sanitary layout legends water supply layout …
TRANSCRIPT
WATER SUPPLY LAYOUT SYMBOLSTEE
45 DEG ELBOW
UNION
WCLAVSHO
WATER CLOSET
LAVATORY
SHOWER
FDFLOOR DRAIN
PU
PD
RISER (PIPE UP)
RISER (PIPE DOWN)
RISER (PIPE UP & DOWN)
WATER SERVICE ENTRANCE
25 mm Ø PPR CWL PIPE
20 mm Ø PPR CWL PIPE
90 DEG ELBOW
MGV
CV
WATER METER
GATE VALVE
CHECK VALVE
HB HOSE BIBB
32 mm Ø PPR CWL PIPE
SANITARY LAYOUT LEGENDSWYE
SANITARY TEE
45 DEG ELBOW
90 DEG ELBOW
90 DEG ELBOWco
WCLAVSHO
WATER CLOSET
LAVATORY
SHOWER
FDFLOOR DRAIN
PU
PD
STACK (PIPE UP)
STACK (PIPE DOWN)
STACK (PIPE UP & DOWN)
75 mm Ø uPVC WASTE PIPE
50 mm Ø uPVC WASTE PIPE
75 mm Ø uPVC VENT PIPE
50 mm Ø uPVC VENT PIPE
P - TRAP
75 mm Ø uPVC STORM DRAIN PIPE
WS WASTE PIPE STACK
VS VENT PIPE STACK
DP DOWNSPOUT
CB CATCH BASIN
63 mm Ø PPR CWL PIPE
END CAP
20 mm Ø PPR HWL PIPE
E. INDIRECT WASTE
1. NO EVAPORATIVE COOLER, OR SIMILAR AIR CONDITIONING EQUIPMENT SHALL HAVE ANYDRAIN PIPE IN CONNECTION THEREWITH, DIRECTLY CONNECTED TO ANY SOIL, WASTE ANDVENT PIPE SUCH EQUIPMENT SHALL BE DRAINED BY MEANS OF INDIRECT WASTE PIPESAND ALL WASTES DRAINED BY THEM SHALL DISCHARGE THROUGH AN AIRBREAK INTO ANOPEN FLOOR SINK OR OTHER APPROVED TYPE RECEPTOR PROPERLY CONNECTED TO THEDRAINAGE SYSTEM.
F. VENT PIPES
1. EACH PLUMBING FIXTURE TRAP, EXCEPT AS OTHERWISE PROVIDED IN THIS CODE, SHALLBE PROTECTED AGAINST SIPHONAGE AND BACK-PRESSURE, AIR CIRCULATION SHALL BEASSURED THROUGHOUT ALL PARTS OF THE EXCRETA DRAINAGE SYSTEM BY MEANS OFVENT PIPES.
2. ALL VENT PIPES SHALL EXTEND UNDIMINISHED IN SIZE ABOVE THE ROOF SHALL BERECONNECTED WITH THE SOIL OR WASTE STACK VENT OF PROPER SIZE AT A POINTBELOW THE ROOF, THE VENT THROUGH THE ROOF (VSTR) SHALL INCREASE ONE (1) PIPESIZE ABOVE.
G. STORM DRAINAGE
1. STORM DRAINAGE SHALL BE PROVIDED FOR ROOF AREAS, COURTS AND COURTYARDS TOCOLLECT STORM WATER AND DISCHARGE THE STORMWATER TO AN APPROVED POINT OFDISPOSAL NOT IN CONFLICT WITH OTHER ORDINANCES OR REGULATIONS.
H. HANGERS AND SUPPORT
1. PIPES SHALL BE SUPPORTED AT SUFFICIENTLY CLOSE INTERVALS TO KEEP THEM INALIGNMENT AND PREVENT SAGGING.
MATERIAL SPECIFICATIONSCOLD WATERLINE SHALL BE POLYPROPYLENE RANDOM CO-POLYMER TYPE 3
SEWERLINE/ SHALL BE UNPLASTICIZED POLYVINYL CHLORIDE (UPVC SERIES)VENT PIPES/DOWNSPOUTS/STORM DRAINAGE
LABORATORY/ SHALL BE HIGH DENSITY POLYETHYLENE (HDPE PB16)
PLUMBING GENERAL NOTESALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED ACCORDING TOTHE PROVISION OF THE NATIONAL PLUMBING CODE OF THE PHILIPPINES ANDTHE LOCAL RULES AND REGULATION
A. VERTICAL PIPING1. PLASTIC PIPE - SHALL BE SUPPORTED AT EVERY - (1) METER INTERVAL
B. HORIZONTAL PIPING1. PLASTIC PIPE - SHALL BE SUPPORTED BY STIFF METAL BACKING
HANGERS IN ITS ENTIRE LENGTH FOR SMALL SIZE TUBING UP TO 38mmDIAMETER AND WITHOUT BACKINGS BUT WITH SPACED METAL HANGERSAT APPROVED FOR LARGER-SIZE TUBING.
C. PLUMBING FIXTURES1. PLUMBING FIXTURE SHALL BE MANUFACTURED OF DENSE, DURABLE,
NON-BORBENT MATERIALS AND HAVE SMOOTH, IMPERVIOUS SURFACES,FREE FROM UNNECESSARY CONCEALED FOULING SURFACES, EXCEPT ASPERMITTED ELSEWHERE IN THIS CODE, ALL FIXTURE SHALL CONFORM INQUALITY AND NATIONAL RECOGNIZED APPLICABLE STANDARDS.
WATER SUPPLY
1. EACH PLUMBING FIXTURE SHALL BE APPROVED WITH AN ADEQUATESUPPLY OF POTABLE RUNNING WATER, SO ARRANGED AS TO FLUSH ANDKEEP SAME IN CLEAN AND HEALTHFUL CONDITIONS WITHOUT DANGER OFBACKFLOW OR CROSS-CONNECTION.
D. SEWERLINE
1. DRAINAGE PIPING SHALL BE PROVIDED WITH APPROVED INLET FITTINGSFOR FIXTURE CONNECTIONS, CORRECTLY LOCATED ACCORDING TO THESIZE AND TYPE OF FIXTURE PROPOSED TO BE CONNECTED.
