SB CONSTRUCTIONS
Company Profile
Registered Office: FF-11, Green Valley Plaza, RPS Omaxe Green Valley,
Sector 41-42, Faridabad, (HR)-121010.
Mobile: 9810288140
Email: [email protected]
[email protected] [email protected]
Website: www.sbconstruction.co.in
TABLE OF CONTENTS
Company Profile Management Profile
Proprietor Technical Brains List of Clients Certificates Gallery
Equipments Projects and Sites
SB CONSTRUCTIONS
COMPANY PROFILE
SB Constructions. Based at A2, RPS Omaxe Green valley Sector 41-42, Faridabad, Haryana-121003, came into existence in Dec 2012 by Mr. S. B. Gurjar (B.E. Civil & MBA) as Proprietor. Now our new Registered address is FF-11, Green Valley Plaza, RPS Omaxe Green Valley, Sector 41-42 Faridabad (HR)-121010.
We, at SB Constructions, are in the process of working towards our goal of the launch of our new project of Storm & Sewer water lines with IL & FS Engineering services Gurgaon. And LNT CC-27 Delhi IN initial stage. During the current days we are perform so many projects of shoring work/soil retention system with reputed clients like M3M, Emaar, Tata Projects, Bayaweaver Limited, L&T Limited, Brookfield, Ajnara, Gulshan Homz etc.
After That also in other activities like piling, pipe line etc. We have been worked for so Many clients as listed in our profile.
Our equipment strength consisting of the following: 4 TMR Piling Rigs of boring capacities of 45 meters depth and 300 to 1200 mm Dia.meter. 1, Hydraulic Rotary Rig Machine Zoomlion ZR-150 Make ACE. 1, Hydraulic Rotary Rig Machine HR Mait 180 and Other Hiring Rigs in contact on rental basis. 2 Nos.. ROC Drilling Machines for soil & Rock anchors. 1500 Mt Steel Girders for shoring works. One set of Pile Load test up to 1800 Mt Capacity Complete with 50 secondary girders 2 Hydra Cranes with 12 Ton capacity of each. 6 Vertical pumps for bentonite slurry shifting. 12 Nos. Polymer Pumps. 20 Welding rectifiers with all accessories. 8 Steel Tank with 40 cum capacity of bentonite mixing Each. Six Grouting pump capacity 25 kg/sq.cm and depth up to 25 m. Dynamic Jacks 350 Ton 2 Nos., and Six Power packs Power pack & Jacks for soil anchoring 5 sets.
Other necessary small tools as slings. D shackles, belts and wood cutting machines. 1 Scorpio and 10 bikes as conveyances facilities. Having own office FF-11 at Green Valley, Faridabad (HR).
Operated and Maintained by a skilled and dedicated workforce of operators and technicians.
It gives us a lot of pride and pleasure today to state that we have now grown to be the single largest Contractor of storm water line in IL&FS. We are also measure contractor for shoring work in M3M and Emaar Gurgaon. Our clientele includes CPEPL, Lanco Infratech Ltd. and IL&FS Engineering Services, L&T, RVAG, Pioneer, SPML Infra Ltd., GR Infraprojects Ltd, CEC, Capacite Infraprojects Ltd. and AVJ., Tata Projects Ltd, Emaar MGF Land Limited, Bayaweaver Limited, Candor, M3M Gurgaon, Supreme Constructions ETC. We are the leading contractor in Delhi NCR for soil retention system. The details of some of our major projects are tabled here below for your references:
SB CONSTRUCTIONS Details of Ongoing and Completed Projects
SR.No. Name of Project Name of our
Client Work Details Our Order Value in lacs
Date of WO Status
1 Supertech Supernova Continental piling and excavation Pvt Ltd.
Conduct Initial Vertical Load Test at Sector-74 Noida 0.25000 28.12.2012 Completed
2 DMRC CC 10 Lanco Infratech Ltd.
DMRC Station Building at Badkhal Faridabad 37.77874 04.02.2013 Completed
3 Huda road project Gurgaon
IL&FS Engineering and Construction Company Limited
Soldier piles 600 mm Dia. for Protection of P6 Pile-cap 12 m Deep
3.42450 30.04.2013 Completed
4 Huda road project Gurgaon
IL&FS Engineering and Construction Company Limited
5.802 KMS Storm Line 175.56573 21.05.2013 Completed
5 Huda road project Gurgaon
IL&FS Engineering and Construction Company Limited
12 m Deep Excavation & Protection 10.10550 27.07.2013 Completed
6 Huda road project Gurgaon
IL&FS Engineering and Construction Company Limited
Soldier Piles of Gateway tower 14.72250 30.09.2013 Completed
7 Huda road project Gurgaon
IL&FS Engineering and Construction Company Limited
1.2 km,1400 mm Dia. Sewer line 190.09600 15.10.2013 Completed
8 Huda road project Gurgaon
IL&FS Engineering and Construction Company Limited
Brick Manholes,2200mm Dia. Sewer 8.42500 15.10.2013 Completed
9 Contract CC-27 (UG-2) DMRC
L&T - SUCG JV CC-27 Delhi.
Providing & Laying of 1600 mm Dia. RCC Pipe SWG at Hauzkhas DMRC Project CC-27
31.00990 31.10.2013 Completed
10 Huda road project Gurgaon
IL&FS Engineering and Construction Company Limited
Back Filling of Storm Water Line 15.00000 30.11.2013 Completed
11 Emmar MGF UG Tank M/s - N.K. Construction Co.
Emmar MGF UG Tank Capacity 1000 MLD 163.75500 05.12.2013 Completed
12 Verona Heights Amrapali Group Pile Chipping 5.00000 18.12.2013 Completed
13 Contract CC-27 (UG-2) DMRC
L&T - SUCG JV CC-27 Delhi.
Soldier Piles for cut and cover Portion at R.K. Puram Station 17.68000 13.01.2014 Completed
14 Contract CC-27 (UG-2) DMRC
L&T - SUCG JV CC-27 Delhi.
