same manner as base stone oklahoma capitol restoration...
TRANSCRIPT
![Page 1: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/1.jpg)
Will require caulk joint. Advise in field if top base is projecting too far out from wall, will need to return in
same manner as base stone
if so - unlikely. Oklahoma Capitol Restoration Project
2300 N Lincoln Blvd. Oklahoma City, OK 73105
July 2018 – Monthly Progress Report
MONTHLY OVERVIEW
� Ground level, complete – All
underground plumbing is
complete.
� Ground Level North – Dining
- Concrete topping slabs
have been placed. Wall and
ceiling framing is underway.
� Auditor / Gov Elect Offices –
Reception marble floor
installation is underway.
� Senate Level 4 and 5 Offices
– Demolition and abatement
are complete. Wall framing
has begun.
� Level 1 North – The
submittal process is
underway.
REPORT CONTENTS
Cover Letter
Executive Summary
Preconstruction Status
Construction Schedule
Request for Information
Submittal Log
Construction Photos
410 N. Walnut, Suite 105, Oklahoma City, OK 73104 | t 405.254.1050 f 405.254.1055 | www.manhattanconstruction.com
Manhattan Job #
3707
Design/Builder:
Project Owner:
![Page 2: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/2.jpg)
Oklahoma Capitol Restoration
2300 N. Lincoln Blvd. Oklahoma City, OK 73105
July 2018 - Monthly
Progress Report
Cover Letter
Tab 1 Executive Summary
Tab 2 Preconstruction Status
• Document deliverable status
Tab 3 Construction Schedule
• Schedule narrative
• Critical Items
• Schedule Update
Tab 4 Requests for Information (RFIs)
• RFI Summary Log
Tab 5 Submittal Log
• Submittal Package Summary Log
Tab 6 Construction Photos
• Detailed progress photos – current month
![Page 3: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/3.jpg)
EXECUTIVE SUMMARY
SECTION 1
Monthly Progress Report – Oklahoma Capitol Restoration
July 2018
1-1
Monthly Progress Report For
Oklahoma Capitol Restoration
July 2018 Significant strides were made during the month of July in all current areas of work in the Oklahoma Capitol Restoration. Ground Level existing concrete slab removal and installation of underground plumbing is complete at South hallway. Ground Level Food Service/Dining metal stud framing is nearly complete. Installation of in-wall plumbing and electrical is also nearing completion. The removal of existing concrete slab at Area E is underway. In the Auditor and Governor Elect offices, installation of cabinets, countertops, and trim is complete. 100% of the flooring, including marble, in the reception areas in both suites is complete. Final paint is upcoming. At the Senate Offices at level 4 and 5, demolition activities wrapped up which gave way for wall framing to begin. Below is a recap of the major construction & design milestones that are upcoming and completion status:
1. Northwest Doghouse Demolition Complete Achieved April 20, 2018
2. Election Board & Ethics Commission Area Turnover Achieved May 18, 2018
3. Northeast Stair Structure Complete Achieved May 22, 2018
4 Ground Floor Senate Storage & Offices Area Turnover Achieved June 4, 2018
5. Northwest Elevator Shaft Complete Projected August 15, 2018
6. OMES State Finance Complete Achieved June 26, 2018
7. Demolition & Abatement Complete – Senate 4/5 Achieved July 12, 2018
8. Northwest Elevator Installation Begins Projected August 15, 2018
9. Northeast Stair Finishes Complete Projected August 30, 2018
10. Rough-in Complete – Senate 4/5 Projected September 30, 2018
11. Auditor / Governor Elect Complete Projected October 1, 2018
Prime Contract Status The prime contract has been updated with Contract Amendment #2 to include funding for the entirety of the Priority 1 scope. Priority 2 funding bill HB 3168 was passed on May 26, 2016. On February 15, 2017, Contract Amendment #3 was executed to incorporate Priority 2 design & the reallocation of construction sequences to seamlessly integrate Priority 1 & 2 scopes of work into the overall project. The Priority 2 construction budget was submitted on 6/26/18. Design Status Planning & development of the full interior restoration project is ongoing. Programming & Schematic Design efforts are now complete with tenant planning and initial document review complete for all areas of the building. As of May 2018, all design documents are 95% complete for the project allowing a thorough constructability and financial planning exercise to commence. Construction Documents
![Page 4: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/4.jpg)
EXECUTIVE SUMMARY
SECTION 1
Monthly Progress Report – Oklahoma Capitol Restoration
July 2018
1-2
are scheduled to complete in their entirety in late 2018. The design team has received approval for the finishes for the Governor’s Office, Blue Room, and Supreme Court. The final approval for the proposed finishes in the Chambers are still pending. Buyout Status Priority 1 buyout efforts are complete. This includes all spaces through Phase 4.0. Phase 5.0 & 6.0 budgeting & constructability reviews are complete through the 100% construction set. Construction Progress & Schedule Status Priority 1 Scope In addition to major progress in the month of July at the Senate Level 4 and 5 renovation, the team made progress in the addition of finishes at the Northeast Stair. Installation of marble and plaster is underway with plans for the wood detailing to follow in September. The stair is expected to be completed and inspected at all levels by early October 2018. Structural steel framing for the new Northwest elevator is underway. Installation of the new elevator and cab to begin early September. Looking ahead to early 2019, early tenant coordination meetings have begun in preparation for construction to begin in the Level 1 North offices, including the Legislative Services Bureau, Photographer, and OMES Facilities new offices. Request for Information (RFI’s) Current RFI Summary Log attached in Tab 4. Submittals Current Submittal Log attached in Tab 5. Cost Events & Authorization Requests There are currently no open proposals for the project.
Prepared by: Lucy Lambert, Project Manager
![Page 5: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/5.jpg)
PRECONSTRUCTION & DESIGN STATUS
SECTION 2
Monthly Progress Report – Oklahoma Capitol Restoration
July 2018
2-1
Document Deliverables:
• Final Documents for Phase 5.0, 6.0 and 6.1 are currently in progress.
Design Status Report:
Frankfurt Short Bruza Architects Engineers Planners
Monthly Project Status Report
Date: August 10, 2018 Project: 15151DB – Capitol Interior Restoration
To: Name Andrea Gossard
Company/Position Manhattan Construction Co./Project Manager
Phone 405.254.1050
Email [email protected]
From: Roger Klein, FSB Project Manager Re: Monthly Project Status Report – July 2018
This project status report is being provided to you to document our status on the current
Capitol Restoration Project, as required by OMES.
DESIGN PROGRESS
In July 2018, the FSB design team is nearing completion on the 95% Construction Documents
for the final phases of the interior restoration at the Capitol including, the Phase 5.0 and Phase
6.1 document packages. FSB has also continued to develop the 95% Design Documents for the
historic interior paint/color scheme and finishes for the Capitol interior restoration.
![Page 6: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/6.jpg)
PRECONSTRUCTION & DESIGN STATUS
SECTION 2
Monthly Progress Report – Oklahoma Capitol Restoration July 2018
2-2
The Phase 5.0 Construction Documents include the Governor, the Treasurer, Judicial Court
Room, House of Representative spaces, remaining Senate spaces, Capitol Press, and
Multipurpose/Training. The design team has addressed the comments and made the
appropriate changes to the construction documents. Manhattan construction has reviewed
Phase 5.0 for quality, cost, and constructability and has completed the budget verification
process as of June 11, 2018. The design team is also working with the House of Representatives
to finalizing their layout and obtaining the Houses approval of plans prior to completion of
issuing the 95% package. The design team is on schedule to submit the Phase 5.0 95%
Memorandum
Construction Documents in late August 2018 and the Final 100% Construction Document
package is scheduled to be submitted September 2018. An early package of Phase 5.0 that
includes the State Auditor offices and the Governor Elect transition space was issued as Phase
5.1 on February 2, 2018. The Phase 5.1 Fire Marshal permit set was issued in January 10, 2018.
The Phase 5.1 100% Construction Documents were issued March 1, 2018.
The original Phase 6.0 Construction Documents included the Capitol Exhibit Space, Tourism,
Food Service, the Attic Support Space, and the New Visitor Entry Addition and Plaza. On
January 4, 2018 the Design Build team agreed to break out a separate CD Package 6.1 that
included the exterior portion of the Visitor Entry, Exterior Plaza, and Landscaping, to further
develop the design and review the scope, cost, and constructability. Phase 6.0 95% CDs were
issued to Manhattan Construction on February 16, 2018. FSB received 95% owner review
comments on March 26, and FSB issued the Phase 6.0 100% Construction Documents on April,
18, 2018. The Phase 6.1 95% Construction Documents are on schedule to issue the documents
in late August 2018.
Also, in July 2018, the FSB design team and consultants have continued the design effort for
the Capitol interior finishes. EverGreene Architectural Arts developed a historic color palette for
the House and Senate Chambers and Lounges, the Supreme Court, and the Blue Room. On July
6, 2018 FSB and EverGreene Arts met via tele conference to discuss the color schemes for the
![Page 7: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/7.jpg)
PRECONSTRUCTION & DESIGN STATUS
SECTION 2
Monthly Progress Report – Oklahoma Capitol Restoration July 2018
2-3
Senate and House Chambers, and to make revisions to the final color design prior to the
scheduled submission to MCC, OMES, AE1, and the House and Senate. Follow-up color design
meetings are scheduled with the Design-Build team, OMES, AE1, and the House and Senate
through August 2018.
On July 31, 2018 the Design Team met with MCC, OMES, AE1, and the House for our first
meeting to present the final finishes and color scheme for the House Chamber, Lounge, Ante
Room, Conference and Committee Rooms. FSB presented an overview of the design process
including defining the historic periods, the scientific discovery, and integration of the historic
colors. The presentation included the historic color pallet paint scheme, the wood flooring,
upholstery fabrics, and proposed historic lighting. Also presented were samples of historic
period woven wool carpets with accent colors in a neo-classical or oriental pattern, and the
velvet drapes and shutters or blinds at the windows. FSB will issue a formal submission for the
designs documenting the presentation, approval, and meeting summary in August 2018. The
final presentation of the proposed design for the House Chamber is scheduled for August 2nd.
The FSB Design Team with EverGreene Arts and the Historic Preservation consultant are
scheduled to present the historic design color palette and paint color scheme at the next
SCREOC meeting on August 9, 2018.
CONSTRUCTION ADMINISTRATION
In addition to attending the scheduled construction progress meetings, and providing
construction material submittal reviews, FSB is currently working with Manhattan Construction
to provide alternate designs to address constructability and construction budget pricing
concerns.
The FSB construction administration team continues to be on site at the Capitol to attend
construction and coordination meetings including the Design/BIM coordination with
Manhattan Construction and the selected sub-contractors. Periodic systems testing, site
inspections, and design changes are ongoing as the building team ramps up the construction
![Page 8: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/8.jpg)
PRECONSTRUCTION & DESIGN STATUS
SECTION 2
Monthly Progress Report – Oklahoma Capitol Restoration July 2018
2-4
inspections, and design changes are ongoing as the building team ramps up the construction
effort for the project duration. The team also continues to respond to RFI’s, monitor
construction product selection and submittals, and construction mock-ups.
In July the Design Build team, OMES, and AE1 reviewed the paint and art lighting mock-up at
the East Corridor 1st Floor, adjacent to the OMES State Finance. After some modification to the
historic replica light fixtures, all reviewers were in agreement that the team was moving in the
right direction and all comments were positive.
HISTORIC PRESERVATION
Historic Preservation Consultant Stephen Kelley will continue to conduct pre-demo and post-
demo inspections as required for the historic preservation of the Capitol.
Mr. Kelley visited the Capitol July 19, 2018 to perform the Post-Demolition Inspection at the
Ground Floor Area D space vacated by the State Election Board and the State Ethics
Commission, the southeast elevator doghouse, and the 4th and 5th Senate Floors East wing
Senate Offices. Also, while on site Mr. Kelley performed some paint stripping trials in the North
vestibule where the historic limestone walls had been painted.
Mr. Kelley will also return to the Capitol in August to participate in the presentation to the
Oversight Committee..
End of Report
![Page 9: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/9.jpg)
CONSTRUCTION SCHEDULE
SECTION 3
Monthly Progress Report – Oklahoma Capitol Restoration July 2018
3-1
Ground Floor – North & East, 1st Floor – East, Northeast Stair
Schedule Status: The renovation of the Senate offices has quickly transitioned from being demolition zone to installation of new materials. The end of July saw the completion of demolition and abatement in the new Senate offices. With the beginning of metal stud framing, the electrical and mechanical contractors are right behind with installation of in-wall material. The construction team has met with the Senate multiple times to finalize finish plans for doors, hardware, and cabinetry. In July, the construction team saw another huge milestone at the Ground Level with the removal of the last areas of existing concrete slab. All underground plumbing work at the ground level is also complete. Finally, the Ground Level is now 100% abated of hazardous materials. With metal stud wall framing wrapping up in the Ground Level Food Service/Dining area and the placement of topping slabs, the construction team is in the middle of procurement of finish material. The Food Service and Dining areas are expected to open by March 2019. Critical Schedule Events: Nearly all critical schedule events correlate with material procurement items. Below is a tracking log of all major material delivery items currently on the schedule:
Item Description Estimated Installation Date
Estimated Delivery Date
Actual Delivery Date
Steel Structure for NW Doghouse 6/1/18 5/20/18 6/11/18
Millwork for OMES State Finance 6/1/18 6/5/18 4/30/18
Doors & Hardware - OMES State Finance 6/10/18 6/10/18 5/29/18
Marble Treads & Risers – NE Stair 7/2/18 6/20/18 7/11/18
Freight Elevator Delivery 9/4/18 9/4/18
Kitchen Exhaust Equipment 8/15/18 8/15/18
Limestone Columns – North & East 9/1/18 9/1/18
Stone Flooring - North Wing 10/1/18 10/1/18
Milestone Description Baseline Schedule
Last Month’s Update
Current Month Update
Gain or Loss this Month
Demolition & Abatement Complete Senate 4/5 8/1/18 8/1/18 7/12/18 -20 Tunnel Demolition & Excavation For VE Begins 9/1/18 9/1/18 10/15/18 +45 Auditor/Governor Elect Suite Complete 9/28/18 9/28/18 9/28/18 0 NE Stairs Complete 12/1/18 10/11/18 10/11/18 0 NW Freight Elevator Complete 1/14/19 1/14/19 1/14/19 0 Legislative Service Bureau Complete 2/11/19 2/11/19 2/11/19 0 Dining Area Complete 3/27/19 3/27/19 3/27/19 0
![Page 10: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/10.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
DesignDesign1049 900 21-Dec-17 A 02-Feb-22
Master PlanMaster Plan1049 900 21-Dec-17 A 02-Feb-22
Construction DocumentsConstruction Documents198 45 21-Dec-17 A 19-Sep-18
Package 4 - Floors 2 through 5Package 4 - Floors 2 through 5194 45 21-Dec-17 A 19-Sep-18
D-M01-1690 CD's 100% 181 30 21-Dec-17 A 28-Aug-18
D-M01-1720 Owner 100% Review 15 15 29-Aug-18 19-Sep-18
Package 5 - Ground N, E, SPackage 5 - Ground N, E, S15 10 10-Jul-18 A 31-Jul-18
D-M01-1700 Owner 100% Review 15 10 10-Jul-18 A 31-Jul-18
Package 5.1 - Exterior DesignPackage 5.1 - Exterior Design35 11 11-Jun-18 A 01-Aug-18
D-M01-1790 95% CD's 35 11 11-Jun-18 A 01-Aug-18
Master Plan MilestonesMaster Plan Milestones761 761 04-Feb-19 02-Feb-22
Legislative Session MilestonesLegislative Session Milestones761 761 04-Feb-19 02-Feb-22
M-M01-1015 2019 Session Begins (Construction Ends) 0 0 04-Feb-19
M-M01-1020 2019 Session Ends (Construction Starts) 0 0 03-Jun-19*
M-M01-1025 2020 Session Starts (Construction Ends) 0 0 04-Feb-20
M-M01-1030 2020 Session Ends (Construction Starts) 0 0 02-Jun-20
M-M01-1035 2021 Session Starts (Construction Ends) 0 0 02-Feb-21
M-M01-1040 2021 Session Ends (Construction Starts) 0 0 02-Jun-21
M-M01-1045 2022 Session Begins (Construction Ends) 0 0 02-Feb-22
SequencesSequences1003 624 03-Oct-16 A 31-Dec-20
Sequence 1Sequence 1713 278 03-Oct-16 A 20-Aug-19
Material ProcurementMaterial Procurement708 273 24-Oct-16 A 13-Aug-19
Procurement Phase SummariesProcurement Phase Summaries519 392 24-Oct-16 A 13-Aug-19
S-S01-1070 Procurement - Sequence 1 519 392 24-Oct-16 A 13-Aug-19
Public CorridorPublic Corridor562 273 05-Jun-17 A 13-Aug-19
P-S01-2240 Order On Hold Per Final Count - H8 Light Fixture 120 33 05-Jun-17 A 31-Aug-18
P-S01-1640 Fab & Deliver - H8 Light Fixture 240 240 04-Sep-18 13-Aug-19
P-S01-2245 Order On Hold Per Final Count - H3 Light Fixture 120 33 05-Jun-17 A 31-Aug-18
P-S01-1680 Fab & Deliver - H3 Light Fixture 120 120 04-Sep-18 22-Feb-19
ConstructionConstruction688 278 03-Oct-16 A 20-Aug-19
Schedule Driven MilestonesSchedule Driven Milestones273 273 24-Jul-18 20-Aug-19
M-S01-1060 Interim Substantial Completion - SW Dog House 0 0 24-Jul-18*
M-S01-1090 Sequence 1 New Construction Ends 0 0 20-Aug-19
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
CD's 100%
Owner 100% Review
Owner 100% Review
95% CD's
2019 Session Begins (Construction Ends)
2019 Session Ends (Construction Starts)
2020 Session Starts (Construction Ends)
2020 Session Ends (Construction Starts)
2021 Session Starts (Construction Ends)
2021 Session Ends (Construction Starts)
2022 Session Begins (Construction Ends)
Procurement - Sequence 1
Order On Hold Per Final Count - H8 Light Fixture
Fab & Deliver - H8 Light Fixture
Order On Hold Per Final Count - H3 Light Fixture
Fab & Deliver - H3 Light Fixture
Interim Substantial Completion - SW Dog House
Sequence 1 New Construction Ends