2. CHANGE IN DIRECTION OF DRAINAGE PIPING SHALL BE MADE BY THEAPPROPRIATE USE OF APPROVED FITTINGS AND SHALL BE OF THEANGLES PRESENTED BY A 22 1
2 DEGREES OR 118 BEND, 45 DEGREES OR 1
8BEND AND 60 DEGREES OR 16 BEND OR OTHER APPROVED FITTINGS.
SCALE1
1P NTS
PLUMBING NOTESSCALE1
2P NTS
PLUMBING LEGENDS
P1
SHEET NO.APPROVED Drawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.
RA 9266 SECTION 33
Drawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.
RA 9266 SECTION 33 CONCURREDRECOMMENDING APPROVALPROJECT TITLE
LOCATION AS SHOWN
PROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FOR
ISOLATION ROOMS
BGHMC Compound, Baguio CityCordillera Administrative Region
SHEET CONTENTS CHECKED
RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief II
Baguio General Hospital & Medical Center
RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional Staff
Baguio General Hospital & Medical Center
VILMA O. MOLTIO, MPASupervising Administrative Officer
OIC,Chief Administrative Officer, HOPSS-BGHMC
RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSS
Baguio General Hospital & Medical Center
LENON S. BANA-E, CE, SE
SANITARY ENGINEER
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH
BAGUIO CITYCORDILLERA ADMINISTRATIVE REGION
100 mm Ø uPVC WASTE PIPE
150 mm Ø uPVC WASTE PIPE
SCALE2
1P 1:1,000 MTRS
SITE DEVELOPMENT PLANPARTIAL INDICATIVE BGHMC MASTER
10
17
OLD PS
A
C E F
6B
2
22
ST
GATE
H
J
G
1
23
24
VU
WATER TANK
1819
R
I
SHED
WATER TANK
P
Q3
BENECO POST
BENECO POST
W
AT
ER
TA
NK
OLD
BU
ILD
ING
25
13
14
27
STAIRS
K
L
STORE
26
W
MAIN ENTRANCE
MAIN EXIT
B G H M C D R I V E W A Y
TO BRGY. PHIL-AM
NORTHF L Y - O V E R
0 10 20 30 40 50 60 70 80 90 100m
0 10 000 50 000 100 000mm
PROJECT:PROPOSED RENOVATION OF
THREE-STOREY BUILDING FORISOLATION ROOMS
P2
SHEET NO.APPROVED Drawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.
RA 9266 SECTION 33
Drawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.
RA 9266 SECTION 33 CONCURREDRECOMMENDING APPROVALPROJECT TITLE
LOCATION AS SHOWN
PROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FOR
ISOLATION ROOMS
BGHMC Compound, Baguio CityCordillera Administrative Region
SHEET CONTENTS CHECKED
RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief II
Baguio General Hospital & Medical Center
RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional Staff
Baguio General Hospital & Medical Center
VILMA O. MOLTIO, MPASupervising Administrative Officer
OIC,Chief Administrative Officer, HOPSS-BGHMC
RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSS
Baguio General Hospital & Medical Center
LENON S. BANA-E, CE, SE
SANITARY ENGINEER
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH
BAGUIO CITYCORDILLERA ADMINISTRATIVE REGION
WS
WS
WSWS
WS
WS
WSWS
WS
WS
WSWS
WSWS WS
WS
WSWS
WS
WS
WS
WS
WC
WC
WC
WC
WC
WC
WC
WC
WC
WCWC
LAV
LAV
LAV
LAV
LAV
LAV LAV
LAV
LAV
SHO
SHO
SHO
SHO
SHO
SHO
SHO
SHO
EEW
EEW
SCALE3
1P 1:100 MTS
GROUND FLOOR WATERLINE LAYOUT
P3 SHEET NO.
APPROVED Drawings and specifications andother contract docum
ents duly signed,stam
ped or sealed, as instruments of
service, are the intellectual propertyand docum
ents of the architect,whether the object for which they arem
ade is executed or not. It shall beunlawful for any person to duplicateor m
ake copies of said documents for
use in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said docum
ents.
RA
9
26
6 S
EC
TIO
N 3
3
Drawings and specifications andother contract docum
ents duly signed,stam
ped or sealed, as instruments of
service, are the intellectual propertyand docum
ents of the architect,whether the object for which they arem
ade is executed or not. It shall beunlawful for any person to duplicateor m
ake copies of said documents for
use in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said docum
ents.
RA
9
26
6 S
EC
TIO
N 3
3
CONCURREDRECOMMENDING APPROVAL
PROJECT TITLE
LOCATIONAS SHOW
N
PROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FOR
ISOLATION ROOMS
BGHMC Compound, Baguio CityCordillera Administrative Region
SHEET CONTENTSCHECKED
RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief II
Baguio General Hospital & Medical Center
RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional Staff
Baguio General Hospital & Medical Center
VILMA O. MOLTIO, MPASupervising Administrative Officer
OIC,Chief Administrative Officer, HOPSS-BGHMC
RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSS
Baguio General Hospital & Medical Center
LE
NO
N S
. B
AN
A-E
, C
E, S
E
SANITARY ENGINEER
BA
GU
IO
G
EN
ER
AL
H
OS
PIT
AL
AN
D M
ED
IC
AL
C
EN
TE
R
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH
BAGUIO CITYCORDILLERA ADMINISTRATIVE REGION
A B C E F G H J
1
2
3
4
5
6
7
8
9
D
1'
G'
10
11
12
13
14
AIRLOCK
Up
Ramp
Up
HALLWAY
HALL
WAY
Up
ACCESSGOING FROMDELTA E.R.
EMERGENCYEXIT
PERS
ONNE
L ACC
ESS
ENTRANCE
BEDELEVATOR
Dn
EXIT
Dn
250mm STRUCTURAL GAP
EXISTING INFECTIOUSDESEASE BUILDING
(PROPOSED DELTA E.R.)
