AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
Safety Initiatives to Reduce Sprains & Strains Injuries
Maintenance Team #40
Jay GilliamDirector Safety
Union Pacific Railroad
AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
FRA Reportable InjuriesFRA Reportable InjuriesAAR Group A Engineering AAR Group A Engineering DeptsDepts
(AMTK, BNSF, CSX, NS, UP)(AMTK, BNSF, CSX, NS, UP)
769 733
523 482
1000100911071057
0
200
400
600
800
1000
1200
1400
1998 1999 2000 2001 2002 2003 2004 2005PROJ
Source: FRA Website
AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
FRA Reportable Injury RatesFRA Reportable Injury RatesAAR Group A Engineering AAR Group A Engineering DeptsDepts
(AMTK, BNSF, CSX, NS, UP)(AMTK, BNSF, CSX, NS, UP)
1.861.62
1.39
2.40
2.71
2.35
2.50
1.98
0.00
0.50
1.00
1.50
2.00
2.50
3.00
1998 1999 2000 2001 2002 2003 2004 2005YTD
Source: FRA Website
AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
Railroads vs Other IndustriesRailroads vs Other IndustriesFRA & OSHA Reportable RatesFRA & OSHA Reportable Rates
0
2
4
6
8
10
1997 1998 1999 2000 2001 2002 2003
ConstructionTransportation and Public UtilitiesAll IndustryAAR Group A Engr Depts
Source: Department of Labor Bureau of Labor Statistics
AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
Percentage of Sprains & StrainsPercentage of Sprains & StrainsEngineering DepartmentEngineering Department
47% 49%42% 42% 43%
34%
41%37%
45%42%43%40%
0.00
0.10
0.20
0.30
0.40
0.50
0.60
BNSF CP CSX NS UPRR ALL
2003 2004
AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
Primary Causes of Sprains & StrainsPrimary Causes of Sprains & Strains
Slips, Trips & FallsLifting (Overexertion)Body Positioning/Work ProceduresUse of Tools (Hand & Power)Contact with Object or Equipment
AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
BNSF % CPR % CSX % NS % UP % All RR %
Back 22 15.00% 44 27.50% 37 26.00% 12 32.00% 62 17.22% 177 23.54%Finger/Hand 27 18.00% 28 17.50% 6 4.00% 8 21.00% 49 13.61% 118 14.82%Ankle/Foot 20 14.00% 15 9.37% 15 10.00% 4 11.00% 25 6.94% 79 10.26%
Shoulder/Neck 20 14.00% 4 2.50% 12 8.00% 4 11.00% 27 7.50% 67 8.60%Wrist/Arm/Elbow 13 9.00% 22 13.75% 5 3.00% 1 3.00% 36 10.00% 77 7.75%
BNSF % CPR % CSX % NS % UP % All RR %
Slip/Trip/Fall 21 14.00% 27 16.88% 38 27.00% 11 29.00% 78 21.67% 175 21.71%Struck by Material 3 2.00% 32 20.00% 8 5.00% 9 24.00% 51 14.17% 103 13.03%
Hand Tools 37 25.00% 13 8.12% 22 15.00% 2 5.00% 36 10.00% 110 12.62%Handling Material/Equip 51 35.00% 15 10.00% 9 24.00% 40 11.11% 115 16.02%Vehicles/Equip Collision 22 15.00% 6 3.75% 12 8.00% 2 5.00% 33 9.17% 75 8.18%
BNSF % CPR % CSX % NS % UP % All RR %
Sprain/Strain 59 40.00% 68 42.50% 60 42.00% 17 45.00% 134 37.22% 338 41.34%Bruise/Contusion 13 9.00% 17 10.62% 15 10.00% 3 8.00% 93 25.83% 141 12.69%Cut/Laceration 32 22.00% 38 23.75% 36 25.00% 8 21.00% 58 16.11% 172 21.57%
Fracture 28 19.00% 8 5.00% 18 12.00% 8 21.00% 20 5.56% 82 12.51%
Highest Percentage of Injuries by Category (2004)
Injuries by Body Part
By Activity
Nature of Injuries
% of Inc % of Rep % of Rep % of Inc
% of Inc % of Rep % of Rep % of Inc
% of Inc % of Rep % of Rep % of Inc
% of Rep
% of Rep
% of Rep
Mixed
Mixed
Mixed
AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
Current Safety Initiatives to Current Safety Initiatives to Reduce Sprains & StrainsReduce Sprains & Strains
Eliminate or Automate Tasks Tool ImprovementsEquipment Improvements Process & Training Improvements
AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
Eliminate or Automate TasksEliminate or Automate TasksHerzog Plus Ballast TrainsMagnets on Boom Equipment to Handle OTM and Remove ScrapOff/On-Track Equipment to Unload OTMBulk Loading Spikes and Anchors
AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
Tool ImprovementsTool ImprovementsHand ToolsHydraulic ToolsMechanical Production Machines
AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
Tool ImprovementsTool Improvements (cont.)(cont.)
AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
Equipment ImprovementsEquipment Improvements
Hy-Rail Transportation VehiclesMechanized Production Track MachinesSpecialized Machinery Mechanical Lifting Devices (Cranes & Lifts)
AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
Equipment Improvements Equipment Improvements (cont.)(cont.)
AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
Process ImprovementsProcess ImprovementsWeekly Safety Audits Ergonomic Awareness:
– Static Muscles and Movements– Safety Guidelines on Tasks
Ergonomic Assessment and Task Program – Currently using CBT Models – Developing Web-Based Model
Stretch/Flex/Prevent - Fatigue Prevention and Neutral Body Positioning
AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
Process Improvements Process Improvements (cont.)(cont.)Walking Program & 3 Point ContactDesign Review Process with Supply & Engineering prior to purchase ensuring Equipment, Vehicles, & Tools utilize an Ergonomic Model.Storage Boxes on Vehicles - Waist High to Eliminate Stooping and BendingTraining Improvements - CBT for Operator Familiarization of OEM Instructions
AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
Process ImprovementsProcess Improvements (cont.)(cont.)Rail Relay Track Materials Laid Out and Scrap Removed in Same Window as Gang is Working (Rail, Plates & OTM)Job Briefings - Total Safety Focus Tool of Month Demonstrations Eliminate Stumbling Hazards on Trucks
AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
Opportunities for ImprovementsOpportunities for ImprovementsHandling Tie Plates in Production GangsInstalling & Removing Rail Anchors or Clips by Hand (Mattweld Tool - NS)Lightweight Portable DerailsUse of Robotics for Highly Repetitive Tasks1-Man Rail Puller
AMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATIONAMERICAN RAILWAY ENGINEERING & MAINTENANCE OF WAY ASSOCIATION
SummarySummaryRailroads Continue to Reduce Personal Injuries while Sprains & Strains Continue to be about 40% of All Injuries
Railroads Spend Millions Annually on Equipment and Tools to Reduce Injuries
Railroads Must Continue to Partner with Equipment Manufacturers to Design Out Potential Hazards