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 1 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 11: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/11.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
Construction Phase SummariesConstruction Phase Summaries510 7 03-Oct-16 A 24-Jul-18
S-S01-1000 Construction - Sequence 1 510 7 03-Oct-16 A 24-Jul-18
SW Dog House (Elevator)SW Dog House (Elevator)5 5 18-Jul-18 24-Jul-18
C-S01-3935 OMES Install Access Control 2 2 18-Jul-18 19-Jul-18
C-S01-8126 AE1 / Owner Punchlist 5 5 18-Jul-18 24-Jul-18
Public CorridorPublic Corridor5 5 14-Aug-19 20-Aug-19
C-S01-4360 Install Historic Lights 5 5 14-Aug-19 20-Aug-19
Sequence 2Sequence 2302 188 26-Jan-18 A 12-Apr-19
Material ProcurementMaterial Procurement227 130 06-Apr-18 A 22-Jan-19
NW Dog House (Elevator) - StructureNW Dog House (Elevator) - Structure78 9 06-Apr-18 A 30-Jul-18
P-S02-1155 Fab & Deliver - NW Elevator 80 9 06-Apr-18 A 30-Jul-18
Food ServiceFood Service124 108 18-Jun-18 A 19-Dec-18
P-S02-1175 Fab & Deliver - Heat Pumps 10 21 28-Jun-18 A 15-Aug-18
P-S02-1190 AE1 (Mass) Receive / Review Submittal - Hood 15 8 09-Jul-18 A 27-Jul-18
P-S02-1195 Fab & Deliver - Hood 25 25 30-Jul-18 31-Aug-18
P-S02-1394 MCC Re-Receive / Re-Review Submittal - Limestone Columns 5 5 18-Jul-18 24-Jul-18
P-S02-1205 AE2 (FSB) Receive / Review Submittal - Limestone Columns 10 10 25-Jul-18 07-Aug-18
P-S02-1210 AE1 (Mass) Receive / Review Submittal - Limestone Columns 15 15 08-Aug-18 28-Aug-18
P-S02-1215 Fab & Deliver - Limestone Columns 60 30 29-Aug-18 10-Oct-18
P-S02-1220 MCC Receive / Review Submittal - Lighting 5 5 01-Aug-18 07-Aug-18
P-S02-1225 AE2 (FSB) Receive / Review Submittal - Lighting 10 10 08-Aug-18 21-Aug-18
P-S02-1230 AE1 (Mass) Receive / Review Submittal - Lighting 15 15 22-Aug-18 12-Sep-18
P-S02-1235 Fab & Deliver - Lighting 30 30 13-Sep-18 24-Oct-18
P-S02-1240 MCC Receive / Review Submittal - Walk In Freezer 5 5 01-Aug-18 07-Aug-18
P-S02-1245 AE2 (FSB) Receive / Review Submittal - Walk In Freezer 10 10 08-Aug-18 21-Aug-18
P-S02-1250 AE1 (Mass) Receive / Review Submittal - Walk In Freezer 15 15 22-Aug-18 12-Sep-18
P-S02-1255 Fab & Deliver - Walk In Freezer 30 30 13-Sep-18 24-Oct-18
P-S02-1393 MCC Revise / Resubmit Submittal - Marble 15 3 18-Jun-18 A 20-Jul-18
P-S02-1270 AE2 (FSB) Receive / Review Submittal - Marble 15 10 23-Jul-18 03-Aug-18
P-S02-1395 AE1 (Mass) Receive / Review Submittal - Marble 15 15 06-Aug-18 24-Aug-18
P-S02-1275 Fab & Deliver - Marble 80 80 27-Aug-18 19-Dec-18
P-S02-1300 MCC Receive / Review Submittal - Wainscott / Trim 5 5 01-Aug-18 07-Aug-18
P-S02-1305 AE2 (FSB) Receive / Review Submittal - Wainscott / Trim 10 10 08-Aug-18 21-Aug-18
P-S02-1310 AE1 (Mass) Receive / Review Submittal - Wainscott / Trim 15 15 22-Aug-18 12-Sep-18
P-S02-1315 Fab & Deliver - Wainscott / Trim 30 30 13-Sep-18 24-Oct-18
P-S02-1320 MCC Receive / Review Submittal - MIllwork 5 5 01-Aug-18 07-Aug-18
P-S02-1325 AE2 (FSB) Receive / Review Submittal - MIllwork 10 10 08-Aug-18 21-Aug-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Construction - Sequence 1
OMES Install Access Control
AE1 / Owner Punchlist
Install Historic Lights
Fab & Deliver - NW Elevator
Fab & Deliver - Heat Pumps
AE1 (Mass) Receive / Review Submittal - Hood
Fab & Deliver - Hood
MCC Re-Receive / Re-Review Submittal - Limestone Columns
AE2 (FSB) Receive / Review Submittal - Limestone Columns
AE1 (Mass) Receive / Review Submittal - Limestone Columns
Fab & Deliver - Limestone Columns
MCC Receive / Review Submittal - Lighting
AE2 (FSB) Receive / Review Submittal - Lighting
AE1 (Mass) Receive / Review Submittal - Lighting
Fab & Deliver - Lighting
MCC Receive / Review Submittal - Walk In Freezer
AE2 (FSB) Receive / Review Submittal - Walk In Freezer
AE1 (Mass) Receive / Review Submittal - Walk In Freezer
Fab & Deliver - Walk In Freezer
MCC Revise / Resubmit Submittal - Marble
AE2 (FSB) Receive / Review Submittal - Marble
AE1 (Mass) Receive / Review Submittal - Marble
Fab & Deliver - Marble
MCC Receive / Review Submittal - Wainscott / Trim
AE2 (FSB) Receive / Review Submittal - Wainscott / Trim
AE1 (Mass) Receive / Review Submittal - Wainscott / Trim
Fab & Deliver - Wainscott / Trim
MCC Receive / Review Submittal - MIllwork
AE2 (FSB) Receive / Review Submittal - MIllwork
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 2 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 12: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/12.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
P-S02-1330 AE1 (Mass) Receive / Review Submittal - MIllwork 15 15 22-Aug-18 12-Sep-18
P-S02-1335 Fab & Deliver - MIllwork 30 30 13-Sep-18 24-Oct-18
P-S02-1340 MCC Receive / Review Submittal - OVHD Door 5 5 01-Aug-18 07-Aug-18
P-S02-1345 AE2 (FSB) Receive / Review Submittal - OVHD Door 10 10 08-Aug-18 21-Aug-18
P-S02-1350 AE1 (Mass) Receive / Review Submittal - OVHD Door 15 15 22-Aug-18 12-Sep-18
P-S02-1355 Fab & Deliver - OVHD Door 20 20 13-Sep-18 10-Oct-18
Public RestroomsPublic Restrooms161 120 01-Aug-18 22-Jan-19
P-S02-1161 MCC Receive / Review Submittal - Historic Lighting 1 1 01-Aug-18 01-Aug-18
P-S02-1356 AE2 (FSB) Receive / Review Submittal - Historic Lighting 10 10 02-Aug-18 15-Aug-18
P-S02-1357 Fab & Deliver - Historic Lighting 150 80 16-Aug-18 10-Dec-18
P-S02-1358 Doors & Hardware Pricing & Submittal Prep 10 10 01-Aug-18 14-Aug-18
P-S02-1359 MCC Receive / Review Submittal - Doors & Hardware 10 10 15-Aug-18 28-Aug-18
P-S02-1360 AE2 (FSB) Receive / Review Submittal - Doors & Hardware 10 10 29-Aug-18 12-Sep-18
P-S02-1361 Fab & Deliver - Door Frames 15 15 13-Sep-18 03-Oct-18
P-S02-1362 Fab & Deliver - Doors & Hardware 40 40 13-Sep-18 07-Nov-18
P-S02-1363 Millwork Pricing & Submittal Prep 10 10 01-Aug-18 14-Aug-18
P-S02-1364 MCC Receive / Review Submittal - Millwork 10 10 15-Aug-18 28-Aug-18
P-S02-1365 AE2 (FSB) Receive / Review Submittal - Millwork 10 10 29-Aug-18 12-Sep-18
P-S02-1367 Fab & Deliver - Base / Case / Crown 5 5 13-Sep-18 19-Sep-18
P-S02-1366 Fab & Deliver - Millwork 20 20 13-Sep-18 10-Oct-18
P-S02-1368 MCC Receive / Review Submittal - Flooring 10 29 02-Aug-18 12-Sep-18
P-S02-1369 AE2 (FSB) Receive / Review Submittal - Flooring 10 10 13-Sep-18 26-Sep-18
P-S02-1371 Fab & Deliver - Marble Tile 80 80 27-Sep-18 22-Jan-19
P-S02-1370 Fab & Deliver - Marble Walls Panels 80 80 27-Sep-18 22-Jan-19
Gift ShopGift Shop74 65 28-Jun-18 A 17-Oct-18
P-S02-1372 MCC Receive / Review Submittal - Lighting 1 1 01-Aug-18 01-Aug-18
P-S02-1373 AE2 (FSB) Receive / Review Submittal - Lighting 10 10 02-Aug-18 15-Aug-18
P-S02-1374 Fab & Deliver - Lighting 30 30 16-Aug-18 27-Sep-18
P-S02-1375 Doors & Hardware Pricing & Submittal Prep 10 5 11-Jul-18 A 24-Jul-18
P-S02-1376 MCC Receive / Review Submittal - Doors & Hardware 10 10 25-Jul-18 07-Aug-18
P-S02-1377 AE2 (FSB) Receive / Review Submittal - Doors & Hardware 10 10 08-Aug-18 21-Aug-18
P-S02-1378 Fab & Deliver - Door Frames 15 15 22-Aug-18 12-Sep-18
P-S02-1379 Fab & Deliver - Doors & Hardware 40 40 22-Aug-18 17-Oct-18
P-S02-1380 Millwork Pricing & Submittal Prep 10 5 11-Jul-18 A 24-Jul-18
P-S02-1381 MCC Receive / Review Submittal - Millwork 10 10 25-Jul-18 07-Aug-18
P-S02-1382 AE2 (FSB) Receive / Review Submittal - Millwork 10 10 08-Aug-18 21-Aug-18
P-S02-1383 Fab & Deliver - Painted Trim (Painted in Shop) 5 5 22-Aug-18 28-Aug-18
P-S02-1384 Fab & Deliver - Millwork 20 20 22-Aug-18 19-Sep-18
P-S02-1389 Flooring Contracting & Submittal Prep 10 10 02-Aug-18 15-Aug-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
AE1 (Mass) Receive / Review Submittal - MIllwork
Fab & Deliver - MIllwork
MCC Receive / Review Submittal - OVHD Door
AE2 (FSB) Receive / Review Submittal - OVHD Door
AE1 (Mass) Receive / Review Submittal - OVHD Door
Fab & Deliver - OVHD Door
MCC Receive / Review Submittal - Historic Lighting
AE2 (FSB) Receive / Review Submittal - Historic Lighting
Fab & Deliver - Historic Lighting
Doors & Hardware Pricing & Submittal Prep
MCC Receive / Review Submittal - Doors & Hardware
AE2 (FSB) Receive / Review Submittal - Doors & Hardware
Fab & Deliver - Door Frames
Fab & Deliver - Doors & Hardware
Millwork Pricing & Submittal Prep
MCC Receive / Review Submittal - Millwork
AE2 (FSB) Receive / Review Submittal - Millwork
Fab & Deliver - Base / Case / Crown
Fab & Deliver - Millwork
MCC Receive / Review Submittal - Flooring
AE2 (FSB) Receive / Review Submittal - Flooring
Fab & Deliver - Marble Tile
Fab & Deliver - Marble Walls Panels
MCC Receive / Review Submittal - Lighting
AE2 (FSB) Receive / Review Submittal - Lighting
Fab & Deliver - Lighting
Doors & Hardware Pricing & Submittal Prep
MCC Receive / Review Submittal - Doors & Hardware
AE2 (FSB) Receive / Review Submittal - Doors & Hardware
Fab & Deliver - Door Frames
Fab & Deliver - Doors & Hardware
Millwork Pricing & Submittal Prep
MCC Receive / Review Submittal - Millwork
AE2 (FSB) Receive / Review Submittal - Millwork
Fab & Deliver - Painted Trim (Painted in Shop)
Fab & Deliver - Millwork
Flooring Contracting & Submittal Prep
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 3 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 13: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/13.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
P-S02-1385 MCC Receive / Review Submittal - Flooring 10 10 16-Aug-18 29-Aug-18
P-S02-1386 AE2 (FSB) Receive / Review Submittal - Flooring 10 10 30-Aug-18 13-Sep-18
P-S02-1388 Fab & Deliver - LVT 10 10 14-Sep-18 27-Sep-18
P-S02-1392 Fab & Deliver - Heat Pumps 10 21 28-Jun-18 A 15-Aug-18
ConstructionConstruction302 188 26-Jan-18 A 12-Apr-19
Schedule Driven MilestonesSchedule Driven Milestones159 159 20-Aug-18 05-Apr-19
M-S02-1010 Interim Substantial Completion - Under Ground 0 0 20-Aug-18
M-S02-1005 Interim Substantial Completion - NW Dog House 0 0 16-Jan-19
M-S02-1020 Interim Substantial Completion - Food Service 0 0 19-Feb-19*
M-S02-1026 Interim Substantial Completion - Gift Shop 0 0 19-Mar-19
M-S02-1025 Interim Substantial Completion - Public Restrooms 0 0 05-Apr-19
M-S02-1015 Sequence 2 New Construction Ends 0 0 05-Apr-19
Construction Phase SummariesConstruction Phase Summaries360 262 26-Jan-18 A 05-Apr-19
S-S02-1000 Construction - Sequence 2 360 262 26-Jan-18 A 05-Apr-19
UG Sanitary SewerUG Sanitary Sewer40 24 02-Jul-18 A 20-Aug-18
C-S02-7380 Underground Plumbing S Sewer Ditch #12 Visitors Entrance 15 19 02-Jul-18 A 13-Aug-18
C-S02-7390 Removal ConcreteArea D, C, State Seal 3 8 12-Jul-18 A 27-Jul-18
C-S02-7395 Excavate S Sewer Ditch #12 5 13 16-Jul-18 A 03-Aug-18
C-S02-7400 Install S Sewer Ditch #12 3 16 17-Jul-18 A 08-Aug-18
C-S02-7410 Test S Sewer Ditch #12 1 1 09-Aug-18 09-Aug-18
C-S02-7405 Backfill & Compact S Sewer Ditch #12 3 2 10-Aug-18 13-Aug-18
C-S02-8454 FRP Ditch #12 and Area D 5 5 14-Aug-18 20-Aug-18
NW Dog House (Elevator) - StructureNW Dog House (Elevator) - Structure27 19 16-Jul-18 A 13-Aug-18
C-S02-8195 Install Structural Steel - 4 3 1 16-Jul-18 A 18-Jul-18
C-S02-8215 Remove & Install Temp Decks Off New Structure - 4 1 2 19-Jul-18 20-Jul-18
C-S02-8220 Install Structural Steel - 5 3 3 19-Jul-18 23-Jul-18
C-S02-8235 Remove & Install Temp Decks Off New Structure - 5 1 2 23-Jul-18 24-Jul-18
C-S02-8265 Install Structural Steel - 6 3 3 24-Jul-18 26-Jul-18
C-S02-8245 Remove & Install Temp Decks Off New Structure - 6 1 2 25-Jul-18 26-Jul-18
C-S02-8255 Demo Existing Beams and Concrete - 3 3 3 25-Jul-18 27-Jul-18
C-S02-8290 Cut Slab Back and Demo at LVL 1 4 4 27-Jul-18 01-Aug-18
C-S02-8395 Cut Slab Back and Demo at LVL 4 4 4 27-Jul-18 01-Aug-18
C-S02-8285 Demo Existing Beams and Concrete - 4 3 3 30-Jul-18 01-Aug-18
C-S02-8300 Demo Existing Beams and Concrete - 5 1 1 02-Aug-18 02-Aug-18
C-S02-8400 Remove Grating & Lower Struc Steel at LVL 1 4 4 02-Aug-18 07-Aug-18
C-S02-8405 Remove Grating & Lower Struc Steel at LVL 4 4 4 02-Aug-18 07-Aug-18
C-S02-8305 Demo Existing Beams and Concrete - 6 3 3 03-Aug-18 07-Aug-18
C-S02-8315 FRP Slabs 1 4 4 08-Aug-18 13-Aug-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
MCC Receive / Review Submittal - Flooring
AE2 (FSB) Receive / Review Submittal - Flooring
Fab & Deliver - LVT
Fab & Deliver - Heat Pumps
Interim Substantial Completion - Under Ground
Interim Substantial Completion - NW Dog House
Interim Substantial Completion - Food Service
Interim Substantial Completion - Gift Shop
Interim Substantial Completion - Public Restrooms
Sequence 2 New Construction Ends
Construction - Sequence 2
Underground Plumbing S Sewer Ditch #12 Visitors Entrance
Removal ConcreteArea D, C, State Seal
Excavate S Sewer Ditch #12
Install S Sewer Ditch #12
Test S Sewer Ditch #12
Backfill & Compact S Sewer Ditch #12
FRP Ditch #12 and Area D
Install Structural Steel - 4
Remove & Install Temp Decks Off New Structure - 4
Install Structural Steel - 5
Remove & Install Temp Decks Off New Structure - 5
Install Structural Steel - 6
Remove & Install Temp Decks Off New Structure - 6
Demo Existing Beams and Concrete - 3
Cut Slab Back and Demo at LVL 1
Cut Slab Back and Demo at LVL 4
Demo Existing Beams and Concrete - 4
Demo Existing Beams and Concrete - 5
Remove Grating & Lower Struc Steel at LVL 1
Remove Grating & Lower Struc Steel at LVL 4
Demo Existing Beams and Concrete - 6
FRP Slabs 1
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 4 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 14: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/14.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
C-S02-8390 FRP Slabs 4 4 4 08-Aug-18 13-Aug-18
NW Dog House (Elevator) - Build OutNW Dog House (Elevator) - Build Out126 126 18-Jul-18 16-Jan-19
C-S02-8205 Install Shaft Walls - 1 3 3 18-Jul-18 20-Jul-18
C-S02-8240 Install Shaft Walls - 2 3 3 23-Jul-18 25-Jul-18
C-S02-8275 Install Shaft Walls - 3 3 3 26-Jul-18 30-Jul-18
C-S02-8295 Install Shaft Walls - 4 3 3 08-Aug-18 10-Aug-18
C-S02-8310 Install Shaft Walls - 5 3 3 13-Aug-18 15-Aug-18
C-S02-8320 Install Shaft Walls - 6 3 3 16-Aug-18 20-Aug-18
C-S02-8325 Install Hoistway Smoke/Heat Detection 2 2 21-Aug-18 22-Aug-18
C-S02-8340 Install Elevator Rails 10 10 21-Aug-18 04-Sep-18
C-S02-8330 Install Hoistway Fire Suppression 3 3 23-Aug-18 27-Aug-18
C-S02-8335 Install Hoistway Lighting 2 2 28-Aug-18 29-Aug-18
C-S02-8345 Install Elevator Cab & Motor 50 50 05-Sep-18 13-Nov-18
C-S02-8350 Install Elevator Cab Finishes 20 20 14-Nov-18 13-Dec-18
C-S02-8355 Install Elevator Door Fronts 25 25 30-Nov-18 07-Jan-19
C-S02-8360 Elevator Test & Balance 5 5 08-Jan-19 14-Jan-19
C-S02-8365 DOL Final Inspection 1 1 15-Jan-19 15-Jan-19
C-S02-8370 Fire Marshal Final - NW Doghouse 1 1 16-Jan-19 16-Jan-19
NW Dog HouseNW Dog House71 71 18-Jul-18 25-Oct-18
C-S02-7950 Install HVAC - Basement 10 10 18-Jul-18 31-Jul-18
C-S02-7955 Install Fire Risers - Basement 5 5 01-Aug-18 07-Aug-18
C-S02-8420 Install Drinking Fountains - Basement 5 5 01-Aug-18 07-Aug-18
C-S02-7965 Install Hose Cabinets - Basement 2 2 08-Aug-18 09-Aug-18
C-S02-7960 Frame Interior Walls - Basement 5 5 08-Aug-18 14-Aug-18
C-S02-7970 In Wall Rough In - Basement 5 5 13-Aug-18 17-Aug-18
C-S02-7975 Install Vertical IT / Low Voltage Pathways - Basement 5 5 13-Aug-18 17-Aug-18
C-S02-7980 Hang, Tape & Finish - Basement 5 5 20-Aug-18 24-Aug-18
C-S02-7985 Prime & 1st Coat - Basement 5 5 27-Aug-18 31-Aug-18
C-S02-7990 Surface Mount All Electrical / MEP - Basement 5 5 04-Sep-18 10-Sep-18
C-S02-8000 Final Paint - Basement 5 5 11-Sep-18 17-Sep-18
C-S02-7995 Install Stone Hard Flooring - All Floors 20 20 18-Sep-18 15-Oct-18
C-S02-8410 Complete MCC / FSB Punchlist 5 5 16-Oct-18 22-Oct-18
C-S02-8415 Complete AE1 / Owner Punchlist 3 3 23-Oct-18 25-Oct-18
C-S02-7545 Install HVAC - 1st 10 10 14-Aug-18 27-Aug-18
C-S02-7555 Install Fire Risers - 1st 5 5 28-Aug-18 04-Sep-18
C-S02-8425 Install Drinking Fountains - 1st 5 5 28-Aug-18 04-Sep-18
C-S02-7580 Install Hose Cabinets - 1st 2 2 05-Sep-18 06-Sep-18
C-S02-7560 Frame Interior Walls - 1s t 5 5 05-Sep-18 11-Sep-18
C-S02-7565 In Wall Rough In - 1s t 5 5 10-Sep-18 14-Sep-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
FRP Slabs 4
Install Shaft Walls - 1
Install Shaft Walls - 2
Install Shaft Walls - 3
Install Shaft Walls - 4
Install Shaft Walls - 5
Install Shaft Walls - 6
Install Hoistway Smoke/Heat Detection
Install Elevator Rails
Install Hoistway Fire Suppression
Install Hoistway Lighting
Install Elevator Cab & Motor
Install Elevator Cab Finishes
Install Elevator Door Fronts
Elevator Test & Balance
DOL Final Inspection
Fire Marshal Final - NW Doghouse
Install HVAC - Basement
Install Fire Risers - Basement
Install Drinking Fountains - Basement
Install Hose Cabinets - Basement
Frame Interior Walls - Basement
In Wall Rough In - Basement
Install Vertical IT / Low Voltage Pathways - Basement
Hang, Tape & Finish - Basement
Prime & 1st Coat - Basement
Surface Mount All Electrical / MEP - Basement
Final Paint - Basement
Install Stone Hard Flooring - All Floors
Complete MCC / FSB Punchlist
Complete AE1 / Owner Punchlist
Install HVAC - 1st
Install Fire Risers - 1st
Install Drinking Fountains - 1st
Install Hose Cabinets - 1st
Frame Interior Walls - 1s t
In Wall Rough In - 1s t
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 5 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 15: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/15.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
C-S02-7570 Install Vertical IT / Low Voltage Pathways - 1st 5 5 10-Sep-18 14-Sep-18
C-S02-7585 Hang, Tape & Finish - 1st 5 5 17-Sep-18 21-Sep-18
C-S02-7590 Prime & 1st Coat - 1st 5 5 24-Sep-18 28-Sep-18
C-S02-7595 Surface Mount All Electrical / MEP - 1st 5 5 01-Oct-18 05-Oct-18
C-S02-7600 Final Paint - 1st 5 5 08-Oct-18 12-Oct-18
C-S02-7610 Install HVAC - 2nd 10 10 26-Jul-18 08-Aug-18
C-S02-7615 Install Fire Risers - 2nd 5 5 09-Aug-18 15-Aug-18
C-S02-8430 Install Drinking Fountains - 2nd 5 5 09-Aug-18 15-Aug-18
C-S02-7625 Install Hose Cabinets - 2nd 2 2 16-Aug-18 17-Aug-18
C-S02-7620 Frame Interior Walls - 2nd 5 5 16-Aug-18 22-Aug-18
C-S02-7630 In Wall Rough In - 2nd 5 5 21-Aug-18 27-Aug-18
C-S02-7635 Install Vertical IT / Low Voltage Pathways - 2nd 5 5 21-Aug-18 27-Aug-18
C-S02-7640 Hang, Tape & Finish - 2nd 5 5 28-Aug-18 04-Sep-18
C-S02-7645 Prime & 1st Coat - 2nd 5 5 05-Sep-18 11-Sep-18
C-S02-7650 Surface Mount All Electrical / MEP - 2nd 5 5 12-Sep-18 18-Sep-18
C-S02-7660 Final Paint - 2nd 5 5 19-Sep-18 25-Sep-18
C-S02-7670 Install HVAC - 3rd 10 10 31-Jul-18 13-Aug-18
C-S02-7675 Install Fire Risers - 3rd 5 5 14-Aug-18 20-Aug-18
C-S02-8435 Install Drinking Fountains - 3rd 5 5 14-Aug-18 20-Aug-18
C-S02-7685 Install Hose Cabinets - 3rd 2 2 21-Aug-18 22-Aug-18
C-S02-7680 Frame Interior Walls - 3rd 5 5 21-Aug-18 27-Aug-18
C-S02-7690 In Wall Rough In - 3rd 5 5 24-Aug-18 30-Aug-18
C-S02-7695 Install Vertical IT / Low Voltage Pathways - 3rd 5 5 24-Aug-18 30-Aug-18
C-S02-7700 Hang, Tape & Finish - 3rd 5 5 31-Aug-18 07-Sep-18
C-S02-7705 Prime & 1st Coat - 3rd 5 5 10-Sep-18 14-Sep-18
C-S02-7710 Surface Mount All Electrical / MEP - 3rd 5 5 17-Sep-18 21-Sep-18
C-S02-7720 Final Paint - 3rd 5 5 24-Sep-18 28-Sep-18
C-S02-7730 Install HVAC - 4th 10 10 14-Aug-18 27-Aug-18