Ramp Up
HOSPITAL ROAD
NORTH
Ramp Dn
200m
m ST
RUCT
URAL
GAP
2 938
1 412
1 725
22 750
2 200 6753 6254 2004 0003 0001 300 2503 500
41 80
0
3 750
3 750
3 750
3 750
1 850
2 950
6 075
200
4 800
1 275
350
3 050
3 275
3 325
2 700
1 500
1 775
2 100
2 475
1 500
41 80
0
200
2 575 1 725 6751 7501 875 7002 5001 0001 3002 700
15 00
0
3 750
3 750
3 750
3 750
1 850
1 500
6 075
1 825
1 500
6 075
26 80
0
2 950
3 050
3 275
1 825
1 500
4 575
2 2004 3004 2004 0004 300 2503 500
22 750
32 MM DIA CWL RISER (GF SUPPLY)
WS
WS
WSWS
WS
WS
WSWS
WSWS
WSWS WS
WS
WSWS
WS
WS
WS
WS
WC
WC
WC
WC
WC
WC
WC
WC
WC
WCWC
LAV
LAV
LAV
LAV
LAV
LAV LAV
LAV
LAV
SHO
SHO
SHO
SHO
SHO
SHO
SHO
SHO
EEW
EEW
SCALE3a
1P 1:100 MTS
SECOND FLOOR WATERLINE LAYOUT
P3a
SHEET NO.APPROVED
Drawings and specifications andother contract docum
ents duly signed,stam
ped or sealed, as instruments of
service, are the intellectual propertyand docum
ents of the architect,whether the object for which they arem
ade is executed or not. It shall beunlawful for any person to duplicateor m
ake copies of said documents for
use in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said docum
ents.
RA
9
26
6 S
EC
TIO
N 3
3
Drawings and specifications andother contract docum
ents duly signed,stam
ped or sealed, as instruments of
service, are the intellectual propertyand docum
ents of the architect,whether the object for which they arem
ade is executed or not. It shall beunlawful for any person to duplicateor m
ake copies of said documents for
use in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said docum
ents.
RA
9
26
6 S
EC
TIO
N 3
3
CONCURREDRECOMMENDING APPROVAL
PROJECT TITLE
LOCATIONAS SHOW
N
PROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FOR
ISOLATION ROOMS
BGHMC Compound, Baguio CityCordillera Administrative Region
SHEET CONTENTSCHECKED
RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief II
Baguio General Hospital & Medical Center
RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional Staff
Baguio General Hospital & Medical Center
VILMA O. MOLTIO, MPASupervising Administrative Officer
OIC,Chief Administrative Officer, HOPSS-BGHMC
RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSS
Baguio General Hospital & Medical Center
LE
NO
N S
. B
AN
A-E
, C
E, S
E
SANITARY ENGINEER
BA
GU
IO
G
EN
ER
AL
H
OS
PIT
AL
AN
D M
ED
IC
AL
C
EN
TE
R
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH
BAGUIO CITYCORDILLERA ADMINISTRATIVE REGION
HALLWAY
HALL
WAY
Up
BEDELEVATOR
Up Dn
Dn
ROOF
ROOF
250mm STRUCTURAL GAP
NORTH
A B C E F G H J
1
2
3
4
5
6
7
8
9
D
1'
G'
10
11
12
13
14
EXISTING INFECTIOUSDESEASE BUILDING
(PROPOSED DELTA E.R.)
200m
m ST
RUCT
URAL
GAP
22 750
2 200 6753 6254 2004 0003 0001 300 2503 500
41 80
0
3 750
3 750
3 750
3 750
1 850
2 950
6 075
200
4 800
1 275
350
3 050
3 275
3 325
2 700
1 500
1 775
2 100
2 475
1 500
41 80
0
200
2 575 1 725 6751 7501 875 7002 5001 0001 3002 700
15 00
0
3 750
3 750
3 750
3 750
1 850
1 500
6 075
1 825
1 500
6 075
26 80
0
2 950
3 050
3 275
1 825
1 500
4 575
2 2004 3004 2004 0004 300 2503 500
22 750
WS WS
32 MM DIA CWL RISER (2F SUPPLY)
32 MM DIA CWL RISER (GF SUPPLY)
WS
WS
WSWS
WS
WS
WSWS
WSWS
WSWS WS
WS
WSWS
WS
WS
WS
WS
WC
WC
WC
WC
WC
WC
WC
WC
WC
WCWC
LAV
LAV
LAV
LAV
LAV
LAV LAV
LAV
LAV
SHO
SHO
SHO
SHO
SHO
SHO
SHO
SHO
EEW
EEW
SCALE3b
1P 1:100 MTS
THIRD FLOOR WATERLINE LAYOUT
P3b
SHEET NO.APPROVED
Drawings and specifications andother contract docum
ents duly signed,stam
ped or sealed, as instruments of
service, are the intellectual propertyand docum
ents of the architect,whether the object for which they arem
ade is executed or not. It shall beunlawful for any person to duplicateor m
ake copies of said documents for
use in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said docum
ents.
RA
9
26
6 S
EC
TIO
N 3
3
Drawings and specifications andother contract docum
ents duly signed,stam
ped or sealed, as instruments of
service, are the intellectual propertyand docum
ents of the architect,whether the object for which they arem
ade is executed or not. It shall beunlawful for any person to duplicateor m
ake copies of said documents for
use in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said docum
ents.
RA
9
26
6 S
EC
TIO
N 3
3
CONCURREDRECOMMENDING APPROVAL
PROJECT TITLE
LOCATIONAS SHOW
N
PROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FOR
ISOLATION ROOMS
BGHMC Compound, Baguio CityCordillera Administrative Region
SHEET CONTENTSCHECKED
RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief II
Baguio General Hospital & Medical Center
RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional Staff
Baguio General Hospital & Medical Center
VILMA O. MOLTIO, MPASupervising Administrative Officer
OIC,Chief Administrative Officer, HOPSS-BGHMC
RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSS
Baguio General Hospital & Medical Center
LE
NO
N S
. B
AN
A-E
, C
E, S
E
SANITARY ENGINEER
BA
GU
IO
G
EN
ER
AL
H
OS
PIT
AL
AN
D M
ED
IC
AL
C
EN
TE
R
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH
BAGUIO CITYCORDILLERA ADMINISTRATIVE REGION
HALLWAY
HALL
WAY
Up
BEDELEVATOR
Up Dn
Dn
ROOF
ROOF
250mm STRUCTURAL GAP
NORTH
A B C E F G H J
1
2
3
4
5
6
7
8
9
D
1'
G'
10
11
12
13
14
EXISTING INFECTIOUSDESEASE BUILDING
(PROPOSED DELTA E.R.)
