salient issues related to the first planning exercise and the production of the draft plan
DESCRIPTION
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the African countries Dakar, Senegal, 25-29 April 2005. Salient issues related to the first planning exercise and the production of the draft plan. Pham Nhu Hai Radiocommunication Bureau. Outline. - PowerPoint PPT PresentationTRANSCRIPT
-
Regional Information Meeting and Workshop relatedto the RRC-06 for the administrations of the African countriesDakar, Senegal, 25-29 April 2005Salient issues related to the first planning exercise and the production of the draft plan Pham Nhu HaiRadiocommunication Bureau
-
OutlineInput requirementsReference situationPublication of input dataPublication of results of planning exerciseAdministrative declarationsRegulatory issues
-
Input requirements First PXDeadline - 28 February 200584 administrations submitted digital requirements36 administrations did not submit32 in Africa2 in Europe2 in RCC
-
Some statistics (in progress)1212 files63213 notices2842 DS11735 DS220102 DT132612 DT25922 DA1
-
Validation and correctionStill in progressApproximately 30% of the notices require correction
-
Common errorsOrigin of analogue of assignment wrongly referenced or not exists!Geographical coordinatesDuplicate identifiersIncoherent SFN ID
-
Common errors..Non-matching maximum effective heightRadiation pattern not normalisedAllotments notified without allotment areasNo value for frequency block or acceptable channel
-
Common errors..Crossing segments in the definition of sub allotment areasWrong file format!
-
Validation of input requirementsIn progressBR to write to administrations in required30 May 2005 at the latest, requirements validated and correctedPXT to carry out the first planning exercise
-
Reference situationCR/230 of 17 December 2005Broadcasting assignmentsST61 and GE89 assignments unless indicated NOT to be taken into accountRCC listsMIFR by 31 Dec 1989Non- duplicatesindicated NOT to be taken into account
-
Broadcasting reference data120 administrations concernedAll BT excluded : AUT, BEL, D, DNK, EST, F, FIN, G, HNG, HOL, I, LIE, LTU, LVA, NOR, POR, S, SUI HRV (1154 out of 1272)IRL (all UHF and < 100 kW in VHFKEN (BT above 62, 155 out of 417)
-
Other services40 administrations concernedNumber of assignments of Categories I and II: ~8996.Number of assignments of Category III: ~3170.
-
Other services reference data7 administrations excluded their assignments: TUR, POL, DNK, E, MDA, NOR, D.8 administrations submitted R06 notice: BEL, BLR, F, G, RUS, UAE, UKR, UZB.UAE and UZB didnt submit Service type code.
-
Other servicesISR requested the inclusion of their assignments, but not provided R06 notices.KEN (no existing assignments), CME (R06 data for assignments outside the frequency bands).
-
Other services6 administrations having AR 11 notices not yet published in part 2 or 3 of the BR IFIC: BLR (13), F (4), JOR (541), RUS (336), UKR (333), UZB (28). 8 administrations having assignments of category III: ARM (3), BLR (129), IRN (28), ISR (777), JOR (1168), KGZ (13), RUS (1021), UZB (28).
-
Other servicesNo information concerning the Service Type Code in response to BR circular and individual letters was received so far from: 23 administrations (ARM, ARS, BHR, COD, CYP, EGY, ETH, GRC, I, IRN, ISL, JOR, KGZ, KWT, LBY, MOZ, MRC, OMA, POR, QAT, TJK, TZA, USA).
-
Publication of input data - first PX31 May 2005CD-ROM + software to be sent to all administrationsInput data available on ITU website Download softwareView if internet connection available
-
The first planning exercisePXT to carry out planning exercise and other studiesCompatibility analysisSynthesisPreliminary results Submitted to IPG (4-8 July 2005)Published on CD-ROM and ITU website
-
Publication of results first PX15 July 2005CD-ROM + software to be sent to all administrationsInput data available on ITU website Download softwareView if internet connection available
-
Digital requirements coverage!!
-
For one channel!
-
Analogue BC coverage
-
Digital requirements
-
Analysis results
-
Interference analysis
-
Interference from analogue BC
-
Synthesis resultsSearch for requirements that got a channel by specifying selection criteria Identify a requirement that did not get a channel and display surrounding requirements that did get a channel
-
Synthesis resultsIdentify a geographic area or a set of geographic areas and display all requirements that got a channel
-
More featuresLink input and output softwareCompatibility calculations on the run!Display pre-coordination data and administrative declarationsOn-lineExport data to other formats
-
Analysis of results first PXAdministrations have 3.5 months toAnalyse resultsCoordinate with neighbouring administrationsPrepare input requirements for production of the draft plan.Submit administrative declarations
-
Production of the draft Plan31 Oct 05 reference situation date and deadline for submission of input requirements.31 Jan 06 publication of input data13-17 Feb 06 IPG second meeting28 Feb 06 publication of the draft plan2 months administrations to analyse
-
The second session15 May 16 June 2006
The NEW agreement!!!
-
CoordinationPre-coordination submitted with requirementsAdministrative declarationsTwo requirements from one or two administrations to be compatibleTwo requirements from one or two administrations to be incompatible
-
Admin declarationsAdministrative declarationsA requirement may use a particular channel.A requirement may NOT use a particular channelThe mechanisms should be preferablySimplepracticable
-
Regulatory issuesIssuesTransition periodModification procedureFlexibility to accommodate new technologyForumsRegional groupsSWG1 New AgreementRevise ST61 and GE89RPG December 2005
-
Dont forget regulatory issuesMust participateMust follow the issuesDont wait till second session
-
Conclusions31 October 2005Work with your neighboursVisit www.itu.int regularlyUpdated softwareNews flashesPresentations from previous workshopsFAQContact us if you have any questions!!
-
Thank you for your attention!