san antonio
TRANSCRIPT
21'-0"
11'-0
"3'-
0"
19'-6"9'-
5"
26'-0
" 21'-6
"6'-0"
4'-6"
6'-0"
21'-6
"
6'-0"
18'-0
"
18'-0"
18'-0
"
12'-4
"
5'-3"
13'-8
"
21'-0"
3'-0"
5'-0"
3'-0"
05'
10'
15'
18'-0"
8'-0"
24'-0"
OPEN PARKINGSPACE
R30'-6"
28'-0"
44'-6"28'-5"
23'-2"
22'-7"
ILLEGAL COVERED PATIOTO BE REMOVED 5'-0" 5'-0" 15'-0"
25'-0"
22.75 SQ. FT.LAUNDRY ROOM
(E)WATER HEATER
(E)ELEC.SERVICE PANEL
35'-0"
2%SLOPE
2%SLOPE
2%SLOPE
2%SLOPE
2%SL
OPE
2%SL
OPE
2%SLOPE
2%SLOPE
2%SLOPE
2%SLOPE2%SLOPE
2%SLOPE 2%
SLOPE2%
SLOPE
2%SLOPE
2%SL
OPE
2%SL
OPE
2%SLOPE
34'-0
"
30'-2
"3'-
10"
1'-7"
1
SANTA ANA ST.
VICT
ORIA
AVE
.
ELIZ
ABET
H AV
E.
VIRG
INIA
AVE
.
CALIF
ORNI
A AV
E.
SAN
ANOT
NIO
AVE.
LIBERTY BLVD.N
SHEARWALL
NEW FOOTING
3/16
SIDE VIEW
SEE PLAN
SHEARWALL
NEW FOOTING
(E) FOOTING
LAP LAP
A B A B
12"
CBSQ-44
BOLTS PER.MANUF. SPECS.
4X4 POST
6" SLAB
2-#4 EA.WAY
SHEARWALL
1 3/4" EDGE DISTANCE12" END DISTANCESEE SHEAR SCHED. FORSPACING
NEW FOOTING
2-1/2 x 2-1/2 x 1/4PLATE WASHER
CON'T BLK'G
BEAM(SEE PLAN)
2X DBL TOP PLATE
2X @16"OCSTUD
HEADER(SEE PLAN)
SIMPSON STRAP(SEE PLAN
2X BLK'G
6
5-16d
BEAM SEE PLAN
2X @16"O.C.CEILING JOIST
LUS HANGERS
BEAM SEE PLAN 2X @16"O.C.FLOOR JOIST
ST 22
16d@16"OC
2X4 SILLU.N.O.
2X4@16"OCSTUD WALL
SIMPSON EPC
E.N.
E.N.
7
(E) 2X ROOF RAFTERS
(E) 2X CEILING JOIST
(N) 2 X @ 16 OC ROOF RAFTERS
2X BLOCKING
BOUNDARY NAILING(E) 1/2" CDX PLY.W/ 8 d @ 6:6:12
(N) 2 X 4 SILL PLATEW/ 16d @6" OC
(N) 2 X 4 @ 16" O.C.CRIPPLE WALL
BEAM SEE PLAN
(N) 2 X 10
A-35@32"OC
(N)2X @16"0CCEILING JOIST
(E)TOP PLATE
(E)STUD WALL.
(N)4X HDR.
SIMPSON HUCQ2-2X4 STUD OR
4X4 POST
8'-0"
124
8'-0"
8'-0"
8'-0"
124
8