200m
m ST
RUCT
URAL
GAP
22 750
2 200 6753 6254 2004 0003 0001 300 2503 500
41 80
0
3 750
3 750
3 750
3 750
1 850
2 950
6 075
200
4 800
1 275
350
3 050
3 275
3 325
2 700
1 500
1 775
2 100
2 475
1 500
41 80
0
200
2 575 1 725 6751 7501 875 7002 5001 0001 3002 700
15 00
0
3 750
3 750
3 750
3 750
1 850
1 500
6 075
1 825
1 500
6 075
26 80
0
2 950
3 050
3 275
1 825
1 500
4 575
2 2004 3004 2004 0004 300 2503 500
22 750
WS WS
32 MM DIA CWL RISER (2F SUPPLY)
32 MM DIA CWL RISER (GF SUPPLY)
32 MM DIA CWL RISER (3F SUPPLY)
PG PS
PRESSURETANK
GV CV
GV CV
GV CV
GV CVGV CV
FV
FV
GV
GV
GV
HB
WATERTANK 1
WATERTANK 2
P
SCALE3c
1P 1:100 MTS
ROOF WATERLINE LAYOUT
P3c
SHEET NO.APPROVED
Drawings and specifications andother contract docum
ents duly signed,stam
ped or sealed, as instruments of
service, are the intellectual propertyand docum
ents of the architect,whether the object for which they arem
ade is executed or not. It shall beunlawful for any person to duplicateor m
ake copies of said documents for
use in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said docum
ents.
RA
9
26
6 S
EC
TIO
N 3
3
Drawings and specifications andother contract docum
ents duly signed,stam
ped or sealed, as instruments of
service, are the intellectual propertyand docum
ents of the architect,whether the object for which they arem
ade is executed or not. It shall beunlawful for any person to duplicateor m
ake copies of said documents for
use in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said docum
ents.
RA
9
26
6 S
EC
TIO
N 3
3
CONCURREDRECOMMENDING APPROVAL
PROJECT TITLE
LOCATIONAS SHOW
N
PROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FOR
ISOLATION ROOMS
BGHMC Compound, Baguio CityCordillera Administrative Region
SHEET CONTENTSCHECKED
RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief II
Baguio General Hospital & Medical Center
RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional Staff
Baguio General Hospital & Medical Center
VILMA O. MOLTIO, MPASupervising Administrative Officer
OIC,Chief Administrative Officer, HOPSS-BGHMC
RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSS
Baguio General Hospital & Medical Center
LE
NO
N S
. B
AN
A-E
, C
E, S
E
SANITARY ENGINEER
BA
GU
IO
G
EN
ER
AL
H
OS
PIT
AL
AN
D M
ED
IC
AL
C
EN
TE
R
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH
BAGUIO CITYCORDILLERA ADMINISTRATIVE REGION
ROOFING
250mm STRUCTURAL GAP
NORTH
A B C E F G H J
1
2
3
4
5
6
7
8
9
D
1'
G'
10
11
12
13
14
22 750
3 500 250 4 300 4 000 4 200 4 300 2 200
4 575
1 500
1 825
3 275
3 050
2 950
26 80
0
6 075
1 500
1 825
6 075
1 500
1 850
3 750
3 750
3 750
3 750
15 00
0
2 700 1 300 1 000 2 500 700 1 875 1 750 6751 7252 575
200
41 80
0
1 500
2 475
2 100
2 700
3 325
3 275
3 050
350
1 275
4 800
200
6 075
2 950
1 850
3 750
3 750
3 750
3 750
41 80
0
3 500 250 1 300 3 000 4 000 4 200 3 625 675 2 200
22 750
EXISTING INFECTIOUSDESEASE BUILDING
(PROPOSED DELTA E.R.)
200m
m ST
RUCT
URAL
GAP
TAP TO EXISTING HOSPITAL WATER SUPPLY
32 MM DIA CWL RISER (2F SUPPLY)
32 MM DIA CWL RISER (GF SUPPLY)
32 MM DIA CWL RISER (3F SUPPLY)
SEPTICTANK
CO CO
CO
CO
CO
CO
CO
CO CO
COCOCO
COCO
COCO
CO
CO
WCWC
WC
WC
WC
WC
WC
WC WC
WC
LAV
LAV
LAV
LAV
LAV
CO CO CO CO
COCO
CO
CO
COCO
CO
CO
CO
CO
FD
FD
FD
FD
FD
FDFD
FD
FD
FD
FD
CO
WS
WS
WS
WS
WS
WS WS
WS
WS
WS
LAV
LAV
LAVWS
WS
WS
WS
WS
WS
WS
WS
LAV LAVWS WS
FDFD
FDFD
FD
FD
FD
WS WS
WS
CO
COCOCO
CO
CO
TOSTP
FD
FD
FD
FD
FD
FD
FD
FD
100 MM DIA WASTE STACK
100 MM DIA WASTE STACK75 MM DIA VENT STACK
100 MM DIA WASTE STACK75 MM DIA VENT STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK75 MM DIA VENT STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK100 MM DIA WASTE STACK
75mmØ DP
75mmØ DP 75mmØ DP 75mmØ DP75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
SCALE4
1P 1:100 MTS
GROUND FLOOR SEWER LINE LAYOUT
P4 SHEET NO.
APPROVED Drawings and specifications andother contract docum
ents duly signed,stam
ped or sealed, as instruments of
service, are the intellectual propertyand docum
ents of the architect,whether the object for which they arem
ade is executed or not. It shall beunlawful for any person to duplicateor m
ake copies of said documents for
use in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said docum
ents.
RA
9
26
6 S
EC
TIO
N 3
3
Drawings and specifications andother contract docum
ents duly signed,stam
ped or sealed, as instruments of
service, are the intellectual propertyand docum
ents of the architect,whether the object for which they arem
ade is executed or not. It shall beunlawful for any person to duplicateor m
ake copies of said documents for
use in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said docum
ents.
