Page 1: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

SAP HANA tailored data center integration -

Overview

December, 2014 Public

Page 2: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

© 2014 SAP SE or an SAP affiliate company. All rights reserved. 2 Public

Disclaimer

This presentation outlines our general product direction and should not be relied on in making a

purchase decision. This presentation is not subject to your license agreement or any other agreement

with SAP. SAP has no obligation to pursue any course of business outlined in this presentation or to

develop or release any functionality mentioned in this presentation. This presentation and SAP's

strategy and possible future developments are subject to change and may be changed by SAP at any

time for any reason without notice. This document is provided without a warranty of any kind, either

express or implied, including but not limited to, the implied warranties of merchantability, fitness for a

particular purpose, or non-infringement. SAP assumes no responsibility for errors or omissions in this

document, except if such damages were caused by SAP intentionally or grossly negligent.

Page 3: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

Motivation

Why does SAP offer SAP HANA Tailored Data Center Integration?

Page 4: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

© 2014 SAP SE or an SAP affiliate company. All rights reserved. 4 Public

SAP HANA Appliance Delivery Model Overview of Vendors and HW Configurations

HW Layout Notes

In-memory DB Size

(# of CPUs and RAM)

Additionally for

SAP Business Suite on

HANA

Westmere EX IvyBridge EX Westmere EX IvyBridge EX

Single-node Server

(Scale-up) - For datamarts or accelerators

- Support for high-availabilty

and disaster recovery

From

2 CPUs/128GB

To

8 CPUs/1TB

From

2 CPUs/128GB

To

8 CPUs/2TB

Up to 4TB Up to 12TB

Multi-node Cluster

(Scale-out)

- To be used when single server

is not enough (e.g. BW)

- Usually, 2 to 16 servers per

cluster

- Largest certified configuration:

56 servers

- Largest tested configuration:

100+ servers

- Support for high-availability

and disaster recovery

Each server:

4 CPUs/512GB

or

8 CPUs/1TB

Each server:

2 CPUs/512GB

or

4 CPUs/1TB

or

8 CPUs/2TB

n.a. n.a.

Page 5: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

© 2014 SAP SE or an SAP affiliate company. All rights reserved. 5 Public

SAP HANA Appliance Delivery Model Pros and Cons

Standardized and highly optimized

Preconfigured hardware set-up and preinstalled software package

Fully supported by SAP

The appliance delivery of SAP HANA is pretty comfortable, …

HANA Server

HANA Server

Storage

SAP

HANA

Server

… but, on the other hand, it comes with limitations regarding hardware flexibility. Using appliances may

require changing established IT operation processes.

Page 6: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

© 2014 SAP SE or an SAP affiliate company. All rights reserved. 6 Public

Alternative: SAP HANA Tailored Data Center Integration Introducing Hardware Flexibility

HANA Server

HANA Server

Storage

SAP HANA Server

SAP HANA TDI is an alternative deployment approach.

Application Server

Database

Operating System

Virtualization

Server (CPU, RAM)

Network

Storage

Enterprise

Storage

HANA Server

HANA Server

SAP HANA Server

Enterprise Network

Network

Storage

Server (CPU, RAM)

Compared to an appliance, it offers more flexibility when you have to select the appropriate hardware for

integrating SAP HANA in your data center.

HW components

with flexibilization

potential

SAP HANA TDI: Use your own prefered HW Appliance building blocks: All in one box

Page 7: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

SAP HANA TDI - Phase 1

Introduction to Enterprise Storage

Page 8: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

© 2014 SAP SE or an SAP affiliate company. All rights reserved. 8 Public

SAP HANA TDI with Enterprise Storage Preconditions

With the introduction of TDI with Enterprise Storage, SAP supports hardware setups which comply with the three

prerequisites below.

Apart from that, no further approval by SAP is required.

1) Use certified hardware only

Only servers listed in the SAP HANA Product Availability Matrix are supported

– Same servers as for SAP HANA appliances

2) Use certified storage only

Storages used for TDI setups must have successfully passed the SAP HANA hardware certification for Enterprise Storage

Certificate states that the storage fulfills SAP HANA’s requirements for data throughput and latency times

Certified storage families (as of June 11, 2014):

– IBM (SVC, Storwize, FlashSystem, XIV), NetApp (FAS-, E-Series), Hitachi (VSP, HUS), EMC (VMAX, VNX2)

– HP (3PAR, XP), Dell (Compellent), Fujitsu (Eternus), Fusion IO (ION Accelerator), Violin (6200 Series)

– More to come ...

