SAVUDU QUARRY S.F.NO: 376 (Sonapettai Eri of 8), Munnavalkottai village, Needamangalam Taluk, Thiruvarur District, Tamil Nadu Quarry lease area 4.90.0Ha (Out of 11.99.5 Hec) Savudu Production 44100m 3 / for 3 Month FORM -1, PREFEASIBILITY REPORT, MINING PLAN APPLICANT Thiru.MR.Bhusan, Assistant Manager (F&A), M/s Madhucon Projects Limited, Nagapattinam-Thanjavur Road Project, (NH67) NewBase Camp, Aravathur Village, Manikamangalam (Po), Thiruvarur. PREPARED BY R.RAJASEKAR M.Sc., Recognized Qualified Person RQP/CNN/264/2015/A Cuddalore-606 105.

Upload: others

Post on 27-Jun-2020

10 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

SAVUDU QUARRY

S.F.NO: 376 (Sonapettai Eri of 8), Munnavalkottai village,Needamangalam Taluk,

Thiruvarur District, Tamil Nadu

Quarry lease area – 4.90.0Ha (Out of 11.99.5 Hec)

Savudu Production – 44100m3/ for 3 Month

FORM -1, PREFEASIBILITY REPORT,

MINING PLAN

APPLICANT

Thiru.MR.Bhusan,

Assistant Manager (F&A),

M/s Madhucon Projects Limited,

Nagapattinam-Thanjavur Road Project,

(NH67) NewBase Camp, Aravathur Village,

Manikamangalam (Po),

Thiruvarur.

PREPARED BY

R.RAJASEKAR M.Sc.,

Recognized Qualified Person

RQP/CNN/264/2015/A

Cuddalore-606 105.

Page 2: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

CONTENTS

S.No. Particulars Page No

1. Form -1

2. Prefeasibility Report

3. Letter from District Collector, Thiruvarur to produce Approved Mining Plan

and Environmental Clearance from DEIAA.

4. Mining Plan Approved Letter from Department of Geology and Mining,

Thiruvarur

5. Approved Mining Plan

Page 3: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

FORM -1

Form-1, Prefeasibility Report , Mining Plan for Savudu, S.F.No.376

(Sonapettai Eri of 8) in Munnavalkottai Village, Needamangalam Taluk,

Thiruvarur District, Tamil Nadu of Thiru.MR.Bhusan, (Extent – 4.90.0Ha

(Out of 11.99.5 Hec).

Page 4: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

FORM – I

Thiru.MR.Bhusan(I) Basic Information

S.No Item Detail

1 Name of the project/s Savudu Quarry project.

2 S.No. in the schedule 1 (a)

3 Proposed capacity/area/length/tonnage to be handled /commandarea/lease area /number of wells to bedrilled.

Savudu for = 4 4 1 0 0 M3

Extent = 4.90.0Ha (Out of 11.99.5 Hec)

4 New/Expansion/Modernization New quarry

5 Existing Capacity/Area etc. Nil

6 Category of Project i.e. ‘A’ or ‘B’ B2

7 Does it attract the general condition? IfYes, please specify.

No. It doesn’t attract any items mentionedin the general conditions

8 Does it attract the specific condition? IfYes, please specify.

No. It doesn’t attract the specificConditions

9

Location:

Plot/Survey/Khasra No. 376 (Sonapettai Eri of 8)

Village Munnavalkottai

Taluk Needamangalam

District Thiruvarur

District Tamilnadu

10 Nearest railway station/airport alongwith distance in kms

Needamangalam– 11km

Thanjavurr– 30 km

11 Nearest Town, city, districtHeadquarters along with distance inkms.

Town - Thiruvarur – 32kms

city - Thiruvarur – 32 kmsDistrict - Thiruvarur –32 kms

12 Village Panchayats, Zilla Parishad,Municipal Corporation, Local body(complete postal addresses withtelephone nos. to be given)

Village - Munnavalkottai

Union - MunnavalkottaiTaluk - NeedamangalamDistrict - Thiruvarur

Name of the applicant Thiru.MR.Bhusan

14 Registered Address Assistant Manager(F&A),M/s Madhucon Projects Limited,Nagapattinam-Thanjavur Road Project,(NH67) NewBase Camp, Aravathur Village,Manikamangalam (Po),Thiruvarur.

Address for correspondence: Same as above

Page 5: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

15

Name Thiru.MR.Bhusan

Designation (Owner/Partner /CEO) CEO

Address Same as above

Pin code

E-mail

Telephone No.

Fax No. Nil

16 Details of Alternative Sites examined, ifAny. Location of these sites should beshown on a topo sheet.

There is no alternative site examined as the project issite specific.

17 Interlinked Projects There is no inter linked projects

18 Whether separate application ofInterlinked project has beensubmitted?

There is no inter linked projects

19 If yes, date of submission Does not arise

20 If no, reason Since the project involves rough stoneOperation only, there is no interlinked projects.

21

Whether the proposal involvesapproval/clearance under: if yes,details of the same and their status to begiven.i. The Forest (Conservation) Act, 1980?ii. The Wildlife (Protection) Act, 1972?iii. The C.R.Z. Notification, 1991?

(i)The project doesn’t attract the Forest(Conservation) Act 1980. There is no Forest landinvolved within the quarry lease applied area(ii) There is no wild life with in 10 km radius from theproject site area under the Wildlife (protection)Act1972.(iii) The quarry is located 70 km away from Bay ofBengal. Hence, the project doesn’t attract the C.R.Z.Notification,1991.