RA
9
26
6 S
EC
TIO
N 3
3
CONCURREDRECOMMENDING APPROVAL
PROJECT TITLE
LOCATIONAS SHOW
N
PROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FOR
ISOLATION ROOMS
BGHMC Compound, Baguio CityCordillera Administrative Region
SHEET CONTENTSCHECKED
RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief II
Baguio General Hospital & Medical Center
RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional Staff
Baguio General Hospital & Medical Center
VILMA O. MOLTIO, MPASupervising Administrative Officer
OIC,Chief Administrative Officer, HOPSS-BGHMC
RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSS
Baguio General Hospital & Medical Center
LE
NO
N S
. B
AN
A-E
, C
E, S
E
SANITARY ENGINEER
BA
GU
IO
G
EN
ER
AL
H
OS
PIT
AL
AN
D M
ED
IC
AL
C
EN
TE
R
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH
BAGUIO CITYCORDILLERA ADMINISTRATIVE REGION
A B C E F G H J
1
2
3
4
5
6
7
8
9
D
1'
G'
10
11
12
13
14
AIRLOCK
Up
Ramp
Up
HALLWAY
HALL
WAY
Up
ACCESSGOING FROMDELTA E.R.
EMERGENCYEXIT
PERS
ONNE
L ACC
ESS
ENTRANCE
BEDELEVATOR
Dn
EXIT
Dn
250mm STRUCTURAL GAP
EXISTING INFECTIOUSDESEASE BUILDING
(PROPOSED DELTA E.R.)
Ramp Up
HOSPITAL ROAD
NORTH
Ramp Dn
200m
m ST
RUCT
URAL
GAP
2 938
1 412
1 725
22 750
2 200 6753 6254 2004 0003 0001 300 2503 500
41 80
0
3 750
3 750
3 750
3 750
1 850
2 950
6 075
200
4 800
1 275
350
3 050
3 275
3 325
2 700
1 500
1 775
2 100
2 475
1 500
41 80
0
200
2 575 1 725 6751 7501 875 7002 5001 0001 3002 700
15 00
0
3 750
3 750
3 750
3 750
1 850
1 500
6 075
1 825
1 500
6 075
26 80
0
2 950
3 050
3 275
1 825
1 500
4 575
2 2004 3004 2004 0004 300 2503 500
22 750
FD
FD
COWC
WC
LAV
LAV
FD
FD
FD
WS
WS
WS
LAV
CO
CO
CO
CO
CO
COCO
CO
CO
COCO
COCO
COCO
CO
CO
CO
CO
CO
COCO
COCO
WS
WS
WS
WSWS
WS
WSWS
WS WS WS
WSWS
WS
WS
WS
WS
WS
LAV
LAV
LAV
LAV LAV
FDFD
FD
FD
FD
FD
FDFD
FD
FD
FD
FD
FD
FD WC
WC
WC
WCWC
WC
WC
WC
WC
LAV
COCO
FD
LAV
FD
100 MM DIA WASTE STACK
100 MM DIA WASTE STACK
100 MM DIA WASTE STACK75 MM DIA VENT STACK
100 MM DIA WASTE STACK75 MM DIA VENT STACK
100 MM DIA WASTE STACK75 MM DIA VENT STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK75 MM DIA VENT STACK
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP 75mmØ DP 75mmØ DP 75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75 MM DIA VENT STACK100 MM DIA WASTE STACK
SCALE4a
1P 1:100 MTS
SECOND FLOOR SEWER LINE LAYOUT
P4a
SHEET NO.APPROVED
Drawings and specifications andother contract docum
ents duly signed,stam
ped or sealed, as instruments of
service, are the intellectual propertyand docum
ents of the architect,whether the object for which they arem
ade is executed or not. It shall beunlawful for any person to duplicateor m
ake copies of said documents for
use in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said docum
ents.
RA
9
26
6 S
EC
TIO
N 3
3
Drawings and specifications andother contract docum
ents duly signed,stam
ped or sealed, as instruments of
service, are the intellectual propertyand docum
ents of the architect,whether the object for which they arem
ade is executed or not. It shall beunlawful for any person to duplicateor m
ake copies of said documents for
use in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said docum
ents.
RA
9
26
6 S
EC
TIO
N 3
3
CONCURREDRECOMMENDING APPROVAL
PROJECT TITLE
LOCATIONAS SHOW
N
PROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FOR
ISOLATION ROOMS
BGHMC Compound, Baguio CityCordillera Administrative Region
SHEET CONTENTSCHECKED
RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief II
Baguio General Hospital & Medical Center
RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional Staff
Baguio General Hospital & Medical Center
VILMA O. MOLTIO, MPASupervising Administrative Officer
OIC,Chief Administrative Officer, HOPSS-BGHMC
RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSS
Baguio General Hospital & Medical Center
LE
NO
N S
. B
AN
A-E
, C
E, S
E
SANITARY ENGINEER
BA
GU
IO
G
EN
ER
AL
H
OS
PIT
AL
AN
D M
ED
IC
AL
C
EN
TE
R
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH
BAGUIO CITYCORDILLERA ADMINISTRATIVE REGION
HALLWAY
HALL
WAY
Up
BEDELEVATOR
Up Dn
Dn
ROOF
ROOF
250mm STRUCTURAL GAP
NORTH
A B C E F G H J
1
2
3
4
5
6
7
8
9
D
1'
G'
10
11
12
13
14
EXISTING INFECTIOUSDESEASE BUILDING
(PROPOSED DELTA E.R.)
200m
m ST
RUCT
URAL
GAP
22 750
2 200 6753 6254 2004 0003 0001 300 2503 500
41 80
0
3 750
3 750
3 750
3 750
1 850
2 950
6 075
200
4 800
1 275
350
3 050
3 275
3 325
2 700
1 500
1 775
2 100
2 475
1 500
41 80
0
200
2 575 1 725 6751 7501 875 7002 5001 0001 3002 700
15 00
0
3 750
3 750
3 750
3 750
1 850
1 500
6 075
1 825
1 500
6 075
26 80
0
2 950
3 050
3 275
1 825
1 500
4 575
2 2004 3004 2004 0004 300 2503 500
22 750
FD
FD
CO
COWC
WC
LAV
LAV
FD
FD
FD
WS
WS
WS
LAV
CO
CO
CO
CO
CO
COCO
CO
CO
COCO
COCO
COCO
CO
CO
CO
CO
CO
COCO
COCO
WS
WS
WS
WSWS
WS
WSWS
WS WS WS
WSWS
WS
WS
WS
WS
WS
LAV
LAV
LAV
LAV LAV
FDFD
FD
FD
FD
FD
FDFD
FD
FD
FD
FD
FD
FD WC
WC
WC
WCWC
WC
WC
WC
WC
LAV
COCO
FD
LAV
FD
100 MM DIA WASTE STACK
100 MM DIA WASTE STACK
100 MM DIA WASTE STACK75 MM DIA VENT STACK
100 MM DIA WASTE STACK75 MM DIA VENT STACK
100 MM DIA WASTE STACK75 MM DIA VENT STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK75 MM DIA VENT STACK
75mmØ DP
75mmØ DP 75mmØ DP 75mmØ DP 75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
SCALE4b
1P 1:100 MTS
THIRD FLOOR SEWER LINE LAYOUT
P4b
SHEET NO.APPROVED
Drawings and specifications andother contract docum
ents duly signed,stam
ped or sealed, as instruments of
service, are the intellectual propertyand docum
ents of the architect,whether the object for which they arem
ade is executed or not. It shall beunlawful for any person to duplicateor m
ake copies of said documents for
use in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said docum
ents.