C-S02-7735 Install Fire Risers - 4th 5 5 28-Aug-18 04-Sep-18
C-S02-8440 Install Drinking Fountains - 4th 5 5 28-Aug-18 04-Sep-18
C-S02-7745 Install Hose Cabinets - 4th 2 2 05-Sep-18 06-Sep-18
C-S02-7740 Frame Interior Walls - 4th 5 5 05-Sep-18 11-Sep-18
C-S02-7750 In Wall Rough In - 4th 5 5 10-Sep-18 14-Sep-18
C-S02-7755 Install Vertical IT / Low Voltage Pathways - 4th 5 5 10-Sep-18 14-Sep-18
C-S02-7760 Hang, Tape & Finish - 4th 5 5 17-Sep-18 21-Sep-18
C-S02-7765 Prime & 1st Coat - 4th 5 5 24-Sep-18 28-Sep-18
C-S02-7770 Surface Mount All Electrical / MEP - 4th 5 5 01-Oct-18 05-Oct-18
C-S02-7780 Final Paint - 4th 5 5 08-Oct-18 12-Oct-18
C-S02-7790 Install HVAC - 5th 10 10 16-Aug-18 29-Aug-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Install Vertical IT / Low Voltage Pathways - 1st
Hang, Tape & Finish - 1st
Prime & 1st Coat - 1st
Surface Mount All Electrical / MEP - 1st
Final Paint - 1st
Install HVAC - 2nd
Install Fire Risers - 2nd
Install Drinking Fountains - 2nd
Install Hose Cabinets - 2nd
Frame Interior Walls - 2nd
In Wall Rough In - 2nd
Install Vertical IT / Low Voltage Pathways - 2nd
Hang, Tape & Finish - 2nd
Prime & 1st Coat - 2nd
Surface Mount All Electrical / MEP - 2nd
Final Paint - 2nd
Install HVAC - 3rd
Install Fire Risers - 3rd
Install Drinking Fountains - 3rd
Install Hose Cabinets - 3rd
Frame Interior Walls - 3rd
In Wall Rough In - 3rd
Install Vertical IT / Low Voltage Pathways - 3rd
Hang, Tape & Finish - 3rd
Prime & 1st Coat - 3rd
Surface Mount All Electrical / MEP - 3rd
Final Paint - 3rd
Install HVAC - 4th
Install Fire Risers - 4th
Install Drinking Fountains - 4th
Install Hose Cabinets - 4th
Frame Interior Walls - 4th
In Wall Rough In - 4th
Install Vertical IT / Low Voltage Pathways - 4th
Hang, Tape & Finish - 4th
Prime & 1st Coat - 4th
Surface Mount All Electrical / MEP - 4th
Final Paint - 4th
Install HVAC - 5th
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 6 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 16: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/16.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
C-S02-7795 Install Fire Risers - 5th 5 5 30-Aug-18 06-Sep-18
C-S02-8445 Install Drinking Fountains - 5th 5 5 30-Aug-18 06-Sep-18
C-S02-7805 Install Hose Cabinets - 5th 2 2 07-Sep-18 10-Sep-18
C-S02-7800 Frame Interior Walls - 5th 5 5 07-Sep-18 13-Sep-18
C-S02-7810 In Wall Rough In - 5th 5 5 12-Sep-18 18-Sep-18
C-S02-7815 Install Vertical IT / Low Voltage Pathways - 5th 5 5 12-Sep-18 18-Sep-18
C-S02-7820 Hang, Tape & Finish - 5th 5 5 19-Sep-18 25-Sep-18
C-S02-7825 Prime & 1st Coat - 5th 5 5 26-Sep-18 02-Oct-18
C-S02-8055 OMES Install LV Cabling 5 5 26-Sep-18 02-Oct-18
C-S02-7830 Surface Mount All Electrical / MEP - 5th 5 5 03-Oct-18 09-Oct-18
C-S02-8060 OMES Activate Security & Card Access 5 5 10-Oct-18 16-Oct-18
C-S02-7840 Final Paint - 5th 5 5 17-Oct-18 23-Oct-18
Food ServiceFood Service197 155 15-May-18 A 26-Feb-19
C-S02-2005 Kitchen Area 5 81 15-May-18 A 08-Nov-18
C-S02-2020 FRP Topping Slab - Kitchen Area 3 3 18-Jul-18 20-Jul-18
C-S02-2023 Frame Hard Lids - Kitchen Area 10 10 23-Jul-18 03-Aug-18
C-S02-2026 Rough-in Mechanical OVHD - Kitchen Area 10 10 23-Jul-18 03-Aug-18
C-S02-2029 Install Kitchen Hoods - Kitchen Area 5 5 04-Sep-18 10-Sep-18
C-S02-2035 Install Grease Duct - Kitchen Area 7 7 11-Sep-18 19-Sep-18
C-S02-2041 Rough-in Electrical OVHD - Kitchen Area 4 4 17-Sep-18 20-Sep-18
C-S02-2044 Inspection of Grease Duct - Kitchen Area 0 0 19-Sep-18
C-S02-2047 Insulate Grease Duct - Kitchen Area 3 3 20-Sep-18 24-Sep-18
C-S02-2050 Rough-in Fire Suppression OVHD - Kitchen Area 4 4 20-Sep-18 25-Sep-18
C-S02-2053 Rough-in Plumbing OVHD - Kitchen Area 5 5 20-Sep-18 26-Sep-18
C-S02-2056 Install Ansul System To Kitchen Hood - Kitchen Area 10 10 26-Sep-18 09-Oct-18
C-S02-2059 Inspection of Fire Suppression - Kitchen Area 0 0 09-Oct-18
C-S02-2062 Above Ceiling Inspections - Kitchen Area 1 1 10-Oct-18 10-Oct-18
C-S02-2065 Install Ceiling Grid - Kitchen Area 3 3 11-Oct-18 15-Oct-18
C-S02-2068 Hang Sheetrock Ceilings - Kitchen Area 3 3 11-Oct-18 15-Oct-18
C-S02-2071 Overhead Device Out - Kitchen Area 5 5 16-Oct-18 22-Oct-18
C-S02-2074 T/B/P Ceilings - Kitchen Area 5 5 16-Oct-18 22-Oct-18
C-S02-2077 Drop Ceiling Tile - Kitchen Area 3 3 23-Oct-18 25-Oct-18
C-S02-2032 Install Walk in Freezer - Kitchen Area 2 2 25-Oct-18 26-Oct-18
C-S02-2080 MEP Trim Outs - Kitchen Area 5 5 26-Oct-18 01-Nov-18
C-S02-2038 Install Exterior Condensers in Light Well - Kitchen Area 2 2 29-Oct-18 30-Oct-18
C-S02-2083 Install Epoxy Floor - Kitchen Area 5 5 02-Nov-18 08-Nov-18
C-S02-2086 Kitchen Exhaust Bldg 1 34 20-Sep-18 06-Nov-18
C-S02-2089 Excavate Area Way and Duct at Exterior - Kitchen Area 10 10 20-Sep-18 03-Oct-18
C-S02-2092 Install Exterior Grease Duct - Kitchen Exhaust Bldg 2 2 04-Oct-18 05-Oct-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Install Fire Risers - 5th
Install Drinking Fountains - 5th
Install Hose Cabinets - 5th
Frame Interior Walls - 5th
In Wall Rough In - 5th
Install Vertical IT / Low Voltage Pathways - 5th
Hang, Tape & Finish - 5th
Prime & 1st Coat - 5th
OMES Install LV Cabling
Surface Mount All Electrical / MEP - 5th
OMES Activate Security & Card Access
Final Paint - 5th
Kitchen Area
FRP Topping Slab - Kitchen Area
Frame Hard Lids - Kitchen Area
Rough-in Mechanical OVHD - Kitchen Area
Install Kitchen Hoods - Kitchen Area
Install Grease Duct - Kitchen Area
Rough-in Electrical OVHD - Kitchen Area
Inspection of Grease Duct - Kitchen Area
Insulate Grease Duct - Kitchen Area
Rough-in Fire Suppression OVHD - Kitchen Area
Rough-in Plumbing OVHD - Kitchen Area
Install Ansul System To Kitchen Hood - Kitchen Area
Inspection of Fire Suppression - Kitchen Area
Above Ceiling Inspections - Kitchen Area
Install Ceiling Grid - Kitchen Area
Hang Sheetrock Ceilings - Kitchen Area
Overhead Device Out - Kitchen Area
T/B/P Ceilings - Kitchen Area
Drop Ceiling Tile - Kitchen Area
Install Walk in Freezer - Kitchen Area
MEP Trim Outs - Kitchen Area
Install Exterior Condensers in Light Well - Kitchen Area
Install Epoxy Floor - Kitchen Area
Kitchen Exhaust Bldg
Excavate Area Way and Duct at Exterior - Kitchen Area
Install Exterior Grease Duct - Kitchen Exhaust Bldg
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 7 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 17: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/17.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
C-S02-2095 Waterproof for Grease Duct Areawa - Kitchen Exhaust Bldg 1 1 08-Oct-18 08-Oct-18
C-S02-2098 FRP Grease Duct Areaway Slab - Kitchen Exhaust Bldg 3 3 09-Oct-18 11-Oct-18
C-S02-2101 FRP Grease Duct Areaway Walls - Kitchen Exhaust Bldg 10 10 12-Oct-18 25-Oct-18
C-S02-2104 Backfill Grease Duct Areaway - Kitchen Exhaust Bldg 1 1 26-Oct-18 26-Oct-18
C-S02-2107 Install Door Frame - Kitchen Exhaust Bldg 1 1 26-Oct-18 26-Oct-18
C-S02-2110 FRP Grease Duct Areaway Infill - Kitchen Exhaust Bldg 1 1 29-Oct-18 29-Oct-18
C-S02-2113 Install Steel - Kitchen Exhaust Bldg 2 2 29-Oct-18 30-Oct-18
C-S02-2116 Complete Backfill Grease Duct Areaway - Kitchen Exhaust Bldg 1 1 30-Oct-18 30-Oct-18
C-S02-2119 Set Kitchen Exhaust Equipment - Kitchen Exhaust Bldg 3 3 31-Oct-18 02-Nov-18
C-S02-2122 Install Masonry - Kitchen Exhaust Bldg 5 5 31-Oct-18 06-Nov-18
C-S02-2125 Install Plumbing - Kitchen Exhaust Bldg 2 2 05-Nov-18 06-Nov-18
C-S02-8447 Dining Area 2 154 16-May-18 A 25-Feb-19
C-S02-2140 FRP Topping Slabs for Storage Areas 2 2 18-Jul-18 19-Jul-18
C-S02-2143 Rough-In In Wall 12 12 18-Jul-18 02-Aug-18
C-S02-2146 Rough-in Plumbing OVHD 5 5 20-Jul-18 26-Jul-18
C-S02-2176 In-Wall Inspections 2 2 03-Aug-18 06-Aug-18
C-S02-2149 Hang Heat Pumps 7 7 16-Aug-18 24-Aug-18
C-S02-2152 Rough-in Electrical OVHD 4 4 27-Aug-18 30-Aug-18
C-S02-2155 Rough-in Mechanical OVHD 10 10 27-Aug-18 10-Sep-18
C-S02-2161 Install K1 Lights 4 4 31-Aug-18 06-Sep-18
C-S02-2164 Rough-in Fire Suppression OVHD 4 4 11-Sep-18 14-Sep-18
C-S02-2167 Insulate Mechanical 15 15 11-Sep-18 01-Oct-18
C-S02-2170 50% Fire Marshall Inspection 0 0 14-Sep-18
C-S02-2134 Hang Sheetrock & Plywood Walls 5 15 17-Sep-18 05-Oct-18
C-S02-2188 Install Door Frames 5 5 01-Oct-18 05-Oct-18
C-S02-2191 Tape / Bed / Paint Sheetrock 20 20 01-Oct-18 26-Oct-18
C-S02-2179 Install Controls for Heat Pumps 6 6 02-Oct-18 09-Oct-18
C-S02-2200 OMES Install LV Cabling 10 10 08-Oct-18 19-Oct-18
C-S02-2185 Start Up of Heat Pumps 2 2 10-Oct-18 11-Oct-18
C-S02-2158 Install Coiling Doors 2 2 11-Oct-18 12-Oct-18
C-S02-2209 Install Ceiling Grid with Borders 8 8 18-Oct-18 29-Oct-18
C-S02-2212 Overhead Device Out 5 5 25-Oct-18 31-Oct-18
C-S02-2194 Hang Doors & Install Hardware 10 10 25-Oct-18 07-Nov-18
C-S02-2197 Install Millwork 20 20 25-Oct-18 21-Nov-18
C-S02-2218 80% Fire Marshall Inspection 0 0 31-Oct-18
C-S02-2221 Above Ceiling Inspections 2 2 01-Nov-18 02-Nov-18
C-S02-2206 OMES Activate Security & Card Access 5 5 01-Nov-18 07-Nov-18
C-S02-2224 Drop Ceiling Tile 3 3 05-Nov-18 07-Nov-18
C-S02-2227 Hang Sheetrock Ceiling 5 5 05-Nov-18 09-Nov-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Waterproof for Grease Duct Areawa - Kitchen Exhaust Bldg
FRP Grease Duct Areaway Slab - Kitchen Exhaust Bldg
FRP Grease Duct Areaway Walls - Kitchen Exhaust Bldg
Backfill Grease Duct Areaway - Kitchen Exhaust Bldg
Install Door Frame - Kitchen Exhaust Bldg
FRP Grease Duct Areaway Infill - Kitchen Exhaust Bldg
Install Steel - Kitchen Exhaust Bldg
Complete Backfill Grease Duct Areaway - Kitchen Exhaust Bldg
Set Kitchen Exhaust Equipment - Kitchen Exhaust Bldg
Install Masonry - Kitchen Exhaust Bldg
Install Plumbing - Kitchen Exhaust Bldg
Dining Area
FRP Topping Slabs for Storage Areas
Rough-In In Wall
Rough-in Plumbing OVHD
In-Wall Inspections
Hang Heat Pumps
Rough-in Electrical OVHD
Rough-in Mechanical OVHD
Install K1 Lights
Rough-in Fire Suppression OVHD
Insulate Mechanical
50% Fire Marshall Inspection
Hang Sheetrock & Plywood Walls
Install Door Frames
Tape / Bed / Paint Sheetrock
Install Controls for Heat Pumps
OMES Install LV Cabling
Start Up of Heat Pumps
Install Coiling Doors
Install Ceiling Grid with Borders
Overhead Device Out
Hang Doors & Install Hardware
Install Millwork
80% Fire Marshall Inspection
Above Ceiling Inspections
OMES Activate Security & Card Access
Drop Ceiling Tile
Hang Sheetrock Ceiling
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 8 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 18: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/18.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
C-S02-2230 Level Five Finish Walls & Ceilings With Paint 5 15 08-Nov-18 30-Nov-18
C-S02-2251 Install Limestone Columns 26 26 15-Nov-18 24-Dec-18
C-S02-2215 Install Countertops 10 10 26-Nov-18 07-Dec-18
C-S02-2233 Crown Moulding & Wall Trim 5 5 29-Nov-18 05-Dec-18
C-S02-2239 T/B/P Ceilings 5 5 06-Dec-18 12-Dec-18
C-S02-2236 Final Paint 10 10 10-Dec-18 21-Dec-18
C-S02-2242 Install Ceramic Tile 2 2 13-Dec-18 14-Dec-18
C-S02-2245 MEP Trim Outs 10 10 13-Dec-18 27-Dec-18
C-S02-2248 Install Carpet / LVT / SDT 15 15 13-Dec-18 04-Jan-19
C-S02-2254 Install Plumbing Fixtures 4 4 17-Dec-18 20-Dec-18
C-S02-2257 Install Bathroom Accessories 1 1 21-Dec-18 21-Dec-18
C-S02-2263 Install Mud Bed for Marble Floor 5 5 26-Dec-18 02-Jan-19
C-S02-2266 Install Marble Floors 5 20 03-Jan-19 30-Jan-19
C-S02-2260 Test & Balance 14 14 07-Jan-19 24-Jan-19
C-S02-2269 Grout & Grind Marble Floors 15 15 16-Jan-19 05-Feb-19
C-S02-2272 Install Granite Base 5 5 30-Jan-19 05-Feb-19
C-S02-2275 Complete MCC / FSB Punch List 10 10 06-Feb-19 19-Feb-19
C-S02-2278 100% Fire Marshall Inspection (Final) 0 0 19-Feb-19
C-S02-2281 Complete AE1 / Owner Punch List 5 5 20-Feb-19 26-Feb-19
C-S02-2284 Owner Move In 1 1 26-Feb-19 26-Feb-19
Public RestroomsPublic Restrooms133 133 04-Oct-18 12-Apr-19
C-S02-2009 Install Door Frames 1 1 04-Oct-18 04-Oct-18
C-S02-2010 Install In-Wall Electrical 3 3 05-Oct-18 09-Oct-18
C-S02-2012 Install In-Wall Plumbing 3 3 10-Oct-18 12-Oct-18
C-S02-2013 Install In-Wall Block ing 1 1 15-Oct-18 15-Oct-18
C-S02-2015 In-Wall Inspections 1 1 16-Oct-18 16-Oct-18
C-S02-2016 50% Fire Marshal Inspection 0 0 16-Oct-18
C-S02-2018 Install Sheetrock 4 4 17-Oct-18 22-Oct-18
C-S02-2019 Sound Caulk all Wall Penetrations 1 1 23-Oct-18 23-Oct-18
C-S02-2021 Frame Ceilings 3 3 24-Oct-18 26-Oct-18
C-S02-2022 Install OVHD MEP 4 4 11-Dec-18 14-Dec-18
C-S02-2024 80% Fire Marshall Inspection 0 0 14-Dec-18
C-S02-2025 Install Sheetrock Ceilings 4 4 17-Dec-18 20-Dec-18
C-S02-2027 Tape/Bed/Paint 5 5 21-Dec-18 28-Dec-18
C-S02-2028 Trim Out MEP 2 2 31-Dec-18 02-Jan-19
C-S02-8448 Install Base / Case / Crown 5 5 31-Dec-18 07-Jan-19
C-S02-8449 Final Paint 5 5 08-Jan-19 14-Jan-19
C-S02-2030 Install Marble Wall Panels 8 8 23-Jan-19 01-Feb-19
C-S02-2031 Install Tile Floors 8 8 04-Feb-19 13-Feb-19
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Level Five Finish Walls & Ceilings With Paint
Install Limestone Columns
Install Countertops
Crown Moulding & Wall Trim
T/B/P Ceilings
Final Paint
Install Ceramic Tile
MEP Trim Outs
Install Carpet / LVT / SDT
Install Plumbing Fixtures
Install Bathroom Accessories
Install Mud Bed for Marble Floor
Install Marble Floors
Test & Balance
Grout & Grind Marble Floors
Install Granite Base
Complete MCC / FSB Punch List
100% Fire Marshall Inspection (Final)
Complete AE1 / Owner Punch List
Owner Move In
Install Door Frames
Install In-Wall Electrical
Install In-Wall Plumbing
Install In-Wall Block ing
In-Wall Inspections
50% Fire Marshal Inspection
Install Sheetrock
Sound Caulk all Wall Penetrations
Frame Ceilings
Install OVHD MEP
80% Fire Marshall Inspection
Install Sheetrock Ceilings
Tape/Bed/Paint
Trim Out MEP
Install Base / Case / Crown
Final Paint
Install Marble Wall Panels
Install Tile Floors
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 9 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 19: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/19.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
C-S02-2033 Grind/Polish Marble Floors 3 3 14-Feb-19 18-Feb-19
C-S02-2034 Install Counter Tops, Vanity's & Mirrors 4 4 19-Feb-19 22-Feb-19
C-S02-2036 Install Toilet Partitions 5 5 25-Feb-19 01-Mar-19
C-S02-2039 Install Doors and Hardware 1 1 04-Mar-19 04-Mar-19
C-S02-2037 Install Plumbing Fixtures 10 10 04-Mar-19 15-Mar-19
C-S02-2040 Install Drinking Fountains 3 3 18-Mar-19 20-Mar-19
C-S02-2042 Final Clean 2 2 21-Mar-19 22-Mar-19
C-S02-2043 Complete MCC / FSB Punch List 5 5 25-Mar-19 29-Mar-19
C-S02-2045 Complete AE1 / Owner Punch List 10 10 25-Mar-19 05-Apr-19
C-S02-2046 Fire Marshal Final 0 0 05-Apr-19
C-S02-2048 Owner Move In 5 5 08-Apr-19 12-Apr-19
Gift ShopGift Shop175 175 18-Jul-18 26-Mar-19
C-S02-2051 Pour Topping Slab 2 2 18-Jul-18 19-Jul-18
C-S02-2055 In-Wall Inspections 2 2 20-Jul-18 23-Jul-18
C-S02-2057 50% Fire Marshal Inspection 0 0 23-Jul-18
C-S02-2058 Install Sheetrock 2 2 08-Aug-18 09-Aug-18
C-S02-2060 Frame Ceilings 4 4 10-Aug-18 15-Aug-18
C-S02-2061 Rough-In Overhead MEP 5 5 16-Aug-18 22-Aug-18
C-S02-2063 Above Ceiling Inspection 2 2 23-Aug-18 24-Aug-18
C-S02-2064 Install Sheetrock Ceilings 8 8 28-Sep-18 09-Oct-18
C-S02-2066 Tape/Bed/Paint 15 15 10-Oct-18 30-Oct-18
C-S02-2067 Install Door Frames 1 1 16-Oct-18 16-Oct-18
C-S02-2069 Install LVT/Rubber Base 3 3 31-Oct-18 02-Nov-18
C-S02-2070 Trim Out MEP 6 6 05-Nov-18 12-Nov-18
C-S02-2072 Install Crown Moulding 10 10 13-Nov-18 28-Nov-18
C-S02-2073 Set Limestone Column Wraps 15 15 13-Nov-18 05-Dec-18
C-S02-2075 Install Doors and Hardware 4 4 29-Nov-18 04-Dec-18
C-S02-2076 Install Glass Wall System 10 10 06-Dec-18 19-Dec-18
C-S02-2078 Install Marble Floors 15 15 20-Dec-18 11-Jan-19
C-S02-2079 Install Granite Wall Base 8 8 14-Jan-19 23-Jan-19
C-S02-2081 Install Millwork 14 14 24-Jan-19 12-Feb-19
C-S02-2082 Install Countertops 5 5 13-Feb-19 19-Feb-19
C-S02-2084 Install Slat Wall 10 10 13-Feb-19 26-Feb-19
C-S02-2085 Final Clean 5 5 27-Feb-19 05-Mar-19
C-S02-2087 Complete MCC / FSB Punch List 10 10 06-Mar-19 19-Mar-19
C-S02-2088 Complete AE1 / Owner Punch List 10 10 06-Mar-19 19-Mar-19
C-S02-2090 Fire Marshal Final 0 0 19-Mar-19
C-S02-2091 Owner Move In 5 5 20-Mar-19 26-Mar-19
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Grind/Polish Marble Floors
Install Counter Tops, Vanity's & Mirrors
Install Toilet Partitions
Install Doors and Hardware
Install Plumbing Fixtures
Install Drinking Fountains
Final Clean
Complete MCC / FSB Punch List
Complete AE1 / Owner Punch List
Fire Marshal Final
Owner Move In
Pour Topping Slab
In-Wall Inspections
50% Fire Marshal Inspection
Install Sheetrock
Frame Ceilings
Rough-In Overhead MEP
Above Ceiling Inspection
Install Sheetrock Ceilings
Tape/Bed/Paint
Install Door Frames
Install LVT/Rubber Base
Trim Out MEP
Install Crown Moulding
Set Limestone Column Wraps
Install Doors and Hardware
Install Glass Wall System
Install Marble Floors
Install Granite Wall Base
Install Millwork
Install Countertops
Install Slat Wall
Final Clean
Complete MCC / FSB Punch List
Complete AE1 / Owner Punch List
Fire Marshal Final
Owner Move In
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 10 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 20: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/20.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
Sequence 3Sequence 3481 481 04-Feb-19 29-May-20
ConstructionConstruction481 481 04-Feb-19 29-May-20
Construction Phase SummariesConstruction Phase Summaries481 481 04-Feb-19 29-May-20
S-S03-1000 Construction - Sequence 3 481 481 04-Feb-19* 29-May-20
Sequence 4Sequence 4285 366 01-Jan-20 31-Dec-20
ConstructionConstruction285 366 01-Jan-20 31-Dec-20
Construction Phase SummariesConstruction Phase Summaries285 366 01-Jan-20 31-Dec-20
S-S04-1000 Construction - Sequence 4 285 366 01-Jan-20 31-Dec-20
CoreCore1413 1131 05-Jun-17 A 30-Dec-22
Risers / Fresh AirRisers / Fresh Air505 110 05-Jun-17 A 21-Dec-18
ConstructionConstruction505 110 05-Jun-17 A 21-Dec-18
Schedule Driven MilestonesSchedule Driven Milestones77 77 31-Aug-18 21-Dec-18
M-C01-1005 Risers Complete - North 0 0 31-Aug-18
M-C01-1020 Risers Complete - NE 0 0 28-Sep-18
M-C01-1015 Risers Complete - SE 0 0 27-Nov-18
M-C01-1010 Risers Complete - South 0 0 21-Dec-18
Construction Phase SummariesConstruction Phase Summaries729 157 05-Jun-17 A 21-Dec-18
S-C01-1000 Construction - Risers / Fresh Air 729 157 05-Jun-17 A 21-Dec-18
S-C01-1040 Construction - North Risers 115 45 11-Dec-17 A 31-Aug-18
S-C01-1035 Construction - NE Risers 233 73 01-May-18 A 28-Sep-18
S-C01-1030 Construction - SE Risers 289 133 21-Jun-18 A 27-Nov-18
S-C01-1045 Construction - South Risers 120 117 27-Aug-18 21-Dec-18
North - LSB West Wall of Server Closet CondensateNorth - LSB West Wall of Server Closet Condensate11 11 18-Jul-18 01-Aug-18
C-C01-4040 Install Temp Walls 2 2 18-Jul-18 19-Jul-18
C-C01-4045 Demo Walls / Ceilings 2 2 20-Jul-18 23-Jul-18
C-C01-4050 Core Drill 1 1 24-Jul-18 24-Jul-18
C-C01-4055 Install Condensate Drain 1 1 25-Jul-18 25-Jul-18
C-C01-4060 Patch Walls as Required 3 3 26-Jul-18 30-Jul-18
C-C01-4065 Re-Install Ceiling 1 1 31-Jul-18 31-Jul-18
