safer isolations - cp6 southern programme · anksome one e y on heath eham ool n er outh ey...
TRANSCRIPT
Safer Isolation Programme
Southern Region
Roll OutNSCD
NSCD Overview
NSCD Rollout
NSCD
SOUTHERN
V2.009/12/19
Western
AngliaWales
NSCD provide the following
A
B
C
D
The NSCD rollout has commenced and are being used in a number of areas already across the Region. The first Phases are being used for Network Rail Delivery Unit Isolations with further areas being phased in across the next 4 years. The
use of B4 and NSCDs for isolations will become available for all industry stakeholders and will be mandated across the Southern Region for all planned access requiring isolations where the NSCD are installed. The dates for this will be communicated to you so that you can implemented the appropriate changes within your organisation such that your teams are trained and competent to use the new B4 process and NSCDs.
When we go live the industry must be ready by having their individuals trained and ready to use the equipment. Here you can find out:
Why we are doing this
What an NSCD does
When we plan to go live
Who needs to be trained
How to obtain the competency
Provide electrical protection against inadvertent energisation of an isolated section by an electric train bridging from an adjacent live section
Prevent, via electrical interlocking, against an inadvertent closure of a circuit breaker
Provide electrical protection, in the event of failed interlocking,from the inadvertent closure of a circuit breaker
Provide a methodology of securing an isolation which is demonstrably compliant with the Electricity at Work Regulations
The Southern Region is making isolations safer and faster
by rolling out Negative Short-Circuiting Devices (NSCDs)
and a new isolation process called the B4.
A key aspect of the safer isolations
programme is to install Negative Short-Circuiting Devices
(NSCD) across the dc network.
Safer Isolations - CP6 Southern Programme
WessexSussex
Kent
Implementing the B4 Isolation
1
2
5
7
910
6
8
3
4
NSCD’s
ECOSignaller
PICOP
ES
COSS
PICOP authorises the ES(s) to set up their worksite & operate the applicable NSCDs
ES(s) or their competent agent(s) operate the applicable NSCDs
ES(s) notifies the PICOP that worksite is set up
& the applicable NSCD`s have been operated
ES(s) issues a CRP
to each COSS
The COSS must carry out ‘Test before Touch’ prior to authorising work to start
PICOP takes possession of the line from the Signaller
PICOP requests ECO to carry out the planned switching in standard manner
The PICOP gives permission to issue CRP`s and start work
ECO provides authority to the PICOP toclose NSCDs as stated on Form B4/B5
ECO opens applicable circuit breakers (applying inhibits/reminder caps) in
accordance with Form B4/B5
Signallers
Route Control / Integrated Control Centres
Operation Delivery Managers
Approved Contract suppliers
Roles Impacted and Training requirementsFor NSCD to be used a number of roles will be affected
Training Required – New competency NSCD Operator
Strapmen – Level B
Engineering Supervisors (ES)
Persons In Charge of Possessions (PICOP)
SWL2 with DC Level A Competency
Equipment Training
Distribution & Plant Maintenance Operatives
Electrification & Plant Maintenance Engineer (EPME)
General Briefing
Worksite requesters/Planning team
Isolation Planners
Electrical Control Room Operators (ECRO)
Controllers of Site Safety (COSS)
This is a competency that is logged on sentinelA number of training organisations have been given the ability to train impacted persons and award the competency NR can offer to Train your trainer so that you can deliver your own training coursesNR can provide training rigs to your organisation if required
Where can I get the NSCD operator competency
The B4 process is contained within
NR/L3/ELP/3091 DC Electrified Lines Working Instructions The B4 Isolation planning process is contained withinNR/L3/ELP/27115 Arrangements for isolation of the conductor rail for pre-planned possessions of the line The application of a NSCD is contained withinNR/L3/ELP/27140 Application of short circuits for conductor rail isolations ECRI Module 8 has been amended to incorporate NSCDNSCD maintenance is specified in Distribution Work Instructions NR/L3/ELP/27240
The full NSCD specification is contained withinNR/L2/ELP/27730 Specification for 750 V dc Switchgear
Applicable Standards
PICOP takes possession of the line from the Signaller
PICOP requests ECO to carry out the planned switching in standard manner
ECO opens applicable circuit breakers (applying inhibits/reminder caps) in accordance with Form B4/B5
ECO provides authority to the PICOP to close NSCDs as stated on Form B4/B5
PICOP authorises the ES(s) to set up their worksite and operate the applicable NSCDs
ES(s) or their competent agent(s) operate the applicable NSCDs
ES(s) notifies the PICOP that worksite is set up and the applicable NSCD`s have been operated
The PICOP gives permission to issue CRP`s and start work
ES(s) issues a CRP to each COSS
The COSS must carry out ‘Test before Touch’ prior to authorising work to start
01
02
03
04
05
06
07
08
09
10
Person in charge of Possession
EngineeringSupervisor
Controller ofSite Safety
Electrical ControlOperator
Safer Isolations - CP6 Southern Programme
Strapping
Out
If you are unsure speak to the PICOP or ES
Retain the option of utilising straps under certain restricted circumstances
Frequently asked questionsCan you use straps in a B4?