RA
9
26
6 S
EC
TIO
N 3
3
Drawings and specifications andother contract docum
ents duly signed,stam
ped or sealed, as instruments of
service, are the intellectual propertyand docum
ents of the architect,whether the object for which they arem
ade is executed or not. It shall beunlawful for any person to duplicateor m
ake copies of said documents for
use in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said docum
ents.
RA
9
26
6 S
EC
TIO
N 3
3
CONCURREDRECOMMENDING APPROVAL
PROJECT TITLE
LOCATIONAS SHOW
N
PROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FOR
ISOLATION ROOMS
BGHMC Compound, Baguio CityCordillera Administrative Region
SHEET CONTENTSCHECKED
RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief II
Baguio General Hospital & Medical Center
RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional Staff
Baguio General Hospital & Medical Center
VILMA O. MOLTIO, MPASupervising Administrative Officer
OIC,Chief Administrative Officer, HOPSS-BGHMC
RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSS
Baguio General Hospital & Medical Center
LE
NO
N S
. B
AN
A-E
, C
E, S
E
SANITARY ENGINEER
BA
GU
IO
G
EN
ER
AL
H
OS
PIT
AL
AN
D M
ED
IC
AL
C
EN
TE
R
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH
BAGUIO CITYCORDILLERA ADMINISTRATIVE REGION
HALLWAY
HALL
WAY
Up
BEDELEVATOR
Up Dn
Dn
ROOF
ROOF
250mm STRUCTURAL GAP
NORTH
A B C E F G H J
1
2
3
4
5
6
7
8
9
D
1'
G'
10
11
12
13
14
EXISTING INFECTIOUSDESEASE BUILDING
(PROPOSED DELTA E.R.)
200m
m ST
RUCT
URAL
GAP
22 750
2 200 6753 6254 2004 0003 0001 300 2503 500
41 80
0
3 750
3 750
3 750
3 750
1 850
2 950
6 075
200
4 800
1 275
350
3 050
3 275
3 325
2 700
1 500
1 775
2 100
2 475
1 500
41 80
0
200
2 575 1 725 6751 7501 875 7002 5001 0001 3002 700
15 00
0
3 750
3 750
3 750
3 750
1 850
1 500
6 075
1 825
1 500
6 075
26 80
0
2 950
3 050
3 275
1 825
1 500
4 575
2 2004 3004 2004 0004 300 2503 500
22 750
75 MM DIA VENT STACK
75 MM DIA VTR
75 MM DIA VTR
75 MM DIA VTR75 MM DIA VTR
75mmØ DP
75mmØ DP75mmØ DP
75mmØ DP 75mmØ DP 75mmØ DP 75mmØ DP
75 MM DIA VTR
75mmØ DP 75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
SCALE4c
1P 1:100 MTS
ROOF SEWER LINE LAYOUT
P4c
SHEET NO.APPROVED
Drawings and specifications andother contract docum
ents duly signed,stam
ped or sealed, as instruments of
service, are the intellectual propertyand docum
ents of the architect,whether the object for which they arem
ade is executed or not. It shall beunlawful for any person to duplicateor m
ake copies of said documents for
use in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said docum
ents.
RA
9
26
6 S
EC
TIO
N 3
3
Drawings and specifications andother contract docum
ents duly signed,stam
ped or sealed, as instruments of
service, are the intellectual propertyand docum
ents of the architect,whether the object for which they arem
ade is executed or not. It shall beunlawful for any person to duplicateor m
ake copies of said documents for
use in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said docum
ents.
RA
9
26
6 S
EC
TIO
N 3
3
CONCURREDRECOMMENDING APPROVAL
PROJECT TITLE
LOCATIONAS SHOW
N
PROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FOR
ISOLATION ROOMS
BGHMC Compound, Baguio CityCordillera Administrative Region
SHEET CONTENTSCHECKED
RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief II
Baguio General Hospital & Medical Center
RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional Staff
Baguio General Hospital & Medical Center
VILMA O. MOLTIO, MPASupervising Administrative Officer
OIC,Chief Administrative Officer, HOPSS-BGHMC
RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSS
Baguio General Hospital & Medical Center
LE
NO
N S
. B
AN
A-E
, C
E, S
E
SANITARY ENGINEER
BA
GU
IO
G
EN
ER
AL
H
OS
PIT
AL
AN
D M
ED
IC
AL
C
EN
TE
R
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH
BAGUIO CITYCORDILLERA ADMINISTRATIVE REGION
ROOFING
250mm STRUCTURAL GAP
NORTH
A B C E F G H J
1
2
3
4
5
6
7
8
9
D
1'
G'
10
11
12
13
14
22 750
3 500 250 4 300 4 000 4 200 4 300 2 200
4 575
1 500
1 825
3 275
3 050
2 950
26 80
0
6 075
1 500
1 825
6 075
1 500
1 850
3 750
3 750
3 750
3 750
15 00
0
2 700 1 300 1 000 2 500 700 1 875 1 750 6751 7252 575
200
41 80
0
1 500
2 475
2 100
2 700
3 325
3 275
3 050
350
1 275
4 800
200
6 075
2 950
1 850
3 750
3 750
3 750
3 750
41 80
0
3 500 250 1 300 3 000 4 000 4 200 3 625 675 2 200
22 750
EXISTING INFECTIOUSDESEASE BUILDING
(PROPOSED DELTA E.R.)
