safe working
Awareness and preparation is the key to safe excavation
Revision No. 19.11
MAINLINEPIPELINESLIMITED
Note: This manual supersedes all previous issues, which should now be sent for recycling.
Linewatch Products Available
Markerpost leaflet
Safe Digging leaflet
Landowner Brief leaflet
Linewatch Presentations
Free Linewatch presentations are available to anygroup involved in planning and undertaking worknear Linewatch members pipelines.
These presentations can be arranged through theLinewatch website www.linewatch.org.uk
Revision No. 19.11 3
What to do in an emergencySigns of a possible pipeline leak may include: pools of fuel, dirt or dust blowing inthe air, hissing sounds, gas or petroleum odours, bubbles in standing water, deador discoloured vegetation and ice on the ground. If you notice any of these in thevicinity of a pipeline, treat as an emergency.
In the event of an emergency
• Remove all personnel immediately from the vicinity of the incident• Extinguish any sources of ignition and shut down all working plant fromthe immediate area (remember, vapours will travel downwind).
• Inform the emergency services. Dial 999 and alert the Fire Brigade andPolice.
• If known, call the Pipeline Operator. There will be a pipeline marker nearbywith emergency contact information. Emergency numbers can also be found on the back page of this booklet.
• Exclude all vehicles and personnel from the vicinity.• Do not attempt to seal any leaks.• Do not attempt to extinguish the flame if the leak has ignited.Action to be taken if the pipeline has been damaged
but has not caused leakage:
• Contact the Pipeline Operator or his Agent.• Do not backfill and await the representative of the Pipeline Operator toinspect the damage and decide on the action required.
• If damage to the pipeline does not cause a leak do not try and hide it.Dents and gouges in a pipe may cause it to fail at a later time withpotentially catastrophic consequences. Report all damage, howeverseemingly insignificant, to the Pipeline Operator.
4 Revision No. 19.11
BPA 01827 63 708
CATS 01642 546404
CLH PS Aldermaston 0118 971 2021(including Inverness – Lossiemouth)
ConocoPhillips Theddlethorpe 01507 473 553
ConocoPhillips Teesside 01642 541 222
E-ON - Winnington 01606 77 508
E-ON - Castleford 01977 555 653
EP Langage Ltd 0800 371 726
Essar Oil (UK) Ltd 0800 389 9607
Esso Petroleum Company Limited 0800 136 812
Humbly Grove Energy 01256 381625
IGas 01522 754 524
INEOS O&P (including TSEP) 0800 374185
Mainline 01646 649 999
Manchester Jetline Limited 01244 665 989
Marchwood Power 0800 328 6030
National Grid 0800 111 999
Oikos Storage Ltd 01268 682206
Petroineos 0800 374185
SABIC TPEP and WGEP 0800 318 105
Total Finaline 0800 592 246
Total Colwick 01159 615 785
Uniper - Cottam and Killingholme 0800 389 4795Uniper - Enfield 0800 783 0140Uniper - Isle of Grain 02476 198 550Uniper - Connahs Quay 01244 894 050Uniper - Holford 01606 841 223
This manual relates to the following pipeline systems only
Revision No. 19.11 5
Special requirements for safe working in close proximity to high pressure pipelines
CONTENTS PAGE
• What to do in an emergency 3
• List of pipeline operator emergency contact numbers 4
• Summary of Guidance 6
• Basic Guidelines for any work near Pipelines 7
• Routes of commercial pipelines 10-26
• Appendix 1 27
(List of pipeline routes available online at www.linewatch.org.uk)
It is emphasised that not all pipelines in the UK are represented and that owners ofpipelines, even those who do not appear in this booklet, should still be consultedregarding procedures to be followed when working close to their pipelines.
General Information
• All the pipelines refered to in this booklet are steel and operate at high pressure containingpetroleum products or gas.
• Sizes vary from 100mm, (4”) to 1220mm (48”) diameter.• Nominal depth of cover is 0.9m, (3ft) although in some locations this cover may be less.e.g. Canal towpaths or rocky areas etc.
• The sponsor/employing authority (and/or their contractor) shall be responsible for all liabilityunder the Health and Safety at Work Act, 1974, etc.
• All the pipelines are covered by the Pipeline Safety Regulations and require all parties towork safely so that no damage is caused to a pipeline.
6 Revision No. 19.11
Summary of GuidanceThe purpose of this booklet is to provideguidance on the basic requirements for safeworking in close proximity to buriedpipelines. The guidance is not exhaustiveand so a safe system of work, including anyspecific requirements of the PipelineOperator, should be agreed prior to workcommencing.
For the purposes of this document the term“easement”, as used, includes propertyrights arising under Deeds of Grant,Wayleave and other rights in land granted.
To fulfil their own duty, the PipelineOperators require notification of theintention to carry out underground workswithin 50 metres of the pipe and in thesame parcel of land, i.e. not separated by afence or other identifiable division. It isrecommended that formal buried servicessearches are recorded onwww.LSBUD.co.uk website. This serviceis free to use. The Pipeline Operator is thenalerted and able to make an appropriateresponse, especially critical when that workwill be within the pipeline easement.
The Pipeline Operator is responsible forclearly marking the detailed route of thepipe (a free service) and to specify anyconstraints on the proposed method ofworking. All works require prior approvalexcept certain routine agriculturaloperations; however, fencing, ditching,drainage operations, sub-soiling and moleploughing must be notified. This is not anexhaustive list of works, please contact thePipeline Operator.
When planning works, which could involvecrossing or working within the easement, it isimportant that sufficient time for Approval by
the Pipeline Operator is allowed prior toworks commencing. In some circumstancesthis can take up to 13 weeks.