The B4 isolation process will primarily utilise NSCDs for short-circuiting purposes but retain the option of utilising straps under certain restricted circumstances. Therefore, a combination of NSCDs and short-circuiting straps may be specified on the Form B4.
How would I know that I’m working in
a B4 isolation?
If you are a COSS or someone working under a COSS then it may not be obvious that you are working in a B4. The ECO/PICOP/ES will know that the isolation is a B4 as they will have a copy of the B4 isolation docket.
How do I find the LCP?
The location of the LCP will be stated on the safe work pack. The LCP will normally be located close to the associated substation or track paralleling hut. If this is not the case the specific location can be found on the Comprehensive Track Diagrams. Signage will be applied to the appropriate access gate to help you locate the LCP
Does this mean I don’t need a
strapping ticket (level B) at all now?
No, you will probably still need to maintain this competency as it is normal during an isolation to have both NSCD and Short Circuit Straps specified on the B Form.
Do I need a safe work pack to
operate an LCP?
Yes, though this could be risk assessed in the future at some sites which are fully fenced and not on or near the line.
Does a NSCD switch off the power?
No. The ECO along with the PICOP open the remotely controllable switches that switch off the affected electrical sections as stated on the B Form. The NSCD is the short circuit protection for an isolation, similar to short circuiting straps.
?
Safety
Potential Electrical Contact
Systems, work activities and protective equipment
Means for cutting off the supply and for isolation
Precautions for work on equipment made dead
Work on or near live conductors
Working space, access and lighting
Regulation 4
Regulation 12
Regulation 13
Regulation 14
Regulation 15
Performance
Compliance with Electricity at Work Regulations
Faster switching & short-circuiting gives more working time
Additional working time provides opportunity to undertake more work or provide better contingency against overrun
Removes several constraints around S&T testing as the running rails are not used for the short circuiting.
Provides an opportunity for smarter planning of work
Improved performance in the following areas
Reduction in the following areas related to the taking and handing back of isolations
Enhanced compliance in the following regulations
Driving
Reduction
Exposure to Infrastructure Risk
Reduction Reduction
Slips, Trips and Falls
Reduction
Increased Performance
+
Safer Isolations - CP6 Southern Programme
LONDON
BERKS
HAMPSHIREDORSET
LONDONLondon
Waterloo
Vauxhall
QueenstownRoad
Clapham
Junction
Wimbledon
BerrylandsSurbiton
Earlsfield
WandsworthTownBarnes
Barnes Bridge
Chiswick
Kew BridgeGunnersbury
Brentford
KewGds
Syon LaneIsleworth
Hounslow
Hampton Court
Thames Ditton
Esher TolworthM
alden
Manor
Chessington
North
Hersham
Chertsey
Addlestone
Byfleet &New HawFrimley Brookwood
Millbrook
Ocean Terminal
Soton Docks
Redbridge
TottonAshurst
Beaulieu Road
Brockenhurst
SwayNew Milton
Hinton Admiral
Christchurch
Pokesdown for Boscombe
Bournemouth
Weybridge
West Byfleet
BasingstokeHook
MicheldeverWinchester
ShawfordEastleigh
Hedge End
Botley
Lymington Pier
Lymington Town
Portchester
