santa clara river watershed feasibility study santa paula ... · santa clara river watershed...

14
Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08 HWY 126 – Downstream side of crossing looking upstream HWY 126 – Downstream side of crossing looking downstream T:\60978 - USACE\61513 Santa Clara\Hydraulic Data Report\Appendix A - photos\Word Files\Appendix_14a_Santa Paula Creek.doc

Upload: others

Post on 28-Oct-2019

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Santa Clara River Watershed Feasibility Study Santa Paula ... · Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08 • HWY 126 – Upstream side of crossing looking

Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08

• HWY 126 – Downstream side of crossing looking upstream

• HWY 126 – Downstream side of crossing looking downstream

T:\60978 - USACE\61513 Santa Clara\Hydraulic Data Report\Appendix A - photos\Word Files\Appendix_14a_Santa Paula Creek.doc

Page 2: Santa Clara River Watershed Feasibility Study Santa Paula ... · Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08 • HWY 126 – Upstream side of crossing looking

Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08

• HWY 126 – Upstream side of crossing looking downstream

• HWY 126 – Upstream side of crossing looking upstream

T:\60978 - USACE\61513 Santa Clara\Hydraulic Data Report\Appendix A - photos\Word Files\Appendix_14a_Santa Paula Creek.doc

Page 3: Santa Clara River Watershed Feasibility Study Santa Paula ... · Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08 • HWY 126 – Upstream side of crossing looking

Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08

• Main St – Downstream side of crossing looking upstream

• Main St – Downstream side of crossing looking downstream

T:\60978 - USACE\61513 Santa Clara\Hydraulic Data Report\Appendix A - photos\Word Files\Appendix_14a_Santa Paula Creek.doc

Page 4: Santa Clara River Watershed Feasibility Study Santa Paula ... · Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08 • HWY 126 – Upstream side of crossing looking

Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08

• Main St – Upstream side of crossing looking downstream

• Railroad – Downstream side of crossing looking upstream

T:\60978 - USACE\61513 Santa Clara\Hydraulic Data Report\Appendix A - photos\Word Files\Appendix_14a_Santa Paula Creek.doc

Page 5: Santa Clara River Watershed Feasibility Study Santa Paula ... · Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08 • HWY 126 – Upstream side of crossing looking

Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08

• Railroad – Upstream side of crossing looking downstream

• Railroad – Looking downstream from top of crossing

T:\60978 - USACE\61513 Santa Clara\Hydraulic Data Report\Appendix A - photos\Word Files\Appendix_14a_Santa Paula Creek.doc

Page 6: Santa Clara River Watershed Feasibility Study Santa Paula ... · Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08 • HWY 126 – Upstream side of crossing looking

Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08

• Railroad – Looking upstream from top of crossing

• Bridge Rd – Looking downstream from top of crossing

T:\60978 - USACE\61513 Santa Clara\Hydraulic Data Report\Appendix A - photos\Word Files\Appendix_14a_Santa Paula Creek.doc

Page 7: Santa Clara River Watershed Feasibility Study Santa Paula ... · Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08 • HWY 126 – Upstream side of crossing looking

Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08

• Bridge Rd – Looking upstream from top of crossing

• Bridge Rd – Upstream side of crossing looking downstream

T:\60978 - USACE\61513 Santa Clara\Hydraulic Data Report\Appendix A - photos\Word Files\Appendix_14a_Santa Paula Creek.doc

Page 8: Santa Clara River Watershed Feasibility Study Santa Paula ... · Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08 • HWY 126 – Upstream side of crossing looking

Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08

• Near Rafferty Rd – Downstream side of diversion structure looking upstream

• Near Rafferty Rd – Upstream side of diversion structure looking downstream

T:\60978 - USACE\61513 Santa Clara\Hydraulic Data Report\Appendix A - photos\Word Files\Appendix_14a_Santa Paula Creek.doc

Page 9: Santa Clara River Watershed Feasibility Study Santa Paula ... · Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08 • HWY 126 – Upstream side of crossing looking

Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08

• Near Rafferty Rd – Upstream side of diversion structure looking upstream

• Mupu Rd – Upstream side of crossing looking downstream

T:\60978 - USACE\61513 Santa Clara\Hydraulic Data Report\Appendix A - photos\Word Files\Appendix_14a_Santa Paula Creek.doc

Page 10: Santa Clara River Watershed Feasibility Study Santa Paula ... · Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08 • HWY 126 – Upstream side of crossing looking

Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08

• Mupu Rd – Looking downstream from top of crossing

• Mupu Rd – Looking upstream from top of crossing

T:\60978 - USACE\61513 Santa Clara\Hydraulic Data Report\Appendix A - photos\Word Files\Appendix_14a_Santa Paula Creek.doc

Page 11: Santa Clara River Watershed Feasibility Study Santa Paula ... · Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08 • HWY 126 – Upstream side of crossing looking

Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08

• Mupu Rd – Downstream side of crossing looking upstream

• HWY 150_A – Upstream side of crossing looking downstream

T:\60978 - USACE\61513 Santa Clara\Hydraulic Data Report\Appendix A - photos\Word Files\Appendix_14a_Santa Paula Creek.doc

Page 12: Santa Clara River Watershed Feasibility Study Santa Paula ... · Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08 • HWY 126 – Upstream side of crossing looking

Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08

• HWY 150_A – Upstream side of crossing looking upstream

• HWY 150_A – Upstream side of crossing looking downstream

T:\60978 - USACE\61513 Santa Clara\Hydraulic Data Report\Appendix A - photos\Word Files\Appendix_14a_Santa Paula Creek.doc

Page 13: Santa Clara River Watershed Feasibility Study Santa Paula ... · Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08 • HWY 126 – Upstream side of crossing looking

Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08

• HWY 150_B – Upstream side of crossing looking downstream

• HWY 150_B – Upstream side of crossing looking upstream

T:\60978 - USACE\61513 Santa Clara\Hydraulic Data Report\Appendix A - photos\Word Files\Appendix_14a_Santa Paula Creek.doc

Page 14: Santa Clara River Watershed Feasibility Study Santa Paula ... · Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08 • HWY 126 – Upstream side of crossing looking

Santa Clara River Watershed Feasibility Study Santa Paula Creek 3/5/08

• HWY 150_B – Downstream side of crossing looking upstream

• HWY 150_B – Downstream side of crossing looking downstream

T:\60978 - USACE\61513 Santa Clara\Hydraulic Data Report\Appendix A - photos\Word Files\Appendix_14a_Santa Paula Creek.doc