22Whether there is any GovernmentOrder/Policy relevant/ relating to thesite.

Nil

23 Forest Land involved ( hectares) No Forest land is involved in the core zone.

24Whether there is any litigation pendingagainst the project and/orland in which the project is propose to beset up?a) Name of the Courtb) Case No.c) Orders/directions of the Court, if anyand its relevance withthe proposed project.

No litigation is pending with court as against thisproject.

Page 6: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

(II) Activity

Construction, Operation or De-commissioning of the Project Involving actions, which will cause physical

changes in the locality (topography, land use, changes in water bodies, etc.)

S.No. Information/ChecklistConfirmation

Yes/No

Details thereof (with approximatequantities /rates, wherever possible)with source of information data

1.1 Permanent or temporary changein land use, land cover ortopography including increase inintensity of land use (withrespect to local land use plan)

No The proposed project is made exclusive for quarryingSavudu. The ultimate pit will be used as waterreservoir. The quarry lease is requested for a period of3 month.

1.2 Clearance of existing land,Vegetation and buildings?

No Not required, since the project is dry, vacant,

uncultivable area, few shrubs and weeds.

No permanent structures like pumping schemes,

bridges a n d b u i l d i n g s , S o there is no need

o f Clearance of existing lands..1.3 Creation of new land uses? No The total quarrying activity is proposed to be carriedout within the quarry lease applied area and hence thereis no proposal for the creation of new land uses.

1.4 Pre-construction investigationsE.g. bore houses, soil testing?

No There are no previous investigations because theSavudu is available from the surface itself.

1.5 Construction works? yes Office building will be constructed in the quarry leasehold area.

1.6 Demolition works? No No demolition work is involved.

1.7 Temporary sites used forconstruction works or housing ofconstruction workers?

No No temporary site for construction works is involved..

1.8 Above ground buildings,structures or earthworks includinglinear structures, cut and fill orexcavations

No There will not any high rise buildings.

1.9 Underground works includingmining or tunnelling?

No No underground working is involved.

1.10 Reclamation works? No There is no proposal for backfilling. The quarryingoperation will be performed to exploit the entirereserves.

1.11 Dredging? No There is no scope for dredging

1.12 Offshore structures? No There is no such activities involved

1.13 Production and ManufacturingProcess

Yes Savudu production 3 months=44100 m3 and there isno manufacturing process here.

1.14 Facilities for storage of goods orMaterials?

Yes Savudu Production for 3 month =44100 m³And there is no manufacturing process here.

Page 7: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

1.15 Facilities for treatment or disposal ofsolid waste or liquid effluents?

yes No storage occurs as all the materialexcavated is loaded and transported to end users

1.16 Facilities for long term housingof operational workers?

No As the entire reserves should be used, there is nosolid waste or liquid effluents.

1.17 New road, rail or sea trafficDuring construction oroperation?

No The proposed project is for a period of 3monthwhere local people will be employed and there is noscope for long term housing for workers.

1.18 New road, rail, air waterborne orother transport infrastructureincluding new or altered routes andstations, ports, airports etc?

No The existing road is adequate. It will be properly relaid or strengthened.

1.19 Closure or diversion of existingTransport routes or infrastructureleading to changes in trafficmovements?

No Not required.

1.20 New or diverted transmissionlines or pipelines?

No This project will not cause any changesto the existing traffic movement

1.21 Impoundment, damming,culverting, realignment or otherchanges to the hydrology ofwatercourses or aquifers?

No The project doesn’t involve diversion oftransmission or pipe lines

1.22 Stream crossings? No The project does not involve impoundment,damming, culverting, realignment or other changes.

1.23 Abstraction or transfers of waterForm ground or surface waters?

No There is no stream crossing within theproposed area

1.24 Changes in water bodies or theland surface affecting drainage orrun-off?

No About 2.5 KLD water will be used for dustsuppression, green belt and domestic sanitaryneeds.

1.25 Transport of personnel orMaterials for construction,operation or de commissioning?

No No changes in the water bodies or the land surfaceunder this project.

1.26 Long-term dismantling orDecommissioning or restorationworks?

No No dismantling, De-commissioning orrestoration works required or planned

1.27 Ongoing activity duringdecommissioning which couldhave an impact on theenvironment?

No No such type of activities involved in theproject

1.28 Influx of people to an area ineither temporarily orpermanently?

Yes Considering the small magnitude of the operation ofthe employment of locals mainly, no major influx ofthe people will happen.

1.29 Introduction of alien species? No No introduction of any species isinvolved

Page 8: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

1.30 Loss of native species or geneticdiversity?

No As the area is devoid of any vegetation and habitation,there is no loss of any native species.

1.31 Any other actions? No None

2. Use of Natural resources for Construction or operation of the Project (such as land, water, materials or

energy, especially any resources which are non-renewable or in short supply):

S.No. Information/checklistconfirmation

Yes/No

Details there of (with approximate quantities/rates, wherever possible) with source ofinformation data

2.1 Land especially undeveloped oragricultural land (ha)

Yes PWD Tank of 4.90.0Ha (Out of 11.99.5 Hec)

2.2 Water (expected source &competing users) unit: KLD

Yes About 2.5 KLD water will be used for dustsuppression, green belt and domestic sanitaryneeds.

