Safer Isolation Programme Southern Region Roll Out NSCD NSCD Overview NSCD Rollout NSCD SOUTHERN V2.0 09/12/19 Western Anglia Wales NSCD provide the following A B C D The NSCD rollout has commenced and are being used in a number of areas already across the Region. The first Phases are being used for Network Rail Delivery Unit Isolations with further areas being phased in across the next 4 years. The use of B4 and NSCDs for isolations will become available for all industry stakeholders and will be mandated across the Southern Region for all planned access requiring isolations where the NSCD are installed. The dates for this will be communicated to you so that you can implemented the appropriate changes within your organisation such that your teams are trained and competent to use the new B4 process and NSCDs. When we go live the industry must be ready by having their individuals trained and ready to use the equipment. Here you can find out: Why we are doing this What an NSCD does When we plan to go live Who needs to be trained How to obtain the competency Provide electrical protection against inadvertent energisation of an isolated section by an electric train bridging from an adjacent live section Prevent, via electrical interlocking, against an inadvertent closure of a circuit breaker Provide electrical protection, in the event of failed interlocking,from the inadvertent closure of a circuit breaker Provide a methodology of securing an isolation which is demonstrably compliant with the Electricity at Work Regulations The Southern Region is making isolations safer and faster by rolling out Negative Short-Circuiting Devices (NSCDs) and a new isolation process called the B4. A key aspect of the safer isolations programme is to install Negative Short-Circuiting Devices (NSCD) across the dc network. Safer Isolations - CP6 Southern Programme Wessex Sussex Kent

Upload: others

Post on 19-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Safer Isolations - CP6 Southern Programme · anksome one e y on Heath eham ool n er outh ey Weymouth 3 Safer Isolation - B4 DC Breaker NSCD Phase 3 Go Live Date: Sep 2020 1 2 Safer

Safer Isolation Programme

Southern Region

Roll OutNSCD

NSCD Overview

NSCD Rollout

NSCD

SOUTHERN

V2.009/12/19

Western

AngliaWales

NSCD provide the following

A

B

C

D

The NSCD rollout has commenced and are being used in a number of areas already across the Region. The first Phases are being used for Network Rail Delivery Unit Isolations with further areas being phased in across the next 4 years. The

use of B4 and NSCDs for isolations will become available for all industry stakeholders and will be mandated across the Southern Region for all planned access requiring isolations where the NSCD are installed. The dates for this will be communicated to you so that you can implemented the appropriate changes within your organisation such that your teams are trained and competent to use the new B4 process and NSCDs.

When we go live the industry must be ready by having their individuals trained and ready to use the equipment. Here you can find out:

Why we are doing this

What an NSCD does

When we plan to go live

Who needs to be trained

How to obtain the competency

Provide electrical protection against inadvertent energisation of an isolated section by an electric train bridging from an adjacent live section

Prevent, via electrical interlocking, against an inadvertent closure of a circuit breaker

Provide electrical protection, in the event of failed interlocking,from the inadvertent closure of a circuit breaker

Provide a methodology of securing an isolation which is demonstrably compliant with the Electricity at Work Regulations

The Southern Region is making isolations safer and faster

by rolling out Negative Short-Circuiting Devices (NSCDs)

and a new isolation process called the B4.

A key aspect of the safer isolations

programme is to install Negative Short-Circuiting Devices

(NSCD) across the dc network.

Safer Isolations - CP6 Southern Programme

WessexSussex

Kent

Page 2: Safer Isolations - CP6 Southern Programme · anksome one e y on Heath eham ool n er outh ey Weymouth 3 Safer Isolation - B4 DC Breaker NSCD Phase 3 Go Live Date: Sep 2020 1 2 Safer

Implementing the B4 Isolation

1

2

5

7

910

6

8

3

4

NSCD’s

ECOSignaller

PICOP

ES

COSS

PICOP authorises the ES(s) to set up their worksite & operate the applicable NSCDs