C-C01-4070 Remove Temp Walls 1 1 01-Aug-18 01-Aug-18
North - Rooms 322 & 323 Condensate - Mech RoomNorth - Rooms 322 & 323 Condensate - Mech Room11 11 02-Aug-18 16-Aug-18
C-C01-4075 Install Temp Walls 2 2 02-Aug-18 03-Aug-18
C-C01-4080 Demo Walls / Ceilings 2 2 06-Aug-18 07-Aug-18
C-C01-4085 Core Drill 1 1 08-Aug-18 08-Aug-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Construction - Sequence 3
Construction - Sequence 4
Risers Complete - North
Risers Complete - NE
Risers Complete - SE
Risers Complete - South
Construction - Risers / Fresh Air
Construction - North Risers
Construction - NE Risers
Construction - SE Risers
Construction - South Risers
Install Temp Walls
Demo Walls / Ceilings
Core Drill
Install Condensate Drain
Patch Walls as Required
Re-Install Ceiling
Remove Temp Walls
Install Temp Walls
Demo Walls / Ceilings
Core Drill
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 11 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 21: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/21.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
C-C01-4090 Install Condensate Drain 1 1 09-Aug-18 09-Aug-18
C-C01-4095 Patch Walls as Required 3 3 10-Aug-18 14-Aug-18
C-C01-4100 Re-Install Ceiling 1 1 15-Aug-18 15-Aug-18
C-C01-4105 Remove Temp Walls 1 1 16-Aug-18 16-Aug-18
North - 430 East Closet Condensate - Mech RoomNorth - 430 East Closet Condensate - Mech Room11 11 17-Aug-18 31-Aug-18
C-C01-4110 Install Temp Walls 2 2 17-Aug-18 20-Aug-18
C-C01-4115 Demo Walls / Ceilings 2 2 21-Aug-18 22-Aug-18
C-C01-4120 Core Drill 1 1 23-Aug-18 23-Aug-18
C-C01-4125 Install Condensate Drain 1 1 24-Aug-18 24-Aug-18
C-C01-4130 Patch Walls as Required 3 3 27-Aug-18 29-Aug-18
C-C01-4135 Re-Install Ceiling 1 1 30-Aug-18 30-Aug-18
C-C01-4140 Remove Temp Walls 1 1 31-Aug-18 31-Aug-18
South - OMES Storage & Photographer Temp Storage Outside AirSouth - OMES Storage & Photographer Temp Storage Outside Air65 65 27-Aug-18 28-Nov-18
C-C01-3030 Install Temp Walls 5 5 27-Aug-18 31-Aug-18
C-C01-3035 Demo Walls & Ceilings 5 5 04-Sep-18 10-Sep-18
C-C01-3040 Saw Cut Floor 5 5 11-Sep-18 17-Sep-18
C-C01-3045 Install Outside Air Riser 5 5 18-Sep-18 24-Sep-18
C-C01-3050 Fire Caulk / Seal Floor Penetration @ Riser 5 5 25-Sep-18 01-Oct-18
C-C01-3055 Install Smoke / Fire Damper 5 5 02-Oct-18 08-Oct-18
C-C01-3060 Install Shaft Walls / Access Panels 5 5 09-Oct-18 15-Oct-18
C-C01-3065 Tape, Bed, Paint 5 5 16-Oct-18 22-Oct-18
C-C01-3070 Re-Install Ceiling Grid & Tile 5 5 23-Oct-18 29-Oct-18
C-C01-3075 Re-Install Floor Finishes 5 5 30-Oct-18 05-Nov-18
C-C01-3080 Test Smoke / Fire Damper 5 5 06-Nov-18 12-Nov-18
C-C01-3085 Remove Temp Walls 5 5 13-Nov-18 19-Nov-18
C-C01-3090 Final Clean 5 5 20-Nov-18 28-Nov-18
South - Hall of Gov & Lt Governor Reception Outside AirSouth - Hall of Gov & Lt Governor Reception Outside Air42 42 18-Sep-18 14-Nov-18
C-C01-3850 Install Scaffold 5 5 18-Sep-18 24-Sep-18
C-C01-3095 Install Temp Walls 2 2 25-Sep-18 26-Sep-18
C-C01-3100 Demo Walls & Ceilings 4 4 27-Sep-18 02-Oct-18
C-C01-3105 Saw Cut Floor 1 1 03-Oct-18 03-Oct-18
C-C01-3110 Install Outside Air Riser 5 5 04-Oct-18 10-Oct-18
C-C01-3115 Fire Caulk / Seal Floor Penetration @ Riser 2 2 11-Oct-18 12-Oct-18
C-C01-3120 Install Smoke / Fire Damper 4 4 15-Oct-18 18-Oct-18
C-C01-3125 Install Shaft Walls / Access Panels 4 4 19-Oct-18 24-Oct-18
C-C01-3130 Tape, Bed, Paint 4 4 25-Oct-18 30-Oct-18
C-C01-3135 Re-Install Ceiling Grid & Tile 2 2 31-Oct-18 01-Nov-18
C-C01-3140 Re-Install Floor Finishes 2 2 02-Nov-18 05-Nov-18
C-C01-3145 Test Smoke / Fire Damper 1 1 06-Nov-18 06-Nov-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Install Condensate Drain
Patch Walls as Required
Re-Install Ceiling
Remove Temp Walls
Install Temp Walls
Demo Walls / Ceilings
Core Drill
Install Condensate Drain
Patch Walls as Required
Re-Install Ceiling
Remove Temp Walls
Install Temp Walls
Demo Walls & Ceilings
Saw Cut Floor
Install Outside Air Riser
Fire Caulk / Seal Floor Penetration @ Riser
Install Smoke / Fire Damper
Install Shaft Walls / Access Panels
Tape, Bed, Paint
Re-Install Ceiling Grid & Tile
Re-Install Floor Finishes
Test Smoke / Fire Damper
Remove Temp Walls
Final Clean
Install Scaffold
Install Temp Walls
Demo Walls & Ceilings
Saw Cut Floor
Install Outside Air Riser
Fire Caulk / Seal Floor Penetration @ Riser
Install Smoke / Fire Damper
Install Shaft Walls / Access Panels
Tape, Bed, Paint
Re-Install Ceiling Grid & Tile
Re-Install Floor Finishes
Test Smoke / Fire Damper
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 12 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 22: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/22.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
C-C01-3150 Remove Temp Walls 2 2 07-Nov-18 08-Nov-18
C-C01-3855 Remove Scaffold 2 2 09-Nov-18 12-Nov-18
C-C01-3155 Final Clean 2 2 13-Nov-18 14-Nov-18
South - Rotunda 4th & 5th FloorOutside AirSouth - Rotunda 4th & 5th FloorOutside Air55 55 04-Oct-18 21-Dec-18
C-C01-3860 Install Scaffold 5 5 04-Oct-18 10-Oct-18
C-C01-3160 Install Temp Walls 4 4 11-Oct-18 16-Oct-18
C-C01-3165 Demo Walls & Ceilings 5 5 17-Oct-18 23-Oct-18
C-C01-3170 Saw Cut Floor 2 2 24-Oct-18 25-Oct-18
C-C01-3175 Install Outside Air Riser 7 7 26-Oct-18 05-Nov-18
C-C01-3180 Fire Caulk / Seal Floor Penetration @ Riser 3 3 06-Nov-18 08-Nov-18
C-C01-3185 Install Smoke / Fire Damper 5 5 09-Nov-18 15-Nov-18
C-C01-3190 Install Shaft Walls / Access Panels 5 5 16-Nov-18 26-Nov-18
C-C01-3195 Tape, Bed, Paint 5 5 27-Nov-18 03-Dec-18
C-C01-3200 Re-Install Ceiling Grid & Tile 3 3 04-Dec-18 06-Dec-18
C-C01-3205 Re-Install Floor Finishes 3 3 07-Dec-18 11-Dec-18
C-C01-3210 Test Smoke / Fire Damper 1 1 12-Dec-18 12-Dec-18
C-C01-3215 Remove Temp Walls 2 2 13-Dec-18 14-Dec-18
C-C01-3225 Remove Scaffold 3 3 17-Dec-18 19-Dec-18
C-C01-3220 Final Clean 2 2 20-Dec-18 21-Dec-18
South - 6th Floor Outside AirSouth - 6th Floor Outside Air20 20 26-Oct-18 26-Nov-18
C-C01-3235 Saw Cut Floor 5 5 26-Oct-18 01-Nov-18
C-C01-3240 Install Outside Air Riser 5 5 02-Nov-18 08-Nov-18
C-C01-3245 Fire Caulk / Seal Floor Penetration @ Riser 5 5 09-Nov-18 15-Nov-18
C-C01-3250 Install Smoke / Fire Damper 5 5 16-Nov-18 26-Nov-18
South - Gift Shop Front Lobby CondensateSouth - Gift Shop Front Lobby Condensate11 11 04-Sep-18 18-Sep-18
C-C01-4145 Install Temp Walls 2 2 04-Sep-18 05-Sep-18
C-C01-4150 Demo Walls / Ceilings 2 2 06-Sep-18 07-Sep-18
C-C01-4155 Core Drill 1 1 10-Sep-18 10-Sep-18
C-C01-4160 Install Condensate Drain 1 1 11-Sep-18 11-Sep-18
C-C01-4165 Patch Walls as Required 3 3 12-Sep-18 14-Sep-18
C-C01-4170 Re-Install Ceiling 1 1 17-Sep-18 17-Sep-18
C-C01-4175 Remove Temp Walls 1 1 18-Sep-18 18-Sep-18
NE - Secretary of State - (Copy Room & Reception) Outside AirNE - Secretary of State - (Copy Room & Reception) Outside Air1 1 18-Jul-18 18-Jul-18
C-C01-3340 Test Smoke / Fire Damper 1 1 18-Jul-18 18-Jul-18
NE - Treasurers Office (Charlie Hover) Outside AirNE - Treasurers Office (Charlie Hover) Outside Air18 7 16-Jul-18 A 26-Jul-18
C-C01-3395 Re-Install Ceiling Grid & Tile 3 1 16-Jul-18 A 18-Jul-18
C-C01-3400 Re-Install Floor Finishes 2 1 19-Jul-18 19-Jul-18
C-C01-3415 Final Clean 2 2 20-Jul-18 23-Jul-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Remove Temp Walls
Remove Scaffold
Final Clean
Install Scaffold
Install Temp Walls
Demo Walls & Ceilings
Saw Cut Floor
Install Outside Air Riser
Fire Caulk / Seal Floor Penetration @ Riser
Install Smoke / Fire Damper
Install Shaft Walls / Access Panels
Tape, Bed, Paint
Re-Install Ceiling Grid & Tile
Re-Install Floor Finishes
Test Smoke / Fire Damper
Remove Temp Walls
Remove Scaffold
Final Clean
Saw Cut Floor
Install Outside Air Riser
Fire Caulk / Seal Floor Penetration @ Riser
Install Smoke / Fire Damper
Install Temp Walls
Demo Walls / Ceilings
Core Drill
Install Condensate Drain
Patch Walls as Required
Re-Install Ceiling
Remove Temp Walls
Test Smoke / Fire Damper
Re-Install Ceiling Grid & Tile
Re-Install Floor Finishes
Final Clean
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 13 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 23: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/23.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
C-C01-3405 Test Smoke / Fire Damper 1 5 20-Jul-18 26-Jul-18
NE - Room 309.1B Outside AirNE - Room 309.1B Outside Air20 20 24-Jul-18 20-Aug-18
C-C01-3450 Install Shaft Walls / Access Panels 5 5 24-Jul-18 30-Jul-18
C-C01-3455 Tape, Bed, Paint 5 5 31-Jul-18 06-Aug-18
C-C01-3460 Re-Install Ceiling Grid & Tile 3 3 07-Aug-18 09-Aug-18
C-C01-3465 Re-Install Floor Finishes 2 2 10-Aug-18 13-Aug-18
C-C01-3470 Test Smoke / Fire Damper 1 1 14-Aug-18 14-Aug-18
C-C01-3475 Remove Temp Walls 2 2 15-Aug-18 16-Aug-18
C-C01-3480 Final Clean 2 2 17-Aug-18 20-Aug-18
NE - 4th Floor Outside AirNE - 4th Floor Outside Air29 20 17-Jul-18 A 14-Aug-18
C-C01-3495 Saw Cut Floor 1 4 17-Jul-18 A 23-Jul-18
C-C01-3500 Install Outside Air Riser 5 5 24-Jul-18 30-Jul-18
C-C01-3505 Fire Caulk / Seal Floor Penetration @ Riser 2 2 31-Jul-18 01-Aug-18
C-C01-3510 Install Smoke / Fire Damper 4 4 02-Aug-18 07-Aug-18
C-C01-3515 Install Shaft Walls / Access Panels 4 4 08-Aug-18 13-Aug-18
C-C01-3535 Test Smoke / Fire Damper 1 1 14-Aug-18 14-Aug-18
NE - 5th Floor Outside AirNE - 5th Floor Outside Air34 32 17-Jul-18 A 30-Aug-18
C-C01-3560 Saw Cut Floor 1 4 17-Jul-18 A 23-Jul-18
C-C01-3565 Install Outside Air Riser 5 5 24-Jul-18 30-Jul-18
C-C01-3570 Fire Caulk / Seal Floor Penetration @ Riser 2 2 31-Jul-18 01-Aug-18
C-C01-3575 Install Smoke / Fire Damper 4 4 02-Aug-18 07-Aug-18
C-C01-3580 Install Shaft Walls / Access Panels 4 4 08-Aug-18 13-Aug-18
C-C01-3585 Tape, Bed, Paint 4 4 14-Aug-18 17-Aug-18
C-C01-3590 Re-Install Ceiling Grid & Tile 2 2 20-Aug-18 21-Aug-18
C-C01-3595 Re-Install Floor Finishes 2 2 22-Aug-18 23-Aug-18
C-C01-3600 Test Smoke / Fire Damper 1 1 24-Aug-18 24-Aug-18
C-C01-3605 Remove Temp Walls 2 2 27-Aug-18 28-Aug-18
C-C01-3610 Final Clean 2 2 29-Aug-18 30-Aug-18
NE - 6th FloorNE - 6th Floor15 15 18-Jul-18 07-Aug-18
C-C01-3630 Install Outside Air Riser 5 5 18-Jul-18 24-Jul-18
C-C01-3635 Fire Caulk / Seal Floor Penetration @ Riser 5 5 25-Jul-18 31-Jul-18
C-C01-3640 Install Smoke / Fire Damper 5 5 01-Aug-18 07-Aug-18
NE - RooftopNE - Rooftop51 52 16-Jul-18 A 28-Sep-18
C-C01-3840 Set Roof Top Curb 7 1 16-Jul-18 A 18-Jul-18
C-C01-3825 Set Roof Top Equipment (NE) 3 1 19-Jul-18 19-Jul-18
C-C01-1090 Install NE Roof Top Equipment 40 40 20-Jul-18 14-Sep-18
C-C01-1100 Start Up NE Roof Top Equipment 10 10 17-Sep-18 28-Sep-18
NE - Rooms 309.2C & 309.6 CondensateNE - Rooms 309.2C & 309.6 Condensate13 13 18-Jul-18 03-Aug-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Test Smoke / Fire Damper
Install Shaft Walls / Access Panels
Tape, Bed, Paint
Re-Install Ceiling Grid & Tile
Re-Install Floor Finishes
Test Smoke / Fire Damper
Remove Temp Walls
Final Clean
Saw Cut Floor
Install Outside Air Riser
Fire Caulk / Seal Floor Penetration @ Riser
Install Smoke / Fire Damper
Install Shaft Walls / Access Panels
Test Smoke / Fire Damper
Saw Cut Floor
Install Outside Air Riser
Fire Caulk / Seal Floor Penetration @ Riser
Install Smoke / Fire Damper
Install Shaft Walls / Access Panels
Tape, Bed, Paint
Re-Install Ceiling Grid & Tile
Re-Install Floor Finishes
Test Smoke / Fire Damper
Remove Temp Walls
Final Clean
Install Outside Air Riser
Fire Caulk / Seal Floor Penetration @ Riser
Install Smoke / Fire Damper
Set Roof Top Curb
Set Roof Top Equipment (NE)
Install NE Roof Top Equipment
Start Up NE Roof Top Equipment
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 14 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 24: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/24.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
C-C01-4275 Re-Install Ceiling 1 1 18-Jul-18 18-Jul-18
C-C01-4280 Remove Temp Walls 1 1 19-Jul-18 19-Jul-18
C-C01-4270 Patch Walls as Required 3 3 01-Aug-18 03-Aug-18
NE - Rooms 423A & 425 CondensateNE - Rooms 423A & 425 Condensate2 2 20-Jul-18 23-Jul-18
C-C01-4295 Core Drill 1 1 20-Jul-18 20-Jul-18
C-C01-4300 Install Condensate Drain 1 1 23-Jul-18 23-Jul-18
NE - Rooms 528 & 527B CondensateNE - Rooms 528 & 527B Condensate7 7 24-Jul-18 01-Aug-18
C-C01-4330 Core Drill 1 1 24-Jul-18 24-Jul-18
C-C01-4335 Install Condensate Drain 1 1 25-Jul-18 25-Jul-18
C-C01-4340 Patch Walls as Required 3 3 26-Jul-18 30-Jul-18
C-C01-4345 Re-Install Ceiling 1 1 31-Jul-18 31-Jul-18
C-C01-4350 Remove Temp Walls 1 1 01-Aug-18 01-Aug-18
SE - 122 Break Room & 121 Cubicles North Outside AirSE - 122 Break Room & 121 Cubicles North Outside Air9 7 16-Jul-18 A 26-Jul-18
C-C01-2145 Install Smoke / Fire Damper 4 2 16-Jul-18 A 19-Jul-18
C-C01-2150 Install Shaft Walls / Access Panels 4 4 20-Jul-18 25-Jul-18
C-C01-2170 Test Smoke / Fire Damper 1 1 26-Jul-18 26-Jul-18
SE - Governors Waiting, Travis & Gary, Blue Room Outside AirSE - Governors Waiting, Travis & Gary, Blue Room Outside Air7 9 17-Jul-18 A 30-Jul-18
C-C01-2220 Tape, Bed, Paint 5 2 17-Jul-18 A 19-Jul-18
C-C01-2225 Re-Install Ceiling Grid, Tile & Plaster 3 3 20-Jul-18 24-Jul-18
C-C01-2230 Re-Install Floor Finishes 3 2 24-Jul-18 25-Jul-18
C-C01-2235 Test Smoke / Fire Damper 1 1 25-Jul-18 25-Jul-18
C-C01-2240 Remove Temp Walls 2 1 26-Jul-18 26-Jul-18
C-C01-2245 Final Clean 2 2 27-Jul-18 30-Jul-18
SE - Rooms 309.36 & 309 Middle Corridor Outside AirSE - Rooms 309.36 & 309 Middle Corridor Outside Air24 15 04-Jun-18 A 07-Aug-18
C-C01-2395 Install Outside Air Riser 5 1 04-Jun-18 A 18-Jul-18
C-C01-2400 Fire Caulk / Seal Floor Penetration @ Riser 2 1 25-Jun-18 A 18-Jul-18
C-C01-2405 Install Smoke / Fire Damper 4 1 18-Jul-18 18-Jul-18
C-C01-2410 Install Shaft Walls / Access Panels 4 2 19-Jul-18 20-Jul-18
C-C01-2415 Tape, Bed, Paint 4 3 23-Jul-18 25-Jul-18
C-C01-2420 Re-Install Ceiling Grid & Tile 2 2 26-Jul-18 27-Jul-18
C-C01-2425 Re-Install Floor Finishes 2 2 30-Jul-18 31-Jul-18
C-C01-2430 Test Smoke / Fire Damper 1 1 01-Aug-18 01-Aug-18
C-C01-2435 Remove Temp Walls 2 2 02-Aug-18 03-Aug-18
C-C01-2440 Final Clean 2 2 06-Aug-18 07-Aug-18
SE - Rooms 309.28 & 309.23E CondensateSE - Rooms 309.28 & 309.23E Condensate6 6 18-Jul-18 25-Jul-18
C-C01-4415 Re-Install Ceiling 1 1 18-Jul-18 18-Jul-18
C-C01-4420 Remove Temp Walls 1 1 19-Jul-18 19-Jul-18
C-C01-4410 Patch Walls as Required 3 3 23-Jul-18 25-Jul-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Re-Install Ceiling
Remove Temp Walls
Patch Walls as Required
Core Drill
Install Condensate Drain
Core Drill
Install Condensate Drain
Patch Walls as Required
Re-Install Ceiling
Remove Temp Walls
Install Smoke / Fire Damper
Install Shaft Walls / Access Panels
Test Smoke / Fire Damper
Tape, Bed, Paint
Re-Install Ceiling Grid, Tile & Plaster
Re-Install Floor Finishes
Test Smoke / Fire Damper
Remove Temp Walls
Final Clean
Install Outside Air Riser
Fire Caulk / Seal Floor Penetration @ Riser
Install Smoke / Fire Damper
Install Shaft Walls / Access Panels
Tape, Bed, Paint
Re-Install Ceiling Grid & Tile
Re-Install Floor Finishes
Test Smoke / Fire Damper
Remove Temp Walls
Final Clean
Re-Install Ceiling
Remove Temp Walls
Patch Walls as Required
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 15 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 25: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/25.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
SE - Rooms 418 & 414 CondensateSE - Rooms 418 & 414 Condensate2 2 20-Jul-18 23-Jul-18
C-C01-4435 Core Drill 1 1 20-Jul-18 20-Jul-18
C-C01-4440 Install Condensate Drain 1 1 23-Jul-18 23-Jul-18
SE - Rooms 522B & 520 CondensateSE - Rooms 522B & 520 Condensate2 2 24-Jul-18 25-Jul-18
C-C01-4470 Core Drill 1 1 24-Jul-18 24-Jul-18
C-C01-4475 Install Condensate Drain 1 1 25-Jul-18 25-Jul-18
SE - 4th Floor Outside AirSE - 4th Floor Outside Air17 17 18-Jul-18 09-Aug-18
C-C01-2455 Saw Cut Floor 1 1 18-Jul-18 18-Jul-18
C-C01-2460 Install Outside Air Riser 5 5 19-Jul-18 25-Jul-18
C-C01-2465 Fire Caulk / Seal Floor Penetration @ Riser 2 2 26-Jul-18 27-Jul-18
C-C01-2470 Install Smoke / Fire Damper 4 4 30-Jul-18 02-Aug-18
C-C01-2475 Install Shaft Walls / Access Panels 4 4 03-Aug-18 08-Aug-18
C-C01-2495 Test Smoke / Fire Damper 1 1 09-Aug-18 09-Aug-18
SE - 5th Floor Outside AirSE - 5th Floor Outside Air30 28 16-Jul-18 A 24-Aug-18
C-C01-3820 Install Steel 5 2 16-Jul-18 A 19-Jul-18
C-C01-2520 Saw Cut Floor 1 2 20-Jul-18 23-Jul-18
C-C01-2525 Install Outside Air Riser 5 5 24-Jul-18 30-Jul-18
C-C01-2530 Fire Caulk / Seal Floor Penetration @ Riser 2 2 31-Jul-18 01-Aug-18
C-C01-2535 Install Smoke / Fire Damper 4 4 02-Aug-18 07-Aug-18
C-C01-2545 Tape, Bed, Paint 4 4 08-Aug-18 13-Aug-18
C-C01-2550 Re-Install Ceiling Grid & Tile 2 2 14-Aug-18 15-Aug-18
C-C01-2555 Re-Install Floor Finishes 2 2 16-Aug-18 17-Aug-18
C-C01-2560 Test Smoke / Fire Damper 1 1 20-Aug-18 20-Aug-18
C-C01-2565 Remove Temp Walls 2 2 21-Aug-18 22-Aug-18
C-C01-2570 Final Clean 2 2 23-Aug-18 24-Aug-18
SE - 6th Floor Outside AirSE - 6th Floor Outside Air17 17 20-Jul-18 13-Aug-18
C-C01-2585 Saw Cut Floor 5 2 20-Jul-18 23-Jul-18
C-C01-2590 Install Outside Air Riser 5 5 24-Jul-18 30-Jul-18
C-C01-2595 Fire Caulk / Seal Floor Penetration @ Riser 5 5 31-Jul-18 06-Aug-18
C-C01-2600 Install Smoke / Fire Damper 5 5 07-Aug-18 13-Aug-18
SE - RooftopSE - Rooftop90 90 20-Jul-18 27-Nov-18
C-C01-3845 Set Roof Top Curb 5 3 20-Jul-18 24-Jul-18
C-C01-3830 Set Roof Top Equipment (SE) 3 1 25-Jul-18 25-Jul-18
C-C01-1110 Install SE Roof Top Equipment 40 40 17-Sep-18 09-Nov-18
C-C01-1120 Start Up SE Roof Top Equipment 10 10 12-Nov-18 27-Nov-18
Attic SpaceAttic Space700 700 18-Jul-18 16-Jun-20
ConstructionConstruction700 700 18-Jul-18 16-Jun-20
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Core Drill
Install Condensate Drain
Core Drill
Install Condensate Drain
Saw Cut Floor
Install Outside Air Riser
Fire Caulk / Seal Floor Penetration @ Riser
Install Smoke / Fire Damper
Install Shaft Walls / Access Panels
Test Smoke / Fire Damper
Install Steel
Saw Cut Floor
Install Outside Air Riser
Fire Caulk / Seal Floor Penetration @ Riser
Install Smoke / Fire Damper
Tape, Bed, Paint
Re-Install Ceiling Grid & Tile
Re-Install Floor Finishes
Test Smoke / Fire Damper
Remove Temp Walls
Final Clean
Saw Cut Floor
Install Outside Air Riser
Fire Caulk / Seal Floor Penetration @ Riser
Install Smoke / Fire Damper
Set Roof Top Curb
Set Roof Top Equipment (SE)
Install SE Roof Top Equipment
Start Up SE Roof Top Equipment
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 16 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 26: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/26.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
Construction Phase SummariesConstruction Phase Summaries700 700 18-Jul-18 16-Jun-20
S-C02-1000 Construction - Attic Space 700 700 18-Jul-18* 16-Jun-20
North East StairsNorth East Stairs707 107 22-Dec-17 A 18-Dec-18
Material ProcurementMaterial Procurement152 90 10-Jul-18 A 21-Nov-18
HandrailsHandrails152 90 10-Jul-18 A 21-Nov-18
P-C03-1146 MCC Develop Handrail Bid Package 15 11 10-Jul-18 A 01-Aug-18