Boring of hole for making support for 700 & 200 mm Dia. water pipe line at Hauzkhas.
0.64000 04.03.2014 Completed
15 Contract CC-27 (UG-2) DMRC
L&T - SUCG JV CC-27 Delhi.
Soldier Piles for Box Pushing Area at R.K. Puram Station & IIT Station
4.78400 06.03.2014 Completed
16 Second Phase of Rapid Metro Rail Gurgaon
RV Akash Ganga Infrastructure Ltd.
Cast in situ 1000 mm Dia. Piles at Gurgaon Metro Station Buildings Sector 55-56, AIT Chouk & Sector-53-54.
228.01600 10.03.2014 Completed
17 Huda road project Gurgaon
IL&FS Engineering and Construction Company Limited
Laying of 600 & 1400 mm Dia. Sewer line at HSIIDC Area Gurgaon.
51.31910 24.03.2014 Completed
18 Contract CC-27 (UG-2) DMRC
L&T - SUCG JV CC-27 Delhi.
Wooden Lagging for RK Puram Cut and cover portion. 3.80000 31.03.2014 Completed
19 Huda road project Gurgaon
IL&FS Engineering and Construction Company Limited
Construction of Soldier piles and wooden lagging at Bristol chouk Gurgaon
24.71360 07.04.2014 Completed
20 Contract CC-27 (UG-2) DMRC
L&T - SUCG JV CC-27 Delhi.
Soldier pile Boring for R.K. Puram, IIT, Munirka and Hauzkhas Stations at Entry Exit Area Hydraulic Rotary rig.
69.02525 05.05.2014 Completed
21 Contract CC-27 (UG-2) DMRC
L&T - SUCG JV CC-27 Delhi.
Splicing and Lowering of Soldier piles Beam For all four Stations
27.19300 05.05.2014 Completed
22 Second Phase of Rapid Metro Rail Gurgaon
IL&FS Engineering and Construction Company Limited
Concreting & Shuttering works of Pile-cap and pier/column 8.29500 13.05.2014 Completed
23 Huda road project Gurgaon
IL&FS Engineering and Construction Company Limited
Retrieval of soldier pile at underpass location 10.50000 05.06.2014 Completed
24 Second Phase of Rapid Metro Rail Gurgaon
IL&FS Engineering and Construction Company Limited
Piling work of 1000 mm Dia. Bored Cast in situ Piles By TMR Machine.
7.94000 25.06.2014 Completed
25
Delhi Metro CC-65 Project at Badarpur Faridabad Corridor of DMRC
Pioneer Fabricators (P) Ltd.
Piling work of FOB'S 16 NOS., 540 Piles of 600 mm & 800 mm Dia. Cast in situ.
59.71500 30.06.2014 Completed
26 Huda road project Gurgaon
IL&FS Engineering and Construction Company Limited
Laying of storm water line at Cyber city area 24.61530 10.07.2014 Completed
27 Second Phase of Rapid Metro Rail Gurgaon
IL&FS Engineering and Construction Company Limited
Piling work of 1000 mm Dia. Bored Cast in situ Piles by TMR Machine.
35.35000 08.08.2014 Completed
28 Huda road project Gurgaon
IL&FS Engineering and Construction Company Limited
Carrying out Load Test on Existing Box Drain 2.40000 12.08.2014 Completed
29 Contract CC-27 (UG-2) DMRC
L&T - SUCG JV CC-27 Delhi.
Laying of solid pre-cast concrete blocks for construction of walls for all the locations at different levels (without materials) for concourse slab & Base slab at IIT and RK Puram Underground Metro Station.
18.93100 12.08.2014 Completed
30 Contract CC-27 (UG-2) DMRC
L&T - SUCG JV CC-27 Delhi.
Piling work of 350 mm Dia. by DTH Machine. 17.19750 25.09.2014 Completed
31 Malviya Nagar Water services DJB Site Delhi
Suez Environment India. Pvt Ltd
Road Restoration work with Bitumen. 25.00000 26.09.2014 Completed
32 Malviya Nagar Water services DJB Site
Suez Environment India. Pvt Ltd
Laying of Pipe line DI 500 mm and 600 mm Dia. pipe line. 35.56000 26.09.2014 Completed
Delhi
33 Malviya Nagar Water services DJB Site Delhi
Suez Environment India. Pvt Ltd
Service contract for manpower supply at MNWS. 2.00000 08.12.2014 Completed
34 Construction of soldier pile & wooden lagging at supreme court underpass project Delhi
Rama Construction Co.
Soldier piles done by TMR Machine 8.50000 09.12.2014 Completed
35 Pile foundation work at Okhla, station for DMRC CC - 79 R Project New Delhi.
SB Protech Private Limited
Pile foundation work at Okhla station for DMRC CC - 79 R Project New Delhi.
26.60000 17.12.2014 Completed
36 Delhi Metro CC-65 Project at Badarpur, Faridabad Corridor of DMRC
Pioneer Fabricators (P) Ltd.
Piling work of FOB'S 16 NOS., 540 Piles of 600 mm & 800 mm Dia. Cast in situ.
37.15000 01.02.2015 Completed
37 Load test at Munirka PWD Fly over Delhi.
SB Protech Private Limited
Test Pile work at Munirka Flyover site HCC 6.54000 06.02.2015 Completed
38 53.5 MGD Sewage pumping station Delhi Jal board Preet Vihar new Delhi.
SPML Infra Ltd. Screen chamber complete work 119.06600 06.02.2015 Completed
39 Laying of sewer line 1400 mm Dia. near Genpact Gurgaon.
IL&FS Engineering and Construction Company Limited
Laying of sewer line 1400 mm Dia. near Genpact Gurgaon.
0.81675
26.02.2015 Completed
40 Contract CC-27 (UG-2) DMRC
L&T - SUCG JV CC-27 Delhi.
Soldier pile Boring for R.K. Puram, IIT, Munirka and Hauzkhas Stations at Entry Exit Area Hydraulic Rotary rig.
15.83380 02.03.2015 Completed
41 53.5 MGD Sewage pumping station Delhi Jal board Preet Vihar, new Delhi.