3) Let only certified person(s) do the SAP HANA software installation

Required exam: “SAP Certified Technology Specialist (Edition 2014) – SAP HANA Installation” (E_HANAINS141)

For more information, see SAP Training and Certification Shop

The exam needs to be successfully passed for a person to perform SAP HANA SW installations

– SAP HANA hardware partners and their employees do not need this certificate

– Companies, or their employees, who are sub-contractors of hardware partners must be certified to perform HANA SW installations

SAP does not offer any certification of TDI hardware setups at customers’ sites.

Page 9: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

© 2014 SAP SE or an SAP affiliate company. All rights reserved. 9 Public

SAP HANA TDI with Enterprise Storage Important Documents and Tools

1) Storage Whitepaper – Background Knowledge

Conceptual storage layout, non-shared storage vs shared storage

Storage sizing formulas

Helps you understand the impact of SAP’s data throughput KPIs in daily

operation of SAP HANA

Explains SAP HANA’s high-availability support (Host Auto Failover)

Available on SCN

2) Storage Configuration – Vendor-specific Configuration

Guide

For getting certified, each storage vendor must file in a configuration guide

Explains how to configure the storage for optimal collaboration with SAP

HANA

– Incl recommendations how many SAP HANA server nodes can be connected

at maximum

Get a copy directly from your storage vendor

3) SAP HANA HW Config Check Tool (HWCCT)

Command-line tool, generally available since SAP HANA SPS07

Used by storage vendors, SAP Support, and customers

Measures the data throughput and latency times between the SAP HANA

servers and the Enterprise Storage system

– Does not require SAP HANA SW being installed beforehand

– Uses the same libraries for file system access and the same IO patterns as

SAP HANA does

Download it from SAP Service Marketplace

– Navigation path: Software Downloads -> Support Packages and Patches -> A

- Z Index -> H -> SAP HANA Platform Edition -> SAP HANA PLATFORM

EDIT. 1.0 -> Entry by Component -> HANA config check -> SAP HANA HW

CONFIG CHECK 1.0 -> Linux on x86_64 64bit -> HWCCT_80_0-

20011536.SAR)

Documented in the SAP HANA Administration Guide

– Contains the latest KPIs

– For latest docu changes, see PDF attachment of SAP Note 1943937

Read SAP’s Storage Whitepaper.

Get a copy of your storage vendor’s configuration guide for SAP HANA.

Use the SAP HANA HW Config Check Tool to check your infrastructure any time you like.

Page 10: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

SAP HANA TDI - Phase 2

Introduction to Enterprise Networking

Page 11: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

© 2014 SAP SE or an SAP affiliate company. All rights reserved. 11 Public

SAP HANA TDI with Enterprise Network Preconditions

With the introduction of TDI with Enterprise Network, SAP supports hardware setups which comply with the

prerequisites below.

Apart from that, no further approval by SAP is required.

1) For the SAP HANA computing nodes, use certified hardware only

Same as with “TDI with Enterprise Storage”

2) In multi-node setups, check the bandwidth available between the computing nodes

Make sure that the intra-node network of your SAP HANA scale-out solution fulfills the recommended minimum

bandwidth requirements

Conduct self-managed tests using the Network Test available with HWCCT since HANA SPS08

SAP does not introduce any additional certification of network components for TDI setups

3) Let only certified person(s) do the SAP HANA software installation

Same as with “TDI with Enterprise Storage”

SAP does not introduce any certification of network components for TDI setups.

Page 12: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

© 2014 SAP SE or an SAP affiliate company. All rights reserved. 12 Public

SAP HANA TDI with Enterprise Network Important Documents and Tools

1) Network Whitepaper – Background Knowledge

Helps you understand the impact of SAP’s network recommendations on the

daily operation of SAP HANA

Introduction to SAP HANA’s logical network zones: Client Zone, Internal

Zone, Storage Zone

Detailed description of the network traffic in typical situations of an application

scenario

– Which network zones are involved in situations like “data load”, “reporting”, “backup”,

“failover”, “takeover”

Technical requirements and recommendations for all network zones

Available on SCN

Complements existing sources of information:

– Network zones, ports and connections, host name resolution: SAP HANA Master Guide,

chapter 3.2 "The SAP HANA Network“

– Network and communication security: SAP HANA Security Guide, chapter 5

– Network recommendations for SAP HANA System Replication: SCN How-To Guide

2) SAP HANA HW Config Check Tool (HWCCT)