ES(s) or their competent agent(s) operate the applicable NSCDs

ES(s) notifies the PICOP that worksite is set up

& the applicable NSCD`s have been operated

ES(s) issues a CRP

to each COSS

The COSS must carry out ‘Test before Touch’ prior to authorising work to start

PICOP takes possession of the line from the Signaller

PICOP requests ECO to carry out the planned switching in standard manner

The PICOP gives permission to issue CRP`s and start work

ECO provides authority to the PICOP toclose NSCDs as stated on Form B4/B5

ECO opens applicable circuit breakers (applying inhibits/reminder caps) in

accordance with Form B4/B5

Signallers

Route Control / Integrated Control Centres

Operation Delivery Managers

Approved Contract suppliers

Roles Impacted and Training requirementsFor NSCD to be used a number of roles will be affected

Training Required – New competency NSCD Operator

Strapmen – Level B

Engineering Supervisors (ES)

Persons In Charge of Possessions (PICOP)

SWL2 with DC Level A Competency

Equipment Training

Distribution & Plant Maintenance Operatives

Electrification & Plant Maintenance Engineer (EPME)

General Briefing

Worksite requesters/Planning team

Isolation Planners

Electrical Control Room Operators (ECRO)

Controllers of Site Safety (COSS)

This is a competency that is logged on sentinelA number of training organisations have been given the ability to train impacted persons and award the competency NR can offer to Train your trainer so that you can deliver your own training coursesNR can provide training rigs to your organisation if required

Where can I get the NSCD operator competency

The B4 process is contained within

NR/L3/ELP/3091 DC Electrified Lines Working Instructions The B4 Isolation planning process is contained withinNR/L3/ELP/27115 Arrangements for isolation of the conductor rail for pre-planned possessions of the line The application of a NSCD is contained withinNR/L3/ELP/27140 Application of short circuits for conductor rail isolations ECRI Module 8 has been amended to incorporate NSCDNSCD maintenance is specified in Distribution Work Instructions NR/L3/ELP/27240

The full NSCD specification is contained withinNR/L2/ELP/27730 Specification for 750 V dc Switchgear

Applicable Standards

PICOP takes possession of the line from the Signaller

PICOP requests ECO to carry out the planned switching in standard manner

ECO opens applicable circuit breakers (applying inhibits/reminder caps) in accordance with Form B4/B5

ECO provides authority to the PICOP to close NSCDs as stated on Form B4/B5

PICOP authorises the ES(s) to set up their worksite and operate the applicable NSCDs

ES(s) or their competent agent(s) operate the applicable NSCDs

ES(s) notifies the PICOP that worksite is set up and the applicable NSCD`s have been operated

The PICOP gives permission to issue CRP`s and start work

ES(s) issues a CRP to each COSS

The COSS must carry out ‘Test before Touch’ prior to authorising work to start

01

02

03

04

05

06

07

08

09

10

Person in charge of Possession

EngineeringSupervisor

Controller ofSite Safety

Electrical ControlOperator

Safer Isolations - CP6 Southern Programme

Page 3: Safer Isolations - CP6 Southern Programme · anksome one e y on Heath eham ool n er outh ey Weymouth 3 Safer Isolation - B4 DC Breaker NSCD Phase 3 Go Live Date: Sep 2020 1 2 Safer

Strapping

Out

If you are unsure speak to the PICOP or ES

Retain the option of utilising straps under certain restricted circumstances

Frequently asked questionsCan you use straps in a B4?

The B4 isolation process will primarily utilise NSCDs for short-circuiting purposes but retain the option of utilising straps under certain restricted circumstances. Therefore, a combination of NSCDs and short-circuiting straps may be specified on the Form B4.

How would I know that I’m working in

a B4 isolation?

 If you are a COSS or someone working under a COSS then it may not be obvious that you are working in a B4. The ECO/PICOP/ES will know that the isolation is a B4 as they will have a copy of the B4 isolation docket.

How do I find the LCP?

The location of the LCP will be stated on the safe work pack. The LCP will normally be located close to the associated substation or track paralleling hut. If this is not the case the specific location can be found on the Comprehensive Track Diagrams. Signage will be applied to the appropriate access gate to help you locate the LCP

Does this mean I don’t need a

strapping ticket (level B) at all now?

No, you will probably still need to maintain this competency as it is normal during an isolation to have both NSCD and Short Circuit Straps specified on the B Form.

