Page 1: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Presentation

Safety, Health & Environment

Chief Project ManagerDFCCIL/Allahabad(East)

Page 2: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Khurja -Bhaupur (343 km)Bhaupur-Mughalsarai (402 km)Khurja-Ludhiana (400 km)Khurja-Dadri (47 km)Mughalsarai-Sonnagar (126 km)Sonnagar-Dankuni (538 km)

Page 3: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

BASIC DESIGN FEATURES

Height

Width

4.265 m 7.1 m

3200 mm 3660 mm

700 m 700/ 1500 m

5.1m

Western Corridor Eastern Corridor

Moving Dimensions

Container Stack

Train Length

Axle Load

Indian Railway DFC Routes

Western Corridor Eastern Corridor

32.5t/25 t22.9 t / 25 t

75 Kmph 100 Kmph

Maximum Speed

www.dfccil.gov.in

Page 4: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Basic Design Features

Indian Railway DFC Routes

•Traction Electrical

(25 KV)

Electrical

(2x25 KV)

•Station Spacing 7-10 Km 40 Km (Approx.)

• Signaling Absolute /Automatic

with 1 Km spacing

Automatic with 2 Km

spacing

•Communication Emergency Sockets/

Mobile Train Radio

Mobile Train Radio

Page 5: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

MUMBAI

DELHI

VASCO

CHENNAI

KOLKATA

LUDHIANA

VIJAYAWADA

KHARAGPUR

JHARSUGUDARAIPUR

PADAPAHAR

Sanctioned projects

Feasibility study for additional four

corridors:

1. North-South corridor (Delhi-Chennai) –

2343 km

2. East-West corridor (Howrah-Mumbai –

2328 km)

3. East Coast corridor (Kharagpur

Vijayawada) – 1123 km

4. Southern corridor (Chennai-Goa) – 899

km

Implementation of first three are under

consideration (total cost of USD 32 billion

APPROX)

Future DFCs

Page 6: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

MADHYA PRADESH

RAJASTHAN

UTTAR PRADESH

NEPAL

CHHATISGARH

JHARKHAND

WEST BENGAL

HARYANA

UTTARAKHANDPUNJAB

BIHAR

BANGLADESH

NEW GANJKHWAJA

LUDHIANA

AMBALA

SAHARANPUR

MEERUTz

HAPUR

KHURJA

ALIGARHHATHRAS

TUNDLA

ETAWAH BHAUPUR

KANPUR

PREMPUR

ALLAHABAD

MUGHALSARAI

SONNAGAR

NEW KARWANDIYA

DANKUNIEXISTING LINE

DFC LINE (PARALLEL)

(EXISTING STNS.

LEGEND

Dedicated Freight Corridor - Eastern Corridor

Dadri

Page 7: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

MAHARASHTRA

MADHYA PRADESH

UTTAR PRADESH

HARYANA

RAJASTHAN

GUJARAT

ARABIAN SEA

PAKISTAN

VASAI

GOTHANGAM

MAKARPURA

SANAD

MAHESANA

PALANPUR

MARWAR

PHULERA

REWARI

JNPT

NIM KA THANA

RINGAS

PHULERA

AJMER

SENDRA

MARWAR

SIROHI

ABU RD.

PALANPUR

MAHESANA

AHMADABAD

VADODRA

BHARUCH

SANJALI

SURAT

VALSAD

SANJAN

DAHANU

PANVEL

VAITARNA

EXISTING LINE

DFC LINE (PARALLEL)

DFC LINE(DETOUR)

DFC JUNCTION STNS.

EXISTING STNS.

LEGEND

Dedicated Freight Corridor - Western Corridor

7

DADRI

Page 8: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

SHE MANUAL

This document defines the principal

requirements of the Employer on Safety, Health

and Environment (SHE) for works associated

with the contractor / sub - contractor and any

other agency to be engaged at construction

worksites of Dedicated Freight Corridor

Corporation of India Ltd.(DFCC). Since DFCC is

the Principal Employer for all work men /

women at all its work sites, applicability of

DFCC’s SHE Manual is very important.

DFCC SHE MANUAL

Page 9: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

DFCCIL as a corporate has made a corporate Safety, Health and Environmental policy

to establish and maintain effective standards for safety of employees & workers,

assets and provide adequate control of the safety, health, pollution risk arising from

work activities

Comply with relevant Rules and Regulations on Safety, Occupational Health and

Environment Protection. Integrate Safety, Health and Environment and Practices in

work activities.

Plan, Design, Construct, Operate and maintain all facilities to secure sustained

Safety, Health and Environment Protection.

Create awareness on SHE and develop required level of knowledge & skills in all

personnel through need based training, internal communications and continue to

enhance the said skills & competence.

Make reasonable effort to prevent accident, work related ill health during

construction & operation and preservation of ecological balance & heritage.