CoshamFareham
Swanwick
Bursledon
Hamble
Netley
Sholing
Bitterne
Swaythling
Woolston
Farnborough
St Denys
SouthamptonAirport Parkway
SouthamptonCentral
Fleet
Winchfield
Woking
Worplesdon
Shalford
Camberley
Bagshot
Aldershot
Ash ValeAsh
Wanborough
Farnham
Bentley
Alton
Walton onThames
Egham
Virginia Water
Longcross
SunningdaleAscot
Martins Heron
Bracknell
Wokingham
Winnersh
Earley
Winnersh Triangle
Datchet
Staines
Reading
Ashford Feltham
Sunnymeads
Wraysbury
Windsor &Eton Riverside
Whitton
PutneyMortlakeRichmond
North Sheen
St Margarets
StrawberryHill
Twickenham
Hampton
Fulwell
Kempton Park
Upper Hallifo
rd
Shepperton
Sunbury
Teddington
London Road
Clandon
Horsley
Hampton Wick
Kingston
Norbiton
RaynesPark
NewMalden
MotspurPark
WorcesterPark
Stoneleigh
EwellWest
ChessingtonSouth
HinchleyWood
Claygate
Oxshott
Farncombe
Guildford
Godalming
Milford
Witley
Liphook
Haslemere
Liss
Havant
Bedhampton
Hilsea
Fratton
Portsmouth Harbour
Portsmouth &
Southsea
PetersfieldRowlands Castle
Cobham &Stoke D’Abernon
EffinghamJunction
Epsom
Ashtead
Leatherhead
Box Hill &Westhumble
DorkingBookham
Bournemouth
Branksome
Parkstone
PooleHamworthy
Holton Heath
Wareham
WoolM
oreton
Dorchester
SouthUpwey
Weymouth
3Safer Isolation - B4 DC Breaker
NSCDPhase 3 Go Live Date: Sep 2020
21Safer Isolation - B4 DC Breaker
Phase 1 & 2
Go Live Date: 27/04/2020
NSCD
B5
B5
Safer Isolation - B5
Phase B5 Go Live Date: Dec 20
NSCD
5Safer Isolation - B4 DC Breaker
Phase 5 Go Live Date: Dec 2022
NSCD
4Safer Isolation - B4 DC Breaker
Phase 4 Go Live Date: Dec 2021
NSCD
2
4
WESSEX ROUTE
Southern Region
Anglia
East Midlands
Western
Sussex
Kent
Wales
Wessex
V2.303/02/2020
Works Overview
Phase 1 & 2 -27/04/20 - Is your organisation ready? Are your staff trained and competent?
Phase 3 Sep 2020
Phase 4 Dec 2021
Phase 5 Dec 2022
Phase B5 Dec 2020
CP6 Phases - Go Live Dates
Safer Isolations - CP6 Wessex Programme
KENT
LONDON
SUSSEXW. SUSSEX
SURREY
3
Phase 3
Safer Isolation - B4 DC Breaker
NSCD
Trials
Safer Isolation - Integrated Devices
Go Live Date:
NSCD
NSCD
4
Phase 4
Safer Isolation - B5
NSCD
21
Phase 1 & 2 BML
Safer Isolation - B4 DC Breaker
Phase 1: 27/04/20 Phase 2: 27/04/20
NSCD
4
4
4
4
4
4
4
Go Live Date: Dec 2021
Tranche 1: July 2020 Tranche 2: Mar 2022
Feb 2021
KENT & SUSSEX
Southern Region
Anglia
East Midlands
Western
Wales
Wessex Sussex
Kent
V2.303/02/2020
London bridge
New Cross Gate
East Dulwich
North Dulwich
West Dulwich
SydenhamHill
Tulse Hill
Herne Hill
West Norwood
CrystalPalace
Gipsy Hill
South Bermondsey
Queens Rd Peckham
Peckham Rye
DenmarkHill
Brockley
Nunhead
Honor Oak Park
Forest Hill
Sydenham Bollingham
BeckenhamHill
Ravensbourne
LowerSydenham
Penge West
Penge East
NewBeckenham
KentHouseAnerly
South Croydon
Sanderstead
Purley Oaks
Purley
ReedhamCoulsdon South
Merstham
Reigate
Dorking
*Interfacewith Wessex Route
Betchworth
Caterham
Nutfield Godstone
Lingfield
Dormans
East Grinstead
HorleySalfords
Earlswood
Kenley
Whyteleafe
WhyteleafeSouth
SmithamChipstead
TattenhamCorner
Kingswood Woodmansterne
Tadworth
Riddlesdown
Upper Warlingham
Woldingham
Oxted
Hurst Green AshfordInternational
Ham Street
Sanding
Wye
Chilham
Chartham
Sturry
MinsterCanterburyWest
Folkestone West
Folkestone Central
Dover Priory
Martin Mill
Walmer
Deal
Sandwich
Ramsgate
Thanet Parkway
Dumpton Park
BroadstairsMargate