SPML Infra Ltd. Screen chamber complete work 16.10000 06.03.15 Completed
42 Soldier Pile girder extraction work.
IL&FS Engineering and Construction Company Limited
Soldier piles extraction work 19.45000 11.03.2015 Completed
43 Piling work at Noida R.S. Sharma Contractors Pvt Ltd.
1000 mm Dia. Piling by Hydraulic machine 82.50000 12.03.2015 Completed
44 Malviya Nagar Water services DJB Site Delhi
Suez Environment India. Pvt. Ltd.
Road Restoration work with Bitumen. 350.00000 13.03.2015 Completed
45 Munirka Delhi Flyover Hindustan Construction Company Ltd.
Pile head Chipping 5.70000 06.05.2015 Completed
46 1200 mm Dia. Piling work at Mukarwa chouk Delhi.
G R Infraprojects Ltd.
37 m deep 1200 mm Dia. pile by TMR Machine. 6.07400 07.05.2015 Completed
47 Delhi Metro CC-65 Project at Badarpur Faridabad Corridor of DMRC
Pioneer Fabricators (P) Ltd.
Piling & Pile cap work of FOB'S 16 NOS., 540 Piles of 600 mm & 800 mm Dia. Cast in situ & 25 Pile caps.
60.67500 11.05.2015 Completed
48 MSIL R&D Facility,Phase-II Project at IMT Rohtak, Haryana
L&T Construction Pile Shoring with Anchoring and shotcrete work 54.33384 19.05.2015 Completed
49 AVJ Buisness Park Best View Properties Ltd
Shoring with Piling and wooden legging 23.51725 29.05.2015 Completed
50 Maruti Suzuki Sector 18 Project
Balot Construction Co.
2 M Piling 750 mm Dia., 350 Nos. for shed 9.35500 13.06.2015 Completed
51 Outer Ring road Corridor Piling work.
Continental Engineering corporation Ltd.
1200 mm Dia., 35 m deep Piling work with TMR Machine.
20.11580 31.07.2015 Completed
52 Okhala Metro station Piling DMRC Project
Quality Buildcon Pvt Ltd.
1200 mm Dia. Piling with rock shocketing. 52.00000 10.10.2015 Completed
53 AVJ Buisness Park Best View Properties Ltd
500 mm Dia. Piling by TMR 154 Nos. 20 M Deep. 21.40000 20.10.2015 Completed
54 Delhi Metro CC-65 Project at Badarpur Faridabad Corridor of DMRC
Pioneer Fabricators (P) Ltd. 600 mm Dia. Piling by TMR. 1.24375 15.10.2015 Completed
55 Huda road project Gurgaon
IL&FS Engineering and Construction Company Limited
Soldier piles 600 mm Dia. for Protection of Underpass Sikanderpur 12 m Deep
24.15000 01.11.2015 Completed
56 MLCP Brookfield Project Sector-21 Gurgaon.
Capacite Infraprojects Ltd.
Soil Retention work up 16.50 m deep by soldier piles 600 mm Dia. and soil anchors 16.5 m deep 150 mm Dia..
145.32687 04.11.2015 Completed
57
Construction of soldier pile & wooden lagging at supreme court underpass project CPWD Delhi
Rama Construction Co.
Soldier piles done by TMR Machine 5.9850 01.12.2015 Completed
58 Contract CC-27 (UG-2) DMRC
L&T - SUCG JV CC-27 Delhi.
Soldier pile Boring for, Munirka at Entry Exit Area by TMR rig. 6.60 12.12.2015 Completed
59 Contract CC-27 (UG-2) DMRC
L&T - SUCG JV CC-27 Delhi.
Soldier pile Boring for Hauzkhas Stations at Entry Exit Area by DTH Machine and TMR rig.