Drinking & Domestic

Purposes (in KLD)

0.750 KLD

Dust Suppression (in KLD) 1.500 KLD

Green belt (in KLD) 0.250 KLD

Total 2.500 KLD

2.3 Minerals (MT) Yes Savudu production for 3 month =44100 m³

2.4 Construction material –stone,aggregates, Sand /soil (expectedsource – MT)

No Not applicable as no major construction isinvolved.

2.5 Forest and Timber (Source-MT) No Nil

2.6 Energy including electricity andfuels (source, competing users) Unit:fuel (MT), energy (MW)

Yes Diesel will be utilized for Tippers and loaders.Electricity will be used only for administrativeand other buildings.

2.7 Any other natural resources (useappropriate standard units)

No No other resource used

Page 9: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to

human health or the environment or raise concerns about actual or perceived risks to human health.

S.No. Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities/rates, wherever possible)with source of information data

3.1 Use of substances or materials,which are hazardous (as perMSIHC rules) to human healthor the environment (flora, fauna, andwater supplies)

No No hazardous materials used in this project.

3.2 Changes in occurrence ofdisease or affect disease vectors (e.g.insect or water borne diseases)

No Not envisaged

3.3 Affect the welfare of people e.g.by changing living conditions?

Yes Welfare of the people will get improveddue to the employment generation activitiesof this project

3.4 Vulnerable groups of peoplewho could be affected by theproject e.g. hospital patients,children, the elderly etc.,

No The project does not affect Vulnerable grouplike hospital patients, children etc.

3.5 Any other causes No No other cause envisaged

4. Production of solid wastes during operation or decommissioning (MT/month)

No Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities/rates, wherever possible)with source of information data

4.1 Spoil, overburden or minewastes

Yes There is no waste material as the entire reserves willbe used.

4.2 Municipal waste (domestic andor commercial wastes)

No Not applicable.

4.3 Hazardous wastes (as perHazardous Waste ManagementRules)

No No hazardous waste is generated in this project.

4.4 Other industrial process wastes No No industrial process is undertaken and no wasteenvisaged.

4.5 Surplus product No No Surplus product developed.

4.6 Sewage sludge or other sludgefrom effluent treatment

No No sewage sludge or other sludge generated by thisproject activity.

4.7 Construction or demolitionwastes

No No construction or demolition wastesGenerated

4.8 Redundant machinery orequipment

No No machinery is left redundant

4.9 Contaminated soils or othermaterials

No There is no contaminated soil or othermaterial noticed in the area

Page 10: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

4.10 Agricultural wastes No No agricultural waste envisaged

4.11 Other solid wastes No Solid waste will be used for foundation purposetowards construction work.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S.No Information/Checklistconfirmation

Yes/No Details thereof (withapproximate quantities/rates, whereverpossible) with source of information data

5.1 Emissions from combustion of fossilfuels from stationary or mobilesources

Yes Only major quantities of gaseous pollutants dueto operation of diesel operated machineries likehydraulic excavator, transport vehicles etc. Butthis will be controlled through proper effectiveremedial measures and proper environmentalmanagement plan.

5.2 Emissions from productionprocesses

Yes Low emission of gases from theHydraulic excavators.

5.3 Emissions from materials handlingincluding storage or transport

Yes Normal standard Emission ofGases from the vehicles while transporting thematerials as certified by the Regional Transportofficer while on Road.

5.4 Emissions from Constructionactivities including plant andequipment

No No construction activities are planned.

5.5 Dust or odours from handling ofmaterials including mining materials,sewage and waste

Yes There will be some dust emanation while loadingand transporting the Savudu. Spraying of waterwill control the dust.

5.6 Emissions from incineration of waste No Savudu quarryingdoesn’t produce any hazardouswaste

5.7 Emissions from burning of waste inopen air (e.g. slash materials,construction debris)

No No incineration of solid waste ormaterials

5.8 Emissions from any other sources No There are no emissions from otherSources.

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No Information/Checklistconfirmation

Yes/No Details thereof (with Approximatequantities/rates, wherever possible) withsource of information data with source ofinformation data

6.1 From operation of equipment e.g.engines, ventilation plant, crushers

Yes The sound produced during vehicle movement

only will be under permissible limit.

Page 11: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

6.2 From industrial or similar processes No There is no processing plant

involved

6.3 From construction or demolition No No construction or demolition

work envisaged6.4 From blasting or piling No Blasting is not required in this project.

Quarrying Savudu is by excavators only.

6.5 From construction or operationaltraffic

Yes Noise generation will be from excavator and

tippers. It should be maintained less than 85dB as

prescribed by DGMS

6.6 From lighting or cooling systems No No lighting or cooling system

required6.7 From any other sources No No Nil

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface

waters, groundwater, coastal waters or the sea:

S.No Information/Checklistconfirmation

Yes/No Details thereof (withApproximate quantities/rates, whereverpossible) with source of information data

7.1 From handling, storage, use orspillage of hazardous materials

No There will be no spillage ofHazardous materials during quarrying.

7.2 From discharge of sewage or othereffluents to water or the land(expected mode and place ofdischarge)

No No sewage or disposal ofeffluents or waste

7.3 By deposition of pollutants emittedto air into the land or into water

Yes No emission except fuel gases from the movingvehicles.