Network test added with SAP HANA SPS08

Used by hardware vendors, SAP Support, and customers

Measures the minimum bandwidth of the intra-node network i.e. the

bandwidth available between the hosts that comprise a multi-node system

– Does not require SAP HANA SW being installed beforehand

Hosts are tested pair-wise. For each pair, two tests are available:

– Unidirectional: Transfer test load from host 1 to host 2, measure bandwidth

– Bidirectional: At the same time, transfer test load from host 1 to host 2 and vice

versa; measure bandwidth

Documented in the SAP HANA Administration Guide

– Contains the latest KPIs recommended for the bandwidth of the intra-node

network

– For latest docu changes, see PDF attachment of SAP Note 1943937

Read SAP’s Network Whitepaper.

Use the SAP HANA HW Config Check Tool to check your intra-node network any time you like.

Page 13: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

SAP HANA TDI - Phase 3

Extended Support for Compute Servers with Intel Xeon E5 v2/v3

Page 14: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

© 2014 SAP SE or an SAP affiliate company. All rights reserved. 14 Public

Basic idea: Leverage Intel‘s E5 technology for SAP HANA cost optimized entry-level system

Intel Xeon 2 socket E5 26xx v2/v3 with minimum 8 cores per CPU are supported

For the SAP HANA computing nodes, use certified hardware only as listed on SCN (GA November 10th)

Homogenous symmetric assembly of DIMMs and maximum utilization of all available memory channels

Single server systems – scale up only

Supported as SAP HANA tailored datacenter integrated system

The sweet spot is around $ 10K (768GB system, populated with 32GB DIMM´s)

Let only certified person(s) do the SAP HANA software installation

Production support for proper sized systems which fulfil the data throughput and the latency KPI´s

Relaxed HW Specifications for Non-Production system (e.g Cost-Optimized SAP HANA Infrastructure for Non-

Production Usage)

Restrictions

No support for Intel Xeon E5 4 socket systems

No support for SAP HANA scale out solutions based on Intel Xeon E5 compute nodes

SAP HANA TDI with Extended Support for Compute Servers with

Intel Xeon E5 v2/v3 With leveraging Intel‘s E5 technology for SAP HANA in production, SAP supports hardware setups which comply

with the prerequisites below. Apart from that, no further approval by SAP is required.

Page 15: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

© 2014 SAP SE or an SAP affiliate company. All rights reserved. 15 Public

1. Sizing 2. System Availability 3. System Order

SAP HANA – TDI Phase III Introduction of Intel Xeon E5 Streamlined customer procurement process for SAP HANA entry level systems

• Customer or SAP business partner

fill in all necessary information into

the NEW SAP HANA quick sizer

(http://service.sap.com/quicksizing).

• The results out of the SAP HANA

quick sizer provides the right system

size for production ready systems.

A Simple 3 step process to get SAP HANA hardware

(entry systems based on Intel Xeon E5 2 socket systems 26xx up to 1.5 TB)

• Customer checks the SCN page for

solutions of his preferred hardware

vendor.

• Customer gets in contact with the

hardware vendor.

• The HW vendor translates SAP quick

sizer results into the right hardware

solution before customer orders the

systems (manual step).

Additional big advantage of this new option:

Customers and the whole SAP ecosystem are very familiar with SAP quick sizer tools!

Page 16: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

SAP HANA Appliance vs TDI

Comparison Between the Appliance and the TDI Delivery Model for SAP HANA

Page 17: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

© 2014 SAP SE or an SAP affiliate company. All rights reserved. 17 Public

SAP HANA Tailored Data Center Integration Comparison with Appliance Delivery Model

Compared to the appliance delivery, SAP HANA TDI is an additional approach providing you with more flexibility

to fulfill your needs of integrating SAP HANA in your data center.