P-C03-1147 Bid Handrails 19 19 02-Aug-18 28-Aug-18
P-C03-1120 MCC Receive / Review Shop Drawings - Handrail 5 5 29-Aug-18 05-Sep-18
P-C03-1125 AE2 (FSB) Receive / Review Submittal - Handrail 10 10 06-Sep-18 19-Sep-18
P-C03-1130 AE1 (Mass) Receive / Review Submittal - Handrail 15 15 20-Sep-18 10-Oct-18
P-C03-1015 Fab & Deliver - Handrail 30 30 11-Oct-18 21-Nov-18
ConstructionConstruction707 107 22-Dec-17 A 18-Dec-18
Schedule Driven MilestonesSchedule Driven Milestones0 0 18-Dec-18 18-Dec-18
M-C03-1000 Interim Substantial Completion - North East Stairs 0 0 18-Dec-18
Construction Phase SummariesConstruction Phase Summaries730 154 22-Dec-17 A 18-Dec-18
S-C03-1000 Construction - North East Stairs 730 154 22-Dec-17 A 18-Dec-18
NE Stairs Finishes - Basement FloorNE Stairs Finishes - Basement Floor186 102 16-Mar-18 A 11-Dec-18
C-C03-2165 Rough In Wall MEP 3 5 16-Mar-18 A 24-Jul-18
C-C03-2325 Inspect Overhead 1 1 18-Jul-18 18-Jul-18
C-C03-2295 Frame Ceilings 1 1 18-Jul-18 18-Jul-18
C-C03-2330 Install Sheetrock at Ceilings 1 1 19-Jul-18 19-Jul-18
C-C03-2335 T/B/P Ceilings 3 3 20-Jul-18 24-Jul-18
C-C03-2180 In Wall Inspec tions - LVL 1 1 1 25-Jul-18 25-Jul-18
C-C03-2360 Trim out MEPF devices 1 1 25-Jul-18 25-Jul-18
C-C03-2365 Install Doors and Hardware 1 1 25-Jul-18 25-Jul-18
C-C03-2190 Install Sheetrock - LVL 1 2 2 26-Jul-18 27-Jul-18
C-C03-2200 Tape and Bed 3 3 30-Jul-18 01-Aug-18
C-C03-2225 1st coat Paint 2 2 02-Aug-18 03-Aug-18
C-C03-2400 Install Stair Marble - LVL 1-Basement NE 10 10 06-Aug-18 17-Aug-18
C-C03-2470 Install Stair Guardrails and Handrails - LVL 1-Basement NE 5 5 26-Nov-18 30-Nov-18
C-C03-2480 Final Paint 2 2 03-Dec-18 04-Dec-18
C-C03-2495 Final Clean - LVL 1-Basement NE 2 2 05-Dec-18 06-Dec-18
C-C03-2505 MCC Punch 3 3 07-Dec-18 11-Dec-18
NE Stairs Finishes - 1st FloorNE Stairs Finishes - 1st Floor115 99 21-Jun-18 A 06-Dec-18
C-C03-2170 Rough In Wall MEP 3 4 21-Jun-18 A 23-Jul-18
C-C03-2546 Modify Intermediate 1-2 Landing Columns & Demo Existing Slab 5 2 16-Jul-18 A 19-Jul-18
C-C03-2549 Frame East Wall 2 2 20-Jul-18 23-Jul-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Construction - Attic Space
MCC Develop Handrail Bid Package
Bid Handrails
MCC Receive / Review Shop Drawings - Handrail
AE2 (FSB) Receive / Review Submittal - Handrail
AE1 (Mass) Receive / Review Submittal - Handrail
Fab & Deliver - Handrail
Interim Substantial Completion - North East Stairs
Construction - North East Stairs
Rough In Wall MEP
Inspect Overhead
Frame Ceilings
Install Sheetrock at Ceilings
T/B/P Ceilings
In Wall Inspec tions - LVL 1
Trim out MEPF devices
Install Doors and Hardware
Install Sheetrock - LVL 1
Tape and Bed
1st coat Paint
Install Stair Marble - LVL 1-Basement NE
Install Stair Guardrails and Handrails - LVL 1-Basement NE
Final Paint
Final Clean - LVL 1-Basement NE
MCC Punch
Rough In Wall MEP
Modify Intermediate 1-2 Landing Columns & Demo Existing Slab
Frame East Wall
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 17 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 27: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/27.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
C-C03-2547 Grout Level 1 Floor 7 7 20-Jul-18 30-Jul-18
C-C03-2195 In Wall Inspec tions - LVL 1 1 1 24-Jul-18 24-Jul-18
C-C03-2205 Install Sheetrock - LVL 1 2 2 25-Jul-18 26-Jul-18
C-C03-2220 Tape and Bed 3 3 27-Jul-18 31-Jul-18
C-C03-2548 Complete Level 1 Frame Wall 1 1 31-Jul-18 31-Jul-18
C-C03-2395 Inspect Overhead 1 1 01-Aug-18 01-Aug-18
C-C03-2230 1st coat Paint 2 2 01-Aug-18 02-Aug-18
C-C03-2410 Install Sheetrock at Ceilings 1 1 02-Aug-18 02-Aug-18
C-C03-2425 T/B/P Ceilings 3 3 03-Aug-18 07-Aug-18
C-C03-2445 Install Doors and Hardware 1 1 08-Aug-18 08-Aug-18
C-C03-2450 Trim out MEPF devices 1 1 08-Aug-18 08-Aug-18
C-C03-2440 Install Stair Marble - LVL 1-Basement NE 10 10 08-Aug-18 21-Aug-18
C-C03-2485 Install Stair Guardrails and Handrails - LVL 1-Basement NE 5 5 26-Nov-18 30-Nov-18
C-C03-2510 Final Paint 2 2 03-Dec-18 04-Dec-18
C-C03-2515 Final Clean - LVL 1-Basement NE 2 2 05-Dec-18 06-Dec-18
NE Stairs Finishes - 2nd FloorNE Stairs Finishes - 2nd Floor136 99 28-May-18 A 06-Dec-18
C-C03-2175 Frame Walls LVL 2 2 3 28-May-18 A 20-Jul-18
C-C03-2185 Rough In Wall MEP 3 2 01-Jun-18 A 20-Jul-18
C-C03-2210 In Wall Inspec tions - LVL 2 1 1 23-Jul-18 23-Jul-18
C-C03-2350 Frame Ceilings 1 1 24-Jul-18 24-Jul-18
C-C03-2215 Install Sheetrock - LVL 2 2 2 24-Jul-18 25-Jul-18
C-C03-2380 Rough In MEP Ceilings 2 2 25-Jul-18 26-Jul-18
C-C03-2390 Inspect Overhead 1 1 27-Jul-18 27-Jul-18
C-C03-2405 Install Sheetrock at Ceilings 1 1 30-Jul-18 30-Jul-18
C-C03-2420 T/B/P Drywall Walls & Ceilings - LVL 2 5 5 31-Jul-18 06-Aug-18
C-C03-2455 Install Stair Marble - LVL 2 10 10 07-Aug-18 20-Aug-18
C-C03-2490 Install Stair Guardrails and Handrails - LVL 2 5 5 26-Nov-18 30-Nov-18
C-C03-2520 Final Paint 2 2 03-Dec-18 04-Dec-18
C-C03-2530 Final Clean - LVL 2 2 2 05-Dec-18 06-Dec-18
NE Stairs Finishes - 3rd FloorNE Stairs Finishes - 3rd Floor113 107 10-Jul-18 A 18-Dec-18
C-C03-2385 Rough In MEP Ceilings 2 2 10-Jul-18 A 19-Jul-18
C-C03-2415 Inspect Overhead 1 1 20-Jul-18 20-Jul-18
C-C03-2430 Install Sheetrock at Ceilings 1 1 23-Jul-18 23-Jul-18
C-C03-2435 T/B/P Drywall Walls & Ceilings - LVL 3 5 5 24-Jul-18 30-Jul-18
C-C03-2465 Install Stair Marble - LVL 3 10 10 31-Jul-18 13-Aug-18
C-C03-2500 Install Stair Guardrails and Handrails - LVL 3 5 5 14-Aug-18 20-Aug-18
C-C03-2525 Final Paint 2 2 21-Aug-18 22-Aug-18
C-C03-2535 Final Clean - LVL 3 2 2 23-Aug-18 24-Aug-18
C-C03-2540 MCC Punch Floors 1 - 4 8 8 07-Dec-18 18-Dec-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Grout Level 1 Floor
In Wall Inspec tions - LVL 1
Install Sheetrock - LVL 1
Tape and Bed
Complete Level 1 Frame Wall
Inspect Overhead
1st coat Paint
Install Sheetrock at Ceilings
T/B/P Ceilings
Install Doors and Hardware
Trim out MEPF devices
Install Stair Marble - LVL 1-Basement NE
Install Stair Guardrails and Handrails - LVL 1-Basement NE
Final Paint
Final Clean - LVL 1-Basement NE
Frame Walls LVL 2
Rough In Wall MEP
In Wall Inspec tions - LVL 2
Frame Ceilings
Install Sheetrock - LVL 2
Rough In MEP Ceilings
Inspect Overhead
Install Sheetrock at Ceilings
T/B/P Drywall Walls & Ceilings - LVL 2
Install Stair Marble - LVL 2
Install Stair Guardrails and Handrails - LVL 2
Final Paint
Final Clean - LVL 2
Rough In MEP Ceilings
Inspect Overhead
Install Sheetrock at Ceilings
T/B/P Drywall Walls & Ceilings - LVL 3
Install Stair Marble - LVL 3
Install Stair Guardrails and Handrails - LVL 3
Final Paint
Final Clean - LVL 3
MCC Punch Floors 1 - 4
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 18 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 28: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/28.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
NE Stairs Finishes - 4th FloorNE Stairs Finishes - 4th Floor17 12 11-Jul-18 A 02-Aug-18
C-C03-2105 Rough In Overhead MEP 1 2 11-Jul-18 A 19-Jul-18
C-C03-2550 Relocate Senate Phone Lines 10 10 18-Jul-18 31-Jul-18
C-C03-2110 Inspect Overhead 1 1 20-Jul-18 20-Jul-18
C-C03-2115 Install sheetrock 1 1 23-Jul-18 23-Jul-18
C-C03-2120 Repair Plaster 3 3 24-Jul-18 26-Jul-18
C-C03-2125 T/B/P Walls and Ceiling 3 3 24-Jul-18 26-Jul-18
C-C03-2130 Trim Out Doors 1 1 26-Jul-18 26-Jul-18
C-C03-2135 Install Doors and Hardware 1 1 27-Jul-18 27-Jul-18
C-C03-2145 Install Marble Base 1 1 30-Jul-18 30-Jul-18
C-C03-2140 Final Paint 2 2 31-Jul-18 01-Aug-18
C-C03-2100 Frame Ceiling 1 1 01-Aug-18 01-Aug-18
C-C03-2150 Final Clean - LVL 4 1 1 02-Aug-18 02-Aug-18
NE Stairs Finishes - 5th FloorNE Stairs Finishes - 5th Floor36 20 21-Jun-18 A 14-Aug-18
C-C03-2085 T/B/P Drywall Walls & Ceilings - LVL 6-5 NE 5 7 21-Jun-18 A 26-Jul-18
C-C03-2320 Install Stair Marble - LVL 6-5 NE 15 13 16-Jul-18 A 03-Aug-18
C-C03-2460 Install Stair Guardrails and Handrails - LVL 6-5 NE 5 5 06-Aug-18 10-Aug-18
C-C03-2475 Final Clean - LVL 6-5 NE 2 2 13-Aug-18 14-Aug-18
South East StairsSouth East Stairs87 87 19-Dec-18 22-Apr-19
ConstructionConstruction87 87 19-Dec-18 22-Apr-19
Schedule Driven MilestonesSchedule Driven Milestones0 0 22-Apr-19 22-Apr-19
M-C04-1000 Interim Substantial Completion - South East Stairs 0 0 22-Apr-19
Construction Phase SummariesConstruction Phase Summaries121 125 19-Dec-18 22-Apr-19
S-C04-1010 Construction - South East Stairs 121 125 19-Dec-18 22-Apr-19
Stair Floor 5Stair Floor 567 67 19-Dec-18 25-Mar-19
C-C04-1000 Install Temp / Permanent Partition Wall 5 5 19-Dec-18 26-Dec-18
C-C04-1005 Demo Existing Partition Wall & Ceilings 5 5 27-Dec-18 03-Jan-19
C-C04-1010 RI MEP at Partition Wall 5 5 27-Dec-18 03-Jan-19
C-C04-1020 Close Gyp Partition Wall 5 5 04-Jan-19 10-Jan-19
C-C04-1025 Install Fire and Communication Riser 10 10 04-Jan-19 17-Jan-19
C-C04-1015 ReRoute Existing Communication Lines 15 15 04-Jan-19 24-Jan-19
C-C04-1030 Install Hard Gyp Ceiling 5 5 25-Jan-19 31-Jan-19
C-C04-1035 RI MEP Gyp Ceiling 5 5 01-Feb-19 07-Feb-19
C-C04-1040 Tape, Bed & Prime Paint Partition Wall and Ceiling 5 5 08-Feb-19 14-Feb-19
C-C04-1045 Install Doors and Hardware 2 2 15-Feb-19 18-Feb-19
C-C04-1050 Final Paint Stairwell 5 5 15-Mar-19 21-Mar-19
C-C04-1055 Final Clean 2 2 22-Mar-19 25-Mar-19
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Rough In Overhead MEP
Relocate Senate Phone Lines
Inspect Overhead
Install sheetrock
Repair Plaster
T/B/P Walls and Ceiling
Trim Out Doors
Install Doors and Hardware
Install Marble Base
Final Paint
Frame Ceiling
Final Clean - LVL 4
T/B/P Drywall Walls & Ceilings - LVL 6-5 NE
Install Stair Marble - LVL 6-5 NE
Install Stair Guardrails and Handrails - LVL 6-5 NE
Final Clean - LVL 6-5 NE
Interim Substantial Completion - South East Stairs
Construction - South East Stairs
Install Temp / Permanent Partition Wall
Demo Existing Partition Wall & Ceilings
RI MEP at Partition Wall
Close Gyp Partition Wall
Install Fire and Communication Riser
ReRoute Existing Communication Lines
Install Hard Gyp Ceiling
RI MEP Gyp Ceiling
Tape, Bed & Prime Paint Partition Wall and Ceiling
Install Doors and Hardware
Final Paint Stairwell
Final Clean
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 19 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 29: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/29.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
Stair Floor 4Stair Floor 482 82 27-Dec-18 22-Apr-19
C-C04-1060 Install Temp / Permanent Partition Wall 5 5 27-Dec-18 03-Jan-19
C-C04-1065 Demo Existing Partition Wall & Ceilings 5 5 04-Jan-19 10-Jan-19
C-C04-1070 RI MEP at Partition Wall 5 5 04-Jan-19 10-Jan-19
C-C04-1080 Close Gyp Partition Wall 5 5 11-Jan-19 17-Jan-19
C-C04-1085 Install Fire and Communication Riser 10 10 11-Jan-19 24-Jan-19
C-C04-1075 ReRoute Existing Communication Lines 15 15 11-Jan-19 31-Jan-19
C-C04-1090 Install Hard Gyp Ceiling 5 5 01-Feb-19 07-Feb-19
C-C04-1095 RI MEP Gyp Ceiling 5 5 08-Feb-19 14-Feb-19
C-C04-1100 Tape, Bed & Prime Paint Partition Wall and Ceiling 5 5 15-Feb-19 21-Feb-19
C-C04-1105 Install Doors and Hardware 2 2 22-Feb-19 25-Feb-19
C-C04-1110 Final Paint Stairwell 5 5 12-Apr-19 18-Apr-19
C-C04-1115 Final Clean 2 2 19-Apr-19 22-Apr-19
Stair Risers 5 - 4Stair Risers 5 - 420 20 15-Feb-19 14-Mar-19
C-C04-1120 Restoration of Existing Stairs and Handrails LVL 5-4 20 20 15-Feb-19 14-Mar-19
Stair Risers 6 - 5Stair Risers 6 - 520 20 15-Mar-19 11-Apr-19
C-C04-1125 Restoration of Existing Stairs and Handrails LVL 6-5 20 20 15-Mar-19 11-Apr-19
Public RestroomsPublic Restrooms730 730 01-Jan-19 30-Dec-20
ConstructionConstruction730 730 01-Jan-19 30-Dec-20
Construction Phase SummariesConstruction Phase Summaries730 730 01-Jan-19 30-Dec-20
S-C05-1005 Construction - Public Restrooms 730 730 01-Jan-19* 30-Dec-20
RotundaRotunda1095 1095 01-Jan-20 30-Dec-22
ConstructionConstruction1095 1095 01-Jan-20 30-Dec-22
Construction Phase SummariesConstruction Phase Summaries1095 1095 01-Jan-20 30-Dec-22
S-C06-1000 Construction - Rotunda 1095 1095 01-Jan-20* 30-Dec-22
Hole in FloorHole in Floor178 178 06-Apr-20 30-Sep-20
ConstructionConstruction178 178 06-Apr-20 30-Sep-20
Construction Phase SummariesConstruction Phase Summaries178 178 06-Apr-20 30-Sep-20
S-C07-1000 Construction - Hole in Floor 178 178 06-Apr-20* 30-Sep-20
TenantsTenants940 898 04-Jan-18 A 31-Jan-22
1st Floor Auditor / Gov Elect1st Floor Auditor / Gov Elect167 29 04-Jan-18 A 27-Aug-18
ConstructionConstruction167 29 04-Jan-18 A 27-Aug-18
Schedule Driven MilestonesSchedule Driven Milestones21 21 24-Jul-18 22-Aug-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Install Temp / Permanent Partition Wall
Demo Existing Partition Wall & Ceilings
RI MEP at Partition Wall
Close Gyp Partition Wall
Install Fire and Communication Riser
ReRoute Existing Communication Lines
Install Hard Gyp Ceiling
RI MEP Gyp Ceiling
Tape, Bed & Prime Paint Partition Wall and Ceiling
Install Doors and Hardware
Final Paint Stairwell
Final Clean
Restoration of Existing Stairs and Handrails LVL 5-4
Restoration of Existing Stairs and Handrails LVL 6-5
Construction - Public Restrooms
Construction - Rotunda
Construction - Hole in Floor
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 20 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 30: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/30.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
M-T04-1010 LV / FA / IT Complete 0 0 24-Jul-18
M-T04-1015 Interim Substantial Completion - Auditor / Gov Elect 0 0 22-Aug-18*
Construction Phase SummariesConstruction Phase Summaries245 36 04-Jan-18 A 22-Aug-18
S-T04-1000 Construction - 1st Floor Auditor / Gov Elect 245 36 04-Jan-18 A 22-Aug-18
1st Floor Auditor / Gov Elect1st Floor Auditor / Gov Elect48 29 11-Jul-18 A 27-Aug-18
C-T04-1190 Install Carpet / LVT / SDT 8 1 11-Jul-18 A 18-Jul-18
C-T04-1165 Install Marble Tile 40 1 16-Jul-18 A 18-Jul-18
C-T04-8090 Install Plumbing Fixtures 2 2 18-Jul-18 19-Jul-18
C-T04-1160 Hang Sheetrock and set frames - Elevator 5 5 18-Jul-18 24-Jul-18
C-T04-8075 OMES Install LV Cabling 5 5 18-Jul-18 24-Jul-18
C-T04-1210 Hang Doors & Install Hardware 10 10 19-Jul-18 01-Aug-18
C-T04-1205 Final Paint 15 10 20-Jul-18 02-Aug-18
C-T04-8080 OMES Activate Security & Card Access 5 5 26-Jul-18 01-Aug-18
C-T04-1215 Install Glazing 6 6 01-Aug-18 08-Aug-18
C-T04-1220 Test & Balance 14 5 02-Aug-18 08-Aug-18
C-T04-1225 Complete MCC / FSB Punch List 15 10 09-Aug-18 22-Aug-18
C-T04-1230 100% Fire Marshall Inspection (Final) 0 0 22-Aug-18
C-T04-1235 Complete AE1 / Owner Punch List 15 3 23-Aug-18 27-Aug-18
C-T04-1240 OMES Owner Move In 0 0 27-Aug-18
5th Floor Senate East5th Floor Senate East178 125 04-Jun-18 A 15-Jan-19
Material ProcurementMaterial Procurement111 70 18-Jun-18 A 24-Oct-18
Floor CoveringFloor Covering111 69 18-Jun-18 A 23-Oct-18
P-T05-1040 MCC Receive/Review Submittal - Flooring 3 9 18-Jun-18 A 30-Jul-18
P-T05-1045 AE2(FSB) Receive/Review Submittal - Flooring 10 10 31-Jul-18 13-Aug-18
P-T05-1055 Fab & Deliver Flooring - Tile/LVT 15 15 14-Aug-18 04-Sep-18
P-T05-1050 Fab & Deliver Flooring - Carpet 50 50 14-Aug-18 23-Oct-18
Doors / HardwareDoors / Hardware55 35 03-Jul-18 A 05-Sep-18
P-T05-1085 Fab & Deliver - Door Frames 25 15 03-Jul-18 A 07-Aug-18
P-T05-1075 Fab & Deliver Historic Frames 40 30 03-Jul-18 A 28-Aug-18
P-T05-1080 Fab & Deliver - Doors & Hardware 45 35 03-Jul-18 A 05-Sep-18
P-T05-1070 AE2 (FSB) Receive / Review Submittal - Doors & Hardware 10 10 18-Jul-18 31-Jul-18
MillworkMillwork50 70 18-Jul-18 24-Oct-18
P-T05-1106 MCC Re-Receive / Re-Review Submittal - Millwork 10 10 18-Jul-18 31-Jul-18
P-T05-1095 AE2 (FSB) Receive / Review Submittal - Millwork 10 10 01-Aug-18 14-Aug-18
P-T05-1105 Fab & Deliver - Base / Case / Crown 5 20 15-Aug-18 12-Sep-18
P-T05-1100 Fab & Deliver - MIllwork 30 50 15-Aug-18 24-Oct-18
ConstructionConstruction165 125 04-Jun-18 A 15-Jan-19
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
LV / FA / IT Complete
Interim Substantial Completion - Auditor / Gov Elect
Construction - 1st Floor Auditor / Gov Elect
Install Carpet / LVT / SDT
Install Marble Tile
Install Plumbing Fixtures
Hang Sheetrock and set frames - Elevator
OMES Install LV Cabling
Hang Doors & Install Hardware
Final Paint
OMES Activate Security & Card Access
Install Glazing
Test & Balance
Complete MCC / FSB Punch List
100% Fire Marshall Inspection (Final)
Complete AE1 / Owner Punch List
OMES Owner Move In
MCC Receive/Review Submittal - Flooring
AE2(FSB) Receive/Review Submittal - Flooring
Fab & Deliver Flooring - Tile/LVT
Fab & Deliver Flooring - Carpet
Fab & Deliver - Door Frames
Fab & Deliver Historic Frames
Fab & Deliver - Doors & Hardware
AE2 (FSB) Receive / Review Submittal - Doors & Hardware
MCC Re-Receive / Re-Review Submittal - Millwork
AE2 (FSB) Receive / Review Submittal - Millwork
Fab & Deliver - Base / Case / Crown
Fab & Deliver - MIllwork
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 21 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 31: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/31.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
Schedule Driven MilestonesSchedule Driven Milestones0 0 08-Jan-19 08-Jan-19
M-T05-1000 Interim Substantial Completion - 5th Floor Senate East 0 0 08-Jan-19
Construction Phase SummariesConstruction Phase Summaries241 175 04-Jun-18 A 08-Jan-19
S-T05-1000 Construction - 5th Floor Senate East 241 175 04-Jun-18 A 08-Jan-19
5th Floor Senate East5th Floor Senate East125 125 12-Jul-18 A 15-Jan-19
C-T05-1095 Demo Topping Slabs as Req'd 5 1 12-Jul-18 A 18-Jul-18
C-T05-1085 Demo Overhead MEP 7 3 12-Jul-18 A 20-Jul-18
C-T05-1105 Infill Existing Trenches 5 5 18-Jul-18 24-Jul-18
C-T05-1100 Layout & Frame Walls 10 10 18-Jul-18 31-Jul-18
C-T05-1120 Rough-In Fire Suppression 5 5 23-Jul-18 27-Jul-18
C-T05-1115 Hang Heat Pumps 7 7 23-Jul-18 31-Jul-18
C-T05-1110 Rough-In Overhead Electric 10 10 23-Jul-18 03-Aug-18
C-T05-1125 Rough-In In Wall 12 12 25-Jul-18 09-Aug-18
C-T05-1130 50% Fire Marshall Inspection 0 0 27-Jul-18
C-T05-1135 Rough Fire-Suppression @ Hard Lids 5 5 01-Aug-18 07-Aug-18
C-T05-1150 Frame Hard Lids 10 10 01-Aug-18 14-Aug-18
C-T05-1140 Rough-In Mechanical Piping & Duct 15 15 01-Aug-18 21-Aug-18
C-T05-1155 Rough-In Electrical @ Hard Lids 5 5 08-Aug-18 14-Aug-18
C-T05-1160 Insulate Mechanical 15 15 08-Aug-18 28-Aug-18
C-T05-1165 Hard Lid Overhead Inspection 1 1 15-Aug-18 15-Aug-18
C-T05-1170 Hang Sheetrock at Hardlids 5 5 16-Aug-18 22-Aug-18
C-T05-1180 In-Wall Inspections 2 2 29-Aug-18 30-Aug-18
C-T05-1145 Install Historic Door Frames 4 4 29-Aug-18 04-Sep-18
C-T05-1175 Install Controls for Heat Pumps 6 6 29-Aug-18 06-Sep-18
C-T05-1185 Hang Sheetrock Walls 10 10 05-Sep-18 18-Sep-18
C-T05-1190 Start Up of Heat Pumps 2 2 07-Sep-18 10-Sep-18
C-T05-1200 Install Door Frames 5 5 12-Sep-18 18-Sep-18
C-T05-1195 Tape / Bed / Paint Sheetrock 20 20 12-Sep-18 09-Oct-18
C-T05-1210 OMES Install LV Cabling 10 10 19-Sep-18 02-Oct-18
C-T05-1205 Plaster in Historic Corridors 10 10 19-Sep-18 02-Oct-18
C-T05-1215 Install Base / Case / Crown 20 20 26-Sep-18 23-Oct-18
C-T05-1220 Install Ceiling Grid with Borders 8 8 01-Oct-18 10-Oct-18