7.4 From any other sources No There is no other source

7.5 Is there a risk of long term build upof pollutants in the environmentfrom these sources?

No There is no scope for long termbuilt up of pollutants in this project

Page 12: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

8. Risk of accidents during construction or operation of the Project, which could affect

Human healthor the

environments

Information/Checklistconfirmation

Yes/No Details thereof (with Approximatequantities/rates, wherever possible) with

source of information data

8.1 From explosions, spillages,fires etc from storage,handling, use or productionof hazardous substances

NoAs there is no blasting in the Savudu quarry, thereis no possible of spillages or fires from anyhazardous substances

8.2 From any other causesYes

Mines safety precautionswill be followed whileQuarrying. The labours will be provided withsafety equipments. No unauthorised persons willbe allowed inside the quarry while working in thequarry face.

8.3 Could the project be affectedby natural disasters causingenvironmental damage (e.g.floods, earthquakes,landslides, cloudburst etc)?

NoQuarry operation will not beAffected during rainy season. A 5HP diesel pumpwill be utilised for dewatering the rain water andthe labours will be provided with employment.

9. Factors which should be considered (such as consequential development) which could lead to

environmental effects or the potential for cumulative impacts with other existing or planned activities in the

locality

S.No Information/Checklist confirmation

Yes/No Details thereof (with approximatequantities/rates, wherever possible) with

source of information data9.1 Lead to development of

supporting. Utilities, ancillarydevelopment or developmentstimulated by the project whichcould have impact on theenvironment e.g.:• Supporting infrastructure (roads,power supply, waste or wastewater treatment, etc.)• housing development• extractive industries• supply industries• other

Yes

The quarrying of boulders will not have anyimpact on Environment. No housingdevelopment or extractive industries or supplyindustries involved in this project.

9.2 Lead to after-use of the site, whichcould have an impact on theenvironment

Yes After excavation the excavated area will be usedas water reservoir and this will enable to increasethe ground water potentiality in the nearby areas.

9.3 Set a precedent for laterdevelopments

Yes It will not set such precedent

9.4 Have cumulative effects due toproximity to other existing orplanned projects with similareffects

No No such effects will occur

Page 13: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

(III) Environmental Sensitivity

S.No Areas Name/Identity

Aerial distance (within 15 km.)Proposed project location boundary

1 Areas protected underinternational conventions, nationalor local legislation for theirecological, landscape, cultural orother related value

No There is no Ecological landscape,Cultural or other related value areas in 500 mradius.

2 Areas which are important orsensitive for ecological reasons -Wetlands, watercourses or otherwater bodies, coastal zone,biospheres, mountains, forests

No There are no sensitive biospheres, national parks,sanctuaries, reserve forest in 500m radius from proposedproject site. No Coastal zone is located in the nearbyarea. Bay of Bengal lies more than 70kms.

3 Areas used by protected,important or sensitive species offlora or fauna for breeding,nesting, foraging, resting, overwintering, migration

No Nil

4 Inland, coastal, marine orunderground waters

No Nil.

5 District, National boundaries No Nil

6 Routes or facilities used by thepublic for access to recreation orother tourist, pilgrim areas

No Nil

7 Defence installations No Nil.

8 Densely populated or built-up area YesDirecti

on

Village Distance

in Kms

Population

North Chettichatram 1 km 300

East Rayapuram 1km 300

South Sonapettai ½ km 300

West Moovarkottai 2km 300

9 Areas occupied by sensitive man-made land uses (hospitals, schools,places of worship, communityfacilities)

No Nil

Page 14: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

10 Areas containing important, highquality or scarce Resources(ground water resources, surfaceresources, forestry, agriculture,fisheries, tourism, minerals)

No There is no high quality or scarce resources s u c h asg r o u n d w a t e r resources, surface resources,forestry, agriculture, fisheries, tourism, a n d r a r em i n e r a l s n e a r t h e site.

11 Areas already subjected topollution or environmentaldamage. (those where existinglegal environmental standards areexceeded)

No This area is not already subjected to any pollution orenvironmental damages.

12 Areas susceptible to natural hazardwhich could cause the project topresent environmental problems(earthquakes, subsidence,landslides, erosion, flooding orextreme or adverse climaticconditions)

No None. Area is not prone of earthquake, floods etc.

“I hereby given undertaking that the data and information given in the application and enclosures are

true to the best of my knowledge and belief and I am aware that if any part of the data and information

submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any

to the project will be revoked at our risk and cost.”

Date:Place:

Signature of Project Proponent\Applicant Signature of Recognized Qualified Person.

Thiru.MR.Bhusan

Page 15: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

PREFEASIBILITY REPORT

Form-1, Prefeasibility Report, Mining Plan for Savudu, S.F.Nos – 376

(Sonapettai Eri of 8), Munnavalkottai Village, Needamangalam Taluk,

Thiruvarur District, Tamil Nadu of Thiru.MR.Bhusan (Extent –4.90.0Ha

(Out of 11.99.5 Hec).

Page 16: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

PREFEASIBILITY REPORT

FOR QUARRYING SAVUDU

Over an Extent of 4.90.0Ha (Out of 11.99 .5 Hec) in S.F. Nos. 376 (Sonapettai Eri of 8) of Munnavalkottai

Village, Needamangalam Taluk,

Thiruvarur District, Tamil Nadu

1. EXECUTIVE SUMMARY

This project is for quarrying of Savudu (Mining of Minor minerals) deposit as permitted by the District

Collector, Thiruvarur in S.F. Nos. 376 (Sonapettai Eri of 8) , Munnavalkottai Village, Needamangalam

Taluk, Thiruvarur District,

The quarry permission has granted by the District Collector, Thiruvarur district vide his letter Rc.No.

