save the kimberley

10
James Price Point LNG proposal James Price Point LNG proposal Gas tankers Pilbara Gas tankers Pilbara

Upload: lisa-barber

Post on 10-Mar-2016

224 views

Category:

Documents


0 download

DESCRIPTION

Proof is in the pictures

TRANSCRIPT

Page 1: Save the Kimberley

James Price Point LNG proposalJames Price Point LNG proposal

Gas tankers PilbaraGas tankers Pilbara

Page 2: Save the Kimberley

LNG near Broome LNG near Broome -- What does it mean?What does it mean?

• 4 gas pipelines, 4 oil pipelines

• 4 export pipelines (4 x monoethylene glycol - anti freeze)

• 8 LNG tanks, 4 LPG storage tanks, 4 oil

tankstanks

• Construction camp 6,000 - 8,000 FIFO’s

• Permanent 600 - 1,000 personnel

•600 – 900 MW of power station

•Desalination plant?LNG industrial complex - Qatar

Page 3: Save the Kimberley

The proposalThe proposal

� Land = 2,500 hectares

(1200 x Subiaco Oval)(1200 x Subiaco Oval)

�Sea = 1,000 hectares

Page 4: Save the Kimberley

Proposed Port at James Price Proposed Port at James Price

PointPoint

6km +

Page 5: Save the Kimberley

Ship movements at proposed portShip movements at proposed port

1,000 1,000 –– 1,500 ships per annum1,500 ships per annum(number of shipping movements (number of shipping movements -- 200200--300 ships per annum per 10 Mtpa proposed 50 Mtpa) 300 ships per annum per 10 Mtpa proposed 50 Mtpa)

Source: Source: Kimberley LNG Precinct Kimberley LNG Precinct Scope of the Strategic Assessment Page 29Scope of the Strategic Assessment Page 29

LNG TankerPhoto: Woodside

Page 6: Save the Kimberley

Dredging

� Permanent

loss of seabed

�~50km²

Page 7: Save the Kimberley

WastewaterWastewater

�� Effluent from 6Effluent from 6--8000 8000

worker town worker town (process waste (process waste

water, ancillary equipment such as condensed water, ancillary equipment such as condensed

water, surface runoff from process areas, sewage water, surface runoff from process areas, sewage

and grey water)and grey water)

�� Broome licensed for 8 Broome licensed for 8 �� Broome licensed for 8 Broome licensed for 8

GL/yrGL/yr

�� 30 GL/yr of waste 30 GL/yr of waste

water (30 billion water (30 billion litreslitres))

Figure 8-6: Maximum predicted summer extent of process waste water dilution zone, location 2,

Scenario 3. The precinct boundary is presented by the black line.

Page 8: Save the Kimberley

BenzeneBenzene

�� “The proposed 50 “The proposed 50 MtpaMtpa LNG precinct LNG precinct

will make a large contribution to will make a large contribution to

emissions”emissions” ((Source:Source: Air assessments Prepared for Air assessments Prepared for

Woodside Energy Ltd Page 32)Woodside Energy Ltd Page 32)

�� KarrathaKarratha -- 198/198/tonnestonnes per annum per annum (source NPI)(source NPI)

�� James Price Point James Price Point -- 1,766/1,766/tonnestonnes

per annum per annum ((Source:Source: Air assessments Prepared for Air assessments Prepared for

Woodside Energy Ltd Page 32)Woodside Energy Ltd Page 32)

Page 9: Save the Kimberley

Oil spill trajectory modelOil spill trajectory model

Southern pipeline

failure

Red zone =

1-10 days to reach

Roebuck Bay

Page 10: Save the Kimberley

James Price Point LNG proposalJames Price Point LNG proposal

�� 2,500 hectare site (1,200 times Subiaco oval)2,500 hectare site (1,200 times Subiaco oval)

�� 1,000 hectare port1,000 hectare port

�� 66--8,000 construction workers8,000 construction workers

�� Wastewater dischargeWastewater discharge�� Wastewater dischargeWastewater discharge

�� Air pollutionAir pollution

�� Oil spill riskOil spill risk