1. What is the Rapid Deployment Solution

2. Benefits and Value Proposition

3. Scope & Deliverables

4. Product Demo

5. Project Approach and Planning

6. Pre-requisites

7. Positioning for SAP Consulting

We Are Here to Discuss

© 2010 SAP AG. All rights reserved. / Page 3

1. What is the Rapid Deployment Solution

2. Benefits and Value Proposition

3. Scope & Deliverables

4. Product Demo

5. Project Approach and Planning

6. Pre-requisites

7. Positioning for SAP Consulting

We Are Here to Discuss

© 2010 SAP AG. All rights reserved. / Page 4

.

SAP BRINGS TOGETHER SOFTWARE AND SERVICES IN A NEW OFFERING THAT GIVES YOU ESSENTIAL PORTFOLIO MONITORING FUNCTIONALITY QUICKLY AND AFFORDABLY

Preconfigured software to eliminate the guesswork

Rapid delivery in as little as thirteen weeks (36 SAP PDs)

Limited scope to jump start

A clear path to your full Portfolio and Project Management vision

Preconfigured software and services enabling rapid deployment

© 2010 SAP AG. All rights reserved. / Page 5

Immediate Value From Pre-configured ContentYou Get What You Need to Run Your Business ‘Out-of-the-box’

Clearly defined scope

Includes pre-configuration content and knowledge transfer to key users

Fast-track implementation methodology

Enables you to go live in 13 weeks

Powerful solution for portfolio monitoring delivered ‘out-of-the-box’ based on leading SAP Portfolio and Project Management

Start fast, with what’s most important, and expand later

Seamless access to ERP back-office information

Value Adding Quick and Lean

Flexible pricing – ‘only pay for what you need’

Attractive fixed-price services

Reduced resource requirement from Business and IT

Cost-effective

© 2010 SAP AG. All rights reserved. / Page 6

1. What is the Rapid Deployment Solution

2. Benefits and Value Proposition

3. Scope & Deliverables

4. Product Demo

5. Project Approach and Planning

6. Pre-requisites

7. Positioning for SAP Consulting

We Are Here to Discuss

© 2010 SAP AG. All rights reserved. / Page 7

The Business Challenge

Customer Pain Points Lack of insight into project pipeline Decision making process is not transparent Limited project resources Inaccurate project / resource forecasts Lack of focused resources on high-value projects Lack of project / capacity visibility Missing cost control and plan profitability on a portfolio

level

Customer Goals/Needs Reduction of project failure rate Project alignment with portfolio strategy Portfolio-based decision making support for new projects Monitoring of running projects on a portfolio level

© 2010 SAP AG. All rights reserved. / Page 8

The Solution: SAP Portfolio and Project Management rapid-deployment solution for portfolio monitoring

The SAP Portfolio Monitoring rapid-deployment solution enables organizations to align their projects to their portfolio strategy and allows:

Portfolio-based decision making support for new projects running in SAP Projects System (PS)

Monitoring of running projects (in SAP PS) on a portfolio level including financial integration and standard analytics via the Business Context Viewer

The SAP Portfolio Monitoring rapid-deployment solution enables organizations to align their projects to their portfolio strategy and allows:

Portfolio-based decision making support for new projects running in SAP Projects System (PS)

Monitoring of running projects (in SAP PS) on a portfolio level including financial integration and standard analytics via the Business Context Viewer

© 2010 SAP AG. All rights reserved. / Page 9

The Service: SAP Portfolio and Project Management rapid-deployment solution for portfolio monitoring

This service aims to implement the pre-defined portfolio management solution and process in your organization. The main activities are as follows: Deliver an installation check to verify everything is installed correctlyConfigure scope according to the pre-configuration in the customer systemUpload example master data into the customer system so that scenarios can be demoedConduct scoping workshop and adapt the standard configuration based on customer inputSupport testing activities by providing scope-specific test case templates for unit testing, business process testing and user acceptance testingSupport Go-live

© 2010 SAP AG. All rights reserved. / Page 10

Target Process for Portfolio and Project Monitoring rapid-deployment solution

Portfolio Management (in scope of RDS)

Project Management (with SAP PS, out of scope of RDS)

Structure ProjectStructure Project Plan Resource Requirements / Costs

Plan Resource Requirements / Costs

Procure Materials and Services

Procure Materials and Services Collect ActualsCollect Actuals

Monitor PortfolioMonitor Portfolio

Monitor ProjectMonitor Project

Portfolio PlanningPortfolio Planning

This SAP Rapid Deployment solution provides an easy monitoring and decision making support for operative projects running in SAP Project System (PS).