428/G&M/2015,Dated:17.05.2017.PWD Tank for quarrying Savudu under Rule 12-2A of Tamil Nadu Minerals

Conservation and Development Rule, 1959 and approved by the Assistant Director of Dept. of Geology and

Mining, Thiruvarur vide letter Rc.No. 428 /G&M/2015, Dt.26.05.2017.

The location of the applied area:

There is a Main road leading to

Thiruvarur – Needamangalam =25 kms

Needamangalam –Adhanur = 4 Kms

Adhanur – Munnavalkottai = 3Kms

Munnavalkottai - Quarry Site = 2 Km (Sonapettai Eri )

The quarry site is located South of Munnavalkottai Village.

District District Panchayat/

union

Taluk Village S.F.Nos Extent in

hectares

Tamil

Nadu

Thiruvarur Munnavalkottai Needamangalam Munnavalkottai 376

(Sonapett

ai Eri of

8)

4.90.0Ha (Out

of 11.99.5

Hec)

Total = 4.90.0Ha

Page 17: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION

The area applied for lease in PWD Tank Savudu Quarry.

As Per EIA Notification and subsequent amendments, the proposed quarry falls under ‘B2’ category

which required environmental Clearance from District Environmental Impact Assessment Authority, Chennai

region.

The entire quantity of Savudu will utilize for Construction propose within the District of Tamil nadu

(i) Identification of project and project proponent. In case of mining project, a copy of mining lease/letter

of intent should be given.

Project proponent : Thiru.MR.Bhusan

District of the proponent : Company

Address : Assistant Manager (F&A),

M/s Madhucon Projects Limited,

Nagapattinam-Thanjavur Road Project,

(NH67) NewBase Camp, Aravathur Village,

Manikamangalam (Po),

Thiruvarur.

Copy of Mining Plan is enclosed.

Copy of Mining lease letter issued by the District Collector Rc.No. 428/G&M/2015 Dated: 17.05.2017

Enclosed in the Mining Plan

(ii) Brief description of nature of project:

The Savudu quarry lies over an extent of 4.90.0Ha (Out of 11.99.5 Hec) in S.F. Nos. 376 (Sonapettai Eri

of 8) in Munnavalkottai Village, Needamangalam Taluk, Thiruvarur District Area falls in

Latitude : N 10˚44’ 6.96”

Longitude : E 79˚22’27.74’’ Toposheet = NC44-5No Vegetation is noted in the lease applied area.

Type of Mining:

Open Cast Mining method of semi mechanised mining without drilling and blasting will be applied to

quarrying.

Mode of quarrying:

This quarrying operation is by using excavators and tippers are proposed for quarrying.

ii) Need for the project and its importance to the country and or region:

The project will provide direct and indirect employment and there by improve the economic standard ofpeople in the surrounding villages.

After quarrying the entire reserves the mined out area will be used as water reservoir of this area.

As it is going to be used as water reservoir, no need of reclamation or back filling.

(IV) Demand - Supply Gap

The demand for Savudu depends upon the requirement of local market.

Page 18: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

(V) Export Possibility

The export possibility does not arise; Since Lessee would like to use this entire quantity of Savudu for

domestic market

(VI) Domestic Export / Markets

The applicant would like to sell out the entire Savudu materials to the nearby Consumers.

(vii) Employment g e n e r a t i o n ( direct a n d i n d i r e c t ) d u e t o t h e project.

The following man power is proposed for quarrying Savudu during the two years period to achieve

the proposed production and to comply the provisions of the Government norms.

1. Skilled Operator 1 No.

Mechanic 1 No.

2. Semi – skilled Driver 1 No

3. Unskilled Musdoor / Labours 2 Nos

Cleaners 1 Nos

Office Boy 1 No

4. Management & Supervisory staff 1 No.

Total = 8Nos

Safety equipments to be provided for the persons employed in the mines.

1. Nose Mask

2. Ear Plug for machine operators and drillers

3. Safety shoes as specified by Director General of Mines Safety

Employment of child labour will be strictly prohibited in the mines.

The applicant has given Notary Affidavit for Non employment of child labour directly or indirectly while

operating the mine and the Affidavit is enclosed.

Page 19: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

3. PROJECT DESCRIPTION

(i) Type of project interlinked and

interdependent projects, if any.

This project is located in Munnavalkottai Village, Needamangalam taluk, Thiruvarur District It is

mandatory to obtain environmental clearance for all mining project irrespective of mining area as per the order

of the Honourable Supreme Court of India in I.A.No.12-/13/2011 in S.L.P.No. 19628-19629 of 2009 etc.,

dated: 27.02.2012, the Ministry of Environmental and Forest Office Memorandum dated:

2 . 8 .12.2013 clearance has to be obtained for Minor Minerals from the District Level Environmental

Impact Assessment Authority, Tamil Nadu. As per above order all projects less than 25 hectares falls in ‘B2’

Category of Schedule 1 (a). The extent of this lease area is 4.90.0Ha (Out of 11.99.5 Hec) and falls in

‘B2’ Category of Schedule 1

(ii) Location

Thiruvarur – Needamangalam =25 kms

Needamangalam –Adhanur = 4 Kms

Adhanur – Munnavalkottai = 3Kms

Munnavalkottai - Quarry Site = 2 Km (Sonapettai Eri )

The quarry site is located South of Munnavalkottai Village.

