  • Santa Cruz River Management Plan05-22-19

    Evan Canfield – Pima County Regional Flood Control DistrictScott Altherr – CMG Drainage Engineering, Inc.

  • Santa Cruz River Mgt Plan – Grant to Trico

    •Introduction•Purpose of this Meeting•Progress on the Existing Conditions Assessment Phase•Flood Hazard Mapping•Infrastructure Assessment

    •Introduction to the Alternatives Development Phase•Three Management Reaches•Need for Stakeholder Input

    •Developing Alternatives Workgroups for the Three Reaches

    2

  • Santa Cruz River Mgt Plan – Grant to Trico

    •The purpose of this project is to develop a management strategy to balance flood risk management, drainage infrastructure protection, water recharge, recreation opportunities and riparian habitat preservation for the Santa Cruz River from Grant to Trico.

    3

  • Goals of this Meeting

    •Update•Look Ahead•Get Stakeholder involvement

    4

  • 5

    Current Phase: Update

  • Current Phase Deliverables

    •Technical Data Notebook for Floodplain mapping

    •Infrastructure Assessment•Existing Conditions Report

    6

  • Flood Hazard Mapping

    Footer text here7

    Tric

    o R

    oad

    Grant Road

    Pinal County

  • 1-D Mapping

    July 22, 2012 Footer text here8

  • 1-D Mapping

    9

  • 1-D Mapping

    10

  • 1-D Mapping

    11

  • 2D Mapping and Videos

    July 22, 201212

  • 2D Model Region Map

  • DEPTH (FT.)

    100-Year Flood Model Simulation

  • DEPTH (FT.)

    Location: Upstream Of Sanders Road Bridge

  • DEPTH (FT.)

    Location: Between Sanders Road Bridge And Trico Marana Road Bridge

  • DEPTH (FT.)

    Location: At Trico Marana Road Bridge

  • DEPTH (FT.)

    10% Chance (10-year) Flood Inundation

  • Evaluation of Infrastructure and Maintenance Needs

    July 22, 2012 Footer text here19

  • Levee freeboard

    Footer text here20

  • Levee freeboard (cont.)

    Footer text here21

  • Infrastructure Assessment

    Footer text here22

  • Sand & Gravel Operations

    Footer text here23

  • Current Phase Deliverable Timeline

    •Existing Conditions Report – Prior to end of June, 2019.

    •Infrastructure Assessment and Maintenance Report – Prior to end of June, 2019

    •Technical Data Notebook (TDN) – end of August 2019

    24

  • Questions?

    25

  • Alternatives Development Phase: Scope (approximately 2 years)

    • Developing Recommended Alternatives By Management Reach

    •Implementation Plan•Public and Stakeholder Engagement Report

    •Adoption of plan by Jurisdictions

    26

  • 27

    Grant to InaLiving River ‘Three Rivers Reach’

  • 28

  • 29

  • 30

  • Three Rivers Reach Issues and Developments (A Preliminary List )•Reduced flows out of Agua Nueva •County Priority for Corazon del Tres Rios Del Norte Multibenefit Projects•Soil Cement Bank Protection of the Orange Grove Pit

    •Connecting the Loop with two pedestrian bridges•Over the Rillito•Over the Canada Del Oro

    •Habitat Restoration and Enhancement (endangered Gila Topminnow)

    •Sunset Innovation Campus•Trash and Illegal Dumping•Homeless Populations

    31

  • Ina to Avra Valley RdLiving River ‘Cortaro Narrows Reach’

    32

  • Collapsed Low-Flow Bank Protection

  • Combined Concept for Cortaro(Bendway Weirs, Infiltration Channels, Rock Fords)35

  • 36

  • Grade Control Concept at Twin Peaks

    37 1600 1800 2000 2200 2400 2600 2800 3000

    2094

    2096

    2098

    2100

    2102

    2104

    2106

    Lower_SantaCruz_Final_5.24.10 w-2015_Twi Plan: 1) LSC_Exist 4/17/2019

    Station (ft)

    Ele

    vatio

    n (ft

    )

    Legend

    WS Regulatory

    Ground

    Ineff

    Bank Sta

    Current Terrain

    .0345 .055

    1800 2000 2200 2400 2600 2800 3000 3200 3400

    2092

    2094

    2096

    2098

    2100

    2102

    2104

    Lower_SantaCruz_Final_5.24.10 w-2015_Twi Plan: 1) LSC_Exist 4/17/2019

    Station (ft)

    Ele

    vatio

    n (ft

    )

    Legend

    WS Regulatory

    Ground

    Ineff

    Bank Sta

    Current Terrain

    .0358 .055

  • Cortaro Narrows Issues and Developments (A Preliminary List)