Page 10: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

SHE MANUAL

Project Management Consultancy services for Mughalsarai – New Bhaupur Section

Package 201 & 202

The scope of this Occupational Health, Safety

Plan covers Project Management Consultancy

Services for Mughalsarai - New Bhaupur section

of the Eastern Dedicated Freight corridor

project-2 Construction site activities that affect ,

beneficially or adversely the:

(a)Health, Safety and security of people

(b)Physical environment

PMC SAFETY MANAGEMENT PLAN

Page 11: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

SHE MANUAL

GIL-SIL JV SHE PLAN

GIL-SIL JV SHE Program set out requirements for

the protection of life and health and Environment .

It also provide guidelines to eliminate, where

possible damages of and to equipment and harm

to people while carrying out specific work task.

Occupational Health & Safety Plan (OHS) is

prepared to interface & implement DFCC SHE

requirements.

Page 12: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

SHE MANUAL

Page 12

203 SHE PLAN

Occupational Health and Safety objectives

The company adheres to principle of “people first”

and strictly controls occupational diseases to ensure

health and life safety of employees.

• Be in comprehensive conformity with laws and

other requirements.

• Prevent serious injury and fatal accidents.

• Avoid fire accident.

• Ensure 100% SHE training rate.

• Avoid serous environmental pollution event.

Page 13: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

SHE MANUAL

Page 13

204 SHE PLAN

Page 14: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Hazard analysis

Page 14

This is one of the basic safety component through which site safety practices are implemented

at site

Identification and evaluation of on-site

safety and health hazards which is done by

Method Statement risk assessment of

particular activities at site which is

approved by the Engineer on the behalf of

client. Engineer’s site safety personals

check and ensure that standards are

implementation at site.

A safety and health risk (hazard) analysis for

each site task and operation that is

identified in the comprehensive work plan

which is pre-approved before the work

starts.

Before starting job at Site, hazards are

discussed with site in charges and supervisors

/workers so that preventive measures can be

ensured.

Page 15: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Comprehensive work plan

Page 15

A written comprehensive work plan of tasks, objectives, logistics, and resources for site

operations, are checked and monitored by Engineer which includes the following:

• Addresses, anticipated work chainages,

clean-up activities and normal operating

procedures information is already available

in approved document. Defines work tasks

and objectives of the various staff of the

contractors so that direct communication

can be done when it is required.

• Describes how the work tasks

and objectives will be

accomplished.

• Establishes the personnel

requirements to implement the

work plan.

• Provides for implementation of

training, briefings, and

information as required by DFCC

SHE plan.

Work planning is going on before starting of

assigned job.

Page 16: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Site control plan

Page 16

• An up-to-date site control plan before work

starts so that a precise work set ups

regarding on site assigned job and related

exposures to unsafe act, condition and

hazardous substances exposure can be

reduce to almost zero level. This includes the

following.

• Site map.

• Establish site work zones.

• Work flow chart.

• The site communications plan, including how

employees are alerted during emergencies.

• The site’s standard operating procedures

(SOPs) or safe work practices.

Page 17: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Site control plan

Page 17

• Identification of the nearest medical

assistance. (Details of the hospitals are

already submitted by contractor to

Engineer.)

Layout displayed, emergency numbers and

visitors guidelines awareness poster.

Page 18: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Personal protective equipment

Page 18

• Site hazards and activities.

• Methods to evaluate the effectiveness of the

PPE plan.

• Criteria for selecting and fitting PPE,

including work duration use limitations of

particular PPE, and medical considerations

such as temperature extremes and heat

stress.

• Training on PPE use.

• Procedures for putting on and taking off

PPE.

• PPE inspection procedures prior to, during,

and after use.

• Decontamination and disposal of PPE

Adequate PPE’s are provided to workers.

A PPE plan that addresses the following

Page 19: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Routine site safety inspection by the Engineer SHE team

Page 19

• The Engineer has SHE Team consist of

Safety personals which includes Safety

Engineers, Chief Safety Engineer and Chief

SHE expert, apart from Environmental

Specialists.

Page 20: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Monthly MARS audit by the Engineer

Page 20

• Each month Chief safety Engineer and site

safety Engineer conducts MARS audit, and

check the documental evidence with the site

practices which consist of 32 documents.

The Engineer evaluate the percentage

through assess marking system.

Page 21: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

SAFETY PERFORMANCE MONITORING

Page 21

The effective monitoring of performance and the establishment of realistic goals

and targets helps to provide a focus and drive towards not only a collective but also

a personal level of improvement.

Key Performance Indicators will help to identify trends of the performances and the

creation of action plans which in turn will help deliver improvements to the SMS.

The data required to monitor the safety performance are based on the leading and

lagging Indicators.

Page 22: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

METHOD STATEMENT PROCESS

Page 22

Approved/Recommendation given by PMC

Construction worked perform according to MS

Review by PMC Team

Execution Team QC Team SHE Team

Method statement submitted by Contractor to PMC

A work method statement, sometimes called a "safe system of work", is a document

that details the way a work task or process is to be completed. The method

statement should outline the hazards involved and include a step by step guide on

how to do the job safely.