Pre-configured functionality, out-of-the-boxPortfolio planningPortfolio monitoring

© 2010 SAP AG. All rights reserved. / Page 11

1. What is the Rapid Deployment Solution

2. Benefits and Value Proposition

3. Scope & Deliverables

4. Product Demo

5. Project Approach and Planning

6. Pre-requisites

7. Positioning for SAP Consulting

We Are Here to Discuss

© 2010 SAP AG. All rights reserved. / Page 12

SAPCRM Rapid

Deployment Solution

*Optional

New! SAP Portfolio and Project Management rapid-deployment Solution for portfolio monitoringSoftware to Give You Compelling Functionality Quickly and Affordably

Pre-configured functionality, out-of-the-box

Portfolio Planning

Portfolio Monitoring

© 2010 SAP AG. All rights reserved. / Page 13

Portfolio Planning - Solution Capabilities

The overall budget is defined on C-Level. Depending on the strategic importance the budget is distributed among the different investment buckets

The project requestor creates a new portfolio item which represents the project proposal. He maintains the basic data of the item like description, dates or risk

The project requestor maintains the financial aspects of the project (external costs) & and provides a high level capacity planning for the portfolio item, the internal labor costs are then derived

Before handing in the proposal the project requestor maintains all relevant data for the portfolio item. He e.g. fills out questionnaires and refines the original proposal.

Define and Assign Top Down Budget

Define and Assign Top Down Budget

Fill in TemplateFill in Template

Perform High-Level Financial & Capacity

Planning

Perform High-Level Financial & Capacity

Planning

Finalize Project ProposalFinalize Project Proposal

© 2010 SAP AG. All rights reserved. / Page 14

Portfolio Planning - Solution Capabilities

Compare proposals, remove duplicates

Before the approval meeting takes place the approved budget for each investment area is assigned. The portfolio manager or an assistant creates a review which is the basis for the decision meeting. The review clusters all projects for approval.

The portfolio review board prioritizes and approves the project proposals and defines the budget for each project. The project manager receives this information via a field on the item and needs to update the approved budget for the project accordingly.

Once the project has been approved and funded an operational project in SAP Project System can be assigned to the portfolio item. The project in PS is used to collect the plan cost, actual cost and commitment. Either the project is created directly from the portfolio item via a template project or the PS project is created in the SAP Project System manually and linked to the item manually.

Consolidate Proposal List and Verify

Consolidate Proposal List and Verify

Prepare ApprovalPrepare Approval

Adjust and Approve Budget

Adjust and Approve Budget

Create / assign operational project

Create / assign operational project

© 2010 SAP AG. All rights reserved. / Page 15

Portfolio Monitoring – Solution Capabilities

The portfolio monitoring is an ongoing process. On a regular basis all projects are reviewed to ensure they are on time, scope and budget and risks are mitigated Changes on the projects may be necessary due to

a budget overrun (item monitoring) budget cut (portfolio adjustment), change of scope or portfolio strategy

Typically reasons for adjustments are either central changes (i.e. budget cut) or project specific changes (e.g. change in scope)

This RDS does not include the following functions: Project Management (project management part of SAP Portfolio and Project Management 5.0)

Initiative Management (managing initiatives and programs)

Reviews

What-If Scenarios

Document Management

© 2010 SAP AG. All rights reserved. / Page 16

SAP Portf. and Proj. Mgmt Rapid-Deployment Solution for Portfolio Monitoring Detailed Scope – Foundation for customizing activities

© 2010 SAP AG. All rights reserved. / Page 17

Implementation of RDS specific configuration and sample master data

Refinement of standard RDS scope within four process workshops. The workshops aim to review the standard RDS configuration and to document customer specific changes

Adaptation of standard configuration in line with the result of process workshops (Configuration)

Test and training activities support

Go-live support

What does SAP deliver?