8.80 08.12.2015 Completed
60 Baba Group VRC Constructions (I) Pvt Ltd
600 mm Dia. Soldier piles and Fabrication work 71.72984 19.01.2016 Completed
61 Baba Group VRC Constructions (I) Pvt Ltd 150 mm Dia. soil anchors 84.08748 19.01.2016 Completed
62 Baba Group VRC Constructions (I) Pvt Ltd 300 mm Dia. Underriemed Piles 24.13600 11.02.2016 Completed
63 DMRC Larsen & Toubro Ltd 1000 mm Dia. cast-in situ piles 107.58158 15.02.2016 Completed
64 VRC Constructions Pvt Ltd
RGCIRC Project Rohini Test Piles 12.0000 07.06.2016 Completed
65 L&T Constructions
Dheeru Bhai Ambani Global Centre aerocity Delhi
Balor Beam Fabrication Work 37.50000 24.06.2016 Completed
66 Supertech Supernova
Supertech Supernova 600 mm Dia. Piling 4.09500 07.09.16 Completed
67 Punjloyd VRC JV Barnala NH Road Project Punjab I-PSC Girders Prestressing work 60.500
16.09.16
Completed
68 Pioneer Fabricators (P) Ltd.
Sainbagh Metro Footover Piling work
1000 mm Dia. Piling work 9.9960
03.10.16 Completed
69 Tata Projects Brookfield Multiplex JV
Tata Centre Gurgaon Project sec-72
Shoring work with ISMB -500 g girders and planking anchoring with Materials
144.53220
08.10.16
Completed
70 L&T Constructions
Dheeru Bhai Ambani Global Centre aerocity Delhi
Soil and rock Anchor & Shoring Works 95.82350 21.10.16
Completed
71 Candor Gurgaon Two Developers & Projects Private Ltd.
SEZ Boundary Piling Work sector -21 Gurgaon
450 MM Dia. . 16 M deep Boundary Piling Work Turnkey Basis
88.57948 05.01.17 Completed
72 Supreme Construction Co. C/O Roungata Mines Ltd
Chaliyama Steel Plant Jharkhand
600 mm & 750 mm Dia. Piles in Rocky strata by hydraulic rotary rig
356.35032 01.03.17 Completed
73 Capacite Infraprojects Ltd
Samsung C&T project Sector -81 Noida
1000 mm Dia. piling 42 m deep and pile load test 1600 Ton capacity
244.62352 08.03.17 Completed
74 Aubade Solar DMRC Solar Plant 600 mm Dia. Piling for solar Plant 0.450 25.03.17 Completed
75 CTC Geotechnical Pvt Ltd
Asrani Inns Project Delhi
62.5 & 71Ton capacity soil anchors 59.4900 27.04.17 Completed
76 R.K. Infra NH-24, Delhi-Meerut Express way Project
1200 mm Dia. Piling by TMR Machine 1.385 10.05.17 Completed
77 Supreme Construction Co.
RML Power Plant, Jharkhand
600 mm and 750 mm Dia. Piling work in rocky strata 356.35032 13.05.17 Completed
78 VRC Constructions India. Pvt Ltd
Building Project Rajoukari Gurgaon
Shoring Work 5.075 20.06.17 Completed
79 Larson & Toubro lTD DMRC Project Faridabad
1000 mm Dia. Piling by TMR 11.209 22.06.17 Completed
80 Reach Promoters Pvt Ltd
Reach site sohna road Gurgaon
400 mm Dia. Under reamed Piles 15 m deep
11.41768 27.07.17 Completed
81 Tata Projects Ltd Gurgaon Sector 72 GGN Shoring work 15.49124 02.08.17 Completed
82 Capacite Infraprojects Limited
Samsung C&T Noida
42 M 1000 Dia. 8 Nos. test pile and 8 Nos. 1800 Ton Pile load test by kentledge method
244.62352 22.08.17 Completed
83 Maccaferri Sector 68 Gurgaon RE Wall Construction work 9.83250 05.09.17 Completed
84 Larson & Toubro Ltd Faridadabad Metro Concrete Block Supply 6.04800 20.09.17 Completed
85 Pioneer Fabricator Pvt Ltd
DMRC Faridabad FOB Site 800 mm Dia. Piling by TMR 35.000 12.10.17 Completed
86 Larson & Toubro Ltd Faridadabad Metro 1200 mm Dia. Piling work 6.04800 17.10.17 Completed
87 Larson & Toubro Ltd Faridadabad Metro 1200 mm Dia. Piling work 5.34600 22.11.18 Completed
88 Emaar MGF Land Ltd Gurgaon Sector-77 Palm Hills Piling Works
600 mm & 750 mm Dia. Piling work 103.25249 26.10.17 Completed
89 Emaar MGF Land Ltd Gurgaon Sector-77 Palm Hills Piling Works
600 mm & 750 mm Dia. Piling work Amendment-1
68.93265 19.12.17 Completed
90 NCC Limited NBCC Building work at Narouji nagar Delhi
150 mm Dia. soil anchors in D-Wall, 917 Nos., 18-20 m depth, Capacity 50 ton each
297.27280 10.01.18 Completed
91 SP Singla Constructions Pvt Ltd
Narela Delhi DDA Flyoer 4.5 km 1350 Ton capacity pile load tests 42.480 23.01.18 Completed
92 Manglam Multiplex Private Limited
65 th Avenue Building work project
65th Avenue, 16.50 M deep shoring work at Gurgaon sector 65
358.715575 01.03.18 Completed
93 SP Singla Constructions Pvt Ltd
Narela Delhi DDA Flyoer 4.5 km 750 Ton capacity pile load tests 28.025 23.01.18 Completed
94 Bayaweaver Limited OMG Project Sector-129 Noida
1000 mm Dia. Secant piles 280 Nos. and 16.5 m depth soil anchors 350 Nos.
481.886 18.04.18 Completed
95 Capacite Infraproject Limited
SEZ Project at sector 135 noida UP
750 MM DIA. 35 m deep Bored Piles 227.4804 18.04.18 Completed
96 Capacite Infraproject Limited
Airtel Bharti Building work
300 MM DIA. 7 m deep Bored Piles for boundary work 8.64892 21.04.18 Completed
97 RYSN Infra LLP NBCC Building work at Narouji Nagar Delhi
Soil anchors 150 mm Dia. 303.17280 27.04.18 Completed
98 SP Singla Constructions Pvt Ltd
Narela Delhi DDA Flyoer 4.5 km 750 Ton capacity pile load tests 28.025 19.05.18 Completed
99 Prompt Engineering Pvt Ltd
M3M Cornerwalk Project sector 74 Gurgaon
Soil nailing and shotcrete work for 12 m deep cut 142.1664 05.06.18 Completed
100 Gulshan Homes and Infrastructure Pvt Ltd
Gulshan High Street Project Sector 129 Noida
12 m excavation Depth Shoring work by steel soldier piles 71.3664 08.06.18 Completed
101 Hirise Builders Pvt Ltd Haldiram Building work Gurgaon
500 mm Dia. Pile by Aunger method 20.00 16.06.18 Completed
102 Gentle Realtors Pvt Ltd M3M IFC Project Sector 66 Gurgaon Soil Nailing and shotcrete Work 68.11491 28.06.18 Ongoing
103 Olive Realcon Pvt Ltd M3M Trump Tower Project Building work
18 m deep shoring work by 600 mm Dia. contigious piles and soldier piles shoring work, nailing and shortcrete work.
534.16476 30.06.18 Ongoing
104 Bayaweaver Limited OMG Project Sector 129 Noida 350 Ton footing load test 14.160 07.07.18 Completed
105 Emaar MGF Land Ltd Gurgaon Sector-77 Palm Hills Piling Works
600 mm & 750 mm Dia. Piling work Amendment-2
31.2807144 09.07.18 Completed
106 Olive Realcon Pvt Ltd M3M Trump Tower Project Building work
18 m deep shoring work by 600 mm Dia. contigious piles and soldier piles shoring work, nailing and shortcrete work. Amendment-1
180.12995 17.08.18 Ongoing
107 Gentle Realtors Pvt Ltd M3M IFC Project Sector 66 Gurgaon
Soil Nailing and shotcrete Work Amendment-
70.89798 18.08.18 Ongoing
108 ATC Project, Kolkota Ramacivil India. Construction Pvt. Ltd. Kolkata
Soil anchors 150 mm Dia., having 50 Ton anchor capacity. 59.92925 03.09.2018 Ongoing
109 94140- Seaview Candor Noida-2
Seaview Devloper P. L. (SEZ), Candor Tech Space, Plot No. 20-21, Sector 135 Noida-201301 UP
Foundation piles all initial layout of piles and setting out, boring through all types of soils, existing road/pavement including empty boring and removal of all obstruction, placement of reinforcement cage, pouring the concret.