Westgate on SeaBirchington on Sea
Herne Bay
Whitstable
Faversham
Sittingbourne
TeynhamKemsley
Swale
Rochester
Chatham Rainham
NewingtonGillingham
Queensborough
Sheerness on Sea
Chestfield &Swalecliff
Selling
Westenhanger
Tonbridge Wells
High Brooms
Frant
Wadhurst
Stonegate
Etchingham
Robertsbridge
Battle
Crowhurst
Appledore
Rye
Winchelsea
Doleham
Three Oaks
Ore
Hastings
St LeonardsWarrior Square
West St Leonards
Bexhill
Cooden Beach
CollingtonNormans
BayPevensey
Bay
Pevensey & Westham
Hampden Pk
Eastbourne
Southease
GlyndeLewes
CooksbridgePlumpton
Wivelsfield
Burgess Hill
Hassocks
Preston Park
Haywards Heath
BalcombeCrawleyIfieldFaygateLittlehavenHorsham
Christ’s Hospital
Billingshurst
Pulborough
Amberley
Arundel
Berwick Polegate
Newhaven Town
Newhaven Harbour
Bishopstone
Seaford
FalmerMoulsecoomb
London Rd
Hove
AldringtonFishergateShorehamby Sea
EastWorthing
WestWorthing
Goringby Sea
PortsladeSouthwickLancingWorthingDurringtonon-Sea
Angmering
LittlehamptonBognor Regis
FordBarnham
Chichester
Fishbourne
Bosham
Nutbourne
SouthbourneEmsworth
Warblington
TowardsGuildford
TowardsWest
London
Warnham
Ockley
Holmwood
Dorking
Box Hill and Westhumble
Leatherhead
Ashtead
Epsom
Ewell East
Belmont
Banstead
Epsom Downs
CarshaltonBeeches
Carshalton
WestSutton
St Helier
Morden South
South Merton
Wimbledon Chase
Wimbledon
HaydonsRoad
Tooting
Balham StreathamHill
Streatham
Brixton
WandsworthCommon
Wandsworth
Road
London Waterloo
Elephant & Castle
Clapham High Street
Clapham Junction
ImperialWharf
BatterseaPark
Sutton Common
Wallington Waddon West Croydon
SelhurstHackbridge
MitchamJunction
Mitcham Eastfields
ThortonHeath
Norbury
StreathamCommon
Sutton
Cheam
To Bournemouth/Portsmouth
TowardsLondon
Tonbridge
BeltringYalding
WateringburyMarden
Staplehurst Pluckley
Headcorn
East Farleigh
Hildenborough
Dunton Green
Sevenoaks
Knockholt
Chelsfield
Orpington
Petts WoodOtford
Kemsing
Shoreham
Eynsford
Swanley
Chiselhurst
BromleySouth
BickleyShortland
Elmsteadwoods
Grove Park
CatfordBridge
CatfordCroftonPark
Ladywell
Bromley North
SundridgePark
St MaryCray
Borough Green & Wrotham
West Malling
East Malling
Barming
Bat & Ball
Maidstone West
Aylesford
New Hythe
Snodland
Hailing
Cuxton
Sole St
Meopham
LongfieldFarningham
RoadStrood
Higham
Gravesend
Northfleet
Swanscombe
Greenhithe
Stone Crossing
Dartford
Crayford
Barnehurst
Bexleyheath
Welling
Falcon Wd
Eltham
Lidbrooke
Charlton
Maze Hill
GreenwichDeptfordWestcombe
Park
WoolwichDockyard
Plumstead Belvedere Slade Gn
WoolwichArsenal
Abbey Wood Erith
Bexley
Albany Pk
Sidcup
New Eltham
Mottingham
Lee
Hither Green
Blackheath
LewishamSt JohnsNew Cross
Maidstone East
BearstedHollingbourne
HarrietshamLenham
Charing
Maidstone Barracks
Ebbs FleetInternational
PaddockWood
LeighPenshurst
Edenbridge
Edenbridge Town
Hever
Cowden
Ashurst
Eridge
Buxted
Uckfield
Crowborough
Birkbeck
Norwood Junction
BeckenhamJunction
Hayes
WestWickham
Eden Park
ElmersEnd
ClockHouse
Blackfriars
Cannon Street
East
Croydon
Redhill
Three Bridges
Gatwick Airport
Brighton
London Victoria
London
Charing Cross
Works Overview
Phase 1 & 2 -27/04/20 - Is your organisation ready? Are your staff trained and competent?
Phase 3- Tranche 1 July 2020
Phase 3 Tranche 2 Mar 2022
Phase 4 Dec 2021
Integrated Devices - Feb 2021
CP6 - Phases
Safer Isolations - CP6 Sussex and Kent Programme