VXS (for SSP, TI …) (together with BB GEM readout) To be identified: 3 in hand (check availablility of the 4th with Alex)

    4 VME crate (no master) for MPDs Simple VME crates (check availablility with Alex)

    1 VME minicrate for slow control + Master To be identified / procured / shared

    320 HDMI cable (+ spares) : 160 shorts (3m) + 160 long (10m) To be procured

    78 Optical fiber MPD – SSP connection To be procured

    78 (+ 1) NIM cables trigger distribution To be identified / procured (1 from SBS GEM hut to electronic hut)

    78 NIM cables (10 cm) for clock distribution To be identified

    46 x HV cables (15 m?, 55 m? ... ) To be identified

    6 x LV cables pairs (15 m?) To be identified / procured

    HV power supplies for 46 channels (40 UVa GEMs + 6 INFN GEMs)In hand: 1 Wiener crate & 6 HV modules (8 ch. each) => 42 channelsTo be procured: 1 spare crate + at least one more HV module

    LV power supplies (2xTTI-Eth., UVa system) Currently used in cosmic (+spare)

    SBS GEMs Electronic Hut JLab Engineering - Spring 2019 (R. Wines & D. Hamilton’s talk)

  • GMn / GEn-RP Preparedness Review10/30/2018 11

    Pre-Experiment Installation and Commissioning

    Plans & Milestones

    Goals:

    ⇨ Assembly and commissioning 11 GEM layers in the EEL Clean Room for Gen-RP Trackers

    ▪ Evaluate the assembled GEM layers for noise levels, efficiency and resolution using cosmic.

    ⇨ Commissioning of hardware level background suppression algorithms

    ▪ Test MPD readout in SSP mode with the zero suppression on a large scale

    ⇨ Develop and test diagnostic scripts to be used in GEM tracker commissioning.

    Milestones:

    ⇨ 11/2018: Complete the assembly and testing of the first large area GEM layer (LT1).

    ⇨ 12/2018: Complete the implementation of hardware background suppression. Demonstrate the proper working at high

    rate trigger and background conditions using x-ray data @ UVa then implemented on large scale on the Cosmic stand

    ⇨ 12/2018 - 12/2019: Assembly and testing of 11 Uva GEM layers. It is expected that after the first layer, each subsequent

    layer will take approximately 1 month. Testing of the layers with cosmic will be carried out simultaneously.

    ⇨ We have a SBS-GMn-GEMs weekly meeting every Tuesday Morning @ 9:00 am with the wiki page below

    ⇨ https://hallaweb.jlab.org/wiki/index.php/GMn_GEM_Commissioning_Meeting

    https://hallaweb.jlab.org/wiki/index.php/GMn_GEM_Commissioning_Meeting

  • GMn / GEn-RP Preparedness Review

    Tentative Timeline for SBS GEMs commissioning / Installation

    10/30/2018 12

    UVa Crew:• NL: Nilanga Liyanage• KG: Kondo Gnanvo• SJ: Siyu Jian • Uva Grad. Stud. (summer 2019)HU crew• MK: Michael Kohl• TC: Tongtong CAO• HU Summer Student (2019)

  • GMn / GEn-RP Preparedness Review10/30/2018 13

    Just stole this from Evaristo’s talk

  • GMn / GEn-RP Preparedness Review10/30/2018 14

    Back up

  • GMn / GEn-RP Preparedness Review10/30/2018 15