Do I need a safe work pack to

operate an LCP?

Yes, though this could be risk assessed in the future at some sites which are fully fenced and not on or near the line.

Does a NSCD switch off the power?

No. The ECO along with the PICOP open the remotely controllable switches that switch off the affected electrical sections as stated on the B Form. The NSCD is the short circuit protection for an isolation, similar to short circuiting straps.

?

Safety

Potential Electrical Contact

Systems, work activities and protective equipment

Means for cutting off the supply and for isolation

Precautions for work on equipment made dead

Work on or near live conductors

Working space, access and lighting

Regulation 4

Regulation 12

Regulation 13

Regulation 14

Regulation 15

Performance

Compliance with Electricity at Work Regulations

Faster switching & short-circuiting gives more working time

Additional working time provides opportunity to undertake more work or provide better contingency against overrun

Removes several constraints around S&T testing as the running rails are not used for the short circuiting.

Provides an opportunity for smarter planning of work

Improved performance in the following areas

Reduction in the following areas related to the taking and handing back of isolations

Enhanced compliance in the following regulations

Driving

Reduction

Exposure to Infrastructure Risk

Reduction Reduction

Slips, Trips and Falls

Reduction

Increased Performance

+

Safer Isolations - CP6 Southern Programme

Page 4: Safer Isolations - CP6 Southern Programme · anksome one e y on Heath eham ool n er outh ey Weymouth 3 Safer Isolation - B4 DC Breaker NSCD Phase 3 Go Live Date: Sep 2020 1 2 Safer

