sample assessment questions

Upload: vidya-sagar

Post on 16-Oct-2015

84 views

Category:

Documents


6 download

TRANSCRIPT

  • Sample Assessment Questions

    IRSE Licensing Scheme

    Issue 3.0

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 ii

    Invensys Rail Pty Ltd ABN 78 000 102 483

    Locked Bag 66

    179-185 Normanby Rd

    South Melbourne

    Victoria 3205

    Australia

    T +61 3 9233 8888

    F +61 3 9233 8777

    E [email protected]

    W www.invensysrail.com

    L:\T&T\IRSE Working\Questions\Sample Assessment Questions_3.0.Docx

  • Sample Assessment Questions IRSE Licensing Scheme

    Sample Assessment Questions

    IRSE Licensing Scheme

    Issue: 3.0

    Issue Date: 6th May 2010

    Reference: Sample Assessment Questions_3.0.docx

    Prepared: Leon Clark Technology & Training

    Change History

    Issue Date Comment Changed Checked Approved

    1.0 12-Jun-1998 First publication LC WMcD WMcD

    2.0 18-Apr-08 New categories added, New template LC DC TD

    3.0 6-May-10 Update to Invensys style FH LC LC

    Copyright This document is protected by copyright and the information contained herein is confidential. The document may not be copied and the information herein may not be disclosed except by the written permission of, and in a manner permitted by the proprietors, Invensys Rail Pty Ltd, 2010.

    Issue: 3.0 6th May 2010 iii

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 iv

    Contents

    Category Questions 1

    1.1.100 Asst Designer (S) 1

    1.1.110 Designer (S) 4

    1.1.130 Principles Designer (S) 7

    1.1.140 Design Manager (S) 9

    1.1.150C Signalling Designer 10

    1.1.150D Signalling Principles Designer 11

    1.2.100 Asst Installer (S) 15

    1.2.110 Installer (S) 16

    1.2.130 Installation Team Leader (S) 17

    1.2.140 Installation Manager (S) 18

    1.2.150 Test Assistant (S) 19

    1.2.180 Principles Tester (S) 20

    1.2.190 Tester in Charge (S) 22

    1.3.160 Signalling Tester (S) 23

    1.3.160 Signalling Tester (S) 24

    1.3.180 Signalling Principles Tester 25

    1.4.110 Maintainer (S) 26

    1.4.130 Maintenance Team Leader (S) 27

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 1 of 27

    Category Questions

    1.1.100 Asst Designer (S)

    Question Assessor

    If you are asked to a location circuits design for an SRA scheme, what

    information/document do you think you will need?

    Mark Chiu

    How are the loop closed and the design verified to have used the latest

    and relevant information?

    Craig Ackroyd

    What would you do when you are designing/modifying a TRM allocation

    and you found an error in the track plan?

    Mark Chiu

    How would you identify the requirements of a given design allocated to

    you and how do you know your design is what your supervisor/client

    wants?

    Mark Chiu

    If you are asked to design SSI location circuits, what type of circuits

    would you need to produce?

    Mark Chiu

    Where do you find standard circuits and equipment for a NSW design? Craig Ackroyd

    When a non-standard requirement is identified in your design, what will

    you do?

    Mark Chiu

    During the design life up to commissioning, what must you do to each

    design change and why?

    Craig Ackroyd

    While designing location circuits, you found a possible error in the track

    plan that an incorrect frequency is used in one of the track circuits, what

    will you do?

    Mark Chiu

    What standard QA document do you need to refer to for designing

    circuits for and RSA scheme and a QR scheme.

    Mark Chiu

    What equipment documentation exists and where? How are WSA

    drawing numbers allocated and records of these kept?

    Craig Ackroyd

    What other QA document do you need? If you found an error (or some

    information is outdated) in a QA document (work instruction) what

    would you do?

    Mark Chiu

    How do you know all your work is completed within the limits of your

    own authority? What resources do you have to carry out your design

    task?

    Mark Chiu

    What would be regarded as a safe distance between following trains? UK

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 2 of 27

    How would you depict a three aspect signal on a track plan? UK

    Describe briefly how you would ensure that two opposing signals, using

    relay interlocking, are not cleared simultaneously onto the same route?

    UK

    What, as an Asst. Designer, would you regard as the limit of your

    responsibility?