SAP Portfolio and Project Management rapid-deployment solution for portfolio monitoring

© 2010 SAP AG. All rights reserved. / Page 18

1. What is the Rapid Deployment Solution

2. Benefits and Value Proposition

3. Scope & Deliverables

4. Product Demo

5. Project Approach and Planning

6. Pre-requisites

7. Positioning for SAP Consulting

We Are Here to Discuss

© 2010 SAP AG. All rights reserved. / Page 19

Product Demonstration

© 2010 SAP AG. All rights reserved. / Page 20

1. What is the Rapid Deployment Solution

2. Benefits and Value Proposition

3. Scope & Deliverables

4. Product Demo

5. Project Approach and Planning

6. Pre-requisites

7. Positioning for SAP Consulting

We Are Here to Discuss

© 2010 SAP AG. All rights reserved. / Page 21

General RDS Implementation MethodologyRDS Delivery View

DeployDeploy Start Start RunRun

Scope•Project Management / setup/staffing•Kick-off workshop•Business Process Management – understanding the business process in detail•Technical Solution Management – preparing technical infrastructure

Accelerators/Deliverables•Consulting delivery guide •Project schedule•WBS•Service delivery model, roles and responsibilities•Process descriptions•Process-flow documents•Pre-delivery requirements and checklist

Scope•Technical Solution Management – installation of software•Business Process Management - configuration and deployment of content •Solution Refinement•Data Management•Testing•Transport•Key User Training

Accelerators/Deliverables•Installation guide•Solution Documentation•SAP Solution Manager content•SAP Best Practices content (pre-configuration)•Configuration activities•Consulting delivery guide •Implementation content

Scope•Performance Tests•Functional Tests•Sign off of solution•Technical Go-Live•Closing of project•Post go-live support and activities

Accelerators/Deliverables•Test cases•Deliverable acceptance forms•Training Materials - Process-flow recordings etc.•Go-Live Checklist

© 2010 SAP AG. All rights reserved. / Page 22

Rapid deployment of portfolio monitoring with SAP Timelines

Start (Preparation*)Start (Preparation*)Start (Preparation*)Start (Preparation*) Deploy (Realization*)Deploy (Realization*)Deploy (Realization*)Deploy (Realization*) Run (Go-Live *)Run (Go-Live *)Run (Go-Live *)Run (Go-Live *)

Duration (Preparation 2 weeks, Realization 9 weeks, Go-live 2 weeks)Duration (Preparation 2 weeks, Realization 9 weeks, Go-live 2 weeks)

SAP involvement Customer involvement

2 weeks before

**Effort in days SAP Consultant/Customer

Start Delivery

* Naming as per step-by-step guide

© 2010 SAP AG. All rights reserved. / Page 23

Rapid-deployment Deliverables:

Access to the implementation methodology materials:http://service.sap.com/solutionpackages

Installation Guide

Readiness Check

Kickoff Workshop

Project Plan

Support PortalCheck Lists

Implementation Methodology

Start Deploy Run

© 2010 SAP AG. All rights reserved. / Page 24

SAP Portfolio and Project Management rapid-deployment solution for portfolio monitoring Project Team: SAP or Partner

SAP Application Consultant Serves as a central contact person, from project initiation to

going live and support On the SAP side, responsible for functional project

management, coordination, support and coaching of the customer’s project manager

Implementation of RDS specific configuration and master data

Refinement of Standard RDS scope within four process workshops. The workshops aim to review the standard RDS configuration and to document changes.