LONDON

BERKS

HAMPSHIREDORSET

LONDONLondon

Waterloo

Vauxhall

QueenstownRoad

Clapham

Junction

Wimbledon

BerrylandsSurbiton

Earlsfield

WandsworthTownBarnes

Barnes Bridge

Chiswick

Kew BridgeGunnersbury

Brentford

KewGds

Syon LaneIsleworth

Hounslow

Hampton Court

Thames Ditton

Esher TolworthM

alden

Manor

Chessington

North

Hersham

Chertsey

Addlestone

Byfleet &New HawFrimley Brookwood

Millbrook

Ocean Terminal

Soton Docks

Redbridge

TottonAshurst

Beaulieu Road

Brockenhurst

SwayNew Milton

Hinton Admiral

Christchurch

Pokesdown for Boscombe

Bournemouth

Weybridge

West Byfleet

BasingstokeHook

MicheldeverWinchester

ShawfordEastleigh

Hedge End

Botley

Lymington Pier

Lymington Town

Portchester

CoshamFareham

Swanwick

Bursledon

Hamble

Netley

Sholing

Bitterne

Swaythling

Woolston

Farnborough

St Denys

SouthamptonAirport Parkway

SouthamptonCentral

Fleet

Winchfield

Woking

Worplesdon

Shalford

Camberley

Bagshot

Aldershot

Ash ValeAsh

Wanborough

Farnham

Bentley

Alton

Walton onThames

Egham

Virginia Water

Longcross

SunningdaleAscot

Martins Heron

Bracknell

Wokingham

Winnersh

Earley

Winnersh Triangle

Datchet

Staines

Reading

Ashford Feltham

Sunnymeads

Wraysbury

Windsor &Eton Riverside

Whitton

PutneyMortlakeRichmond

North Sheen

St Margarets

StrawberryHill

Twickenham

Hampton

Fulwell

Kempton Park

Upper Hallifo

rd

Shepperton

Sunbury

Teddington

London Road

Clandon

Horsley

Hampton Wick

Kingston

Norbiton

RaynesPark

NewMalden

MotspurPark

WorcesterPark

Stoneleigh

EwellWest

ChessingtonSouth

HinchleyWood

Claygate

Oxshott

Farncombe

Guildford

Godalming

Milford

Witley

Liphook

Haslemere

Liss

Havant

Bedhampton

Hilsea

Fratton

Portsmouth Harbour

Portsmouth &

Southsea

PetersfieldRowlands Castle

Cobham &Stoke D’Abernon

EffinghamJunction

Epsom

Ashtead

Leatherhead

Box Hill &Westhumble

DorkingBookham

Bournemouth

Branksome

Parkstone

PooleHamworthy

Holton Heath

Wareham

WoolM

oreton

Dorchester

SouthUpwey

Weymouth

3Safer Isolation - B4 DC Breaker

NSCDPhase 3 Go Live Date: Sep 2020

21Safer Isolation - B4 DC Breaker

Phase 1 & 2

Go Live Date: 27/04/2020

NSCD

B5

B5

Safer Isolation - B5

Phase B5 Go Live Date: Dec 20

NSCD

5Safer Isolation - B4 DC Breaker

Phase 5 Go Live Date: Dec 2022

NSCD

4Safer Isolation - B4 DC Breaker

Phase 4 Go Live Date: Dec 2021

NSCD

2

4

WESSEX ROUTE

Southern Region

Anglia

East Midlands

Western

Sussex

Kent

Wales

Wessex

V2.303/02/2020

Works Overview

Phase 1 & 2 -27/04/20 - Is your organisation ready? Are your staff trained and competent?

Phase 3 Sep 2020

Phase 4 Dec 2021

Phase 5 Dec 2022

Phase B5 Dec 2020

CP6 Phases - Go Live Dates

Safer Isolations - CP6 Wessex Programme

Page 5: Safer Isolations - CP6 Southern Programme · anksome one e y on Heath eham ool n er outh ey Weymouth 3 Safer Isolation - B4 DC Breaker NSCD Phase 3 Go Live Date: Sep 2020 1 2 Safer

KENT

LONDON

SUSSEXW. SUSSEX

SURREY

3

Phase 3

Safer Isolation - B4 DC Breaker

NSCD

Trials

Safer Isolation - Integrated Devices

Go Live Date:

NSCD

NSCD

4

Phase 4

Safer Isolation - B5

NSCD

21

Phase 1 & 2 BML

Safer Isolation - B4 DC Breaker

Phase 1: 27/04/20 Phase 2: 27/04/20

NSCD

4

4

4

4

4

4

4

Go Live Date: Dec 2021

Tranche 1: July 2020 Tranche 2: Mar 2022

Feb 2021

KENT & SUSSEX

Southern Region

Anglia

East Midlands

Western

Wales

Wessex Sussex

Kent

V2.303/02/2020

London bridge

New Cross Gate

East Dulwich

North Dulwich

West Dulwich

SydenhamHill

Tulse Hill

Herne Hill

West Norwood

CrystalPalace

Gipsy Hill

South Bermondsey

Queens Rd Peckham

Peckham Rye

DenmarkHill

Brockley

Nunhead

Honor Oak Park

Forest Hill

Sydenham Bollingham

BeckenhamHill

Ravensbourne

LowerSydenham

Penge West

Penge East

NewBeckenham

KentHouseAnerly

South Croydon

Sanderstead

Purley Oaks

Purley

ReedhamCoulsdon South

Merstham

Reigate

Dorking

*Interfacewith Wessex Route

Betchworth

Caterham

Nutfield Godstone

Lingfield

Dormans

East Grinstead

HorleySalfords

Earlswood

Kenley

Whyteleafe

WhyteleafeSouth

SmithamChipstead

TattenhamCorner

Kingswood Woodmansterne

Tadworth

Riddlesdown

Upper Warlingham

Woldingham

Oxted

Hurst Green AshfordInternational

Ham Street

Sanding

Wye

Chilham

Chartham

Sturry

MinsterCanterburyWest

Folkestone West

Folkestone Central

Dover Priory

Martin Mill

Walmer

Deal

Sandwich

Ramsgate

Thanet Parkway

Dumpton Park

BroadstairsMargate

Westgate on SeaBirchington on Sea

Herne Bay

Whitstable

Faversham

Sittingbourne

TeynhamKemsley

Swale

Rochester

Chatham Rainham

NewingtonGillingham

Queensborough

Sheerness on Sea

Chestfield &Swalecliff

Selling

Westenhanger

Tonbridge Wells

High Brooms

Frant

Wadhurst

Stonegate

Etchingham

Robertsbridge

Battle

Crowhurst

Appledore

Rye

Winchelsea

Doleham

Three Oaks

Ore

Hastings

St LeonardsWarrior Square

West St Leonards

Bexhill

Cooden Beach

CollingtonNormans

BayPevensey

Bay

Pevensey & Westham

Hampden Pk

Eastbourne

Southease

GlyndeLewes

CooksbridgePlumpton

Wivelsfield

Burgess Hill

Hassocks

Preston Park

Haywards Heath

BalcombeCrawleyIfieldFaygateLittlehavenHorsham

Christ’s Hospital

Billingshurst

Pulborough

Amberley

Arundel

Berwick Polegate

Newhaven Town

Newhaven Harbour

Bishopstone

Seaford

FalmerMoulsecoomb

London Rd

Hove

AldringtonFishergateShorehamby Sea

EastWorthing

WestWorthing

Goringby Sea

PortsladeSouthwickLancingWorthingDurringtonon-Sea

Angmering

LittlehamptonBognor Regis

FordBarnham

Chichester

Fishbourne

Bosham

Nutbourne

SouthbourneEmsworth

Warblington

TowardsGuildford

TowardsWest

London

Warnham

Ockley

Holmwood

Dorking

Box Hill and Westhumble

Leatherhead

Ashtead

Epsom

Ewell East

Belmont

Banstead

Epsom Downs

CarshaltonBeeches

Carshalton

WestSutton

St Helier

Morden South

South Merton

Wimbledon Chase

Wimbledon

HaydonsRoad

Tooting

Balham StreathamHill

Streatham

Brixton

WandsworthCommon

Wandsworth

Road

London Waterloo

Elephant & Castle

Clapham High Street

Clapham Junction

ImperialWharf

BatterseaPark

Sutton Common

Wallington Waddon West Croydon

SelhurstHackbridge

MitchamJunction

Mitcham Eastfields

ThortonHeath

Norbury

StreathamCommon

Sutton

Cheam

To Bournemouth/Portsmouth

TowardsLondon

Tonbridge

BeltringYalding

WateringburyMarden

Staplehurst Pluckley

Headcorn

East Farleigh

Hildenborough

Dunton Green

Sevenoaks

Knockholt

Chelsfield

Orpington

Petts WoodOtford

Kemsing

Shoreham

Eynsford

Swanley

Chiselhurst

BromleySouth

BickleyShortland

Elmsteadwoods

Grove Park

CatfordBridge

CatfordCroftonPark

Ladywell

Bromley North

SundridgePark

St MaryCray

Borough Green & Wrotham

West Malling

East Malling

Barming

Bat & Ball

Maidstone West

Aylesford

New Hythe

Snodland

Hailing

Cuxton

Sole St

Meopham

LongfieldFarningham

RoadStrood

Higham

Gravesend

Northfleet

Swanscombe

Greenhithe

Stone Crossing

Dartford

Crayford

Barnehurst

Bexleyheath

Welling

Falcon Wd

Eltham

Lidbrooke

Charlton

Maze Hill

GreenwichDeptfordWestcombe

Park

WoolwichDockyard

Plumstead Belvedere Slade Gn

WoolwichArsenal

Abbey Wood Erith

Bexley

Albany Pk

Sidcup

New Eltham

Mottingham

Lee

Hither Green

Blackheath

LewishamSt JohnsNew Cross

Maidstone East

BearstedHollingbourne

HarrietshamLenham

Charing

Maidstone Barracks

Ebbs FleetInternational

PaddockWood

LeighPenshurst

Edenbridge

Edenbridge Town

Hever

Cowden

Ashurst

Eridge

Buxted

Uckfield

Crowborough

Birkbeck

Norwood Junction

BeckenhamJunction

Hayes

WestWickham

Eden Park

ElmersEnd

ClockHouse

Blackfriars

Cannon Street

East

Croydon

Redhill

Three Bridges

Gatwick Airport

Brighton

London Victoria

London

Charing Cross

Works Overview

Phase 1 & 2 -27/04/20 - Is your organisation ready? Are your staff trained and competent?

Phase 3- Tranche 1 July 2020

Phase 3 Tranche 2 Mar 2022

Phase 4 Dec 2021

Integrated Devices - Feb 2021

CP6 - Phases

Safer Isolations - CP6 Sussex and Kent Programme