6.74016 13.09.2018 Completed
110 Golf Estate Phase 1A (Gate NO.2)
M3M India. Private Limited. At sec 65, Gurgaon, Haryana.
Supply & Laying 15200 sand bags sequentially in layers to provide passive support to excavated profile.
1.25552 13.09.2018 Completed
111 Prompt Engineering Pvt Ltd
M3M Cornerwalk Project sector 74 Gurgaon
Soil nailing and shotcrete work for 12 m deep cut Amendment-1
82.48200 17.09.2018 Completed
112 Olive Realcon Pvt Ltd M3M Trump Tower Project Building work
18 m deep shoring work by 600 mm Dia. contigious piles and soldier piles shoring work, nailing and shortcrete work. Amendment-3
145.82251 17.09.2018 Ongoing
113 The Megaleio Sector-129, Jaypee Greens, Noida (UP)
Adonis Buildtech Pvt. Ltd. 1600 sq.m soaring work, 181.24800 26.09.2018 Ongoing
114 Larsen & Toubro Ltd.
Asset Area 13, Hospitality District, Aerocity, New Delhi
Executions of inclined soil anchor, rock anchor works (various capacity anchor is 50T, 60T, 65T, 90T) with labour, plant, machinery and material
245.878252 01.10.2018 Ongoing
115 Manglam Multiplex Private Limited
65 th Avenue Building work project
65th Avenue, 16.50 M deep shoring work at Gurgaon sector 65
4.54300 11.10.2018 Completed
116 Eldora Constructions Pvt. Ltd.
M3M India. Pvt. Ltd. Marina sierra, sector 68, Gurgoun.
M30 grade RCC cast in situ vertical pile as per IS 2911 (Part 1, Section 2) with 450mm Dia.meter and 12 m depth below cut of level
6.18320 30.11.2018 Ongoing
117 Manglam Multiplex Private Limited
65 th Avenue Building work project
750mm Dia. RCC Pile 72. Nos.. 12.5 m deep each. 150mm Soil anchors (85T capacity), waler beam and stressing. Soil strenthning work by 75mm pressure grout pile
118.00007 03.12.2018
Ongoing
118 Capacite Infraproject Limited.
Construction of Tower-11 and Multi Level Car Parking,
Shoring with ISMB-450 Girders, with two layer of anchor 150mm Dia. 16m. deep 3m c/c, with two Nos. ISMB 200 Girder walers.
111.39200 15.12.2018 Ongoing
119 Bayaweaver Ltd. & Leigton India Contractors Pvt. Ltd.
OMG, Sector-129, Noida, UP
Borring, Driling, Installation & Testing Piling work 311.00000 28.12.2018 Completed
120 Prompt Engineering Pvt. Ltd.
Corner Walk, Situated at sector 74, Gurugram, Haryana.
Design And Build shoring system for soil stabilization by Soil Nailing work
151.06000 15.01.2018 Completed
122 Lavish Buildmart Pvt. Ltd.
“Commercial Project” Situated at sector-73, Gurugram, Haryana.
Soil stabilization work by 100mm dia Soil Nailing 60.50000 21.01.2019 Completed
121 Mangalm Multiplex Private Limited.
65th Avenue, sector 65 Gurugram, Haryana. Amendment No-1
Shoring with RCC 750mm Dia Pile with anchor 100.04385 13.03.2019 Completed
122 Olive Realcon Pvt Ltd M3M Trump Tower Project Building work
18 m deep shoring work by 600 mm Dia. contigious piles and soldier piles shoring work, nailing and shortcrete work.
253.98452 05.03.2019 Ongoing
123 Melco India Pvt. Ltd. DIS-NTPC Dadri. Pile load Test. 27.50000 14.03.2019 Ongoing
124 Heritage Infraspace India Pvt. Ltd.
BHEL, Sector16A, Noida.
150mm dia soil Anchor by ROC/Conventional method 30.60000 01.04.2019 ongoing
Total 9545.276941 Lacs
We take extreme pride in the fact that in all the above mentioned projects which include Pile load test , Station Building DMRC , Soldier Piling works,Shoring with piling and shotcrete and Sewer and Storm water line alongwith EPC contract for civil engineering job for road widening at Gurgaon,Delhi , Haryana and MGF Emmar Reservior UG Tank,Screen chamber and sumpwell work, soil retention up to 16.5 m deep with anchoring , DI Water line work etc. we have been able to achieve complete customer satisfaction by delivering works within budget & schedule while conforming in totality with the Quality & SHE standards of DMRC , HUDA , DJB, PWD , CPWD and SEZ Projects which are the current benchmarks for any Construction Project in India..
We can therefore offer our services to you in the following areas of works where we provide a complete package:
i. Execute pile load test of any of piles. ii. Installation of Bored Cast in Situ Piles and Soldier piles by Hydraulic Rotary and TMR Machine.
iii. Manufacture of Reinforcement as per drawing and execute all type of RCC Works. iv. Preparation & Laying of Storm, Sewer and Portable Water lines (With or without pipes). v. Fabrication & Handling of steel structures.
vi. Any type of shoring works with Secant piles, contiguous, soldier and sheet piling with anchoring and Nailing and shotcrete with and without Materials like with fleet up to 1500 MT, ISMB 500 Girders.
A brief writes up describing the technical aspects and detailing our responsibilities for the above-mentioned items of work follows:
Execute Pile load test and submitting of reports:
We are able to execute pile load test as per prepared drawing layouts and make a plateform by secondary
girders with main girder and placing the jacks on prepared pile head of required capacity, after that placed the kentledge loading by concrete blocks with the crane and hydras.