C-T05-1230 Overhead Device Out 5 5 08-Oct-18 12-Oct-18
C-T05-1225 Install Sub Floor 8 8 08-Oct-18 17-Oct-18
C-T05-1240 Install Ceramic Tile 2 2 15-Oct-18 16-Oct-18
C-T05-1245 Above Ceiling Inspections 2 2 15-Oct-18 16-Oct-18
C-T05-1250 Install Plumbing Fixtures 4 4 17-Oct-18 22-Oct-18
C-T05-1260 80% Fire Marshall Inspection 0 0 17-Oct-18
C-T05-1265 Drop Ceiling Tile 3 3 18-Oct-18 22-Oct-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Interim Substantial Completion - 5th Floor Senate East
Construction - 5th Floor Senate East
Demo Topping Slabs as Req'd
Demo Overhead MEP
Infill Existing Trenches
Layout & Frame Walls
Rough-In Fire Suppression
Hang Heat Pumps
Rough-In Overhead Electric
Rough-In In Wall
50% Fire Marshall Inspection
Rough Fire-Suppression @ Hard Lids
Frame Hard Lids
Rough-In Mechanical Piping & Duct
Rough-In Electrical @ Hard Lids
Insulate Mechanical
Hard Lid Overhead Inspection
Hang Sheetrock at Hardlids
In-Wall Inspections
Install Historic Door Frames
Install Controls for Heat Pumps
Hang Sheetrock Walls
Start Up of Heat Pumps
Install Door Frames
Tape / Bed / Paint Sheetrock
OMES Install LV Cabling
Plaster in Historic Corridors
Install Base / Case / Crown
Install Ceiling Grid with Borders
Overhead Device Out
Install Sub Floor
Install Ceramic Tile
Above Ceiling Inspections
Install Plumbing Fixtures
80% Fire Marshall Inspection
Drop Ceiling Tile
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 22 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 32: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/32.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
C-T05-1255 Install Marble Tile 10 10 18-Oct-18 31-Oct-18
C-T05-1270 Install Bathroom Accessories 1 1 23-Oct-18 23-Oct-18
C-T05-1275 Hang Doors & Install Hardware 10 10 25-Oct-18 07-Nov-18
C-T05-1235 Install Millwork 20 20 25-Oct-18 21-Nov-18
C-T05-1280 OMES Activate Security & Card Access 5 5 01-Nov-18 07-Nov-18
C-T05-1285 Restore Marble in Corridors 20 20 01-Nov-18 30-Nov-18
C-T05-1290 Install Glazing 6 6 07-Nov-18 14-Nov-18
C-T05-1300 Install Countertops 10 10 26-Nov-18 07-Dec-18
C-T05-1295 Install Carpet / LVT / SDT 15 15 26-Nov-18 14-Dec-18
C-T05-1305 Final Paint 10 10 10-Dec-18 21-Dec-18
C-T05-1310 Test & Balance 14 14 17-Dec-18 07-Jan-19
C-T05-1315 Complete MCC / FSB Punch List 10 10 24-Dec-18 08-Jan-19
C-T05-1320 100% Fire Marshall Inspection (Final) 0 0 08-Jan-19
C-T05-1325 Complete AE1 / Owner Punch List 5 5 09-Jan-19 15-Jan-19
C-T05-1330 Owner Move In 0 0 15-Jan-19*
4th Floor Senate East4th Floor Senate East178 120 04-Jun-18 A 08-Jan-19
Material ProcurementMaterial Procurement111 69 18-Jun-18 A 23-Oct-18
Floor CoveringFloor Covering111 69 18-Jun-18 A 23-Oct-18
P-T06-1040 MCC Receive/Review Submittal - Flooring 3 9 18-Jun-18 A 30-Jul-18
P-T06-1045 AE2(FSB) Receive/Review Submittal - Flooring 10 10 31-Jul-18 13-Aug-18
P-T06-1055 Fab & Deliver Flooring - Tile/LVT 15 15 14-Aug-18 04-Sep-18
P-T06-1050 Fab & Deliver Flooring - Carpet 50 50 14-Aug-18 23-Oct-18
Doors / HardwareDoors / Hardware55 35 03-Jul-18 A 05-Sep-18
P-T06-1085 Fab & Deliver - Door Frames 25 15 03-Jul-18 A 07-Aug-18
P-T06-1075 Fab & Deliver Historic Frames 40 30 03-Jul-18 A 28-Aug-18
P-T06-1080 Fab & Deliver - Doors & Hardware 45 35 03-Jul-18 A 05-Sep-18
P-T06-1070 AE2 (FSB) Receive / Review Submittal - Doors & Hardware 10 10 18-Jul-18 31-Jul-18
MillworkMillwork50 50 18-Jul-18 26-Sep-18
P-T06-1106 MCC Re-Receive / Re-Review Submittal - Millwork 10 10 18-Jul-18 31-Jul-18
P-T06-1095 AE2 (FSB) Receive / Review Submittal - Millwork 10 10 01-Aug-18 14-Aug-18
P-T06-1105 Fab & Deliver - Base / Case / Crown 5 5 15-Aug-18 21-Aug-18
P-T06-1100 Fab & Deliver - MIllwork 30 30 15-Aug-18 26-Sep-18
ConstructionConstruction165 120 04-Jun-18 A 08-Jan-19
Schedule Driven MilestonesSchedule Driven Milestones0 0 31-Dec-18 31-Dec-18
M-T06-1000 Interim Substantial Completion - 4th Floor Senate East 0 0 31-Dec-18
Construction Phase SummariesConstruction Phase Summaries241 167 04-Jun-18 A 31-Dec-18
S-T06-1000 Construction - 4th Floor Senate East 241 167 04-Jun-18 A 31-Dec-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Install Marble Tile
Install Bathroom Accessories
Hang Doors & Install Hardware
Install Millwork
OMES Activate Security & Card Access
Restore Marble in Corridors
Install Glazing
Install Countertops
Install Carpet / LVT / SDT
Final Paint
Test & Balance
Complete MCC / FSB Punch List
100% Fire Marshall Inspection (Final)
Complete AE1 / Owner Punch List
Owner Move In
MCC Receive/Review Submittal - Flooring
AE2(FSB) Receive/Review Submittal - Flooring
Fab & Deliver Flooring - Tile/LVT
Fab & Deliver Flooring - Carpet
Fab & Deliver - Door Frames
Fab & Deliver Historic Frames
Fab & Deliver - Doors & Hardware
AE2 (FSB) Receive / Review Submittal - Doors & Hardware
MCC Re-Receive / Re-Review Submittal - Millwork
AE2 (FSB) Receive / Review Submittal - Millwork
Fab & Deliver - Base / Case / Crown
Fab & Deliver - MIllwork
Interim Substantial Completion - 4th Floor Senate East
Construction - 4th Floor Senate East
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 23 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 33: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/33.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
4th Floor Senate East4th Floor Senate East129 120 16-Jul-18 A 08-Jan-19
C-T06-1140 Abatement Door Frames 5 3 16-Jul-18 A 20-Jul-18
C-T06-1160 Abatement of Overhead and Floor Mastics 10 8 16-Jul-18 A 27-Jul-18
C-T06-1210 Infill Existing Trenches 5 5 30-Jul-18 03-Aug-18
C-T06-1200 Layout & Frame Walls 10 10 30-Jul-18 10-Aug-18
C-T06-1240 Rough-In Fire Suppression 5 5 02-Aug-18 08-Aug-18
C-T06-1220 Hang Heat Pumps 7 7 02-Aug-18 10-Aug-18
C-T06-1230 Rough-In Overhead Electric 10 10 02-Aug-18 15-Aug-18
C-T06-1250 Rough-In In Wall 12 12 06-Aug-18 21-Aug-18
C-T06-1260 50% Fire Marshall Inspection 0 0 08-Aug-18
C-T06-1270 Rough Fire-Suppression @ Hard Lids 5 5 13-Aug-18 17-Aug-18
C-T06-1280 Frame Hard Lids 10 10 13-Aug-18 24-Aug-18
C-T06-1290 Rough-In Mechanical Piping & Duct 15 15 13-Aug-18 31-Aug-18
C-T06-1310 Rough-In Electrical @ Hard Lids 5 5 20-Aug-18 24-Aug-18
C-T06-1320 Insulate Mechanical 15 15 20-Aug-18 10-Sep-18
C-T06-1330 Hard Lid Overhead Inspection 1 1 27-Aug-18 27-Aug-18
C-T06-1340 Hang Sheetrock at Hardlids 5 5 28-Aug-18 04-Sep-18
C-T06-1300 Install Historic Door Frames 4 4 29-Aug-18 04-Sep-18
C-T06-1360 In-Wall Inspections 2 2 11-Sep-18 12-Sep-18
C-T06-1350 Install Controls for Heat Pumps 6 6 11-Sep-18 18-Sep-18
C-T06-1370 Hang Sheetrock Walls 10 10 13-Sep-18 26-Sep-18
C-T06-1380 Start Up of Heat Pumps 2 2 19-Sep-18 20-Sep-18
C-T06-1390 Install Door Frames 5 5 20-Sep-18 26-Sep-18
C-T06-1400 Tape / Bed / Paint Sheetrock 20 20 20-Sep-18 17-Oct-18
C-T06-1420 OMES Install LV Cabling 10 10 27-Sep-18 10-Oct-18
C-T06-1410 Plaster in Historic Corridors 10 10 27-Sep-18 10-Oct-18
C-T06-1430 Install Base / Case / Crown 20 20 04-Oct-18 31-Oct-18
C-T06-1440 Install Ceiling Grid with Borders 8 8 09-Oct-18 18-Oct-18
C-T06-1450 Overhead Device Out 5 5 16-Oct-18 22-Oct-18
C-T06-1460 Install Sub Floor 8 8 16-Oct-18 25-Oct-18
C-T06-1470 Install Millwork 20 20 18-Oct-18 14-Nov-18
C-T06-1490 Above Ceiling Inspections 2 2 23-Oct-18 24-Oct-18
C-T06-1480 Install Ceramic Tile 2 2 23-Oct-18 24-Oct-18
C-T06-1500 Install Plumbing Fixtures 4 4 25-Oct-18 30-Oct-18
C-T06-1520 80% Fire Marshall Inspection 0 0 25-Oct-18
C-T06-1530 Drop Ceiling Tile 3 3 26-Oct-18 30-Oct-18
C-T06-1510 Install Marble Tile 10 10 26-Oct-18 08-Nov-18
C-T06-1540 Install Bathroom Accessories 1 1 31-Oct-18 31-Oct-18
C-T06-1550 Hang Doors & Install Hardware 10 10 01-Nov-18 14-Nov-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Abatement Door Frames
Abatement of Overhead and Floor Mastics
Infill Existing Trenches
Layout & Frame Walls
Rough-In Fire Suppression
Hang Heat Pumps
Rough-In Overhead Electric
Rough-In In Wall
50% Fire Marshall Inspection
Rough Fire-Suppression @ Hard Lids
Frame Hard Lids
Rough-In Mechanical Piping & Duct
Rough-In Electrical @ Hard Lids
Insulate Mechanical
Hard Lid Overhead Inspection
Hang Sheetrock at Hardlids
Install Historic Door Frames
In-Wall Inspections
Install Controls for Heat Pumps
Hang Sheetrock Walls
Start Up of Heat Pumps
Install Door Frames
Tape / Bed / Paint Sheetrock
OMES Install LV Cabling
Plaster in Historic Corridors
Install Base / Case / Crown
Install Ceiling Grid with Borders
Overhead Device Out
Install Sub Floor
Install Millwork
Above Ceiling Inspections
Install Ceramic Tile
Install Plumbing Fixtures
80% Fire Marshall Inspection
Drop Ceiling Tile
Install Marble Tile
Install Bathroom Accessories
Hang Doors & Install Hardware
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 24 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 34: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/34.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
C-T06-1560 OMES Activate Security & Card Access 5 5 08-Nov-18 14-Nov-18
C-T06-1570 Restore Marble in Corridors 20 20 09-Nov-18 10-Dec-18
C-T06-1580 Install Glazing 6 6 14-Nov-18 21-Nov-18
C-T06-1600 Install Countertops 10 10 15-Nov-18 30-Nov-18
C-T06-1590 Install Carpet / LVT / SDT 15 15 15-Nov-18 07-Dec-18
C-T06-1610 Final Paint 10 10 03-Dec-18 14-Dec-18
C-T06-1620 Test & Balance 14 14 10-Dec-18 28-Dec-18
C-T06-1630 Complete MCC / FSB Punch List 10 10 17-Dec-18 31-Dec-18
C-T06-1640 100% Fire Marshall Inspection (Final) 0 0 31-Dec-18
C-T06-1650 Complete AE1 / Owner Punch List 5 5 02-Jan-19 08-Jan-19
C-T06-1660 Owner Move In 0 0 08-Jan-19*
MCC Field Office RelocationMCC Field Office Relocation30 30 09-Aug-18 07-Sep-18
ConstructionConstruction30 30 09-Aug-18 07-Sep-18
Construction Phase SummariesConstruction Phase Summaries30 30 09-Aug-18 07-Sep-18
S-T07-1000 Construction - MCC Field Office Relocation 30 30 09-Aug-18* 07-Sep-18
1st Floor OMES North1st Floor OMES North177 170 01-Aug-18 02-Apr-19
Material ProcurementMaterial Procurement75 75 01-Aug-18 14-Nov-18
OAU & Heat PumpsOAU & Heat Pumps21 21 01-Aug-18 29-Aug-18
P-T08-1000 MCC Receive/Review Submittal - Heat Pumps 1 1 01-Aug-18 01-Aug-18
P-T08-1005 AE2(FSB) Receive/Review Submittal - Heat Pumps 10 10 02-Aug-18 15-Aug-18
P-T08-1010 Fab & Deliver - Heat Pumps 10 10 16-Aug-18 29-Aug-18
Light FixturesLight Fixtures41 41 01-Aug-18 27-Sep-18
P-T08-1015 MCC Receive/Review Submittal - Lighting 1 1 01-Aug-18 01-Aug-18
P-T08-1020 AE2(FSB) Receive/Review Submittal - Lighting 10 10 02-Aug-18 15-Aug-18
P-T08-1025 Fab & Deliver - Lighting 30 30 16-Aug-18 27-Sep-18
Floor CoveringFloor Covering48 48 01-Aug-18 08-Oct-18
P-T08-1030 Buyout Flooring Labor 10 10 01-Aug-18 14-Aug-18
P-T08-1040 MCC Receive/Review Submittal - Flooring 3 3 15-Aug-18 17-Aug-18
P-T08-1045 AE2(FSB) Receive/Review Submittal - Flooring 10 10 20-Aug-18 31-Aug-18
P-T08-1035 Fab & Deliver - Marble Tile 20 20 20-Aug-18 17-Sep-18
P-T08-1050 Fab & Deliver Flooring - Carpet 25 25 04-Sep-18 08-Oct-18
Doors / HardwareDoors / Hardware75 75 01-Aug-18 14-Nov-18
P-T08-1055 Doors & Hardware Pricing & Submittal Prep 10 10 01-Aug-18 14-Aug-18
P-T08-1060 MCC Receive / Review Submittal - Doors & Hardware 10 10 15-Aug-18 28-Aug-18
P-T08-1065 AE2 (FSB) Receive / Review Submittal - Doors & Hardware 10 10 29-Aug-18 12-Sep-18
P-T08-1070 Fab & Deliver - Door Frames 25 25 13-Sep-18 17-Oct-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
OMES Activate Security & Card Access
Restore Marble in Corridors
Install Glazing
Install Countertops
Install Carpet / LVT / SDT
Final Paint
Test & Balance
Complete MCC / FSB Punch List
100% Fire Marshall Inspection (Final)
Complete AE1 / Owner Punch List
Owner Move In
Construction - MCC Field Office Relocation
MCC Receive/Review Submittal - Heat Pumps
AE2(FSB) Receive/Review Submittal - Heat Pumps
Fab & Deliver - Heat Pumps
MCC Receive/Review Submittal - Lighting
AE2(FSB) Receive/Review Submittal - Lighting
Fab & Deliver - Lighting
Buyout Flooring Labor
MCC Receive/Review Submittal - Flooring
AE2(FSB) Receive/Review Submittal - Flooring
Fab & Deliver - Marble Tile
Fab & Deliver Flooring - Carpet
Doors & Hardware Pricing & Submittal Prep
MCC Receive / Review Submittal - Doors & Hardware
AE2 (FSB) Receive / Review Submittal - Doors & Hardware
Fab & Deliver - Door Frames
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 25 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 35: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/35.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
P-T08-1075 Fab & Deliver - Doors & Hardware 45 45 13-Sep-18 14-Nov-18
MillworkMillwork40 40 01-Aug-18 26-Sep-18
P-T08-1080 MCC Receive / Review Submittal - Millwork 10 10 01-Aug-18 14-Aug-18
P-T08-1085 AE2 (FSB) Receive / Review Submittal - Millwork 10 10 15-Aug-18 28-Aug-18
P-T08-1090 Fab & Deliver - MIllwork 20 20 29-Aug-18 26-Sep-18
ConstructionConstruction151 144 07-Sep-18 02-Apr-19
Schedule Driven MilestonesSchedule Driven Milestones0 0 29-Mar-19 29-Mar-19
M-T08-1000 Interim Substantial Completion - 1st Floor OMES North 0 0 29-Mar-19
Construction Phase SummariesConstruction Phase Summaries214 201 10-Sep-18 29-Mar-19
S-T08-1000 Construction - 1st Floor OMES North 214 201 10-Sep-18 29-Mar-19
1st Floor OMES North1st Floor OMES North144 144 07-Sep-18 02-Apr-19
C-T08-1010 Pre-Demo Conference 1 1 07-Sep-18 07-Sep-18
C-T08-1000 MCC Move Into Basement Area D 1 1 10-Sep-18 10-Sep-18
C-T08-1015 Frame and 1-Side Demising Wall 2 2 11-Sep-18 12-Sep-18
C-T08-1005 Abatement Pricing & Approval 8 8 11-Sep-18 20-Sep-18
C-T08-1020 Make Safe for Demo 3 3 13-Sep-18 17-Sep-18
C-T08-1030 Abatement Testing 2 2 18-Sep-18 19-Sep-18
C-T08-1025 Demo 3 3 18-Sep-18 20-Sep-18
C-T08-1035 Abatement 7 7 21-Sep-18 01-Oct-18
C-T08-1040 Post Abatement Demo 2 2 02-Oct-18 03-Oct-18
C-T08-1045 Cut Openings for New Door 2 2 02-Oct-18 03-Oct-18
C-T08-1060 Post-Demo Conference 1 1 04-Oct-18 04-Oct-18
C-T08-1050 Infill Existing Door Opening 2 2 04-Oct-18 05-Oct-18
C-T08-1055 Demo Topping Slab 5 5 04-Oct-18 10-Oct-18
C-T08-1065 Cut in Locations for New Track Lighting 2 2 05-Oct-18 08-Oct-18
C-T08-1070 Existing Ceiling Restoration 15 15 09-Oct-18 29-Oct-18
C-T08-1075 Layout & Frame Walls 5 5 30-Oct-18 05-Nov-18
C-T08-1085 Cut Slab For Mech Openings 1 1 06-Nov-18 06-Nov-18
C-T08-1080 Rough-In In Wall 5 5 06-Nov-18 12-Nov-18
C-T08-1090 Rough-In Overhead Electric 10 10 06-Nov-18 19-Nov-18
C-T08-1095 Rough-In Underfloor Mechanical 5 5 07-Nov-18 13-Nov-18
C-T08-1100 Rough-In Mechanical Piping 5 5 14-Nov-18 20-Nov-18
C-T08-1105 Rough-In Fire Suppression 8 8 19-Nov-18 30-Nov-18
C-T08-1110 Insulate Mechanical 5 5 21-Nov-18 29-Nov-18
C-T08-1115 Install Controls for Heat Pumps 3 3 30-Nov-18 04-Dec-18
C-T08-1120 In-Wall Inspections 3 3 30-Nov-18 04-Dec-18
C-T08-1125 50% Fire Marshal Inspection 0 0 30-Nov-18
C-T08-1135 Start Up of Heat Pumps 1 1 05-Dec-18 05-Dec-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Fab & Deliver - Doors & Hardware
MCC Receive / Review Submittal - Millwork
AE2 (FSB) Receive / Review Submittal - Millwork
Fab & Deliver - MIllwork
Interim Substantial Completion - 1st Floor OMES North
Construction - 1st Floor OMES North
Pre-Demo Conference
MCC Move Into Basement Area D
Frame and 1-Side Demising Wall
Abatement Pricing & Approval
Make Safe for Demo
Abatement Testing
Demo
Abatement
Post Abatement Demo
Cut Openings for New Door
Post-Demo Conference
Infill Existing Door Opening
Demo Topping Slab
Cut in Locations for New Track Lighting
Existing Ceiling Restoration
Layout & Frame Walls
Cut Slab For Mech Openings
Rough-In In Wall
Rough-In Overhead Electric
Rough-In Underfloor Mechanical
Rough-In Mechanical Piping
Rough-In Fire Suppression
Insulate Mechanical
Install Controls for Heat Pumps
In-Wall Inspections
50% Fire Marshal Inspection
Start Up of Heat Pumps
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 26 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 36: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/36.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
C-T08-1130 Hang Sheetrock 4 4 05-Dec-18 10-Dec-18
C-T08-1140 Tape / Bed / Paint Sheetrock 7 7 07-Dec-18 17-Dec-18
C-T08-1145 Install Door Frames 3 3 11-Dec-18 13-Dec-18
C-T08-1150 OMES Install LV Cabling 3 3 11-Dec-18 13-Dec-18
C-T08-1155 Install Base 3 3 13-Dec-18 17-Dec-18
C-T08-1160 Plaster in Rotunda 15 15 14-Dec-18 07-Jan-19
C-T08-1170 Install Ceiling Grid with Borders 5 5 18-Dec-18 24-Dec-18
C-T08-1165 Install Marble Tile 6 6 18-Dec-18 26-Dec-18
C-T08-1180 Overhead Device Out 3 3 20-Dec-18 24-Dec-18
C-T08-1175 Install Sub Floor 5 5 20-Dec-18 27-Dec-18
C-T08-1185 Above Ceiling Inspections 1 1 26-Dec-18 26-Dec-18
C-T08-1190 80% Fire Marshal Inspection 0 0 27-Dec-18
C-T08-1195 Drop Ceiling Tile 1 1 28-Dec-18 28-Dec-18
C-T08-1200 Install Carpet 3 3 31-Dec-18 03-Jan-19
C-T08-1205 Install Millwork 5 5 04-Jan-19 10-Jan-19
C-T08-1210 Install Countertops 2 2 11-Jan-19 14-Jan-19
C-T08-1220 Hang Doors & Install Hardware 1 1 15-Jan-19 15-Jan-19
C-T08-1215 Final Paint 6 6 15-Jan-19 22-Jan-19
C-T08-1230 OMES Activate Security & Card Access 5 5 16-Jan-19 22-Jan-19
C-T08-1225 Test & Balance 10 10 16-Jan-19 29-Jan-19
C-T08-1235 Complete MCC / FSB Punch List 2 2 28-Jan-19 29-Jan-19
C-T08-1240 100% Fire Marshal Inspection (Final) 0 0 29-Jan-19
C-T08-1245 Complete AE1 / Owner Punch List 4 4 30-Jan-19 04-Feb-19
C-T08-1250 Owner Move In 0 0 04-Feb-19
C-T08-1255 Make Safe 2 2 05-Feb-19 06-Feb-19
C-T08-1260 Demo Old OMES Office 2 2 07-Feb-19 08-Feb-19
C-T08-1265 Abatement 2 2 11-Feb-19 12-Feb-19
C-T08-1270 Remove and Repair Topping Slab 2 2 13-Feb-19 14-Feb-19
C-T08-1275 Layout and Frame Walls 1 1 15-Feb-19 15-Feb-19
C-T08-1280 Rough-In In Walls 4 4 18-Feb-19 21-Feb-19
C-T08-1285 Rough-In Overhead Mechanical 4 4 18-Feb-19 21-Feb-19
C-T08-1295 In-Wall Inspections 2 2 20-Feb-19 21-Feb-19
C-T08-1305 Rough-In Fire Suppression 2 2 22-Feb-19 25-Feb-19
C-T08-1300 Insulate Mechanical 3 3 22-Feb-19 26-Feb-19
C-T08-1290 Rough In Overhead Electric 4 4 22-Feb-19 27-Feb-19
C-T08-1315 50% Fire Marshal Inspection 0 0 25-Feb-19
C-T08-1310 Hang Sheetrock 2 2 26-Feb-19 27-Feb-19
C-T08-1320 Install Controls for Heat Pumps 2 2 27-Feb-19 28-Feb-19
C-T08-1330 Install OMES LV Cabling 2 2 28-Feb-19 01-Mar-19
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Hang Sheetrock
Tape / Bed / Paint Sheetrock
Install Door Frames
OMES Install LV Cabling
Install Base
Plaster in Rotunda
Install Ceiling Grid with Borders
Install Marble Tile
Overhead Device Out
Install Sub Floor
Above Ceiling Inspections
80% Fire Marshal Inspection
Drop Ceiling Tile
Install Carpet
Install Millwork
Install Countertops
Hang Doors & Install Hardware
Final Paint
OMES Activate Security & Card Access
Test & Balance
Complete MCC / FSB Punch List
100% Fire Marshal Inspection (Final)
Complete AE1 / Owner Punch List
Owner Move In
Make Safe
Demo Old OMES Office
Abatement
Remove and Repair Topping Slab
Layout and Frame Walls
Rough-In In Walls
Rough-In Overhead Mechanical
In-Wall Inspections
Rough-In Fire Suppression
Insulate Mechanical
Rough In Overhead Electric
50% Fire Marshal Inspection
