san bernardino associated governments garry cohoe, director of freeway construction april 13, 2010
DESCRIPTION
San Bernardino Associated Governments Garry Cohoe, Director of Freeway Construction April 13, 2010. What is SANBAG? … and what do we do?. PLAN, FUND and BUILD Transportation Systems in San Bernardino County. - PowerPoint PPT PresentationTRANSCRIPT
San Bernardino Associated GovernmentsGarry Cohoe, Director of Freeway Construction
April 13, 2010
What is SANBAG?… and what do we do?
PLAN, FUND and BUILD Transportation Systemsin San Bernardino County
SANBAG is located in the Historic Santa Fe Depot In San Bernardino
An Icon of Transportation Networks
1915 2010
NEWMEASURE PROGRAM
2010-2040
I-15: WideningRiverside Co. Line to I-215
Interchanges- 38 interchanges
- Estimated cost $1.4
billion
- Funded by Measure,
DIF, Federal, State
Live Oak Canyon Interchange,
Yucaipa, CA
June 2008
Railroad Grade Separations• 21 RR Grade Separations• Total estimated cost $378.4 Million • Funding sources –
Measure I, DIF, State, and Federal
State Street/University Parkway Grade Separation, North San Bernardino, June 2008
Colton CrossingRail-to-RailGrade Separation
Aerial View of Project AreaAerial View of Project AreaAerial View of Project AreaAerial View of Project Area
BNSF
UP
RR
San Bernardino Associated Governments
Redlands Passenger Rail Project
Challenge:Freight Movement
Source: US Department of Transportation
Intermodal Freight – Number 1 Route in the USA
• 44% of nation’s containerized imports enter the U.S. through LA/LB ports
• 90% of cargo that leaves Southern California passes through San Bernardino County
Challenge:
Transportation Funding
Measure I Revenue Dropped by Approximately 28 % Since
2006
Source: Caltrans, California Transportation Plan to 2025
Good Things Good Things DoDo
Happen in Happen in Bad TimesBad Times
Good Things Good Things DoDo Happen…Happen…
American Recovery and Reinvestment American Recovery and Reinvestment
Act Federal StimulusAct Federal Stimulus
$180 Million $180 Million For For
San Bernardino County Transportation ProjectsSan Bernardino County Transportation Projects
$ 128 million for I-215
Interstate 215 Widening
Widening between Orange Show Road and University Parkway
Add one general use lane and one carpool lane in both directions – bringing total of five lanes in each direction
Estimated completion by 2013
Total project cost – Approximately $700 million
Key Stimulus Funding Project
More Good More Good Things to ComeThings to Come
More Good More Good Things to ComeThings to Come
210 Landscaping
4 construction projects in Fontana, Rialto, and San Bernardino
Construction Contracts to be advertised Summer 2010, Spring 2011, Late 2011 and Summer 2012
Engineer’s Estimate $5M per project
210 Landscaping
4 construction projects in Fontana, Rialto, and San Bernardino
Construction Contracts to be advertised Summer 2010, Spring 2011, Late 2011 and Summer 2012
Engineer’s Estimate $5M per project
I-10 Westbound
Construction Contract to be advertised in Spring 2010Engineer’s Estimate $38M
I-10 Westbound
Construction Contract to be advertised in Spring 2010Engineer’s Estimate $38M
SR 60 Soundwall in Chino between Ramona Ave and Pipeline Ave
SR 60 Soundwall in Chino between Ramona Ave and Pipeline Ave
Construction Management RFPConstruction Management RFPLate 2010Late 2010
Construction Contract to be Construction Contract to be Advertised Early 2011Advertised Early 2011
Engineer’s Estimate $750KEngineer’s Estimate $750K
Grade SeparationsGrade Separations
Project Construction Management
RFQ
Advertisement for
Construction
Engineer’s Estimate for Construction
Project
North Milliken Currently Advertised
Fall 2010 $44M
Hunts Lane √ Fall 2010 $28M
Palm Ave End 2010 Spring 2011 $33M
Lenwood Spring 2011 Fall 2011 $23M
I-10 Cherry and Citrus InterchangesI-10 Cherry and Citrus Interchanges
RFQ for Construction ManagementEarly 2011
Advertise for a Construction ContractMid 2011
Citrus IC Engineer’s Estimate $47.2M
Cherry IC Engineer’s Estimate $61.5M
Citrus IC
Cherry IC
I-10 Tippecanoe InterchangeI-10 Tippecanoe Interchange
Construction Management RFP Construction Management RFP Late 2011Late 2011
Construction Contract to be Construction Contract to be advertised in advertised in
Spring/Summer 2012Spring/Summer 2012
Engineer’s Estimate $33MEngineer’s Estimate $33M
Caltrans Advertisement,
Award, & Administration (AAA)
of Construction Contracts
PROS:
• One-Stop Shopping
• Claims Avoidance
• Caltrans Knowledge, Experience, & Expertise
• Simpler Administration Process
• Reduced RTPA Liability
• Caltrans Fronts Expenditures
CONS:
• RTPA Does Not Control Cash Flow
• RTPA Does Not Have Final Decision Making Authority
• Less Caltrans Flexibility
• Controlling/Monitoring Caltrans Support Cost
• Caltrans Process Delays
For More Information
• Call SANBAG, (909) 884-8276
• Visit www.sanbag.ca.gov