After loading the plateform by required loading we are calculated the load chart and accordingly we loaded
the pile as per IS Code requirements then taken all reading and plotted the graph for collected datas.
Installation of Bored Cast In Situ Piles and Soldier piles
All piles are installed by TMR, DTH and Hydraulic Rotary Piling Rig.
The works comprises mainly of the following steps:
(a) Drilling of bore holes of required Dia.meter
(b) Insert temporary casing
(c) Lower Reinforcement Cage.
(d) Flushing of bore.
(e) Pouring of Concrete as per approved Design Mix.
(f) Disposing of Muck / Bentonite etc.
Equipment and Accessories required for Piling are detailed below:
(a) TMR, DTH and Hydraulic Rotar piling rig with all accessories
(b) Temporary casing pipe
(c) Bentonite Mixing Set-up comprising of mixing tank and pumps
(d) Tremie pipe of 200 or 250mm I.D. min along with Hopper
(e) Testing Apparatus
Measuring cylinder, Mud Balance Hydrometer Marsh cone Weighing balance Hot plate pH papers
Sodium based bentonite will be used with pH of Fluid between 9.5 and 11.5. Bentonite powder shall conform to requirements given in IS: 2911 (Part -1/Sec -2). All batches of bentonite powder delivered & suspension fluid made there from shall be tested to satisfy requirements failing which they shall be rejected.
Bentonite powder shall be mixed with clean water to make a suspension of density as specified. The suspension shall be regularly tested to ensure its suitability for use as drilling mud.
Concrete as per approved mix design will be supplied from centralized batching plant for all piles. Slump test will be done to check the workability of Tremie Concrete & Concrete. The Concrete shall generally be poured with minimum interruption.
Grade, length, Dia.meter etc. shall be as per design requirement shown on relevant drawings. Concrete cover blocks to ensure proper concrete covering shall be tied to rings of the cage.
Setting Out: This shall be provided by the Client.
Setting of Piling Rig: Rig will be centered on pile point. Drilling will be carried out using auger/bucket to a depth of approx. 2 to 3 meters. Then a temporary MS casing for about 4 to 6 m (approx) length from the ground level will be driven to protect loose soil from falling in the bore hole at locations where the soil is in loose state and there is a tendency of collapse of bore hole. After driving the casing its verticality will be checked by plumb bob.
Boring of Piles: The excavation is generally performed by rotation using a rotary drill, composed of a rotary table.
Borehole Stabilization: During the entire operation, the pile bore will be kept stable with bentonite solution.
Determination of Density: The bentonite sample from the bottom of borehole will be collected and its density will be measured by Hydrometer having a range of 1.001 to 1.300 gm/ml.
Determination of Marsh Cone Viscosity: The viscosity will be determined by using cone apparatus.
Reinforcement Fixing: Pile reinforcement cage shall be fabricated as per the details given in drawing and Bar Bending Schedule.
Flushing the Borehole: After cage lowering is completed the bore will be flushed with Bentonite Flushing shall be done continuously with bentonite till consistency of bottom slurry becomes less than 1.20.
Concreting: Minimum time interval between the completion of boring and placing of concrete will be maintained. The gap between the bottom of the bore to the end of tremie pipe will be min 300mm. The Dia. of the tremie pipe will be not less than 200mm. The Tremie pipe shall be removed in stages during pouring of concrete ensuring that the Tremie bottom is always inside the concrete.
Manufacture of Reinforcement as per drawing
Bar Bending & Cutting machines of required capacities would be set up in the Client’s work yard inside a covered shed that would function as a reinforcement factory.
The factory will also be equipped with necessary tables for working, electricity, other tools as required and overhead EOT if so required.
Normally full length reinforcement bars would be procured by the client and issued to us.
Reinforcement will be cut, bend and manufactured to required lengths, shapes and sizes as per the approved Bar Bending schedule which shall be provided to us.
The reinforcement thus manufactured will be tagged off mentioning the length, drawing no, structure identification etc and will be stacked in a designated location for transportation to the construction site as per the schedule provided to us.
Preparation & Laying of Storm, Sewer and portable Water lines (With or without pipes)
The Following steps are followed by us during the laying of Storm and Sewer water lines at deeper:- Fixing of Alignment in plan as per given drawings by Co-ordinate method. Soldier piles installation by Manual labour, TMR and DTH Machine in required Dia.. Inserted the ISMB Girders in pile holes and back fill with 1:20 (cement : soil). Fabricated struts and walers before excavation in deep position beyond 3.5 meter. Excavation of trenches by JCB and Poclain. Leggings by wooden planks with excavated layers. Dressing of bed by manual labour. PCC or Sand Filling in Bed before Laying the Pipe. Placing of RCC humepipes by pick and carry crane.
Joining of pipes in proper alignment by help of manual labour and crane. Joints Filling by mortar 1:6 (1 cement:6 course sand) with rubber packings Making of Manholes at given location and distances as per drawings. Hounching by PCC or Sand filling around the pipe in minimum 150 mm thick. Back filling by selected soil in 250 mm thick layers with 98 % proctor density. Final finishing and restoration of roads, if alignment in running roads.
Fabrication & Handling of Barricades Barricade Boards, which demarcate the working area from the traffic movement corridor, would be fabricated, painted & marked as per the drawings and specifications. The fabricated barricade boards would be installed in position and locked.
Rehandling of barricades by lifting from the previously installed positions and placing at the new locations would be carried out as per the requirement of the client.
Maintenance, repainting and cleaning of the installed barricade boards would be carried out.
Any type of shoring works with contiguous, soldier and sheet piling with anchoring and shotcrete
First installed Piling by TMR Machine as per required drawing and design on marked alignment after that execute excavation in steps and installed anchors at 20 degree from horizontal at required depth. Waler beam fabricated and installed with anchor rod on horizontally and fixed with wedge plates and bolts. Shotcrete made on that soil faces which are highly alarmed as collapsed soil, 75 x75x4.2 mm mess installed on soil face with nails, grouted by grouting pump as required grouting materials after installed the mess.