Hang Sheetrock
Install Controls for Heat Pumps
Install OMES LV Cabling
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 27 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 37: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/37.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
C-T08-1325 Tape/Bed/Paint 4 4 28-Feb-19 05-Mar-19
C-T08-1335 Install Ceiling Grid 2 2 06-Mar-19 07-Mar-19
C-T08-1340 Overhead Device Out 3 3 08-Mar-19 12-Mar-19
C-T08-1345 Above Ceiling Inspections 2 2 13-Mar-19 14-Mar-19
C-T08-1350 80% Fire Marshal Inspection 0 0 14-Mar-19
C-T08-1355 Drop Ceiling Tiles 2 2 15-Mar-19 18-Mar-19
C-T08-1360 Install Flooring 5 5 19-Mar-19 25-Mar-19
C-T08-1365 Hang Door and Hardware 1 1 26-Mar-19 26-Mar-19
C-T08-1370 Test and Balance 1 1 27-Mar-19 27-Mar-19
C-T08-1375 OMES Activate Security and Card Access 1 1 27-Mar-19 27-Mar-19
C-T08-1380 Complete MCC/FSB Punch List 2 2 28-Mar-19 29-Mar-19
C-T08-1385 Complete 100% Fire Marshal Inspection 0 0 29-Mar-19
C-T08-1390 Complete AE1/Owner Punch List 2 2 01-Apr-19 02-Apr-19
C-T08-1395 Owner Move In 0 0 02-Apr-19
1st Floor LSB1st Floor LSB134 134 01-Aug-18 11-Feb-19
Material ProcurementMaterial Procurement75 75 01-Aug-18 14-Nov-18
OAU & Heat PumpsOAU & Heat Pumps21 21 01-Aug-18 29-Aug-18
P-T09-1000 MCC Receive/Review Submittal - Heat Pumps 1 1 01-Aug-18 01-Aug-18
P-T09-1005 AE2(FSB) Receive/Review Submittal - Heat Pumps 10 10 02-Aug-18 15-Aug-18
P-T09-1010 Fab & Deliver - Heat Pumps 10 10 16-Aug-18 29-Aug-18
Light FixturesLight Fixtures41 41 01-Aug-18 27-Sep-18
P-T09-1015 MCC Receive/Review Submittal - Lighting 1 1 01-Aug-18 01-Aug-18
P-T09-1020 AE2(FSB) Receive/Review Submittal - Lighting 10 10 02-Aug-18 15-Aug-18
P-T09-1025 Fab & Deliver - Lighting 30 30 16-Aug-18 27-Sep-18
Floor CoveringFloor Covering58 58 01-Aug-18 22-Oct-18
P-T09-1035 Buyout Flooring Labor 10 10 01-Aug-18 14-Aug-18
P-T09-1040 MCC Receive/Review Submittal - Flooring 3 3 15-Aug-18 17-Aug-18
P-T09-1045 AE2(FSB) Receive/Review Submittal - Flooring 10 10 20-Aug-18 31-Aug-18
P-T09-1055 Fab & Deliver Flooring - Tile/SVT 15 15 04-Sep-18 24-Sep-18
P-T09-1030 Fab & Deliver - Marble Tile 20 20 04-Sep-18 01-Oct-18
P-T09-1050 Fab & Deliver Flooring - Carpet 35 35 04-Sep-18 22-Oct-18
Doors / HardwareDoors / Hardware75 75 01-Aug-18 14-Nov-18
P-T09-1060 Doors & Hardware Pricing & Submittal Prep 10 10 01-Aug-18 14-Aug-18
P-T09-1065 MCC Receive / Review Submittal - Doors & Hardware 10 10 15-Aug-18 28-Aug-18
P-T09-1070 AE2 (FSB) Receive / Review Submittal - Doors & Hardware 10 10 29-Aug-18 12-Sep-18
P-T09-1075 Fab & Deliver - Door Frames 25 25 13-Sep-18 17-Oct-18
P-T09-1080 Fab & Deliver - Doors & Hardware 45 45 13-Sep-18 14-Nov-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Tape/Bed/Paint
Install Ceiling Grid
Overhead Device Out
Above Ceiling Inspections
80% Fire Marshal Inspection
Drop Ceiling Tiles
Install Flooring
Hang Door and Hardware
Test and Balance
OMES Activate Security and Card Access
Complete MCC/FSB Punch List
Complete 100% Fire Marshal Inspection
Complete AE1/Owner Punch List
Owner Move In
MCC Receive/Review Submittal - Heat Pumps
AE2(FSB) Receive/Review Submittal - Heat Pumps
Fab & Deliver - Heat Pumps
MCC Receive/Review Submittal - Lighting
AE2(FSB) Receive/Review Submittal - Lighting
Fab & Deliver - Lighting
Buyout Flooring Labor
MCC Receive/Review Submittal - Flooring
AE2(FSB) Receive/Review Submittal - Flooring
Fab & Deliver Flooring - Tile/SVT
Fab & Deliver - Marble Tile
Fab & Deliver Flooring - Carpet
Doors & Hardware Pricing & Submittal Prep
MCC Receive / Review Submittal - Doors & Hardware
AE2 (FSB) Receive / Review Submittal - Doors & Hardware
Fab & Deliver - Door Frames
Fab & Deliver - Doors & Hardware
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 28 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 38: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/38.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
MillworkMillwork40 40 01-Aug-18 26-Sep-18
P-T09-1085 MCC Receive / Review Submittal - Millwork 10 10 01-Aug-18 14-Aug-18
P-T09-1090 AE2 (FSB) Receive / Review Submittal - Millwork 10 10 15-Aug-18 28-Aug-18
P-T09-1100 Fab & Deliver - Base / Case / Crown 5 5 29-Aug-18 05-Sep-18
P-T09-1095 Fab & Deliver - MIllwork 20 20 29-Aug-18 26-Sep-18
ConstructionConstruction107 107 10-Sep-18 11-Feb-19
Schedule Driven MilestonesSchedule Driven Milestones0 0 05-Feb-19 05-Feb-19
M-T09-1000 Interim Substantial Completion - 1st Floor LSB 0 0 05-Feb-19
Construction Phase SummariesConstruction Phase Summaries122 149 10-Sep-18 05-Feb-19
S-T09-1000 Construction - 1st Floor LSB 122 149 10-Sep-18 05-Feb-19
1st Floor LSB1st Floor LSB107 107 10-Sep-18 11-Feb-19
C-T09-1000 Layout and Frame Walls for Server Room 3 3 10-Sep-18 12-Sep-18
C-T09-1005 Install Sheetrock at Server Room 1 1 13-Sep-18 13-Sep-18
C-T09-1010 Install Door into MCC Office for LSB Access During Construction 1 1 13-Sep-18 13-Sep-18
C-T09-1015 T/B/P Server Room 4 4 14-Sep-18 19-Sep-18
C-T09-1020 Re-Run Conduits and Data for Server Room 5 5 20-Sep-18 26-Sep-18
C-T09-1025 Install Flooring at Server Room 1 1 25-Sep-18 25-Sep-18
C-T09-1030 LSB Move Into MCC Office 4 4 27-Sep-18 02-Oct-18
C-T09-1035 Make Safe 3 3 03-Oct-18 05-Oct-18
C-T09-1045 Salvage Hardware, Historic Window Frames, Door Frames 2 2 08-Oct-18 09-Oct-18
C-T09-1040 Demo 2 2 08-Oct-18 09-Oct-18
C-T09-1050 Abatement Door Frames 4 4 10-Oct-18 15-Oct-18
C-T09-1055 Abatement of Asbestos 3 3 16-Oct-18 18-Oct-18
C-T09-1060 Post Abatement Demo 2 2 19-Oct-18 22-Oct-18
C-T09-1070 Post-Demo Conference 1 1 23-Oct-18 23-Oct-18
C-T09-1065 Demo Topping Slab 2 2 23-Oct-18 24-Oct-18
C-T09-1075 Layout & Frame Walls 5 5 25-Oct-18 31-Oct-18
C-T09-1095 Frame Hard Lids 3 3 01-Nov-18 05-Nov-18
C-T09-1080 Rough-In In Wall 5 5 01-Nov-18 07-Nov-18
C-T09-1085 Rough-In Overhead Mechanical 5 5 01-Nov-18 07-Nov-18
C-T09-1090 Rough-In Overhead Electric 7 7 01-Nov-18 09-Nov-18
C-T09-1100 Rough-In @ Hard Lids 5 5 06-Nov-18 12-Nov-18
C-T09-1105 Rough-In Mechanical Piping 5 5 08-Nov-18 14-Nov-18
C-T09-1110 Rough-In Fire Suppression 8 8 09-Nov-18 20-Nov-18
C-T09-1115 Hang Sheetrock @ Hardlids 2 2 13-Nov-18 14-Nov-18
C-T09-1120 Insulate Mechanical 5 5 15-Nov-18 21-Nov-18
C-T09-1125 50% Fire Marshall Inspection 0 0 20-Nov-18
C-T09-1130 Install Controls for Heat Pumps 3 3 26-Nov-18 28-Nov-18
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
MCC Receive / Review Submittal - Millwork
AE2 (FSB) Receive / Review Submittal - Millwork
Fab & Deliver - Base / Case / Crown
Fab & Deliver - MIllwork
Interim Substantial Completion - 1st Floor LSB
Construction - 1st Floor LSB
Layout and Frame Walls for Server Room
Install Sheetrock at Server Room
Install Door into MCC Office for LSB Access During Construction
T/B/P Server Room
Re-Run Conduits and Data for Server Room
Install Flooring at Server Room
LSB Move Into MCC Office
Make Safe
Salvage Hardware, Historic Window Frames, Door Frames
Demo
Abatement Door Frames
Abatement of Asbestos
Post Abatement Demo
Post-Demo Conference
Demo Topping Slab
Layout & Frame Walls
Frame Hard Lids
Rough-In In Wall
Rough-In Overhead Mechanical
Rough-In Overhead Electric
Rough-In @ Hard Lids
Rough-In Mechanical Piping
Rough-In Fire Suppression
Hang Sheetrock @ Hardlids
Insulate Mechanical
50% Fire Marshall Inspection
Install Controls for Heat Pumps
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 29 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 39: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/39.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
C-T09-1135 In-Wall Inspections 3 3 26-Nov-18 28-Nov-18
C-T09-1145 Start Up of Heat Pumps 1 1 29-Nov-18 29-Nov-18
C-T09-1140 Hang Sheetrock 7 7 29-Nov-18 07-Dec-18
C-T09-1150 Tape / Bed / Paint Sheetrock 7 7 06-Dec-18 14-Dec-18
C-T09-1155 Install Door Frames 3 3 10-Dec-18 12-Dec-18
C-T09-1160 OMES Install LV Cabling 5 5 10-Dec-18 14-Dec-18
C-T09-1165 Plaster in Rotunda 15 15 13-Dec-18 04-Jan-19
C-T09-1170 Install Ceiling Grid with Borders 5 5 17-Dec-18 21-Dec-18
C-T09-1175 Install Sub Floor 2 2 19-Dec-18 20-Dec-18
C-T09-1180 Overhead Device Out 3 3 19-Dec-18 21-Dec-18
C-T09-1190 80% Fire Marshall Inspection 0 0 21-Dec-18
C-T09-1185 Above Ceiling Inspections 3 3 24-Dec-18 27-Dec-18
C-T09-1195 Drop Ceiling Tile 2 2 28-Dec-18 31-Dec-18
C-T09-1205 Install Marble Tile 3 3 02-Jan-19 04-Jan-19
C-T09-1200 Install Trim 3 3 02-Jan-19 04-Jan-19
C-T09-1210 Install Carpet / LVT 5 5 07-Jan-19 11-Jan-19
C-T09-1215 Install Millwork 5 5 14-Jan-19 18-Jan-19
C-T09-1225 Install Shoe Molding 3 3 21-Jan-19 23-Jan-19
C-T09-1220 Install Countertops 3 3 21-Jan-19 23-Jan-19
C-T09-1235 Hang Doors & Install Hardware 4 4 24-Jan-19 29-Jan-19
C-T09-1230 Final Paint 6 6 24-Jan-19 31-Jan-19
C-T09-1245 OMES Activate Security & Card Access 3 3 30-Jan-19 01-Feb-19
C-T09-1240 Test & Balance 4 4 30-Jan-19 04-Feb-19
C-T09-1250 Complete MCC / FSB Punch List 2 2 04-Feb-19 05-Feb-19
C-T09-1255 100% Fire Marshall Inspection (Final) 0 0 05-Feb-19
C-T09-1260 Complete AE1 / Owner Punch List 4 4 06-Feb-19 11-Feb-19
C-T09-1265 Owner Move In 0 0 11-Feb-19
1st Floor Photographer1st Floor Photographer240 240 12-Feb-19 09-Oct-19
ConstructionConstruction240 240 12-Feb-19 09-Oct-19
Construction Phase SummariesConstruction Phase Summaries240 240 12-Feb-19 09-Oct-19
S-T10-1000 Construction - 1st Floor Photographer 240 240 12-Feb-19* 09-Oct-19
2nd Floor Governor2nd Floor Governor359 359 07-Jan-19 31-Dec-19
ConstructionConstruction359 359 07-Jan-19 31-Dec-19
Construction Phase SummariesConstruction Phase Summaries359 359 07-Jan-19 31-Dec-19
S-T11-1000 Construction - 2nd Floor Governor 359 359 07-Jan-19* 31-Dec-19
2nd Floor Court of Criminal Appeals2nd Floor Court of Criminal Appeals359 359 07-Jan-19 31-Dec-19
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
In-Wall Inspections
Start Up of Heat Pumps
Hang Sheetrock
Tape / Bed / Paint Sheetrock
Install Door Frames
OMES Install LV Cabling
Plaster in Rotunda
Install Ceiling Grid with Borders
Install Sub Floor
Overhead Device Out
80% Fire Marshall Inspection
Above Ceiling Inspections
Drop Ceiling Tile
Install Marble Tile
Install Trim
Install Carpet / LVT
Install Millwork
Install Shoe Molding
Install Countertops
Hang Doors & Install Hardware
Final Paint
OMES Activate Security & Card Access
Test & Balance
Complete MCC / FSB Punch List
100% Fire Marshall Inspection (Final)
Complete AE1 / Owner Punch List
Owner Move In
Construction - 1st Floor Photographer
Construction - 2nd Floor Governor
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 30 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 40: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/40.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
ConstructionConstruction359 359 07-Jan-19 31-Dec-19
Construction Phase SummariesConstruction Phase Summaries359 359 07-Jan-19 31-Dec-19
S-T12-1000 Construction - 2nd Floor Court of Criminal Appeals 359 359 07-Jan-19 31-Dec-19
2nd Floor Judicial2nd Floor Judicial302 302 03-Jun-19 30-Mar-20
ConstructionConstruction302 302 03-Jun-19 30-Mar-20
Construction Phase SummariesConstruction Phase Summaries302 302 03-Jun-19 30-Mar-20
S-T13-1000 Construction - 2nd Floor Judicial 302 302 03-Jun-19* 30-Mar-20
2nd Floor House West2nd Floor House West243 243 03-Jun-19 31-Jan-20
ConstructionConstruction243 243 03-Jun-19 31-Jan-20
Construction Phase SummariesConstruction Phase Summaries243 243 03-Jun-19 31-Jan-20
S-T14-1000 Construction - 2nd Floor House West 243 243 03-Jun-19 31-Jan-20
2nd Floor Senate North2nd Floor Senate North243 243 03-Jun-19 31-Jan-20
ConstructionConstruction243 243 03-Jun-19 31-Jan-20
Construction Phase SummariesConstruction Phase Summaries243 243 03-Jun-19 31-Jan-20
S-T15-1000 Construction - 2nd Floor Senate North 243 243 03-Jun-19 31-Jan-20
2nd Floor Treasurer2nd Floor Treasurer180 180 05-Aug-19 31-Jan-20
ConstructionConstruction180 180 05-Aug-19 31-Jan-20
Construction Phase SummariesConstruction Phase Summaries180 180 05-Aug-19 31-Jan-20
S-T16-1000 Construction - 2nd Floor Treasurer 180 180 05-Aug-19* 31-Jan-20
1st Floor Lt. Governor1st Floor Lt. Governor180 180 05-Aug-19 31-Jan-20
ConstructionConstruction180 180 05-Aug-19 31-Jan-20
Construction Phase SummariesConstruction Phase Summaries180 180 05-Aug-19 31-Jan-20
S-T17-1000 Construction - 1st Floor Lt. Governor 180 180 05-Aug-19 31-Jan-20
3rd Floor House West3rd Floor House West240 240 05-Aug-19 31-Mar-20
ConstructionConstruction240 240 05-Aug-19 31-Mar-20
Construction Phase SummariesConstruction Phase Summaries240 240 05-Aug-19 31-Mar-20
S-T18-1000 Construction - 3rd Floor House West 240 240 05-Aug-19 31-Mar-20
3rd Floor Senate North3rd Floor Senate North240 240 05-Aug-19 31-Mar-20
ConstructionConstruction240 240 05-Aug-19 31-Mar-20
Construction Phase SummariesConstruction Phase Summaries240 240 05-Aug-19 31-Mar-20
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Construction - 2nd Floor Court of Criminal Appeals
Construction - 2nd Floor Judicial
Construction - 2nd Floor House West
Construction - 2nd Floor Senate North
Construction - 2nd Floor Treasurer
Construction - 1st Floor Lt. Governor
Construction - 3rd Floor House West
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 31 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 41: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/41.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
S-T19-1000 Construction - 3rd Floor Senate North 240 240 05-Aug-19 31-Mar-20
4th Floor Senate North4th Floor Senate North177 177 06-Jan-20 30-Jun-20
ConstructionConstruction177 177 06-Jan-20 30-Jun-20
Construction Phase SummariesConstruction Phase Summaries177 177 06-Jan-20 30-Jun-20
S-T20-1000 Construction - 4th Floor Senate North 177 177 06-Jan-20* 30-Jun-20
419 A & B419 A & B177 177 06-Jan-20 30-Jun-20
ConstructionConstruction177 177 06-Jan-20 30-Jun-20
Construction Phase SummariesConstruction Phase Summaries177 177 06-Jan-20 30-Jun-20
S-T21-1000 Construction - 419 A & B 177 177 06-Jan-20 30-Jun-20
511 A511 A177 177 06-Jan-20 30-Jun-20
ConstructionConstruction177 177 06-Jan-20 30-Jun-20
Construction Phase SummariesConstruction Phase Summaries177 177 06-Jan-20 30-Jun-20
S-T22-1000 Construction - 511 A 177 177 06-Jan-20 30-Jun-20
1st Floor Art Gallery1st Floor Art Gallery177 177 06-Jan-20 30-Jun-20
ConstructionConstruction177 177 06-Jan-20 30-Jun-20
Construction Phase SummariesConstruction Phase Summaries177 177 06-Jan-20 30-Jun-20
S-T23-1000 Construction - 1st Floor Art Gallery 177 177 06-Jan-20 30-Jun-20
1st Floor Multipurpose1st Floor Multipurpose177 177 06-Jan-20 30-Jun-20
ConstructionConstruction177 177 06-Jan-20 30-Jun-20
Construction Phase SummariesConstruction Phase Summaries177 177 06-Jan-20 30-Jun-20
S-T24-1000 Construction - 1st Floor Multipurpose 177 177 06-Jan-20 30-Jun-20
5th Floor Senate North5th Floor Senate North245 245 01-Jun-20 31-Jan-21
ConstructionConstruction245 245 01-Jun-20 31-Jan-21
Construction Phase SummariesConstruction Phase Summaries245 245 01-Jun-20 31-Jan-21
S-T25-1000 Construction - 5th Floor Senate North 245 245 01-Jun-20* 31-Jan-21
5th Floor Conference Rooms South5th Floor Conference Rooms South245 245 01-Jun-20 31-Jan-21
ConstructionConstruction245 245 01-Jun-20 31-Jan-21
Construction Phase SummariesConstruction Phase Summaries245 245 01-Jun-20 31-Jan-21
S-T26-1000 Construction - 5th Floor Conference Rooms South 245 245 01-Jun-20 31-Jan-21
4th Floor House Committee North4th Floor House Committee North245 245 01-Jun-20 31-Jan-21
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Construction - 3rd Floor Senate North
Construction - 4th Floor Senate North
Construction - 419 A & B
Construction - 511 A
Construction - 1st Floor Art Gallery
Construction - 1st Floor Multipurpose
Construction - 5th Floor Senate North
Construction - 5th Floor Conference Rooms South
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 32 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 42: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/42.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
ConstructionConstruction245 245 01-Jun-20 31-Jan-21
Construction Phase SummariesConstruction Phase Summaries245 245 01-Jun-20 31-Jan-21
S-T27-1000 Construction - 4th Floor House Committee North 245 245 01-Jun-20 31-Jan-21
4th Floor Press North4th Floor Press North245 245 01-Jun-20 31-Jan-21
ConstructionConstruction245 245 01-Jun-20 31-Jan-21
Construction Phase SummariesConstruction Phase Summaries245 245 01-Jun-20 31-Jan-21
S-T28-1000 Construction - 4th Floor Press North 245 245 01-Jun-20 31-Jan-21
4th & 5th Large Conference South4th & 5th Large Conference South245 245 01-Jun-20 31-Jan-21
ConstructionConstruction245 245 01-Jun-20 31-Jan-21
Construction Phase SummariesConstruction Phase Summaries245 245 01-Jun-20 31-Jan-21
S-T29-1000 Construction - 4 & 5th Large Conference South 245 245 01-Jun-20 31-Jan-21
4th Floor House West4th Floor House West245 245 01-Jun-20 31-Jan-21
ConstructionConstruction245 245 01-Jun-20 31-Jan-21
Construction Phase SummariesConstruction Phase Summaries245 245 01-Jun-20 31-Jan-21
S-T30-1000 Construction - 4th Floor House West 245 245 01-Jun-20 31-Jan-21
5th Floor House West5th Floor House West245 245 01-Jun-20 31-Jan-21
ConstructionConstruction245 245 01-Jun-20 31-Jan-21
Construction Phase SummariesConstruction Phase Summaries245 245 01-Jun-20 31-Jan-21
S-T31-1000 Construction - 5th Floor House West 245 245 01-Jun-20 31-Jan-21
6th Floor House West6th Floor House West245 178 04-Jan-21 30-Jun-21
ConstructionConstruction245 178 04-Jan-21 30-Jun-21
Construction Phase SummariesConstruction Phase Summaries245 178 04-Jan-21 30-Jun-21
S-T32-1000 Construction - 6th Floor House West 245 178 04-Jan-21* 30-Jun-21
Senate ChambersSenate Chambers245 245 01-Jun-21 31-Jan-22
ConstructionConstruction245 245 01-Jun-21 31-Jan-22
Construction Phase SummariesConstruction Phase Summaries245 245 01-Jun-21 31-Jan-22
S-T33-1000 Construction - Senate Chambers 245 245 01-Jun-21* 31-Jan-22
House ChambersHouse Chambers245 245 01-Jun-21 31-Jan-22
ConstructionConstruction245 245 01-Jun-21 31-Jan-22
Construction Phase SummariesConstruction Phase Summaries245 245 01-Jun-21 31-Jan-22
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Construction - 4th Floor House Committee North
Construction - 4th Floor Press North
Construction - 4 & 5th Large Conference South
Construction - 4th Floor House West
Construction - 5th Floor House West
Construction - 6th Floor House West
Construction - Senate Chambers
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 33 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 43: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/43.jpg)
Activity ID Activity Name Orig Dur
RemDur
Start Finish
S-T34-1000 Construction - House Chambers 245 245 01-Jun-21 31-Jan-22
J J A S J A J J A S J A J J AS J A J J A J A J J A J A J J
2018 2019 2020 2021 2022 2023
Construction - House Chambers
Start Date 23-Feb-15
Finish Date 30-Dec-22
Data Date 18-Jul-18
Run Date 25-Jul-18
Page 34 of 34
3707-CR40
TASK filter: Not Complete.