(iii) Details of alternate sites considered and the basis of selecting the proposed site.

This is a mining project, which is site specific due to availability of mineral. Hence the site

cannot be shifted. Opencast Semi Mechanised mining without drilling and blasting will be applied to quarrying.

The quarry site is considered on the availability of deposits.

(IV) Size or magnitude of operation

Targeted production of quarrying Savudu will be 44100m³ a period for one year by open cast

mechanised mining method.

(v) Project description with Process Details

Mining Process Details

1. No bench is required as proposed depth is only 0.9m for quarrying the Savudu.

2. The applicant should maintain a safety distance of 7.5m &10m meters to the adjacent lands.

The following quantity of Savudu for the given year is as follows.

PRODUCTION SCHEDULE

SectionL

(m)

W

(m)

D

(m)

Volume

m3

XY-AB 245 200 0.9 44100

TOTAL 44100

Proposed Production of : 44100 m3

No of working days for : 75 days

No of lorry loads per Day : 103 lorry loads (206Units / day)

Page 20: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

Sequence of Mining Operation

(Opencast Mechanised Mining)

DEMARCATION OF LEASE AREA

SITE PREPARATION

LOADING THE SAVUDUBY EXCAVATORS AND DIRECTLY

LOADED INTO TIPPERS / TRUCKS

Proposed method of mining:

Opencast shallow mining, without drilling and blasting

Removal of over burden

There is no overburden. Savudu is available from the surface itself.

a) Mining

Opencast shallow mining, without drilling and blasting

b) Loading equipment

Hydraulic excavators are used for loading purpose and loaded by tippers.

(c) Transportation`

Transportation by Trucks/ tippers directly f r o m t h e m i n i n g a r e a .

(VI) Raw material required along with estimated quantity, likely source, marketing area of final product/s,

mode of transport of raw material and finished products.

This is a mining project for mining of Savudu and so no need of raw material except utility items like

fuel and lubricants Diesel, oil and water for drinking and utilities. The Product will be natural. No stocking is

required or permitted anywhere either inside the lease area.

(vii) Resource optimization/recycling and reuse envisaged in the project.

The Savudu will be despatched to nearby construction units.

(VIII) Availability of water its source, energy/power requirement and source.

During initial working mineral water will be provided to labour. For water sprinkling and green belt area

water tanker is provided. For permanent solution a bore well will be drilled near the office room to care take

drinking water, water sprinkling and for green belt.

(ix) Quantity of waste to be generated (liquid and solid) and scheme for their management/disposal.

There is no liquid / solid waste generated while quarrying the Savudu.

(x) Schematic representations of the feasibility drawing which give information of EIA purpose.

As per the order of the Honourable Supreme Court of India in I.A.No. 12-/13/2011 in S.L.P.No. 19628-

19629 of 2009 etc., dated: 27.02.2012 and the Ministry of Environment and Forest Office Memorandum dated:

Page 21: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

18.05.2012 clearance has to be obtained for mining of Minor Minerals from the District Level Environment Impact

Assessment Authority, Tamil Nadu. Form I and Pre-Feasibility report is required to get Environmental

Clearance for the project from SEAC. EIA Report identifies all of the issues and technical requirements of a

proposed operation, with particular attention to potential Environmental, Health and Safety, Social and

Economic Impacts. The purpose of EIA is to ensure the protection and conservation of the environment and natural

resources including human health aspects against uncontrolled development.

The long-term objective is to ensure a sustainable economic development that meets present needs without

compromising future generations’ ability to meet their own needs. EIA is an important tool in the integrated

environmental management approach. The aim of Environmental Impact Assessment (EIA) is to enable the

approving authority, the public, local and central government and the developer to properly consider the potential

environmental consequences of a proposal, and to make recommendations to reduce the environmental

consequences if necessary.

It is important to provide sufficient information for the approving authority to make a decision on

whether to approve a proposal and if so, under what conditions. The EIA provides the basis for sound

ongoing environmental management.

4. SITE ANALYSIS

(i) Connectivity:

Thiruvarur – Needamangalam =25 kms

Needamangalam –Adhanur = 4 Kms

Adhanur – Munnavalkottai = 3Kms

Munnavalkottai - Quarry Site = 2 Km (Sonapettai Eri )

The quarry site is located South of Munnavalkottai Village.

(ii) Land form, land use and land ownership.

Sl.No. Description

Present Area(Hect)

Area to beAdded forRequired

during thisPeriod

1. Mining Area Nil 4.90.0Ha

2. Mine Roads Nil 0.00.00

Total = 4.90.0Ha 4.90.0Ha

area applied for mining lease is a gentle plain terrain of 1m below the ground level. The area is covered with

Sa v ud u . No vegetation is noted in this area.

Necessary infra structure will be provided in the lease hold area. First aid, sanitation facilities will be

provided in the office building. Afforestation will also provide on the boundary barrier as the green belt

area.

The lease area is a Poramboke land the project proponent Thiru.MR.Bhusan was the highest bidder and he

is the lease holder until the lease period.

(iii) Topography:

The area applied for mining lease is a gentle plain terrain .The area is covered with Savudu. No

vegetation is noted in this area.