In conclusion, we would be proud to be associated with you in your prestigious project / projects and would request you to spare some of your valuable time for an appointment with us where we can understand the total scope of work in detail. This would enable us to come up with a comprehensive techno-commercial proposal for the subject work. As always, we promise state of the art equipment, transparent, honest and diligent service and a product conforming to schedule, budget and the strictest standards of quality and safety
MANAGEMENT PROFILE
Proprietor: S. B. Gurjar (B. E. Civil & MBA) A2, RPS Omaxe Green valley, Sector 41-42 Faridabad -121003 Proprietor – S.B.Gurjar In 2001 passed a civil Engineering Degree from Engineering College Kota Rajasthan with First division. & MBA from Delhi in 2010. From May 2001 working with different companies in different capacities as a civil engineer like – GM Civil & Proffit Partner : (From I st Oct 2012 to till Nov 2012). Company : RV Akash Ganga Infrastructure Ltd. Location : DMRC Project CC-23 ,.Nehru Place ,Panchsheel , Houz khas Responsibilities: Total planning and management of front for Three Grab Rigs for D-wall activity, Related Drawings, Manpower, Staff,Cages making, Billing, Target achieving, for this 3 Nos. Underground station building Metro Project. Dealing with Client Pratibha industries Ltd. And Parrelel Controlling of whole RVAG Piling& D-wall projects, Contracts Division. GM Civil : (From I st May 2012 to Sep .2012). Company : RV Akash Ganga Infrastructure Ltd. Location : DMRC Project CC-10 & CC -11.Faridabad Responsibilities : Total planning and management of front for four rotary Rigs for piling activity ,Related Drawings ,Manpower , Staff ,Cages making, Billing, Target achieving, for this 8 Nos. station building Metro Project. Dealing with Client Lanco Infratech Ltd. And Parrelel Controlling of whole RVAG Piling projects, Contracts Division SR. PROJECT MANAGER (From Feb.2011 to 31.03.2012). Company : RV Akash Ganga Infrastructure Ltd. Location : Rapid Metro Rail Project, Gurgaon. Responsibilities : Total planning and management of front for four rotary Rigs for piling activity ,Related Drawings ,Manpower , Staff ,Cages making, Billing, Target achieving, for this 6.5 kms Metro Project. Dealing with Client IL & FS Engineering services. And Parrelel Controlling of whole RVAG Piling projects , Contracts Division. PROJECT MANAGER ( From Oct .2010 to Feb.2011). Company : RV Akash Ganga Infrastructure Ltd. Location : Rapid Metro Rail Project, Gurgaon. Responsibilities : Total planning and management of front for four rotary Rigs for piling activity ,Related Drawings ,Manpower , Staff ,Cages making, Billing, Target achieving, for this 6.5 kms Metro Project. Dealing with Client IL & FS Engineering services. PROJECT MANAGER ( From Feb. 2009 to Oct .2010). Company : RV Akash Ganga Infrastructure Ltd. Location : Badarpur Flyover ,6 lane 4.45 kms.
Responsibilities : Total planning and management of front for four rotary Rigs for piling activity ,Related Drawings ,Manpower , Staff ,Cages making, Billing, Target achieving, for this 4.45 kms Highway Project. Dealing with Client Hindustan Construction Company Ltd. PROJECT MANAGER ( From Nov. 2007 to Feb .2009). Company : RV Akash Ganga Infrastructure Ltd. Location : BC-26, DMRC Project ,Length 6.65 kms. Responsibilities : Total planning and management of front for three rotary Rigs for piling,Pile-cap,Piers,Piercap ,launching of girders activity ,Related Drawings ,Manpower , Staff ,Cages making, Billing, Target achieving, for this 6.65 kms Metro Project. Dealing with Client Delhi Metro Rail Corporation Ltd. PROJECT MANAGER ( From July 2007 to Nov. to 2007). Company : RV Akash Ganga Infrastructure Ltd. Location : BC-21, DMRC Project ,Length 2.25 kms. Responsibilities : Total planning and management of front for one rotary Rig for piling,activity ,Related Drawings ,Manpower , Staff ,Cages making, Billing, Target achieving, for this 2.25 kms Metro Project. Dealing with Client ITD Cementation Ltd. CONSTRUCTION MANAGER ( From Jan 2007 to July 2007). Company : ITD Cementation Ltd.(BU3) Location : BC-21, DMRC Project ,Length 9.25 kms. Responsibilities : Dealing with subcontractors for Piling of whole 9.25 kms,arranging of vendors and subcontractors , piling progress responsibility. DY.PROJECT MANAGER ( From Oct 2005 to Jan. 2007). Company : Harish Chandra (India.) Ltd. Location : Parwati Dam Canal Project Dholpur (Raj.),Length 72 kms. Responsibilities: 72 km. canal lining project of parvati main canal from parvati dam in dholpur Rajasthan,Syphons,outlets,regulatory heads,major & minor branches,canal culverts & aquaducts with piling work etc made from bottom to top in all respects
SR. ENGINEER ( From Aug. 2002 Oct 2005). Company : Harish Chandra (India.) Ltd. Location : Bhopal –Sehore ,Length 45 kms. Responsibilities : NHAI Road work from Bhopal to sehore six lane highway work execution ,testing, reporting to seniors& Piling work Billing by autoplotter shoftware ,complete major & minor bridges from bottom to top,earthwork,GSB,WMM,BT,WMM plant errection,100 tonn crusher plant errection etc. whole responsibility related to NH Project 45 kms. SITE ENGINEER ( From May 2001 to Aug. 2002). Company : DODSAL. Location : Chikli Valsad Gujrat,Length 80 kms. Responsibilities : NHAI Road work execution 80 km. road project in chikli valsad Gujrat. Density of test,layers control,front- planning & Achieve availability of compaction for next front.
