safety calender aone

1
7/23/2019 Safety Calender Aone http://slidepdf.com/reader/full/safety-calender-aone 1/1 1 2 3 4 1 2 3 4 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 1 13 5 6 7 8 5 6 7 8 7 8 9 10 11 12 6 7 8 9 10 7 8 9 10 11 12 2 14 9 10 9 10 13 14 11 13 23 3 15 11 11 12 15 12 14 24 4 16 12 13 14 16 13 15 25 5 6 7 8 17 13 14 15 16 15 16 17 18 17 18 19 20 21 14 15 16 17 16 26 9 10 11 12 18 17 18 19 20 19 20 21 22 22 23 24 25 26 18 19 20 21 17 27 19 21 23 24 27 22 18 28 20 22 25 26 28 23 19 29 21 24 23 27 28 29 24 20 30 23 22 25 26 27 28 29 30 25 26 27 28 29 21 31 24 25 26 27 28 29 30 31 31 30 22 29 30 MD= - MD= - MD= - MD= - MD= - MD= - LH= 0.5 Hrs LH= 2.3 Hrs LH= 1.3 Hrs LH= 1.4 Hrs LH= 0.5 Hrs LH= 2 Hrs 5-Jan 6-Feb 17-Feb 10-Mar 28-Mar 11-Apr 25-Apr 24-May 5-Jun 26-Jun JANUARY TO JUNE 2012 Section: Particle in Eye 49  Anjum/ Production Slipped on floor During die setting, setting rod slipped off and jerked hand badly Major Accident Red Production JANUARY FEBRUARY MARCH No Accident Green SHE-001 Loss time (Min.) Slit on Forearm JUNE MAY Location: Sheet Metal Safety Code: Minor Accident Blue Date. APRIL 26 17 Irfan/ Production  Ankle sprain Back cramp Hashim/ Packing A-ONE TECHNIQUES (PVT.) LTD. SAFETY CALENDAR Minor Accident Detail Safety Leader: Department: Employee Name/ Deptt. Plant Nasir Lodi Root Cause(s) Employee Number 60 82 30 Imran/ Production Qasim/ Production Tariq/ Tool Room Masoom/ Production Rameez/ Packing 4 60 90 144 Foot damaged 30 40 21 38 Foot damaged Small cut on leg wearing no safety shoes Part sticking out of trolley 90 Bumped head on machine 30 40 30 9 60 Rehan/ Production Nadeem/Production Counter Measure(s) Lifting Excessive Sheets, Oiliness Junk lying on floor Lifting in non standard manner Working without safety goggles Negligence Part lying on floor Oily floor Oily Rod, Negligence Training, Long arm gloves for Loaders 5S, Training Training, Lifting standard visualized Training, Strict monitoring of PPEs Training Training, Strict monitoring of PPEs Training, Trolley movement track 5S Training 5S Training 5S & Safety Training

Upload: anonymous-5f2c52v

Post on 17-Feb-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Safety Calender Aone

7/23/2019 Safety Calender Aone

http://slidepdf.com/reader/full/safety-calender-aone 1/1

1 2 3 4 1 2 3 4 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 5 6 1 13

5 6 7 8 5 6 7 8 7 8 9 10 11 12 6 7 8 9 10 7 8 9 10 11 12 2 14

9 10 9 10 13 14 11 13 23 3 15

11 11 12 15 12 14 24 4 16

12 13 14 16 13 15 25 5 6 7 8 17

13 14 15 16 15 16 17 18 17 18 19 20 21 14 15 16 17 16 26 9 10 11 12 18

17 18 19 20 19 20 21 22 22 23 24 25 26 18 19 20 21 17 27 19

21 23 24 27 22 18 28 20

22 25 26 28 23 19 29 21

24 23 27 28 29 24 20 30 23 22

25 26 27 28 29 30 25 26 27 28 29 21 31 24 25 26 27 28

29 30 31 31 30 22 29 30

MD= - MD= - MD= - MD= - MD= - MD= -

LH= 0.5 Hrs LH= 2.3 Hrs LH= 1.3 Hrs LH= 1.4 Hrs LH= 0.5 Hrs LH= 2 Hrs

5-Jan

6-Feb

17-Feb

10-Mar 

28-Mar 

11-Apr 

25-Apr 

24-May

5-Jun

26-Jun

JANUARY TO JUNE 2012

Section:

Particle in Eye

49

 Anjum/ Production

Slipped on floor 

During die setting, setting rod slipped off and jerked hand badly

Major Accident Red

Production

JANUARY FEBRUARY MARCH

No Accident Green

SHE-001

Loss time

(Min.)

Slit on Forearm

JUNEMAY

Location: Sheet Metal Safety Code:

Minor Accident BlueDate.

APRIL

26

17

Irfan/ Production

 Ankle sprain

Back cramp

Hashim/ Packing

A-ONE TECHNIQUES (PVT.) LTD.

SAFETY CALENDAR

Minor Accident Detail

Safety Leader:Department:

Employee Name/ Deptt.

Plant Nasir Lodi

Root Cause(s)Employee

Number 

60

82 30

Imran/ Production

Qasim/ Production

Tariq/ Tool Room

Masoom/ Production

Rameez/ Packing

4

60

90

144

Foot damaged 30

40

21

38

Foot damaged

Small cut on leg

wearing no safety shoes

Part sticking out of trolley

90

Bumped head on machine 30

40

30

9

60

Rehan/ Production

Nadeem/ Production

Counter Measure(s)

Lifting Excessive Sheets, Oiliness

Junk lying on floor 

Lifting in non standard manner 

Working without safety goggles

Negligence

Part lying on floor 

Oily floor 

Oily Rod, Negligence

Training, Long arm gloves for Loaders

5S, Training

Training, Lifting standard visualized

Training, Strict monitoring of PPEs

Training

Training, Strict monitoring of PPEs

Training, Trolley movement track

5S Training

5S Training

5S & Safety Training