    UK

    Draw the symbol for a front contact as used in a relay interlocking and

    Westrace data ladder diagrams.

    UK

    What information is shown on the Control Sheet? UK

    Give two examples of the type of information reflected on a Track plan. UK

    What information is shown on Aspect / Code sequence charts? UK

    On the items listed on the CAC do you understand what they are?

    Explain? Where would you find each one of these?

    Craig Ackroyd

    What is a Bonding plan used for? UK

    Explain very briefly how you would go about preparing the design for a

    WESTRACE interlocking.

    UK

    Where would you get the terminal connection details for connecting to a

    WESTRACE protection and filter module?

    UK

    What areas of the Central Line do we have bonding plans for? UK

    If the detection fails on a set of points in a cleared route, what should

    the signalling do?

    UK

    Why are double cut circuits used to feed external equipment? UK

    What determines between the use of dedicated or common fusing. UK

    If the detection fails on a set of points in a cleared route, what should

    the signalling do?

    UK

    What code should be applied to the track circuit behind a train? UK

    If a trainstop fails to lower what should the signalling do. UK

    What is an overlap? UK

    What does route locking prevent? UK

    Describe approach locking. UK

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 3 of 27

    Describe what is meant by approach release. UK

    Describe the meaning of interlocking when used in railway signalling. UK

    Describe interlocking between signals. UK

    Why is interlocking between signals and points provided? UK

    Describe what is meant by flank protection. UK

    Describe what is meant by back locking. UK

    Why are double cut circuits used to feed external equipment? UK

    Why are fuses used on the signalling equipment room termination with

    all outside equipment in electrified areas?

    UK

    Why is multi-strand wire used in the railway signalling environment? UK

    Name a few alternative places you would get relevant information from. K Allen

    Why do we provide analysis of terminals and contacts? K Allen

    What points are required to be locked in the sketch attached and what

    way for main route 14 16?

    K Allen

    What or who would be contacted if the scope of work issued was

    misleading?

    K Allen

    State what specific document covers TPWS materials. K Allen

    Why do we record durations and start/finish days of jobs? K Allen

    Describe the letters used in:

    a) QNAI

    b) QBAI

    K Allen

    What was the main reason for TPWS site surveys? K Allen

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 4 of 27

    1.1.110 Designer (S)

    Question Assessor

    What documents do you consider necessary before you start

    designs?

    Phillip Baker

    Presented candidate with track circuit:

    What signals required at locking level? When the route reverses what does it do to opposing route

    and points in route and overlap?

    How is this locking maintained after the train has passed the signal?

    How is the route protected if the signal is replaced with approaching train?

    Philip Baker

    If there are documents missing, or, the information in them

    conflicts what would you do?

    Philip Baker

    In the evidence for this criterion, the design is signed off by JT,

    although the work experience is signed off as this being done by

    Richard. Why is this?

    Philip Baker

    What happens if you do not have a standard cell for a particular

    piece of equipment?

    Philip Baker

    What happens if during design you need an extra function from

    an area being designed by another person?

    W. Blackmore

    In your summary of evidence (page 7) you mentioned production

    of care plans in accordance with company standards. Please

    specify the work instruction and QR standards.

    Philip Baker

    What Quality Procedures do apply to the design process? Steven Barker

    How are faults in data or interlocking circuits identified and what

    are the procedures for correcting these faults.

    Stuart Ferguson

    How are faults in loc designs or cable plans identified and what is

    the method for correcting these faults?

    W. Blackmore

    Explain how you personally ensure the resources under your

    control are controlled monitored and accurately recorded

    especially with respect to time.

    Philip Baker

    If an error was found in your design during testing what action

    would you take?

    Philip Baker

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 5 of 27

    How would you go about rectifying a fault? Philip Baker

    If there are two versions of a document say 711.3.0 and 3.3

    which version do you use & why?

    Philip Baker

    On Arncliff, when the blues were returned by the client, what

    action was taken?

    Philip Baker

    If an error was discovered in two separate projects you are

    working on what action would you take?

    Philip Baker

    When designing a signalling system, what would be regarded as a

    safe distance between following trains?

    UK

    Provide the number and title of the WSL quality standard for

    Signalling design.

    UK

    What would you do if you noticed an error in a design or scheme

    plan?