Page 22: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

(iv)Existing land use pattern agriculture, non-agriculture, forest, water bodies including area under CRZ:

shortest distances from the periphery of the project to periphery of the forest, national park, wild life

sanctuary, eco sensitive areas, water bodies( distance from the HFL of the river), CRZ. In case of notified

industrial area, a copy of the gazette notification should be given.

(v) Existing infrastructure:

There is no existing infrastructure available in the site. The entire requisite infrastructure required for

mining shall be developed. An office room and rest room is going to be built. A well equipped first aid facility will

be maintained.

Extent of Mechanization

The working will be by Opencast, shallow mining without drilling and blasting. Loading of S a v u d u

i n the quarry will be done by JCB.

(VI) Soil classification:

The entire Savudu will be transported to the end users and hence, there is no waste generated during the

quarrying operation.

(vii) Climatic data from Secondary Sources:

The climate of the area is tropical and the annual rainfall is about 8 00mm during North -East

monsoon.

Temperature

From the middle of February, temperature increases steadily. In May which is usually the hottest month in

the interior, the mean daily maximum temperature rises to 200 to 400 degree Celsius and during winter period it

drops to 1 8 0 to 250 C. The weather is quite hot in May and June and the maximum temperature sometimes

reaches 40°Celsius. With the onset of the southwest monsoon by the end of May or beginning of June, there is

some drop in temperature.

Humidity

The relative humidity in general, during the year, is between 55 and 65 percent in the region of the project

area, except during the northeast monsoon season, when it is over 65 per cent.

Cloudiness

During the months of April and May, the skies become heavily clouded and threatening in the afternoons

on many days when thunderstorms follow. In the southwest and northeast monsoon seasons, the sky is heavily

clouded or overcast.

Winds

Generally light to moderate in strength and NW-SW and vice-versa. Between May and September winds

are mainly north westerly or westerly From October to February winds are mainly north easterly or northerly

Rainfall

Main rainy season is from October to the middle of January. November is generally the rainiest month.

The average rain fall in the in the region of the project area is 800mm to 900mm per annum during North-

East Monsoon

(viii) Social infrastructure:

There is no village available in the lease area. So inhabitants do not required any rehabilitation. On

t h e co nt r a r y n e a r b y v i l l a g e r s e a r n l i v e l i h o o d b y working in mine.

Page 23: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

5. PLANNING BRIEF

(i) Planning concept (type of industries, facilities, transportation etc) Town and country

planning/development authority classification.

It is Opencast, shallow mining without drilling and blasting project. The mine is proposed to run for a

period of Three Months. No bench is required as proposed depth is only 1m for quarrying the Savudu

(ii) Population Projection

(iii) Present land use planning (break up along with green belt etc).

Sl.No.

DescriptionPresent Area (Hect)

1. Savudu Working 4.90.0Ha

2. Water storage -

Total = 4.90.0Ha

(iv)Assessment of infrastructure demand (physical & social): Physical Infrastructure

The road facility is already available which shall be used and maintained. The labour r e q u i r e m e n t i s

t a k e n f r o m t h e n e a r e s t v i l l a g e . Other r e q u i s i t e infrastructure as transport of mine labours is

available by way of jeep and two-wheeler.

Medical facility is available for first aid at project site. Government Dispensary is available nearest to ML

area at 2Kms in Munnavalkottai. Rest room to meet the demand of shelter and office room for project

management will be built in the project area. The tippers Lorries will convey the mined Savudu outside the quarry

site to the end users. General safety precaution will be taken as per mining practice

Access Roads

Access roads from the main road to the quarry site to a length of 2km from Munnavalkottai are available

for transport facilities. Access roads will be restored to pre-quarry conditions or better condition. Usage of

public road for transport shall be done as per approved Practices.

Social Infrastructure

This project is providing employment for villagers and shopkeepers, mechanic, drivers, local labour and

transporter. Proper safety measures will be taken for the safety of the workers by providing helmets, hand

gloves, masks and first aid facilities.

(v) Amenities/facilities:

As the workers are from nearby villages, the shelter room with toilet facilities & the first aid room will be

built in proposed building. Water required for drinking purpose is available by the water tankers from nearby area.

Power is available at proximity. First aid box with all necessary materials will be kept all time in the office for use

as and when required.

Direction Village Distance

in Kms

Population

North Chettichatram 1 km 300

East Rayapuram 1km 300

South Sonapettai ½ km 300

West Moovarkottai 2km 300

Page 24: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

6. PROPOSED INFRASTRUCUTRE

(i) Industrial area (processing area):

No processing unit is required, as the Savudu Material can be directly consumed by the end user. An

office-cum-store will be built at mine site. A thatched shelter room with toilet facilities & the first aid facilities

will be built.

(ii) Residential area (non processing area):

Not applicable, local personnel will be employed and so no residential area is proposed.

(iii) Greenbelt:

Afforestation will be on the primary of the lease boundary.

(iv) Social infrastructure:

This project is providing employment for villager’s shopkeepers, mechanic, drivers, transporters etc.

