saint john safe clean drinking water project · local and provincial companies founding companies...

2
Main Figures: June 2017 Saint John Harbour South Bay Manawagonish Cove Saint John River Sand Bank Hill Rockwood Park Lakewood Heights Pump Station The project involves the renewal of part of the water distribuon system in the city and consists of a drinking water plant with a capacity of 75 million liters per day and a storage capacity of 33 million liters. To date 5,678 cubic meters of concrete has been poured. The Well House structure, located in West Saint John, structure has been completed along with the generators being set, the pumps have been installed and the electrical and instrumentation is underway. The project also covers improvements to the existing water distribution, disinfection and pumping systems. To date 12.8 kilometers of pipe has been installed and 3.2 kilometers of pipe has been rehabilitated. © ACCIONA S.A. All rights reserved. June 2017 Saint John Safe Clean Drinking Water Project Design, construction, operation, rehabilitation and financing of watershed (water source) and transmission (water pipe) improvements, a new drinking water treatment facility and water storage facilities, industrial system improvements in East Saint John, and the implementation of a groundwater system and treatment in West Saint John. The project’s total net present value (NPV) is $216.8 million Canadian dollars. MONEY SPENT IN SAINT JOHN AND PROVINCIALLY $92.1M NUMBER OF SAFETY ORIENTATIONS 1361 NUMBER OF LOCAL MAN HOURS WITHOUT A LOST TIME INCIDENT 461,236 VEHICLE PURCHASED 17 AVERAGE DAILY WORKERS ON THE PROJECT 172 LOCAL WORKFORCE INVOLVED WITH THE PROJECT 775 Proposed Rehabilitated Water Mains Proposed New Water Mains Water Treatment Plant Site (WTP) 4-6 4-5 5-3 5-3 5-3 5-2 5-1 4-3 4-4 4-4 4-2 4-1 1-1 2-1

Upload: others

Post on 25-Jun-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Saint John Safe Clean Drinking Water Project · Local and Provincial Companies Founding Companies Construction Activities - FCC (Saint John) • JH Waterproofing and Air Barrier

Main Figures: June 2017

Saint John

Harbour

SouthBay

ManawagonishCove

Saint JohnRiver

Sand BankHill

RockwoodPark

LakewoodHeights Pump

Station

• The project involves the renewal ofpart of the water distribution systemin the city and consists of a drinkingwater plant with a capacity of 75million liters per day and a storagecapacity of 33 million liters.

• To date 5,678 cubic metersof concrete has been poured.

• The Well House structure,located in West Saint John,structure has beencompleted along with thegenerators being set, thepumps have been installedand the electrical andinstrumentation is underway.

• The project also coversimprovements to the existing waterdistribution, disinfection andpumping systems. To date 12.8kilometers of pipe has beeninstalled and 3.2 kilometers of pipehas been rehabilitated.

© ACCIONA S.A. All rights reserved. June 2017

Saint John Safe Clean DrinkingWater ProjectDesign, construction, operation, rehabilitation and financing of watershed (water source) and transmission (water pipe) improvements, a new drinking water treatment facility and water storage facilities, industrial system improvements in East Saint John, and the implementation of a groundwater system and treatment in West Saint John. The project’s total net present value (NPV) is $216.8 million Canadian dollars.

MONEY SPENT INSAINT JOHN AND

PROVINCIALLY

$92.1M

NUMBER OFSAFETY ORIENTATIONS

1361

NUMBER OF LOCALMAN HOURS WITHOUTA LOST TIME INCIDENT

461,236

VEHICLEPURCHASED

17

AVERAGE DAILY WORKERSON THE PROJECT

172

LOCAL WORKFORCEINVOLVED WITH

THE PROJECT

775

Proposed Rehabilitated Water Mains

Proposed New Water Mains

Water Treatment Plant Site (WTP)

4-6

4-5

5-35-3 5-3

5-2

5-1

4-3

4-4

4-4

4-24-1

1-1

2-1

Page 2: Saint John Safe Clean Drinking Water Project · Local and Provincial Companies Founding Companies Construction Activities - FCC (Saint John) • JH Waterproofing and Air Barrier

© A

CCIO

NA

S.A.

All

right

s res

erve

d. Ju

ne 2

017

www.acciona.ca

Local and Provincial Companies

Founding Companies

Construction Activities

- FCC (Saint John)• JH Waterproofing and Air Barrier (Tree Harvesting) - Saint John• Spectrum Enterprises – (Clearing, Grubbing & Blasting) - Saint John• Fundy Fencing (Fencing) - Saint John• Thomas Construction (Construction) - Saint John

June

201

7 Ju

ne 2

017

- Amec Foster Wheeler (Designer) - Fredericton/Toronto- Stantec Consulting (Designer) - Montreal/Saint John

- Port City Water Partners (PCWP) / ACCIONA• Crandall Engineering Ltd (Pipe Report & Design Audit) - Saint John• Revolution Strategy (Media & Communication) - Saint John• Hughes (Surveys) - Saint John• Wolseley (Pipework, fittings, valves & ancillary items) - Saint John• Raytek/Royal Environmental Incorporated (Pipe Surveys) - Saint John• Safety First (Traffic Control) - Saint John

- North American Construction (Ontario) • Gemtec (Materials Testing Services) - Saint John• Hughes Surveys & Consultants (Survey Services) - Saint John• Lead Structural Formwork (Concrete Forming & Placement) - Moncton• Ocean Steel (Reinforcing Steel Supply & Installation) - Saint John• OSCO Concrete (Concrete Supply) - Saint John

- Gulf Operators (Saint John)• Dexter Construction (Pipe inst.), 50/50 split local workforce - Saint John/Halifax• EXP (Engineering/Testing) - Saint John• NRB (Paving) - Saint John

Government funding Partners