    •Channel Flow Against the Bank Protection•Expanding recreational opportunities (Loop and El Rio Preserve)

    •Need to improve channel conveyance in some areas

    •Incising effluent channel requires repeat maintenance of low flow bank protection

    38

  • 39

    North of Avra Valley RdLiving River ‘Marana Flats Reach’

  • High Plains Recharge Basins

  • Santa Cruz River Managed Recharge

  • Marana Flats Issues and Developments(A Preliminary List)

    •Complex wide floodplain, especially north of Sanders Rd

    •Interest in Subdivision Development•Terminus of Managed Recharge Project•Proposed Marana Drainage Master Plan Improvements

    •Older homes in high risk flood areas at Trico-Marana Rd

    42

  • Alternatives Identification Task- Stakeholder Working Groups By Management Reach (3 Groups

    • Purpose•Help develop an appropriate set of reach specific alternatives

    • Size•Less than 10 people per workgroup

    • Representation•Jurisdictions•Consultant Team•Water Owners•Community Water Coalition

    • Level of Effort•2-3 Hour Meetings on Quarterly Basis

    43

  • Proposed Timeline for Alternatives Selection Phase

    44

    July Aug Sept Oct Nov Dec Jan Feb March April May June July Aug Sept Oct Nov Dec Jan Feb March April May June

    Stakeholder Alternatives Working Group

    Separtate For Three Rivers, Cortaro Narrows and Marana Flats

    Initial MeetingIdentify Suite of Alternatives

    Refine AlternativesGo Back to Stakeholders with Possible AlternativesDevelopment of Recommended AlternativesDevelopment of Implementation Plan

    Public Process

    Separtate For Three Rivers, Cortaro Narrows and Marana Flats

    Mail 'Living River'

    Public 'Inform' and 'Solicit'

    Possible AlternativesRecommended Alternatives

    Jurisdictional Process

    Inform about Flood Hazards and InfrastructureOngoing Staff Level ParticipationProvide Plan and Propose Adoption

    2019 2020 2021

    Sheet1

    201920202021

    JulyAugSeptOctNovDecJanFebMarchAprilMayJuneJulyAugSeptOctNovDecJanFebMarchAprilMayJune

    Stakeholder Alternatives Working GroupSepartate For Three Rivers, Cortaro Narrows and Marana Flats

    Initial Meeting

    Identify Suite of Alternatives

    Refine Alternatives

    Go Back to Stakeholders with Possible Alternatives

    Development of Recommended Alternatives

    Development of Implementation Plan

    Public ProcessSepartate For Three Rivers, Cortaro Narrows and Marana Flats

    Mail 'Living River'

    Public 'Inform' and 'Solicit'

    Possible Alternatives

    Recommended Alternatives

    Jurisdictional Process

    Inform about Flood Hazards and Infrastructure

    Ongoing Staff Level Participation

    Provide Plan and Propose Adoption

  • Stakeholder Participation Form

    45

  • Questions?

    46

  • Website

    Evan CanfieldPima County Regional Flood Control District

    [email protected]

    Scott AltherrCMG Drainage Engineering, Inc.

    [email protected]

    mailto:[email protected]:[email protected]

    Santa Cruz River Management Plan�05-22-19Santa Cruz River Mgt Plan – Grant to TricoSanta Cruz River Mgt Plan – Grant to TricoGoals of this MeetingSlide Number 5Current Phase DeliverablesFlood Hazard Mapping1-D Mapping1-D Mapping1-D Mapping1-D Mapping2D Mapping and VideosSlide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18Evaluation of Infrastructure and Maintenance NeedsLevee freeboardLevee freeboard (cont.)Infrastructure AssessmentSand & Gravel OperationsCurrent Phase Deliverable TimelineQuestions?Alternatives Development Phase: Scope (approximately 2 years)Grant to Ina�Living River ‘Three Rivers Reach’Slide Number 28Slide Number 29Slide Number 30Three Rivers Reach Issues and Developments �(A Preliminary List )Ina to Avra Valley Rd�Living River ‘Cortaro Narrows Reach’Collapsed Low-Flow Bank Protection Slide Number 34Combined Concept for Cortaro �(Bendway Weirs, Infiltration Channels, Rock Fords)Slide Number 36Grade Control Concept at Twin PeaksCortaro Narrows Issues and Developments �(A Preliminary List) North of Avra Valley Rd�Living River ‘Marana Flats Reach’High Plains Recharge BasinsSanta Cruz River Managed RechargeMarana Flats Issues and Developments�(A Preliminary List)Alternatives Identification Task�- Stakeholder Working Groups By Management Reach (3 GroupsProposed Timeline for Alternatives Selection PhaseStakeholder �Participation FormQuestions?Slide Number 47