Appliance Delivery Model SAP HANA TDI Approach

Hardware

Selection

• Little flexibility only

• Customer can choose between different appliance

vendors

• No possibility to replace certain components by HW

already used in customers’ DC

• Save IT budget and existing investments

• Use preferred storage

• Use preferred network components

• A choice of compute server processor (E5, E7) (New with SP09)

Implementation

Effort

• Low for customer

• Preconfigured HW plus preinstalled SW

• Only HW is delivered

• Installation to be done by customer (incl. OS)

• Extensive documentation (guides, SAP notes) available

Safeguarding /

Solution

Validation

• Done together by SAP and HW Partner

• SAP HANA Going-Live check offered by SAP AGS

• Self-managed infrastructure tests possible

• SAP HANA HW Configuration Check Tool

Support • Fully provided by SAP • Individual support agreement(s) with HW partner(s) required

OS Service

Contract • Appliance vendor is reseller of OS provider’s service contract • Customer to care for getting the OS provider’s service contract

Page 18: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

SAP HANA TDI Process

Steps to set up an SAP HANA infrastructure using the TDI approach

Page 19: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

© 2014 SAP SE or an SAP affiliate company. All rights reserved. 19 Public

1) Determine the size of your future SAP HANA system

SAP Quick Sizer tool is a quick and easy way for customers to

determine the CPU, memory, and SAPS requirements for running

their workloads on SAP HANA.

Consider involving SAP Active Global Support for IT landscape

planning

2) Check the offerings of SAP‘s HANA Hardware Partners

See the SAP Certified Appliance Hardware for SAP HANA site

3) Order your SAP HANA server hardware

If you decided to follow the TDI approach, please note:

– You do not need to order the local disks/integrated storage - these are only

required for appliances

– If you want your SAP HANA system to boot from SAN, additional Fibre

Channel adapters are allowed

4) Check the offerings of certified storage vendors

Select one from the list of certified storage families

If your prefered storage is not yet on the list, contact the vendor on

their plans to get certified

5) Set up your SAP HANA hardware infrastructure

Make yourself familiar with SAP HANA’s IO patterns and the

impact of SAP’s data throughput KPIs during daily SAP HANA

operation

Configure the storage system following the vendor’s directions

and recommendations

– See the vendor’s Configuration Guide for SAP HANA

Check the data throughput and the latency times using HWCCT

– SAP’s KPIs are listed in the tool documentation

Contact your storage vendor if the KPIs are not met

6) Install SAP HANA software

Make sure that only certified persons do the SAP HANA

installation

See SAP’s installation guides and related SAP notes at

help.sap.com

7) Go Live

Consider involving SAP Active Global Support to perform a

HANA Go-Live Check prior to going productive

Going Live with SAP HANA TDI High-level Process

Page 20: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

© 2014 SAP SE or an SAP affiliate company. All rights reserved. 20 Public

Further Information

SAP Public Web

TDI at a glance: SAP HANA Openness

Overview - SAP HANA tailored data center integration

FAQ - SAP HANA tailored data center integration

SAP HANA tailored data center integration for enterprise storage is generally available

The Evolution Continues: SAP HANA tailored data center integration – enterprise network

SAP Extends openness and partner co-innovation with SAP HANA phase 3 tailored data center

integration

Page 21: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

© 2014 SAP SE or an SAP affiliate company. All rights reserved.

Thank you

Contact information:

[email protected]

Page 22: SAP HANA tailored data center integration - Overview · Documented in the SAP HANA Administration Guide –Contains the latest KPIs –For latest docu changes, see PDF attachment

© 2014 SAP SE or an SAP affiliate company. All rights reserved. 22 Public

© 2014 SAP SE or an SAP affiliate company. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP SE or an

SAP affiliate company.

SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE

(or an SAP affiliate company) in Germany and other countries. Please see http://global12.sap.com/corporate-en/legal/copyright/index.epx for additional trademark

information and notices.

Some software products marketed by SAP SE and its distributors contain proprietary software components of other software vendors.

National product specifications may vary.

These materials are provided by SAP SE or an SAP affiliate company for informational purposes only, without representation or warranty of any kind, and SAP SE or its

affiliated companies shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP SE or

SAP affiliate company products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing

herein should be construed as constituting an additional warranty.

In particular, SAP SE or its affiliated companies have no obligation to pursue any course of business outlined in this document or any related presentation, or to develop or

release any functionality mentioned therein. This document, or any related presentation, and SAP SE’s or its affiliated companies’ strategy and possible future

developments, products, and/or platform directions and functionality are all subject to change and may be changed by SAP SE or its affiliated companies at any time for

any reason without notice. The information in this document is not a commitment, promise, or legal obligation to deliver any material, code, or functionality. All forward-

looking statements are subject to various risks and uncertainties that could cause actual results to differ materially from expectations. Readers are cautioned not to place

undue reliance on these forward-looking statements, which speak only as of their dates, and they should not be relied upon in making purchasing decisions.