san francisco-oakland bay bridge east span seismic safety project pier e9 following the 1989 loma...
TRANSCRIPT
San Francisco-Oakland Bay BridgeSan Francisco-Oakland Bay BridgeEast Span Seismic Safety ProjectEast Span Seismic Safety Project
Pier E9 Following thePier E9 Following the1989 Loma Prieta Earthquake1989 Loma Prieta Earthquake
San Francisco – Oakland Bay Bridge
Yerba Buena Island
San Francisco
Oakland
Cantilever Truss Spans (E1-E4)
504 Feet Span Steel Trusses (E4-E9)
288 Feet Span Steel Trusses (E9-23)
Main Sections of Existing SFOBB for Dismantling
YBI Detour (E1-Tunnel)
The Cantilever
Quality Schedule
Cost
Leadership is Present and Strong
Cantilever Truss Spans (E1-E4)
504 Feet Span Steel Trusses (E4-E9)
288 Feet Span Steel Trusses (E9-23)
Main Sections of Existing SFOBB for Dismantling
YBI Detour (E1-Tunnel)