    UK

    Describe briefly any TWO principles that should generally be

    applied whilst designing a signalling interlocking.

    UK

    What do the following abbreviations generally mean in a

    signalling design? RLR; NLPR; HR; NKPR

    UK

    What function does a control table perform? UK

    When designing circuit modification for a commissioned room

    what considerations should you make.

    UK

    What code should be applied to the track circuit behind a train? UK

    If a trainstop fails to lower what should the signalling do. UK

    Describe what is meant by approach release. UK

    Discuss briefly the criteria to be considered when commencing

    the design of a signalling layout?

    UK

    How would you determine the design principles to be used on a

    signalling scheme?

    UK

    What information would you expect to find on an Aspect / Code

    sequence chart?

    UK

    Give THREE examples of the type of information you would

    expect to find on a control sheet.

    UK

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 6 of 27

    Explain briefly the Design Control Procedure currently in use by

    WSL.

    UK

    What does the code charts for each station show? UK

    What document would you use to determine the correct EPROM

    to be used for the data on a WESTRACE VLM card?

    UK

    Describe interlocking between signals. UK

    Why is multi-strand wire used in the railway signalling

    environment?

    UK

    What determines between the use of dedicated or common

    fusing.

    UK

    What very important criterion is satisfied through the design /

    checking procedure?

    UK

    List some of the standards that you would adopt if required to

    pick up functions from an existing Relay room.

    UK

    List three implications of changes made during the design phase. UK

    When checking your design, what would you regard as your most

    valuable resource?

    UK

    List three of the principle design documents used to ensure that a

    design complies with company / project standards.

    UK

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 7 of 27

    1.1.130 Principles Designer (S)

    Question Assessor

    Where are relevant documents and information specified and

    found?

    CA

    What standards are specified and where found? CA

    What principles were used in the jobs listed in Appendix 7? CA

    How are design changes communicated to the rest of design

    team?

    CA

    What are the companys QA requirements and where are they

    kept?

    CA

    What reviews are carried out on a design and how are they

    recorded?

    CA

    What Quality Procedures did you follow with respect to the

    example given in evidence?

    W. D. Blackmore

    How is your role on a project documented? CA

    How is your time recorded? How are target dates defined? CA

    How are reported defects from the client handled? CA

    How are design changes from site handled? CA

    How are internal checking comments handled? CA

    In what ways are design changes agreed to by the client? CA

    How are design changes agreed to by the Supervisor of Project

    Manager?

    CA

    On what scheme did this occur and what records would there be

    of this?

    CA

    Discuss briefly the criteria to be considered when commencing

    the design of a signalling layout?

    UK

    How would you determine the design principles to be used on a

    signalling scheme?

    UK

    What information would you expect to find on an Aspect / Code

    sequence chart?

    UK

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 8 of 27

    Give THREE examples of the type of information you would

    expect to find on a control sheet.

    UK

    Explain briefly the Design Control Procedure currently in use by

    WSL.

    UK

    What does the code charts for each station show? UK

    What document would you use to determine the correct EPROM

    to be used for the data on a WESTRACE VLM card?

    UK

    Describe interlocking between signals. UK

    Why is multi-strand wire used in the railway signalling

    environment?

    UK

    What determines between the use of dedicated or common

    fusing.

    UK

    What very important criterion is satisfied through the design /

    checking procedure?

    UK

    List some of the standards that you would adopt if required to

    pick up functions from an existing Relay room.

    UK

    List three implications of changes made during the design phase. UK

    When checking your design, what would you regard as your most

    valuable resource?

    UK

    List three of the principle design documents used to ensure that a

    design complies with company / project standards.

    UK

    A route is set from 37. When is locking released with train in

    route on:

    a) 101 points;

    b) 102 points;

    c) 103 points; and

    d) 104 points.

    S. Barker

    Is locking required between 7 and 5 signals? S. Barker

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 9 of 27

    1.1.140 Design Manager (S)

    Question Assessor

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 10 of 27

    1.1.150C Signalling Designer

    Question Assessor

    What does the term swinging overlap mean? R Barker

    How is the signal aspect maintained whilst the O/L swings? R Barker

    Why do we apply approach clearing to some signals? R Barker

    What is a repeater signal and when or where would it be

    positioned?