200m
m ST
RUCT
URAL
GAP
SHEET NO.APPROVED Drawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.
RA 9266 SECTION 33
Drawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.
RA 9266 SECTION 33 CONCURREDRECOMMENDING APPROVALPROJECT TITLE
LOCATION AS SHOWN
PROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FOR
ISOLATION ROOMS
BGHMC Compound, Baguio CityCordillera Administrative Region
SHEET CONTENTS CHECKED
RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief II
Baguio General Hospital & Medical Center
RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional Staff
Baguio General Hospital & Medical Center
VILMA O. MOLTIO, MPASupervising Administrative Officer
OIC,Chief Administrative Officer, HOPSS-BGHMC
RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSS
Baguio General Hospital & Medical Center
LENON S. BANA-E, CE, SE
SANITARY ENGINEER
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH
BAGUIO CITYCORDILLERA ADMINISTRATIVE REGION
WS
WS
WS
WS
WS
WS
WS
WS
WSWS
WS
WSWS
WS
WS
WSWS
WSWS
WS
WS
WS
WC
WC
WC
WC
WC
WC
WC
WC
WC
WC
WC
LAVLAV
LAV
LAV
LAV
LAV
LAV
LAV
LAV
SHO
SHO
SHO
SHOSHO
SHO
SHO
SHOEEW
EEW
AB
C
E
F
G
HJ
1
23
4
56
78
9
D
1'
G'
10
11
12
13
14
AIRLOCK
Up Ramp Up
HALLWAY
HALLWAY
Up
ACCESS
GOING FROM
DELTA E.R.
EMERGENCY
EXIT
PERSONNEL ACCESS
ENTRANCE
BEDELEVATOR
Dn
EXIT
Dn
250mm STRUCTURAL GAP
EXISTING INFECTIOUS
DESEASE BUILDING
(PROPOSED DELTA E.R.)
Ramp Up
HOSPITAL ROAD
NORTH
Ramp Dn
200mm STRUCTURAL GAP2 938
1 412
1 725
22 750
2 200
675
3 625
4 200
4 000
3 000
1 300
250
3 500
41 800
3 750
3 750
3 750
3 750
1 850
2 950
6 075
200
4 800
1 275 350
3 050
3 275
3 325
2 700
1 5001 775
2 100
2 475
1 500
41 800 200
2 575
1 725
675
1 750
1 875
700
2 500
1 000
1 300
2 700
15 000
3 750
3 750
3 750
3 750
1 850
1 500
6 075
1 8251 500
6 075
26 800
2 950
3 050
3 275
1 8251 500
4 575
2 200
4 300
4 200
4 000
4 300
250
3 500
22 750
WS
WS
WS
WS
WS
WS
WS
WS
WS
WSWS
WS
WS
WSWS
WSWS
WS
WS
WS
WC
WC
WC
WC
WC
WC
WC
WC
WC
WC
WC
LAVLAV
LAV
LAV
LAV
LAV
LAV
LAV
LAV
SHO
SHO
SHO
SHOSHO
SHO
SHO
SHOEEW
EEW
WS WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WSWS
WS
WS
WSWS
WSWS
WS
WS
WS
WC
WC
WC
WC
WC
WC
WC
WC
WC
WC
WC
LAVLAV
LAV
LAV
LAV
LAV
LAV
LAV
LAV
SHO
SHO
SHO
SHOSHO
SHO
SHO
SHOEEW
EEW
WS WS
PGPS
PRESSURE
TANK
GV CV GV CV
GV CVGV CVGV CV
FV
FVGV
GV
GV
HB
WATERTANK 1
WATERTANK 2
P
TAP TO EXISTING HOSPITAL WATER SUPPLY
32 MM DIA CWL RISER (2F SUPPLY)
32 MM DIA CWL RISER (GF SUPPLY)
32 MM DIA CWL RISER (3F SUPPLY)
SCALE5
1P 1:120 MTRS
WATERLINE ISOMETRY
P5
SHEET NO.APPROVED Drawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.
RA 9266 SECTION 33
Drawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.
RA 9266 SECTION 33 CONCURREDRECOMMENDING APPROVALPROJECT TITLE
LOCATION AS SHOWN
PROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FOR
ISOLATION ROOMS
BGHMC Compound, Baguio CityCordillera Administrative Region
SHEET CONTENTS CHECKED
RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief II
Baguio General Hospital & Medical Center
RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional Staff
Baguio General Hospital & Medical Center
VILMA O. MOLTIO, MPASupervising Administrative Officer
OIC,Chief Administrative Officer, HOPSS-BGHMC
RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSS
Baguio General Hospital & Medical Center
LENON S. BANA-E, CE, SE
SANITARY ENGINEER
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH
BAGUIO CITYCORDILLERA ADMINISTRATIVE REGION
SEPTICTANK
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
COCO
COCOWC
WC
WC
WC
WC
WC
WC
WC
WC
WC
LAVLAV LAV
LAV
LAV
COCO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
FDFD
FD
FD
FD FDFD
FD
FD
FD
FD
COWS
WS
WS WS
WS
WSWS
WS
WS
WS
LAV
LAV
LAV
WS
WS
WS
WSWS
WSWS
WS
LAV
LAV
WS
WSFD
FD
FD
FD
FD
FD
FD
WS
WS
WS
COCO
COCO
CO
CO
TO STP
FD
FDFD
FD
FD
FD
FD
FD
100 MM DIA WASTE STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK
75 MM DIA VENT STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK
100 MM DIA WASTE STACK
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP 75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
AB
C
E
F
G
HJ
1
23
4
56
78
9
D
1'
G'
10
11
12
13
14
AIRLOCK
Up Ramp Up
HALLWAY
HALLWAY
Up
ACCESS
GOING FROM
DELTA E.R.
EMERGENCY
EXIT
PERSONNEL ACCESS
ENTRANCE
BEDELEVATOR
Dn
EXIT
Dn
250mm STRUCTURAL GAP
EXISTING INFECTIOUS
DESEASE BUILDING
(PROPOSED DELTA E.R.)