Actual Level of Effort
Actual Work
Remaining Work
Suspension
Remaining LOE
Critical Remaining Work
Milestone
Critical Milestones
Oklahoma Capitol Restoration-Interior RehabiliationOklahoma City, Oklahoma
MCC Project #3707
![Page 44: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/44.jpg)
RFI LOG
SECTION 4
Monthly Progress Report – Oklahoma Capitol Restoration April 2018
4-2
RFI’s
RFI LOG
RFI’s
018-R001
Capitol Maintenance - Water Infiltration 4/27/2016 5/12/2016 Not Sure5/17/2016Manhattan Construction Company
Mass Architects, Inc.
019 Structual Load 12/16/2015 12/22/2015 Not Sure12/23/2015Manhattan Construction Company
Frankfurt Short Bruza
020 H 109 Dog House Electrical Panel 4/25/2016 5/11/2016 Not Sure5/2/2016Manhattan Construction Company
Frankfurt Short Bruza
021 Window Infill 5/10/2016 5/17/2016 Not Sure5/12/2016Manhattan Construction Company
Frankfurt Short Bruza
022 Structural Infill Confirmation 5/11/2016 7/11/2016 Not Sure5/13/2016Manhattan Construction Company
Frankfurt Short Bruza
023 Mounting Heights 5/17/2016 5/19/2016 Not Sure5/24/2016Manhattan Construction Company
Frankfurt Short Bruza
024 Plaster at Rotunda 5/17/2016 5/19/2016 Not Sure5/20/2016Manhattan Construction Company
Frankfurt Short Bruza
025 Confirmation of Ceiling Height Room 109.11 5/17/2016 5/19/2016 No5/24/2016Manhattan Construction Company
Frankfurt Short Bruza
026 New Duct Chase Location 5/17/2016 5/19/2016 No5/20/2016Manhattan Construction Company
Frankfurt Short Bruza
027 Door 109.45 Swing Change 6/2/2016 6/3/2016 Not Sure6/9/2016Manhattan Construction Company
Frankfurt Short Bruza
028 Slab Penetration at Duct Chase 6/2/2016 6/21/2016 Not Sure6/10/2016Manhattan Construction Company
Frankfurt Short Bruza
029 Column Framing at Exterior Walls 6/2/2016 6/8/2016 Not Sure6/9/2016Manhattan Construction Company
Frankfurt Short Bruza
030 Structural In-fill Detail for NW Dog house 6/21/2016 6/24/2016 Not Sure6/24/2016Manhattan Construction Company
Frankfurt Short Bruza
031 109 Entry Clerk Return Air 6/29/2016 7/8/2016 Not Sure7/6/2016Manhattan Construction Company
Frankfurt Short Bruza
032 Urinal Mounting Heights 8/11/2016 8/17/2016 Not Sure8/18/2016Manhattan Construction Company
Frankfurt Short Bruza
RFI # Subject Author
Company
Answer
Company
Date
Created
Date
Req'd
Date Resp Dwg
Impact
033 Guardrails at Rotunda 10/4/2016 11/17/2016 Not Sure10/11/2016Manhattan Construction Company
Mass Architects, Inc.
034 Future Fiber Distribution Plans 10/10/2016 Not Sure10/17/2016Manhattan Construction Company
Mass Architects, Inc.
035 Elevator Pit Infill - Area 4 10/14/2016 11/4/2016 Not Sure10/21/2016Manhattan Construction Company
Frankfurt Short Bruza
036 Partial Footing Removal for Electrical Trenching 1/16/2017 1/27/2017 Not Sure1/23/2017Manhattan Construction Company
Frankfurt Short Bruza
7/10/2017
May 2018 June 2018 July 2018
![Page 45: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/45.jpg)
RFI LOG
SECTION 4
Monthly Progress Report – Oklahoma Capitol Restoration April 2018
4-3
RFI’s
RFI’s
Company
037 State Capitol Grounding 1/24/2017 1/27/2017 Not Sure1/31/2017Manhattan Construction Company
Frankfurt Short Bruza
038 Ground Rod Access Well 1/25/2017 2/20/2017 Not Sure2/1/2017OESCO Frankfurt Short Bruza
039 3.2 - Structural Clarifications 2/6/2017 2/21/2017 Not Sure2/13/2017Basden Steel Corporation Frankfurt Short Bruza
040 Variable Frequency Motor Controllers 2/9/2017 2/20/2017 Not Sure2/16/2017Manhattan Construction Company
Frankfurt Short Bruza
041 3.2 - Structural Clarifications 2/9/2017 2/21/2017 Not Sure2/16/2017Basden Steel Corporation Frankfurt Short Bruza
042 Structural Steel Connection 2/9/2017 2/22/2017 Not Sure2/16/2017Manhattan Construction Company
Frankfurt Short Bruza
043 3.2 - Stair Loads and Serviceability Confirmation 2/10/2017 2/22/2017 Not Sure2/17/2017Manhattan Construction Company
Frankfurt Short Bruza
044 Temporary Smoke Evacuation 2/14/2017 2/16/2017 Not Sure2/21/2017Manhattan Construction Company
Frankfurt Short Bruza
045 Miscellaneous Mechanical Piping Insulation 2/14/2017 2/20/2017 Not Sure2/21/2017Matherly Mechanical Contractors, LLC
Frankfurt Short Bruza
046 3.2 Stair and Railing Details 2/14/2017 2/22/2017 Not Sure2/21/2017Manhattan Construction Company
Frankfurt Short Bruza
047 3.2 Damper Clarifications 2/15/2017 2/16/2017 Not Sure2/22/2017Manhattan Construction Company
Frankfurt Short Bruza
048 3.2 Beam to Column Connection in Generator Area 2/21/2017 2/21/2017 Not Sure2/28/2017Manhattan Construction Company
Frankfurt Short Bruza
049 3.2 HSS8x4 Connections 2/24/2017 2/28/2017 Not Sure3/3/2017Manhattan Construction Company
Frankfurt Short Bruza
049-R001
3.2 HSS8x4 Connections 2/27/2017 3/13/2017 Not Sure3/6/2017Manhattan Construction Company
Frankfurt Short Bruza
050 3.2 - G-5 Diffuser Specification 2/24/2017 2/28/2017 Not Sure3/3/2017Manhattan Construction Company
Frankfurt Short Bruza
051 3.2 Duct Transition 2/28/2017 3/2/2017 Not Sure3/7/2017Manhattan Construction Company
Frankfurt Short Bruza
RFI # Subject Author
Company
Answer
Company
Date
Created
Date
Req'd
Date Resp Dwg
Impact
052 5th Floor SW Doghouse EM Bus Duct and Spiral Stair Conflict 3/8/2017 3/15/2017 Yes3/15/2017OESCO Frankfurt Short Bruza
053 3.2 FS Dampers at SW Doghouse 3/17/2017 3/22/2017 Not Sure3/24/2017Manhattan Construction Company
Frankfurt Short Bruza
054 RFI 054 - Electrical Panels BSE1 and BSE2 - Location Confirmation Request
3/30/2017 4/3/2017 Not Sure4/6/2017Manhattan Construction Company
Frankfurt Short Bruza
055 3.2 - Concrete Lintel at SW Elevator 4/3/2017 Not Sure4/10/2017Manhattan Construction Company
Frankfurt Short Bruza 4/14/2017
May 2018 June 2018 July 2018
![Page 46: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/46.jpg)
RFI LOG
SECTION 4
Monthly Progress Report – Oklahoma Capitol Restoration April 2018
4-4
RFI’s
RFI LOG
RFI’s
Company
056 3.2 - Supply Grille Elevations at SW doghouse 4/4/2017 4/7/2017 Not Sure4/10/2017Manhattan Construction Company
Frankfurt Short Bruza
057 3.2 - Fire Smoke Damper at G-5 Supply Grille 4/5/2017 4/14/2017 Not Sure4/12/2017Manhattan Construction Company
Frankfurt Short Bruza
058 3.2 Steel Framing for ACCU's 4/13/2017 5/8/2017 Not Sure4/13/2017Manhattan Construction Company
Frankfurt Short Bruza
059 3.2 - Supply Air Duct Conflict in SW Doghouse 4/17/2017 4/28/2017 Not Sure4/24/2017Manhattan Construction Company
Frankfurt Short Bruza
060 3.2 - Slab Cores in SW Doghouse 4/19/2017 5/8/2017 Not Sure4/26/2017Manhattan Construction Company
Frankfurt Short Bruza
061 3.2 - Column to Beam Connx in SW Doghouse 5/5/2017 5/8/2017 Not Sure5/12/2017Manhattan Construction Company
Frankfurt Short Bruza
062 3.3 - Detail at Coffered Ceiling 5/9/2017 5/17/2017 Not Sure5/16/2017Manhattan Construction Company
Frankfurt Short Bruza
063 3.3 - Millwork Conflict in Office 122.5 5/9/2017 5/15/2017 Not Sure5/16/2017Manhattan Construction Company
Frankfurt Short Bruza
064 Clay Masonry Endwall Support 5/22/2017 6/23/2017 Not Sure5/29/2017Manhattan Construction Company
Frankfurt Short Bruza
065 Outside Air Wall Penetration Reinforcement 5/22/2017 6/9/2017 Not Sure5/29/2017Manhattan Construction Company
Frankfurt Short Bruza
066 Granite Removal for Waterproofing at Generator Areaway 5/24/2017 6/2/2017 Not Sure5/31/2017Manhattan Construction Company
Mass Architects, Inc.
067 3.2 & 3.3 - Finish Clarification 6/1/2017 6/8/2017 Not Sure6/8/2017Manhattan Construction Company
Frankfurt Short Bruza
068 3.3 - K1 Substitution in Area 122 6/22/2017 7/7/2017 Not Sure6/29/2017Manhattan Construction Company
Frankfurt Short Bruza
069 1SE1 Panel Clarification 6/28/2017 7/7/2017 Not Sure7/5/2017Manhattan Construction Company
Frankfurt Short Bruza
070 Dowels for Walls at Generator Areaway 6/28/2017 6/28/2017 Not Sure7/5/2017Manhattan Construction Company
Frankfurt Short Bruza
071 Generator Room Roof Structure Rust Remediation 7/5/2017 7/21/2017 No7/12/2017Manhattan Construction Frankfurt Short Bruza
Company
RFI # Subject Author
Company
Answer
Company
Date
Created
Date
Req'd
Date Resp Dwg
Impact
Company
072 Existing Beam Conflict for 6th Floor Framing 7/12/2017 7/14/2017 Not Sure7/19/2017Manhattan Construction Company
Frankfurt Short Bruza
073 East Elevator Rail to Beam Connection 7/13/2017 7/14/2017 Not Sure7/20/2017Manhattan Construction Company
Frankfurt Short Bruza
074 Fabric Wall Panels & Acoustic Plaster 7/20/2017 Not Sure7/27/2017Manhattan Construction Company
7/28/2017
May 2018 June 2018 July 2018
![Page 47: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/47.jpg)
RFI LOG
SECTION 4
Monthly Progress Report – Oklahoma Capitol Restoration April 2018
4-5
RFI’s
RFI LOG
RFI’s
Company
075 Stair Details at Machine Room 7/24/2017 8/22/2017 Not Sure7/31/2017Manhattan Construction Company
Frankfurt Short Bruza
076 Generator Exhaust Installation 7/31/2017 8/7/2017 Not Sure8/7/2017Manhattan Construction Company
Frankfurt Short Bruza
077 Generator Pad Detail 8/1/2017 8/11/2017 Not Sure8/8/2017Manhattan Construction Company
Frankfurt Short Bruza
078 Shower Wall in Men's G2.1 8/4/2017 8/14/2017 Not Sure8/11/2017Manhattan Construction Company
Mass Architects, Inc.
079 FSD's at Roof Penetrations 8/28/2017 8/29/2017 Not Sure9/4/2017Manhattan Construction Company
Frankfurt Short Bruza
81Total Number of RFIs for this project: 0
Total Created Total Outstanding
Company
Company
RFI # Subject Author
Company
Answer
Company
Date
Created
Date
Req'd
Date Resp Dwg
Impact
080 4.1 Structural Infill Clarifications 9/7/2017 9/15/2017 Not Sure9/14/2017Manhattan Construction Company
Frankfurt Short Bruza
82Total Number of RFIs for this project: 0
Total Created Total Outstanding
081 Ladder in SW Elevator Pit 10/3/2017 10/12/2017 Not Sure10/10/2017Manhattan Construction Company
Frankfurt Short Bruza
082 Clip Detail Near Existing Column 10/9/2017 10/24/2017 Not Sure10/16/2017Manhattan Construction Company
Frankfurt Short Bruza
84Total Number of RFIs for this project: 0
Total Created Total Outstanding
083 West Entry Structural Beam Repair 11/8/2017 11/14/2017 Not Sure11/15/2017Manhattan Construction Company
Frankfurt Short Bruza
084 Grout and Joint Sealant Color Confirmation 11/9/2017 11/15/2017 Not Sure11/16/2017Manhattan Construction Company
Frankfurt Short Bruza
085 CMU Demo at State Finance 1/10/2018 1/22/2018 Not Sure1/17/2018Manhattan Construction Company
Frankfurt Short Bruza
086 Existing Beam at 4th Floor NE Stair 1/22/2018 Not Sure1/29/2018Manhattan Construction Company
Frankfurt Short Bruza
88Total Number of RFIs for this project: 1
Total Created Total Outstanding
0
2/19/2018
087 Detail 5/3.2-SF105 3/22/2018 4/5/2018 Not Sure3/29/2018Manhattan Construction Company
Frankfurt Short Bruza
088 Heat Pump for G15 IT Room & NE Stairwell 3/27/2018 3/28/2018 Not Sure4/3/2018Manhattan Construction Company
Frankfurt Short Bruza
089 3.2 Structural Detail Clarification 3/30/2018 4/5/2018 Not Sure4/6/2018Manhattan Construction Company
Frankfurt Short Bruza
090 ASI 015 Structural Clarifications 4/6/2018 Not Sure4/13/2018Manhattan Construction Frankfurt Short BruzaCompany
091 SS Riser/Main Tie-in 4/10/2018 4/13/2018 Not Sure4/17/2018Manhattan Construction Company
Frankfurt Short Bruza
092 NE Stair Stringer to Tube Connection 5/1/2018 5/1/2018 Not Sure5/8/2018Manhattan Construction Company
Frankfurt Short Bruza
4/11/2018
May 2018 June 2018 July 2018
![Page 48: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/48.jpg)
RFI LOG
SECTION 4
Monthly Progress Report – Oklahoma Capitol Restoration April 2018
4-6
093 NW Doghouse - Connection Conflict Under Existing Beam 5/2/2018 Not Sure5/9/2018Manhattan Construction Company
Frankfurt Short Bruza
95Total Number of RFIs for this project: 1
Total Created Total Outstanding
Company
Company
094 NE Stair - 4th Floor Stringer to Beam Connection 5/8/2018 5/8/2018 Not Sure5/15/2018Manhattan Construction Company
Frankfurt Short Bruza
095 NW Doghouse - 1st Floor W10x22 Revision 5/29/2018 Not Sure6/5/2018Manhattan Construction Company
Frankfurt Short Bruza
97Total Number of RFIs for this project: 1
Total Created Total Outstanding
May 2018
5/21/2018
096 NE Stair Landing Support Relocation 6/6/2018 6/12/2018 Not Sure6/13/2018Manhattan Construction Company
Frankfurt Short Bruza
097 Level 4 Existing Slab Beneath NE Stair 6/12/2018 Not Sure6/19/2018Manhattan Construction Company
Frankfurt Short Bruza
098 NW Doghouse Additional Slab Support 6/28/2018 Not Sure7/5/2018Manhattan Construction Company
Frankfurt Short Bruza
100Total Number of RFIs for this project: 2
Total Created Total Outstanding
6/8/2018
June 2018
099 Hood Fire Suppression - Change Request 7/17/2018 8/6/2018 Not Sure7/24/2018Manhattan Construction Company
Frankfurt Short Bruza
100 NW Doghouse 4th Floor Slab Support 7/19/2018 Not Sure7/26/2018Manhattan Construction Company
Frankfurt Short Bruza
101 C15x33.9 Moved to Avoid Existing Bus Duct 7/31/2018 Not Sure8/7/2018Manhattan Construction Company
Frankfurt Short Bruza
102 Ground Floor - North Wing - Exterior Wall Penetrations 8/6/2018 Not Sure8/13/2018Manhattan Construction Company
103 Handrails - 4.1-A-501 and on 6.0-A-405 8/8/2018 Not Sure8/15/2018Manhattan Construction Company
Frankfurt Short Bruza
104 KEF-01 VFD Location 8/8/2018 8/10/2018 Not Sure8/15/2018Manhattan Construction Company
Frankfurt Short Bruza
106Total Number of RFIs for this project: 4
Total Created Total Outstanding
7/10/2018
7/11/2018
RFI LOG
RFI’s
RFI LOG
RFI’s
Company
Company
RFI # Subject Author
Company
Answer
Company
Date
Created
Date
Req'd
Date Resp Dwg
Impact
093 NW Doghouse - Connection Conflict Under Existing Beam 5/2/2018 Not Sure5/9/2018Manhattan Construction Company
Frankfurt Short Bruza
95Total Number of RFIs for this project: 1
Total Created Total Outstanding
Company
Company
094 NE Stair - 4th Floor Stringer to Beam Connection 5/8/2018 5/8/2018 Not Sure5/15/2018Manhattan Construction Company
Frankfurt Short Bruza
095 NW Doghouse - 1st Floor W10x22 Revision 5/29/2018 Not Sure6/5/2018Manhattan Construction Company
Frankfurt Short Bruza
97Total Number of RFIs for this project: 1
Total Created Total Outstanding
5/21/2018
096 NE Stair Landing Support Relocation 6/6/2018 6/12/2018 Not Sure6/13/2018Manhattan Construction Company
Frankfurt Short Bruza
097 Level 4 Existing Slab Beneath NE Stair 6/12/2018 Not Sure6/19/2018Manhattan Construction Company
Frankfurt Short Bruza
098 NW Doghouse Additional Slab Support 6/28/2018 Not Sure7/5/2018Manhattan Construction Company
Frankfurt Short Bruza
100Total Number of RFIs for this project: 2
Total Created Total Outstanding
6/8/2018
099 Hood Fire Suppression - Change Request 7/17/2018 8/6/2018 Not Sure7/24/2018Manhattan Construction Company
Frankfurt Short Bruza
100 NW Doghouse 4th Floor Slab Support 7/19/2018 Not Sure7/26/2018Manhattan Construction Company
Frankfurt Short Bruza
101 C15x33.9 Moved to Avoid Existing Bus Duct 7/31/2018 Not Sure8/7/2018Manhattan Construction Company
Frankfurt Short Bruza
102 Ground Floor - North Wing - Exterior Wall Penetrations 8/6/2018 Not Sure8/13/2018Manhattan Construction Company
103 Handrails - 4.1-A-501 and on 6.0-A-405 8/8/2018 Not Sure8/15/2018Manhattan Construction Company
Frankfurt Short Bruza
104 KEF-01 VFD Location 8/8/2018 8/10/2018 Not Sure8/15/2018Manhattan Construction Company
Frankfurt Short Bruza
106Total Number of RFIs for this project: 4
Total Created Total Outstanding
7/10/2018
7/11/2018
July 2018
![Page 49: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/49.jpg)
OUTSTANDING SUBMITTAL LOG
SECTION 5
Monthly Progress Report – Oklahoma Capitol Restoration July 2018
5-1
Submittals
Capitol Interior Restoration Project # 37072300 N Lincoln Blvd. Oklahoma City, OK 73105 Tel: 405-521-2147 Fax:
Number-Rev From Company Description To Company Sent Due Rec'd ActionDays +/-
Mass Architects, Inc.
00001-10 2800-0 Manhattan Construction Company Visitor Center - Toilet Accessories Product Data and Shop Drawings
Mass Architects, Inc. 7/27/2018 8/10/2018 Action Pending
-120003-22 4216.16-0
Manhattan Construction Company 6.0 Commercial Sinks Mass Architects, Inc. 8/8/2018 8/22/2018 Action Pending
-120003-09 5113-1 Manhattan Construction Company 6.0 Acoustical Panel Ceilings Mass Architects, Inc. 8/8/2018 8/22/2018 Action Pending
-120019-26 5119-0 Manhattan Construction Company 6.0 - LED Interior Lighting - H12 Mass Architects, Inc. 8/8/2018 8/22/2018 Action Pending
170030-00 4253-0 Manhattan Construction Company 15151DB Phase 6.0 100% CD's Mass Architects, Inc. 7/10/2018 7/24/2018 Action Pending
5Number of Submittal Packages in this Project:
![Page 50: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/50.jpg)
PROGRESS PHOTOS
SECTION 6
Monthly Progress Report – Oklahoma Capitol Restoration
July 2018
6-1
Food Service - Framing Ongoing
Pictured Right: Dome Ceiling
framing in Entry GN.5A
Pictured Below: Ceiling
framing in Dining G22.2
Pictured Right: Prep for topping
slab in Kitchen G22.1.
![Page 51: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/51.jpg)
PROGRESS PHOTOS
SECTION 6
Monthly Progress Report – Oklahoma Capitol Restoration July 2018
6-2
Area D - Exhibit Space Underground Plumbing
Pictured: Underground plumbing
taking place after the old concrete
slab was demo’d. New concrete slab
was placed back once underground
plumbing was completed.
![Page 52: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/52.jpg)
PROGRESS PHOTOS
SECTION 6
Monthly Progress Report – Oklahoma Capitol Restoration July 2018
6-3
NW Elevator/Doghouse Construction
The structure for the new NW
elevator has been installed from
Ground floor to the machine room
level. Pictured left is the new
elevator machine room structure.
Pictured above: Steel decking and
wire mesh installed in the 1st floor
doghouse to provide a new slab,
replacing the old grated flooring.
![Page 53: same manner as base stone Oklahoma Capitol Restoration Projectcapitolrestore.ok.gov/wp-content/uploads/2018/08/... · 7/8/2018 · Cover Letter Tab 1 Executive Summary Tab 2 Preconstruction](https://reader034.vdocuments.mx/reader034/viewer/2022052100/60397f5f26b6ce7a6756875f/html5/thumbnails/53.jpg)
PROGRESS PHOTOS
SECTION 6
Monthly Progress Report – Oklahoma Capitol Restoration July 2018
6-4
4th and 5th Floor Senate Construction
Pictured Left: All demo complete at the
4th and 5th floor Senate wings, ready to
begin framing.
Pictured Left: Plaster repair and
historic door frame restoration.
Pictured Right: Metal stud framing
ongoing at 4th and 5th Senate wings.