Santa Maria Avenue IMPROVEMENT PROJECT Construction Overview PROJECT LIMITS Santa Maria Avenue, from Castro Valley Boulevard to Wilson Avenue CONSTRUCTION DETAILS Construction on the Santa Maria Avenue Improvement Project will begin in late January/early February.* e construction work includes constructing sidewalks, curbs and gutters along the length of Santa Maria from Castro Valley Boulevard to Wilson Ave. Improved bike lanes will also be included. In early January, crews will begin marking off construction areas. is will be followed by construction of sidewalks, driveway improvements and build out of curbs, gutters and tree planters. e project area spans from the area near the downtown Village to Castro Valley High School. Work will proceed on a block-by-block basis. Access to driveways will be available at all times. Please pay attention to construction, detour and safety notices that will be posted. When finished Santa Maria will be a “complete street” designed to benefit to all roadway users, especially pedestrians and bicyclists. PROJECT FEATURES Concrete Sidewalks, Curbs and Gutters Class III Bicycle Routes with Sharrows Street Trees Pedestrian Ramps High Visibility Crosswalks *Schedule subject to change For project updates visit: www.acpwa.org or call (510) 670-5591 Santa Maria Avenue

Upload: others

Post on 17-Jan-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Santa Maria Avenue - Alameda County, CaliforniaConstruction on the Santa Maria Avenue Improvement Project will begin in late January/early February.* The construction work includes

Santa Maria AvenueImprovement project

Construction Overview

Project LiMitS

Santa Maria Avenue, from Castro Valley Boulevard to Wilson Avenue

conStruction DetAiLS

Construction on the Santa Maria Avenue Improvement Project will begin in late January/early February.*

The construction work includes constructing sidewalks, curbs and gutters along the length of Santa Maria from Castro Valley Boulevard to Wilson Ave. Improved bike lanes will also be included.

In early January, crews will begin marking off construction areas. This will be followed by construction of sidewalks, driveway improvements and build out of curbs, gutters and tree planters.

The project area spans from the area near the downtown Village to Castro Valley High School. Work will proceed on a block-by-block basis. Access to driveways will be available at all times. Please pay attention to construction, detour and safety notices that will be posted.

When finished Santa Maria will be a “complete street” designed to benefit to all roadway users, especially pedestrians and bicyclists.

Project FeAtureS

•Concrete Sidewalks, Curbs and Gutters

•Class III Bicycle Routes with Sharrows

•Street Trees

•Pedestrian Ramps

•High Visibility Crosswalks

*Schedule subject to change

For project updates visit: www.acpwa.org or call (510) 670-5591

San

ta M

ari

a A

ve

nu

e

Page 2: Santa Maria Avenue - Alameda County, CaliforniaConstruction on the Santa Maria Avenue Improvement Project will begin in late January/early February.* The construction work includes

Santa Maria AvenueImprovement project

FrequentLy ASkeD queStionS

Why is this project needed?Santa Maria Avenue currently has intermittent concrete sidewalks interspersed with dirt and asphalt pathways. This project will replace these pathways with a concrete sidewalk, curbs and gutter to provide continuous pedestrian and bicycle routes along Santa Maria Avenue between the Castro Valley downtown area and the vicinity of Castro Valley High School.

What are the construction hours?9 a.m. to 3 p.m. Whenever possible, construction activities will be scheduled to lessen impacts in the commercial areas and at the schools during class. The project team will coordinate with property owner to ensure safe access and to minimize disruption. Signs will be installed advising the public that businesses are open during construction.

What impacts can be expected during construction?Motorists, bicyclists and pedestrians will experience some delays. During construction, intermittent lane closures will be necessary, and traffic control/flaggers will be on site. During construction, parking will be restricted. During non-working hours, travel and parking lanes will be open whenever safely possible. Advance notification of temporary lane closures and parking restrictions will be provided to residents and business owners along Santa Maria Avenue.

How will construction affect access into my property? Access into your property will be maintained during construction. Part of your driveway and sidewalk may be blocked for limited time during sidewalk construction in specific areas. Construction crews will work with you to make sure there is access.

Where do I park during this construction?During construction of your driveway and the sidewalk fronting your property, you will need to find temporary alternative parking. Construction will be done on one side of the street at a time.

Where can I find additional information? Notification and project updates will the County provide?The Public Works Agency will post project updates on its website: www.acpwa.org or you may call (510) 670-5591

399 Elmhurst Street, Hayward, Ca 94544

How to reAcH uSPhone: (510) 670-5591

Email: [email protected]