Adoption of standard configuration in line with the result of process workshops (Configuration)

Support test and training activities Go-live and Go-live support

© 2010 SAP AG. All rights reserved. / Page 25

SAP Portfolio and Project Management rapid-deployment solution for portfolio monitoring Project Team: Customer

Project Manager Serves as a central contact person, from project initiation to

going live and support Responsible for functional and commercial project

management, coordination, overall project controlling, preparation of steering committees

Functional lead Responsible for workshops, questions from SAP,

end-user training, preparation of unit and end-user tests

Technical lead Especially responsible for the installation and

administration of the development and productive system landscapes

Business representative Responsible for preparing and performing unit as well as

end-user tests Responsible for master data provision and preparation

© 2010 SAP AG. All rights reserved. / Page 26

1. What is the Rapid Deployment Solution

2. Benefits and Value Proposition

3. Scope & Deliverables

4. Product Demo

5. Project Approach and Planning

6. Pre-requisites

7. Positioning for SAP Consulting

We Are Here to Discuss

© 2010 SAP AG. All rights reserved. / Page 27

SAP Portfolio and Project Management rapid-deployment solution for portfolio monitoringExample of System Landscape

SAP Project and Portfolio Management 5.0

SAP Portf. and Proj. Management Application System

SAP NetWeaver

ABAP (NW7.02)

NW Portal

JAVA (optional)*

Business Package for

PPM

CPRXRPM

TREX

ADS

SAPFinancials

SAP Project System SAP ERP ECC 6.0 or higher

RFC

HTTP / HTTPS(SSO)

BS_FND 7.02

Implementing a two-level landscape

Connection of SAP ERP software

A Development/Quality and Productive

Environment should be set up

© 2010 SAP AG. All rights reserved. / Page 28

1. What is the Rapid Deployment Solution

2. Benefits and Value Proposition

3. Scope & Deliverables

4. Product Demo

5. Project Approach and Planning

6. Pre-requisites

7. Positioning for SAP Consulting

We Are Here to Discuss

© 2010 SAP AG. All rights reserved. / Page 29

SAP ConsultingWorldwide Delivery

SAP Consulting

12,000 consultants worldwide

50 consultants with special SAP Portfolio and Project Management application expertise

Consultants located all over the world, in every region

Why SAP Consulting

Product and solution experts

SAP knows SAP software best

Deep process knowledge and translation of processes to standard software

Best use of own SAP product close to standard, which gains release “sustainability” and protection of investment

Quality assurance

© 2010 SAP AG. All rights reserved. / Page 30

Benefits of SAP ConsultingBest Choice for SAP Portfolio and Project Management Implementations

Sales Support

Sales support via single point of contacts in every market unit

Various deployment possibilities

Presales customer experience by supporting test drives (what you see is what you get)

Delivery

Experience in lean, fast implementation leveraging a “quick time to value” implementation methodology

Service offering developed based on years of customer experiences

Numerous satisfied customers of rapidly deployed SAP Portfolio and Project Management solution

Direct access to sales, development, and support organizations – the global skills, information networks, and resources of SAP

© 2010 SAP AG. All rights reserved. / Page 31

1. What is the Rapid Deployment Solution

2. Benefits and Value Proposition

3. Scope & Deliverables

4. Product Demo

5. Project Approach and Planning

6. Pre-requisites

7. Positioning for SAP Consulting

We Are Here to Discuss

© 2010 SAP AG. All rights reserved. / Page 32

FAST TO DEPLOY AND EASIER TO CONSUME Rapid-deployment – Preconfigured software that delivers essential

portfolio planning and monitoring processes in as little as 13 weeks. Reduced complexity – A robust Portfolio and Project Management

solution from a single vendor, with superior global support, means fewer worries for you

1

2

3BUILDING FOR SUCCESS

Foundation for growth – start small, prove the value of this solution, and then grow on your schedule to the full SAP Portfolio and Project Management application, if needed.