    R Barker

    Is a repeater signal different to a distant signal? R Barker

    What is the difference between a unit lever and a route setting

    control panel?

    R Barker

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 11 of 27

    1.1.150D Signalling Principles Designer

    Question Assessor

    LUL principles: What indication is given that a trainstop fails to

    drive down?

    S Barker

    LUL principles:

    a) What is Berth Track Diversity and why is it provided?

    b) How is it provided? (3 methods)

    S Barker

    LUL principles: How do we prove the trainstop has normalised? S Barker

    LUL principles: Draw locking charts for the following

    a) 1 Locks 2

    b) 1 Locks 2 N & R

    S Barker

    LUL principles: What is backlogging? S Barker

    LUL principles: With the aid of diagrams show examples of back

    log release by:

    a) ALR only

    b) ALR and Delta

    c) ALR and JR

    d) ALR and Delta JR

    S Barker

    LUL principles: What is Hand Over Locking and, with the aid of

    a diagram, when is it applied?

    S Barker

    SRT principles: How far in rear of a signal is the comprehensive

    approach locking?

    S Barker

    SRT principles: What is Anti-Preselection and why is it

    provided?

    S Barker

    SRT principles: Any route stick (USR) that locks point normal and

    reverse have a WZR of the points around the USRs primary

    function. Why? In such cases how do the points become locked

    and when does the USR drop?

    S Barker

    SRT principles: With the aid of a drawing describe Indirect

    locking?

    S Barker

    SRT principles: With the aid of a drawing show how Conditional

    Locking may be applied to a crossover. What is Counter

    Conditional Locking?

    S Barker

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 12 of 27

    SRT principles: How far in rear of a signal is the comprehensive

    approach locking?

    S Barker

    SRT principles: What is Anti-Preselection and why is it

    provided?

    S Barker

    SRT principles: Any route stick (USR) that locks point normal and

    reverse have a WZR of the points around the USRs primary

    function. Why? In such cases how do the points become locked

    and when does the USR drop?

    S Barker

    SRT principles: With the aid of a drawing describe Indirect

    locking?

    S Barker

    SRT principles: With the aid of a drawing show how Conditional

    Locking may be applied to a crossover. What is Counter

    Conditional Locking?

    S Barker

    How do we know when templates from cab-i-net are not correct? B Bedford

    What are your considerations when being allocated a task or

    allocating tasks?

    B Bedford

    How do we maintain design records & confidentiality? B Bedford

    Provide some examples of signals requiring non standard

    installation.

    B Bedford

    You find that a template issued for use is not correct. What do

    you do?

    B Bedford

    Identify some of the various risks associated with the current

    design you are performing for the Detailed Design of Harrow on

    the Hill.

    B Bedford

    What is the measure of how .. sufficiently and clearly detailed

    design is?

    B Bedford

    What procedure is in place to minimise risk of lost work in the

    event of a LAN failure?

    B Bedford

    What is done with WIP copies of Design Checked Copies of Design

    and Design Calculations?

    B Bedford

    A change has been identified during site testing. How should the

    change be implemented?

    B Bedford

    What would be some examples of looking for an alternative

    solution to a design change?

    B Bedford

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 13 of 27

    Can you describe how you have been calculating overlaps on the

    PPP project?

    S Barker

    Can you tell me when you may need to reduce the O/L length and

    what are the rules?

    S Barker

    Can you describe headways? S Barker

    Show an example. What is RORI (LUL) S Barker

    How do you ensure design inputs are current and applicable to

    the design task?

    B Bedford

    Why did you request performance curves and gradient data when

    you were performing scheme design?

    B Bedford

    By way of a diagram show what is required for Train Away

    control?

    B Bedford

    What control measures could we use to control the speed of a

    train through a junction?

    B Bedford

    With reference to the diagram @ back, identify a potential risk

    and suggest a possible solution? Assume FULL sectional route

    release.

    B Bedford

    What are some methods of securely storing design? B Bedford

    Who do we monitor changes in design scope of work? B Bedford

    Can you describe how you have been calculating overlaps on the

    PPP project?

    S Barker

    Can you tell me when you may need to reduce the O/L length and

    what are the rules?