The lessee will be responsible for social benefits like water, health care measures. Plantation done will improve

environmental conditions in the area and aesthetic beauty of the area. Positive community relationship proposed

will be adopted by following methods:

Care will be taken to ensure Mining Industrial Traffic not degrading public roads or jeopardize public

safety

Consulting with local people in a sincere manner

Protecting drinking water and all water sources

Minimize visual impacts to the landscape

Minimize disruption of local footpaths and public areas

Mine Supervisor and Workers will be aware and at all times meet the following requirements:

Usage of Personal Protective equipments

Necessary signage at mine access point

Gates, Fences, Signs (Or) other barriers to ensure the mine site is secured against unauthorized and / or

accidental entry

Ensure the mine site is not used for any other purpose other than mining

Drinking water management (source & supply of water):

PROPOSAL FOR WATER MANAGEMENT

Details Source Provision quantity/day

A Drinking water Initially drinking water will be supplied fromwater supplier vendor. For permanent solution abore well will be drilled nearthe office area for providing drinking water 0.500KLD

B Dust Suppression- watersprinkling Water tanker on hired basis 1.500 KLD

CGreen belt

From the water tanker and the bore well0.250 KLD

D DomesticWater storage in tub near working area

0.250 KLD

TOTAL 2.5KLDThe labours will be provided with drinking water for the persons employed in the quarry. Initially

mineral water will be provided by purchasing from markets and for permanent solution a bore well

will be drilled to provide water supply and for water sprinkling.

Page 25: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

(vii) Sewage system:

No sewage will be generated from this project. There is no Sewage System available in the Mining

proposed area.

(viii) Industrial waste management:

There is no industrial waste. Since this project is mining.

Sources of Air Pollution

S.No. Activities in Mines Air Pollutants

1 Haul Road Permissible limit

2 Transportation Permissible limit

For safety purpose while drilling wet drilling method will be adopted for the suppression of dust. The

haul roads will be made water sprinkling during transportation.

Air Pollution Control Measures

Air or Dust expected to be generated from hauling roads, places of excavation etc., will be

suppressed by periodical wetting of land by water spraying.

Mine Drainage

From the study of the adjacent wells, the ground water table is ranging from 20m onwards.

Noise Levels

Quarrying of Savudu will be carried by without drilling and blasting, so that naturally, noise will be

very minimum. However, periodical noise level monitoring will be carried out to check the noise level in and

around the quarry site.

Vibration Levels

No vibration in the case of Savudu quarrying.

(ix) Solid waste management:

No solid waste is generated in the Savudu quarry.

Page 26: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

7. REHABILITATION & RESETTLEMENT PLAN (R&R Plan)

(i) Policy to be adopted (central/District) in respect of the project affected persons including home ousters,

land ousters, and landless labours.

a) PAP

There is no hutment in the lease area. No human being will be displaced from the project area so no

person will be affected contrary local people will get job opportunities and better facilities. There is

no rehabilitation & resettlement of people is required.

b) Mine Closure

Once the process of economical extraction of a mine is complete there is need for scientific

mine closure which will not only restore ecology and regenerate bio mass but also take into account the socio-

economic aspects of such closure. When mining activities are carried out, mining communities get established

and closure of the mine means not only loss of jobs but also disruption of community life. At the mine

closure, it will be orderly and systematic and so planned as to help the workers and the dependent community to

rehabilitate them without undue hardship. The mined out area after closure of mine will be used as a water

reservoir.

8. PROJECT SCHEDULE & COST ESTIMATES

(i) Likely date of start of operation and likely date of completion

The proposed mining operation may commence from and may be completed within 3Months .The

mine will be commenced after execution of quarry lease and will be renewed or completed before the expiry

date of quarry lease.

(ii) Estimated project cost along with analysis in terms of economic viability of the project.

1. Machinery(Hire) : RS .4,00,000/-

EMP Cost:

1. Drinking water facility

2. Safety kids

3 Water sprinkling

4 Afforestation

5 Cost towards charity

Total

:

:

:

:

:

Rs. 20,000/-

Rs. 10,000/-

Rs. 30,000/-

Rs. 20,000/-

Rs. 20,000/-

Rs. 1,00,000/-

Total Project Cost : 5 ,00,000/-

Page 27: SAVUDU QUARRY - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/...Name Thiru.MR.Bhusan Designation (Owner/Partner /CEO) CEO Address Same as above Pin

9. ANALYSIS OF PROPOSAL AND FINAL RECOMENDATIONS

(i) Financial and social benefits with special emphasis on the benefit to the local people including tribal

population, if any in the area.

Social Benefits:

Mining in the project area will provide employment to nearby villagers. This employment will help in

raising the standard of living on the people in the area. The mining activity in this belt will benefit the locals

both directly and indirectly. The direct beneficiaries will be those who get employed in the mines as

skilled and un-skilled workers. The indirect beneficiaries will be those who open small business to sell

goods required by the residents whose “Per Capita income will be enhanced by the mining activity, and thereby

their purchasing power. In the long run a lot of social goods are expected in the comparatively backward area

when the inhabitants will be able to send their children to school, the change, though slow, is bound to be

perceptible.

Financial Benefits:

It is clear from the objectives of the project that it will have significant positive impacts since it will:

Provide filling material to the society at large.

Give a boost to economic development in the region in the long run. Make a significant contribution to

the construction and infrastructure sector of India.

Management will ensure good production and in turn there will be good revenue to the Government of

Tamilnadu and Government of India through taxes. The industry is an asset to the nation. This project is planned

keeping in view the above mentioned advantages.

The quarrying operations will be carried out scientifically and systematically with an integrated mining

plan and mine design may not disturb the environment and ecology of the area.

Date:Place:

X

Signature of Project Proponent\Applicant Signature of Recognized Qualified Person.

Thiru.MR.Bhusan