Valuable customer insight – integrated with the SAP ERP application

COMPETITIVELY PRICED Predictable costs – Low, predetermined fees and clearly outlined

deliverables mean no hidden fees for the delivered solution

Key Takeaways

© 2010 SAP AG. All rights reserved. / Page 33

Questions

Appendix

© 2010 SAP AG. All rights reserved. / Page 35

Portfolio Planning Process 1/2

Fill in template

Fill in template

Finalize Project

Proposal

Finalize Project

Proposal

Perform Highlevel

Financial & Capacity Planning

Perform Highlevel

Financial & Capacity Planning

Define & Assign

TopDown Budget

Define & Assign

TopDown Budget

Define Strategy

Define Strategy

* The named roles are going to be delivered with this rapid-deployment solution. They are an example only and can be adapted by the customer, if required.

© 2010 SAP AG. All rights reserved. / Page 36

Portfolio Planning Process 2/2

Adjust & Approve Budget

Adjust & Approve Budget

Consolidate Proposal List

& Verify

Consolidate Proposal List

& Verify

Prepare Approval

Prepare Approval

Create/Assign Operational

Project

Create/Assign Operational

Project

* The named roles are going to be delivered with this rapid-deployment solution. They are an example only and can be adapted by the customer, if required.

© 2010 SAP AG. All rights reserved. / Page 37

Portfolio MonitoringBudget Overrun/Item Monitoring (Review)

* The named roles are going to be delivered with this rapid-deployment solution. They are an example only and can be adapted by the customer, if required.

Change Planning

Change Planning

Request Budget Change

Request Budget Change

Create Review

Create Review

Consolidate Change List

& Verify

Consolidate Change List

& Verify

Prepare Approval

Prepare Approval

Adjust & Approve Budget

Adjust & Approve Budget

Dashboard Monitoring

© 2010 SAP AG. All rights reserved. / Page 38

Portfolio MonitoringBudget Cut/Portfolio Adjustment 1/2

Create Review

Create Review

Define & Adjust

TopDown Budget

Define & Adjust

TopDown Budget

Prepare Approval

Prepare Approval

Consolidate List & Verify

Consolidate List & Verify

Dashboard Monitoring

* The named roles are going to be delivered with this rapid-deployment solution. They are an example only and can be adapted by the customer, if required.

Adjust & Approve Budget

Adjust & Approve Budget

© 2010 SAP AG. All rights reserved. / Page 39

Portfolio MonitoringBudget Cut/Portfolio Adjustment 2/2

Dashboard Monitoring

* The named roles are going to be delivered with this rapid-deployment solution. They are an example only and can be adapted by the customer, if required.

Adjust planning

Adjust planning

© 2010 SAP AG. All rights reserved. / Page 40

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.

Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.

Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.

IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer, z/VM, z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6, POWER5+, POWER5, POWER, OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are trademarks or registered trademarks of IBM Corporation.

Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries.

Oracle is a registered trademark of Oracle Corporation.

UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.

Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc.

HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology.

Java is a registered trademark of Sun Microsystems, Inc.

JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.

SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, Clear Enterprise, SAP BusinessObjects Explorer and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.

Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP France in the United States and in other countries.

All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.

The information in this document is proprietary to SAP. No part of this document may be reproduced, copied, or transmitted in any form or for any purpose without the express prior written permission of SAP AG.

This document is a preliminary version and not subject to your license agreement or any other agreement with SAP. This document contains only intended strategies, developments, and functionalities of the SAP® product and is not intended to be binding upon SAP to any particular course of business, product strategy, and/or development. Please note that this document is subject to change and may be changed by SAP at any time without notice.

SAP assumes no responsibility for errors or omissions in this document. SAP does not warrant the accuracy or completeness of the information, text, graphics, links, or other items contained within this material. This document is provided without a warranty of any kind, either express or implied, including but not limited to the implied warranties of merchantability, fitness for a particular purpose, or non-infringement.

SAP shall have no liability for damages of any kind including without limitation direct, special, indirect, or consequential damages that may result from the use of these materials. This limitation shall not apply in cases of intent or gross negligence.

The statutory liability for personal injury and defective products is not affected. SAP has no control over the information that you may access through the use of hot links contained in these materials and does not endorse your use of third-party Web pages nor provide any warranty whatsoever relating to third-party Web pages.

© 2010 SAP AG. All Rights Reserved