Ramp Up
HOSPITAL ROAD
NORTH
Ramp Dn
200mm STRUCTURAL GAP2 938
1 412
1 725
22 750
2 200
675
3 625
4 200
4 000
3 000
1 300
250
3 500
41 800
3 750
3 750
3 750
3 750
1 850
2 950
6 075
200
4 800
1 275 350
3 050
3 275
3 325
2 700
1 5001 775
2 100
2 475
1 500
41 800 200
2 575
1 725
675
1 750
1 875
700
2 500
1 000
1 300
2 700
15 000
3 750
3 750
3 750
3 750
1 850
1 500
6 075
1 8251 500
6 075
26 800
2 950
3 050
3 275
1 8251 500
4 575
2 200
4 300
4 200
4 000
4 300
250
3 500
22 750
FD
FD
CO
WC
WC
LAVLAV FD
FD
FD
WS
WS
WS
LAV
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
WS
WS
WSWS
WS
WS
WS
WSWS
WS
WS
WS
WS
WS
WSWS
WS
WS
LAV
LAV
LAV
LAV
LAVFD
FD
FD
FD
FD
FD
FDFD
FD
FD
FD
FD
FD
FD WC
WC
WC
WC
WC
WC
WC
WCWC
LAV
CO
CO
FD
LAV
FD
100 MM DIA WASTE STACK
100 MM DIA WASTE STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK
75 MM DIA VENT STACK
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75 MM DIA VENT STACK
100 MM DIA WASTE STACK
FD
FD
CO
WC
WC
LAVLAV FD
FD
FD
WS
WS
WS
LAV
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
WS
WS
WSWS
WS
WS
WS
WSWS
WS
WS
WS
WS
WS
WSWS
WS
WS
LAV
LAV
LAV
LAV
LAVFD
FD
FD
FD
FD
FD
FDFD
FD
FD
FD
FD
FD
FD WC
WC
WC
WC
WC
WC
WC
WCWC
LAV
CO
CO
FD
LAV
FD
100 MM DIA WASTE STACK
100 MM DIA WASTE STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK
75 MM DIA VENT STACK
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75 MM DIA VENT STACK
100 MM DIA WASTE STACK
75 MM DIA VENT STACK
75 MM DIA VTR
75 MM DIA VTR
75 MM DIA VTR
75 MM DIA VTR
75mmØ DP75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75 MM DIA VTR
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
75mmØ DP
SCALE5a
1P 1:120 MTRS
SEWER LINE ISOMETRY
P5a
FFL
50mm DIA. PVC WASTE STACK
PPR WATER SUPPLY PIPE
2"DIA. P TRAP W/ CLEAN-OUT
ESCUTCHEON
20mm DIA. PPR AIR CHAMBER
20mm DIA. PPR END CAP
HORIZONTAL PVC PIPE
444m
m
535m
m
800m
m
STAINLESS STEEL (SUS304)
WALL ANGLE VALVE
20MM DIA. PPR PIPE AIR CHAMBER20MM DIA. PPR PIPE WATER SUPPLY
ESCUTCHEONSUS304 TWO-WAYANGLE VALVE
FFL
TOILET
LAVATORY
AIR CHAMBER
PIPE SIZE
OUTLET
INLET
DC
38.10mm
38.10mm
PIPE SIZE
ø60mm
ø75mm
101.60mm
127.00mm
FLOOR DRAIN DETAIL;
50.80mmø150mm 155.80mm
44mm 152.40mmø100mm
D
FLR. LEVELC
PIPE SIZE
D
450mm
300mm
ø20mm
ø20mm
PIPE SIZEAIR CHAMBER DETAIL
50mm DIA. PVC VENT STACK
450m
m400m
m
600m
m
4
5
0
m
m
100m
m
STAINLESS STEEL SINK
(SUS) 3MM THK
STAINLESS STEEL
GOOSENECK FAUCET
SHEET NO.APPROVED Drawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.
RA 9266 SECTION 33
Drawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.
RA 9266 SECTION 33 CONCURREDRECOMMENDING APPROVALPROJECT TITLE
LOCATION AS SHOWN
PROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FOR
ISOLATION ROOMS
BGHMC Compound, Baguio CityCordillera Administrative Region
SHEET CONTENTS CHECKED
RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief II
Baguio General Hospital & Medical Center
RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional Staff
Baguio General Hospital & Medical Center
VILMA O. MOLTIO, MPASupervising Administrative Officer
OIC,Chief Administrative Officer, HOPSS-BGHMC
RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSS
Baguio General Hospital & Medical Center
LENON S. BANA-E, CE, SE
SANITARY ENGINEER
BAGUIO GENERAL HOSPITAL
AND MEDICAL CENTER
REPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH
BAGUIO CITYCORDILLERA ADMINISTRATIVE REGION
P6
MAN HOLE
MAN HOLE
MAN HOLE
200 3000 200 1000 200
200
W =
3000
200
200
1400
200
1400
200
D =
1800
300
150
250
D +
450
1:25 METERS50mm THK. LEAN CONCRETE
WATER LEVEL
100mmINLET
c.o. c.o. c.o.
c.o.
c.o.
c.o.
150mmINLET
100mmINLET
DIGESTIVE CHAMBER
LEACHING CHAMBER 1
LEACHING CHAMBER 2
DIGESTIVE CHAMBER
WATER LEVEL
LEACHING CHAMBER
PLAN
SECTION
75mm INLET FROMNEUTRALIZATION TANK
100mmINLET
10mmØ DEF. BARS SPACED
@ 100mm O.C.B.W.
c.o.
c.o.
10mmØ DEF. BARS SPACED
@ 150mm O.C.B.W.
10mmØ DEF. BARS SPACED
@ 100mm O.C.B.W.
10mmØ HOR.DEF. BARS SPACED
EVERY 3 LAYERS
150mm THK. CHBWALL PLASTERED
@ BOTH SIDES
12mm Ø SPACED@ 300mm .O.C
100mmOUTLET
12mmØ VERT.DEF. BARS SPACED
@ 800mm O.C.
12mm Ø SPACED@ 300mm B.W.O.C
4-PCS 12mm ØCONT. BARS
SLOPE SLOPE
SCALE6
1P NTS
TYPICAL FIXTURE DETAILSSCALE6
3P NTS
FLOOR DRAIN &AIR CHAMBER DETAIL
SCALE6
4P NTS
SEPTIC TANK DETAILS
SCALE6
2P NTS
WASH SINK DETAIL