sample energy survey overview
DESCRIPTION
I've done a number of energy surveys for a big energy user and there are a lot of opportunities to improve their performance and realise a significant saving. I produced a few slides as a summary of my findings. Let's hope they move to phase 2!TRANSCRIPT
Energy Survey Overview
Sites Surveyed
Site 1
Site 3
Site 2
Site 4
Company-Wide Actions
ISO50001 Energy
Management Standard
Energy Awareness Campaign
Bureau Service with
Monitoring & Targeting
Air Conditioning Inspections
Energy Surveys
Sub Metering Building
Management Systems
Prioritised Actions S
ite
1
•Steam demand
•Monitor Boiler Use
•Enhance Maintenance
•ACI
•Combustion efficiency
•Heat transfer efficiency
•Boiler heat loss
•Maintenance manual
•Combustion efficiency
•Boiler Blowdown
•Variable Speed Drive
•Steam System Review
•Compressor management
•M&T Tool
•Flue-gas heat recovery
•Radiant heaters
•VOT
•Compressor heat recovery
Sit
e 2
•Sub Metering Survey
•Volt Op Survey
•Generation Study
•Motors & Drives Study
•Energy KPIs
•ACI
•Asset Register
•Compressed Air Survey
•M&T
•Bureau Service
•Sub Metering
•BMS
•Boiler Maintenance
•Combustion Efficiency
•Heat Transfer
•Boiler Heat Loss
•Maintenance manual
•Steam Distribution
•ISO50001
•Heater controllers
•Lighting Upgrade
Sit
e 3
•Condition Survey
•Shop Floor Heating
•Ventilation Survey
•Humidification System
•Pollution Issue
•Non-Process Heating
•Staff awareness
•Maintenance manual
•ACI
•Compressed Air Survey
•Asset Register Upgrade
•M&T
•Bureau Service
•Sub Metering
•BMS
•ISO50001
•Lighting Upgrade
•Compressed Air Replacement
Sit
e 4
•Sub Metering Survey
•VO Survey
•Reorganise Offices
•Revise Lighting Proposal
•Compressed Air Survey
•Motors & Drives
•ACI
•Asset Register
•Staff awareness
•Maintenance Manual
•VSD on kitchen extract
•M&T
•Bureau Service
•Install Sub Metering
•BMS
•Heater controllers
•Extract Fans Controllers
•Washroom Upgrade
•ISO50001
Renewable Options
Technology Bradford Greenford East Kilbride Newcastle
Solar PV Yes Yes Yes Yes
Solar Water Heating Yes Yes Yes Yes
Wind turbine Yes No No Yes
Ground Source Heat Pump Yes No No Yes
Rainwater Harvesting Yes Yes Yes Yes
Micro CHP Yes Yes Yes Yes
Wood Fuelled Boilers Yes Yes Yes Yes
CCHP Yes Yes Yes Yes
Next Steps
Client to agree to move to next step
Return to four sites with specialists to produce accurately costed proposals
Undertake Air Conditioning Inspections to ensure compliance with the Energy Performance of Buildings Directive across portfolio
Appoint Dedicated Energy Management Resource conversant with ISO50001
Initiate Energy Awareness Campaign
Potential
A saving on total energy costs of between 20 and 30% can be
achieved at each site