    S Barker

    Can you describe headways? S Barker

    Show an example. What is RORI (LUL) S Barker

    What sources are used to obtain design inputs that are current? B Bedford

    In addition to design specifications, what other references should

    be used for Scheme Design?

    B Bedford

    If asked to perform a new design task, what steps would you take

    to allow you to carry out the task?

    B Bedford

    How is security enforced and a high level of protection provided

    to design data?

    B Bedford

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 14 of 27

    How do we ensure that current versions of design inputs are

    being used?

    B Bedford

    How would we address the need for a signal to be positioned in a

    non standard position?

    B Bedford

    How can standards and methods be maintained between design

    teams?

    B Bedford

    Provide an example of a hazardous situation and solution for:

    a) signal placement

    b) installation of comms, Equipment cabling.

    B Bedford

    A site survey reveals that an IRJ must move. What are your

    considerations when moving the Test Boundary?

    B Bedford

    How are you able to determine your completion targets for design

    tasks?

    B Bedford

    What procedure is in place to ensure minimal work is lost in the

    event of a LAN failure?

    B Bedford

    Following the issue of Approved Design, what is done with

    WIP/Check Copies and Design Calculations?

    B Bedford

    A change has been identified during site testing. How should the

    change be implemented?

    B Bedford

    You encounter a problem that you are aware has been

    encountered previously. What do you do?

    B Bedford

    LUL principle What indication is (aspect) given to the train

    driver when the trainstop fails to drive down?

    S Barker

    Queensland Rail Typically when is a flashing yellow aspect

    displayed in CTC areas?

    S Barker

    SRT when would you sequence points movements in the

    overlap when setting the forward route and why? (not for power

    reasons, CTC mainline practice)

    S Barker

    LUL principle Describe berth track diversity. S Barker

    Describe three methods of approach locking release. S Barker

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 15 of 27

    1.2.100 Asst Installer (S)

    Question Assessor

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 16 of 27

    1.2.110 Installer (S)

    Question Assessor

    From what information would you obtain the site whereabouts

    and how would you verify your position?

    Craig Ackroyd

    What procedures are used for the protection of operational

    systems form accidental and unauthorised interference

    Craig Ackroyd

    What installation practises, procedures and standards are used? Craig Ackroyd

    What special tools are used in Installation? What is done with

    these, and how are they made?

    Craig Ackroyd

    What are the requirements of installation? Craig Ackroyd

    What test equipment and procedures are used? Craig Ackroyd

    Why do we calibrate test equipment? Craig Ackroyd

    What company procedures exist for installation Integrity? Craig Ackroyd

    Where do we list Test WIs? Craig Ackroyd

    How is work content communicated to the installer? Craig Ackroyd

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 17 of 27

    1.2.130 Installation Team Leader (S)

    Question Assessor

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 18 of 27

    1.2.140 Installation Manager (S)

    Question Assessor

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 19 of 27

    1.2.150 Test Assistant (S)

    Question Assessor

    Give TWO examples of types of Safety Procedures that should be

    followed when testing

    UK

    How would you be expected to communicate with the Tester

    whilst testing?

    UK

    What certificates and authority would you require to have before

    you could commence testing?

    UK

    What, as a Test Assistant, would you regard as the limit of your

    responsibility?

    UK

    What information would you require to be given by the Tester

    before you could accurately locate a piece of equipment?

    UK

    What would you do, as a Test Assistant, as soon as you arrived at

    the remote location for testing?

    UK

    Give some examples of the test equipment you would be likely to

    be carrying, when testing remote location cases or track circuits.

    UK

    What would you do if you became aware of a defect / discrepancy

    whilst at a remote location during testing?

    UK

    How would you report the lay / position of a relay if asked by the

    tester?

    UK

    What do you understand by the term Authority to work

    certificate?

    UK

    What formal documentation should be in place before any testing

    can commence?

    UK

    When corresponding a set of points, what information should be

    conveyed between the tester at the trackside and the tester at

    the control panel?

    UK

    When Belling wiring, describe the actions required between the

    caller and the operators?

    UK

    Describe the procedures to be undertaken when discovering a

    malfunctioning circuit during testing.

    UK

    When testing within a freewired interlocking, describe the

    procedures for controlling the use of Straps.