Page 23: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

METHOD STATEMENT PROCESS

Page 23

Safe Work Procedure for working at parallel

section.

This particular procedure defines the

requirements of managing all work compliances

with all applicable procedures, practices and the

requirements of this project in working at

parallel section.

Page 24: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Page 24

DRIVERS SAFETY SUPERVISION CHECKLIST/GENERAL SAFETY CHECKLIST FOR/WORK NEAR PARALLEL SECTION

Page 25: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

METHOD STATEMENT PROCESS

Page 25

Safe work procedures for working at night

There are a few specific requirements which

has to be added for SWP at night. The

procedures details the roles and

responsibilities PTWs various checklists and

emergency numbers etc.

Page 26: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

METHOD STATEMENT PROCESS

Page 26

NIGHT WORK PERMIT TO WORK FORM

Page 27: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

METHOD STATEMENT PROCESS

Page 27

PMC has tailor-made SHE HAND BOOK for

this project which is used by GIL SIL-JV

through their safety induction and

training.

Page 28: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

SAFETY PERFORMANCE MONITORING BY PMC

Page 28

A. Routine site safety inspection by PMC SHE team.

B. Monthly MARS Audit by PMC

C. Monthly Safety Committee Meeting

D. External Safety Audit by 3rd Party

Page 29: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

SAFETY PERFORMANCE MONITORING BY PMC (SHE INSPECTION)

Page 29

Page 30: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

SAFETY PERFORMANCE MONITORING BY PMC (MARS AUDIT)

Page 30

Page 31: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

SAFETY TRAINING

Page 31

The Contractor ensure that all personnel working at the site receive an induction

SHE training explaining the nature of the work, the hazards that may be

encountered during the site work and the particular hazards attached to their own

function within the operation.

Contractor issue a personnel SHE handbook/ card in a language known to the

workers, which provides information on SHE and emergency procedures that all

personnel working on contract.

After the induction, personnel are issued a photo identity card of size 85mm x

55mm duly signed by the authorized representative of the contractor before they

are engaged for any work.

SAFETY INDUCTION

Page 32: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

SAFETY TRAINING MATRIX

Page 32

Page 33: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

PMC SAFETY CHART OF ORGANIZATION

33

Mr. Panagiotis Amerikanos

(Team Leader)

Mr. Ricardo Esperenza

(Chief Safety Engineer)

Mr. Satyajit R Pandey

(Chief Safety Engineer)

CP-201&204

Mr. Abhishek Singh

(Safety Engineer)

Section 201 A

Mr. Rashid Wahid

(Safety Engineer)

Section 201 B

Mr.

(Safety Engineer)

Section 201 C

Ms. Vasudha Garg

Environmental Specialist

Mr. Mirza Fahim Baig

(Chief Safety Engineer)

CP-202&203

Mr. R.K. Pandey

(Safety Engineer)

Section 202 A & Yamuna

Mr. Ramjan Ansari

(Safety Engineer)

Section 202 B

Mr. Biswaranjan Dhal

(Safety Engineer)

Section 202 C & D

Mr. Satya Pal Singh Environmental

Specialist

Page 34: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Record of accident

Page 34

Package Man-Hours

CP-201 4166465

CP-202 6012156

TOTAL MAN-HOURS WITHOUT LTA TILL

September’1710.17 MILLION

Summary of Accidents in EDFC-2

201 on work sites on road

Fatalities Nil Nil

Accidents Nil Nil

202 on work sites on road

Fatalities Nil Nil

Accidents Nil Nil

A Lost Time Accident is incident in which an employee is not able to return to work or is

assigned restricted work on the day or shift following the incident.

Page 35: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

PICTURES

• Training on Emergency Response • Tool box talk conducted at site

• Safety Committee Meeting • Safety Committee Meeting • Fire safety training at site

Page 35

• Training on Hand & Power Tools

Page 36: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Hazard analysis

Before starting job at Site, hazards are discussed with site in charges and supervisors

/workers so that preventive measures can be ensured.

Page 37: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Comprehensive work plan

Work planning is going on before starting of assigned job.

Page 38: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Site control plan

Layout displayed, emergency numbers and visitors guidelines awareness poster.

Page 39: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Personal protective equipment

Adequate PPE’s are provided to workers.

Page 40: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Display of signages and posters at site

Identification of well during mansoon period

through red balloons.

Poster displayed near IR Track along with

fencing wire in parallel section.

Page 41: Safety, Health & Environmentiricen.gov.in/iricen/iricen_day/2017/3_A HAQUE.pdf ·  · 2017-11-09Safety, Health & Environment Chief Project Manager DFCCIL/Allahabad ... PALANPUR MARWAR

Thank You