Project Status
1. We are in the early phases of design
2. Design Decisions Move from Big toSmall
3. At this phase, input is first needed at themacro level
-
8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)
3/12
Master Plan Programming Goals
High School : Grades 9-12 Middle School: Grades 6-8Initial Capacity: 600 Initial Capacity 480
Future Capacity: 800 Future Capacity: 600
Core Classrooms: 37/47 Core Classrooms: 24/30
Other Major Building Amenities1200-seat GymnasiumFull-Size Auxiliary GymField-House for Home/Visitor
2 P.E. / 2 Team Locker Rooms800-seat AuditoriumDining Area for Enrollment
Other Major Building Amenities600-seat Gymnasium2P.E. / 2 Team Locker Rooms250 to 300-seat Auditorium
Dining Area for 1/3 Enrollment
Will Follow Planning Standards Adopted by the School Board in
2000
For the Building
-
8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)
4/12
Master Plan Programming Goals
High School : Grades9-12
Middle School: Grades6-8
Auto Parking: 515 Auto Parking: 120
Football Stadium / Track(Existing)
Competition BaseballField
Competition SoftballField
- -
For Site Amenities
-
8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)
5/12
Comparing Old and New
Existing High School Existing Middle School
Main Building Area: 77,600 SF Main Building Area: 30,500 SF
Out-Buildings: 14,400 SF Out-Buildings:
Temporary Buildings: 1800 SF Temporary Buildings: 7300 SFTotal Existing : 93,800 SF(Existing Enrollment: Approx.394)
Total Existing: 37,800 SF(Existing Enrollment: Approx.280)
Estimated Area for New HS:212,000 SF (Enrollment of 800)
Estimated Area for New MS:125,300 SF (Enrollment of 600)
-
8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)
6/12
Aerial Photo
-
8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)
7/12
Aerial Photograph of Site
BASEBALL
SOFTBALL
STADIUM
NEW HIGHSCHOOL
RENOVATEDMIDDLESCHOOL
MP #1
MP #2
MP #3
ELEMENTARYSCHOOL COMPLEX
-
8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)
8/12
Note that theExisting MiddleSchool isDemolished inthese Scenarios
BASEBALL
SOFT-BALL
STADIUM
NEWMIDDLESCHOOL
RENOVATEDHIGHSCHOOL
MP #1MP #2
MP #3
ELEMENTARYSCHOOL COMPLEX
MP #4
-
8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)
9/12
Key Planning Criteria / Assumptions
All Facilities on Site
Separate Buildings for MS and HS
Shared Site Amenities (Parking and Athletic Fields)
Cabin / Cannery Are Not Accommodated at Existing Location
Masterplan Driven v. Funding Driven
Re-Use What Makes Sense to Re-Use (Maximize Investment)
Existing Middle School Will Be Demolished
Awkward Location
Poor Programmatic Fit, One Story
Excess Vehicular Entrances
Limited Land Area
-
8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)
10/12
-
8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)
11/12
New High School Site Plan
r-------l/11 I... " I I I/ ' I I 1/ I I I
' I I I/ :: :j i = ~ ~ ; ~ ~ ~ ~ -' , , ,I I I II I I II I I II I I II I I II I I II I I II I I .JI ~ L __ _ _C _-- __1' 1_ """""-=
-
8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)
12/12
New Middle School Site Plan
-,-- ,- ,/ ,, ,, ,, ,' ,' ,' ," ,, ,, ,, ,, ,, ,r-- - - - - - i, ,, ,, ,, ,, ,, ,, ,, ,, ,, ,, ,, ,, ,, ,, ,I J
L _____ ~ = L_______ ..J