    UK

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 20 of 27

    1.2.180 Principles Tester (S)

    Question Assessor

    What is involved in a test plan or commissioning test plan? CA

    What type of communication to Senior Management is there? CA

    How is the SSI Simulation testing monitored, verified etc? What

    spec details this?

    CA

    How are conflicts in documentation or principle/operational

    queries dealt with?

    CA

    Where are safety procedures both occupational and operational

    detailed or referred to?

    CA

    On a commissioning, what document details authority etc?

    Describe the breakdown off this?

    CA

    How are circuit discrepancies handled during the stages pre test,

    site test, commission?

    CA

    What legislation and rules would you apply when carrying out

    your duties as a Principles Tester?

    UK

    Give an example of what you would consider to be a discrepancy. UK

    Give TWO examples of conditions that must be fulfilled before a

    system is returned to operational use.

    UK

    What tasks would you perform before you commenced testing? UK

    How would you establish your task and the limits of your

    authority?

    UK

    What Signalling and Interlocking Principles do you apply when

    first approaching a new installation?

    UK

    What documentation would you expect to have on site when

    commencing your testing?

    UK

    What would you consider as effective communication with your

    Test Assistants?

    UK

    How would you verify that testing you had requested has been

    completed?

    UK

    What action would you take if you were requested to undertake

    testing that you considered to be beyond the limits of your own

    authority?

    UK

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 21 of 27

    What does signal sighting serve to prove? UK

    Why are double cut circuits used to feed external equipment? UK

    What terminology should be used for points testing? UK

    What terminology should be used for signal testing? UK

    How do you know you have set the signal lamps to the correct

    voltage?

    UK

    What would be your actions if a discrepancy was found in the

    wiring of a location case?

    UK

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 22 of 27

    1.2.190 Tester in Charge (S)

    Question Assessor

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 23 of 27

    1.3.160 Signalling Tester (S)

    Question Assessor

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 24 of 27

    1.3.160 Signalling Tester (S)

    Question Assessor

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 25 of 27

    1.3.180 Signalling Principles Tester

    Question Assessor

    What legislative requirements have you accessed while testing? V Snook

    When you are collecting information before you test, what do you

    do if documentation is missing or out of date?

    V Snook

    If you are working at Dapto, what were the specific Health &

    Safety issues?

    V Snook

    For a level crossing test, what are the other considerations? V Snook

    How would you identify safe access points? V Snook

    How would you differentiate between the tests you would have to

    do for a SSI and a Westrace?

    V Snook

    How would you check the competency of staff required for the

    Portuguese project?

    V Snook

    For a new railway authority, how would you identify what

    methods of testing are required?

    V Snook

    For Portugal how did you identify outstanding tests to be done

    at commissioning and who did you notify?

    V Snook

    What are the organisational requirements for testing

    documentation?

    V Snook

    Where are your limits of authority defined? V Snook

    Can you tell me about the certification required before you work

    in installation in UK or Portugal or NSW?

    V Snook

    How did you identify the amount of testing required for Dapto

    Interface?

    V Snook

    Where are the methods for recording what tests have been

    completed/detailed for RFR?

    V Snook

    How do you document tests done for Sydenham-SSI? V Snook

    When you were testing ADRAIL Xings, what

    procedures/specifications did you use?

    V Snook

    What do you understand the implications of signing CISR off are? V Snook

    What are the reporting lines for Portugal project? V Snook

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 26 of 27

    1.4.110 Maintainer (S)

    Question Assessor

  • Sample Assessment Questions IRSE Licensing Scheme

    Issue: 3.0 6th May 2010 Page 27 of 27

    1.4.130 Maintenance Team Leader (S)

    Question Assessor

    Category Questions1.1.100 Asst Designer (S)1.1.110 Designer (S)1.1.130 Principles Designer (S)1.1.140 Design Manager (S)1.1.150C Signalling Designer1.1.150D Signalling Principles Designer1.2.100 Asst Installer (S)1.2.110 Installer (S)1.2.130 Installation Team Leader (S)1.2.140 Installation Manager (S)1.2.150 Test Assistant (S)1.2.180 Principles Tester (S)1.2.190 Tester in Charge (S)1.3.160 Signalling Tester (S)1.3.160 Signalling Tester (S)1.3.180 Signalling Principles Tester1.4.110 Maintainer (S)1.4.130 Maintenance Team Leader (S)