SUPPORTING BRAIN POWER
S.NO. NAME DESIGNATION PREVIOUS
COMPANY EXPERIENCE CONTAT
PROPRIETOR
1 S.B.Gurjar MBA, B.E. (Civil) Proprietor RV Akash Ganga
Infrastructure Ltd. 18 Years 9810288140
DESIGN AND STRUCTURAL CONSULTANT
2
Badarshahi Sandip Jethalal M.Tech (Structural Engg), B.Tech (Civil)
Sr. Structure Design Engineer
Master Leader Engineers, Porbandar,
Gujarat. 7 Years 9024285703
TECHNICAL MENAGEMENT
3 Gaurav Jangid General Manger GTL Ltd. (Myanmar) 8 Years 9351621070
4 Koushlandra Gurjar Project Manager IL & FS Engineering services 12 Years 9310162461
5 Abhishek Chikara Project Manager RV Akash Ganga Infrastructure Ltd. 12 Years 9716282945
TECHNICAL DEPARTMENT
6 Deshraj Site Incharge Aggcon Equipments Pvt Ltd. 8 Years 9310898681
7 Maihmber Site Incharge RV Akash Ganga Infrastructure Ltd 6 Years 8802214115
8 Yogendra Kumar Civil Engineer Dilip Buildcon Ltd. 10 Years 9691026988 9 Bablu Civil Engineer SBC (fresh joining) 2 Years 8118860842
10 Binesh Kumar Sah Civil Engineer SBC (fresh joining) 4 Years 9991960949 11 Ajay Prajapati Civil Engineer Dynamic Prestress
Pvt. Ltd. 8 Years 7380327693 12 Haribhan Civil Engineer SBC (fresh joining) 2 Years 6350508257 13 Paras Kumar Manarya Civil Engineer SBC (fresh joining) 3 Years 9761660402 14 Mahesh Soni Civil Engineer SBC (fresh joining) 2 Years 9351364177 15 Anita Harbola Civil Engineer SBC (fresh joining) Fresher 8859107968 16 Chander Prakash meena Civil Engineer SBC (fresh joining) Fresher 9711480483 17 Aman Kumar Prajapati Mechanical
Engineer Dilip Buildcon Ltd. 4 Years 9399657020 18 Asveer Civil Forman SBC (fresh joining) 6 Years 9928468506
19 Harinder singh Civil Supervisor RV Akash Ganga Infrastructure Ltd 5 Years 7742849140
20 Birendra Kumar Civil Supervisor DCIPL 5 Years 8470923251
21 Devender Civil Supervisor RV Akash Ganga Infrastructure Ltd 7 Years 9910497272
22 Sanjay Singh Civil Supervisor RV Akash Ganga Infrastructure Ltd 3 Years 7240532591
23 Ramhet Civil Supervisor SBC (fresh joining) 1 Years 7747914858 24 Siyaram Civil Supervisor SBC (fresh joining) 1 Years 9911869039 25 Rajveer Civil Supervisor SBC (fresh joining) 1 Years 6352376036 26 Naresh Civil Supervisor SBC (fresh joining) 1 Years 7665400578 27 Surender Singh Civil Supervisor SBC (fresh joining) 4 Years 8750110117 28 Reena Singh Civil Supervisor SBC (fresh joining) 3 Years 9907128737 29 Renu Chikara Civil Supervisor SBC (fresh joining) 3 Years 7011040500 30 Guddan Civil Supervisor SBC (fresh joining) 3 Years 9873626926 31 Ramveer Civil Supervisor SBC (fresh joining) 1 Years 7217853325 32 Harichand Civil Supervisor SBC (fresh joining) 2 Years 6375268276 33 Ashok Kumar Technician SBC (fresh joining) 2 Years 9871852384 34 Madhav Upadhyay Technician SBC (fresh joining) 2 Years - 35 Balram Technician SBC (fresh joining) 2 Years 9454821020 36 Abdhesh Kumar Ray welder SBC (fresh joining) 3 Years 931573461 37 Ritesh Kumar Gaur Electrician Hp Signal
Construction 4 Years 8619735344 38 K. Malumnaidu Store In charge SBC (fresh joining) 1 Years 6370998499 39 Lokesh Kumar Store keeper SBC (fresh joining) 3 Years 8302155148 40 Harendra Kumar Safety Officer Pioneer fabricator Pvt.
Ltd. 2 Years 8285905653
FINANCE DEPARTMENT
41 Savita Gurjar Finance Head SBC (fresh joining) 12 Years 9871167800
42 Lachhaman Sr. Accountant Anjani Casting Pvt. Ltd. Sohna Gurgaun, 8 Years 9812951414
43 Raghuraj Accountant SBC (fresh joining) 6 Years 8619783497 44 Hitendra Kumar Sharma Office boy Dynamic Beneficial
Accot 1 Years 8302419422
OTHER STAFF
45 Bijendra singh Driver SBC (fresh joining) 4 Years 9599652632 46 Darav singh Cook SBC (fresh joining) Fresher 6378771511
LIST OF CLIENTS
Continental Piling & Excavation Pvt. Ltd Lanco Infratech Ltd. IL & FS Engineering and Construction Company Ltd. L&T – SUCG JV CC-27. M/s N.K. Construction Company. Amrapali Group. RV Akash Ganga Infrastructure Ltd. Pioneer Fabricators Pvt. Ltd. Rama Construction Co. SB Protech Pvt Ltd Suez Environment India. Pvt Ltd. SPML Infra Ltd L&T Construction (B&F) Rohtak. GR Infra Projects Ltd. CEC Quality Buildcon Pvt Ltd. Capacite Infraprojects Ltd. Best View Properties Ltd. L&T LTD VRC Construction (I) Pvt Ltd. AVJ Group HCC LTD Capacite Infraprojects Ltd. Supertech Ltd Pujlloyd –VRC JV Tata Projects Brookfield Multiplex JV Candor Gugaon Two Developers Pvt Ltd (Brookfield) Supreme Construction Co. Aubade Solar CTC Geotechnical Engineering Pvt Ltd Continental Piling & Excavation Pvt Ltd. R.K. Infra Reach Promoters Pvt Ltd