sap subcontracting process.pdf
TRANSCRIPT
Subcontracting Business process:
Tcodes-
ME21n – Create Purchase Order
ME29n – Release PO (If Release strategy is there)
MB1B – Transfer the material of components through movement type 541 against Purchase order
J1IF01 – Create Subcontrcating Challan with refernce to the document posted by movement type 541
MIGO – Enter the GRN with reference to Purchase order and refer the subcontracting Challan in the excise tab at hedaer level.
MIRO – Invoice verification.
Create Sub-contracting PO by ME21n with doc type subcontracting PO and item category L. Click on the button components to enter the BOM.
Enter the components in the material item tab and define the BOM. In case scrap quantity you need to define the quantity in (-).
Transfer the material against the PO by using MB1B, 541 movement type.
Now the assigned quantity is equal to the open quantity and save it.
Now complete the challan by J1IF13