13 October 2011 1 SARAF Phase-I Control System Rebuild E. Reinfeld I. Gertz, I. Eliyahu ICALEPCS 2011

Upload: others

Post on 18-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most

13 October 2011

1

SARAF Phase-I Control System Rebuild

E. ReinfeldI. Gertz, I. Eliyahu

ICALEPCS 2011

Page 2: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most

2

Outline

ICALEPCS 2011

Overview of SARAF control system Problem definition Solution definition Implementation

Page 3: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most

3

Introduction

SARAF Phase-I consists of a 4MeV high current RF superconducting LINAC of protons and deuterons Commissioned to ACCEL the facility was planned to be delivered as a turnkey project The commissioning process and the control system were not completed Phase II (upgrade up to 40MeV) is planned to be completed untill 2017

2006-2009:Commissioning of SARAF accelerator

2010:Delivery to SARAF team

2010:First two beam lines are completed

2018:Facility is working in full capacity.Phase 2 done

ICALEPCS 2011

Page 4: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most

4

System overview

ICALEPCS 2011

Accelerator part mounted by ACCELin 2006-2010

Beam lines0 and 1, completedBy the SARAF Teamin 2010

Page 5: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most

5

Control system overview

ICALEPCS 2011

Page 6: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most

6

Problem definition

ICALEPCS 2011

The control system was delivered while in development phase. Lack of knowledge transfer, limited documentation Fragile infrastructure Undocumented methodology and strategy Simple design – complex operation The rebuilding process needs to be done in parallel to accelerator operation The control system has to be streamlined and stable before SARAF phase II

Need to invest the effort now.

Page 7: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most

7

Solution definition

ICALEPCS 2011

The control system needs to be moved to operational phase.

Build knowledge base Revamp infrastructure Define a clear strategy Simplify operation Restructure the control system Define a methodology Deliver the rebuilt system before SARAF phase II

Systematic approach is planned.

Page 8: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most

8ICALEPCS 2011

Implementation

Study the system

Migrate software

Rebuild the system

Deliver the system to the operation team

Page 9: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most

9ICALEPCS 2011

Vacuum control system

Accelerator vacuum control system.

Beam lines vacuum control system.

Initial state of vacuum control systems before redesign and rebuild.

Page 10: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most

10ICALEPCS 2011

Accelerator full vacuum control system – new system.

Operator screen Expert screen

Vacuum control system

Page 11: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most

11ICALEPCS 2011

Phase A - Preparations Study, map and document the control system Clear and organize the system elements Fix major issues, and provide support to operators Design the control methodology in light of SARAF Phase-II

Vacuum CS

Ion source CS

Diagnostics CS

Page 12: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most

12ICALEPCS 2011

Phase B – software migration

The control system is based on Labview 8.2.1. Migrate the software to the latest stable version of Labview. Verify correct operation and document the process.

Page 13: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most

13ICALEPCS 2011

Phase C – rebuild the system

Review each control system and application Add system level capabilities and design Streamline hardware and application Rebuild and modernize the control room Verify, validate, document

Page 14: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most

14ICALEPCS 2011

Phase D – delivery

Write procedures Train the team Activate the system

Diagnostics CS

Vacuum CS

Ion source CS

Page 15: SARAF Phase-I Control System RebuildThe SARAF Phase-I control system needs to be delivered from development to operational status. Phase A of the project is currently ongoing Most

15ICALEPCS 2011

Summary

The SARAF Phase-I control system needs to be delivered from development to operational status.

Phase A of the project is currently ongoing Most of the control system is documented and mapped Methodology and strategy are being consideredWorking hard to restructure the system and start migrating the software soon