Some Pipeline Operators may havetheir own specific requirements whichwill be made available by request.
Supervision of WorksThe Pipeline Operators require strictcontrols to be applied on all third partyworks that could affect the pipeline, whichare administered by the Pipeline Operatoror Agent. The minimum controls are:
• A minimum of three working days priornotice shall be given by the third party tothe Pipeline Operator or Agent beforecommencement of any works within 3m(10ft) of the pipeline. It should be notedthat National Grid requires at least sevendays notice.
• All works within the pipeline easementshall be attended by the PipelineOperator or Agent and shall notcommence without the written authorityand supervision by the Pipeline Operatoror Agent.
• There will generally be no charge for suchattendance for the first three 8 hourworking days. Thereafter, the costs maybe recovered by the Pipeline Operatorfrom the third party. Current contractrates for supervision charges will beprovided by the Pipeline Operator to thethird party on request.
Details of the relevant PipelineOperators or their agents are listed inthis booklet.
Revision No. 19.11 7
1 In general, a legal consent or agreedlevel of supervision will be required prior toany works within the easement. Adequatetime should be allowed for the completionof any consent. Prior to commencement ofall works full details of the proposed workshould be submitted to the appropriatePipeline Operator or their Agent.
2 No raising or lowering of ground levelthroughout the easement is permittedwithout written consent from the PipelineOperator. All excavations above, below orwithin 3m (10 ft) on either side of thepipeline must always be supervised by arepresentative of the Pipeline Operator.Manual digging will be employed unlessanother method is specifically authorised bythe representative.
3 Protection will be required over thepipeline at road crossings and parkingareas, including temporary constructionareas, typically, as per example (Appendix I). Under the supervision of thePipeline Operator and prior to installation,the promoter shall expose the pipeline forthe existing protective pipe wrapping to beinspected, repaired and then doublewrapped at the Promoter's expense by acontractor approved by the PipelineOperator. Some Operators employ othermethods so agreement of the method isimportant before any investigation orremoval.
4 The pipeline is wrapped to preventcorrosion and any damage to the pipe orits wrapping must be notified immediately tothe Pipeline Operator or their Agent whowill arrange for repairs to be carried out. ThePipeline Operator reserves the right torecover the cost of repairs.
5 Backfilling shall be in layers of maximumdepth of 300mm (12 inches) andconsolidated before any further backfillingtakes place. Backfill must be free of flints orany other material, which may damage theanti-corrosion wrapping. If the backfillmaterial is not suitable in the opinion of therepresentative of the Pipeline Operator,imported sand, pea gravel or otherapproved fine material shall be provided togive a minimum 150mm (6 inches) surroundto the pipeline.
6 The easement shall be marked or peggedout and fenced off prior to workscommencing. Agreed crossing pointsacross the easement for constructionmachines shall be protected by plates, “BogMat”, a temporary concrete slab or hard-core layers. Specification for each crossingpoint will need submitting to the pipelineoperator prior to approval.
7 To prevent indiscriminate crossings alongthe pipeline, service crossings (i.e. drains,cables, pipes, etc.), should be groupedtogether at a common point. These shouldbe ducted if possible. Any plant crossingthe easement can be hazardous to thepipeline especially if the ground is soft orwet.
8 Where a new service passes under orover the existing pipeline, there should be aminimum of 600mm (24 inches) clearancebetween them and cross at an angle of notless than 60°. A lesser clearance or angleof crossing will not be permitted withoutauthority in writing from the PipelineOperator or their Agent. A concreteseparation slab, marker tiles or warning tapemay be required. If the new service or worksincludes a high pressure gas pipe or otherpipe containing material whose escapemight endanger the pipeline(s), sleevingand/or construction in pre-tested pipeacross the width of the easement may berequired.
Basic Guidelines for any work near Pipelines
8 Revision No. 19.11
9 Directional drilling, thrust boring or othertrenchless techniques will be consideredas an alternative method of crossing thepipelines subject to agreed supervision. Amethod statement complete with drawingsfor the completion of pipeline crossingsusing trenchless methods shall be approvedby the pipeline operator. Approval by thePipeline Operator shall in no way reduce theresponsibilities and liabilities of the thirdparty for the safe and successful completionof the crossing works. Clearance betweenthe pipeline and the drilling auger (orsimilar) should be maximised. Ideally theminimum clearance shall be 1.5 metres.
10 Pipeline marker posts shall be installedat the Promoter's expense each side of allroad crossings and elsewhere as necessaryto mark the pipeline route.
11 No buildings, structures or caravans tobe sited within the pipeline easement. Thepipeline easement should always be free ofobstructions as access to the easementand/or the pipeline is required at all times.
12 No gas vermin eliminator or ignitionbased tunnel collapsing systems, eg.Rodenator, are to used within 100 metres.
13 No explosives are to be used within400 metres (1300 ft) or pile driving, 3Dseismic survey or bore holes within 30metres (100 ft) of the pipelines without prioragreement with the Pipeline Operator. In allcases the maximum PPV at the pipeline is25 mm per second.
14 Wind turbines should be situated aminimum distance of one and a half timesthe mast height from the pipeline in line withcurrent UKOPA guidelines.(www.ukopa.co.uk/publications)
15 Where permission is granted for a newpipe, cable, etc., to cross a pipeline, thatpermission will only be granted subject tothe following condition:
“If at any time during the course of the newconstruction it is discovered that thePipeline Operator requires to carry outemergency works on their pipeline thenwork on the new construction must ceaseuntil the pipeline repair work has beencompleted. This repair work will be carriedout with the shortest possible delay. Inthese circumstances the Pipeline Operatorwill not be responsible for any delay orassociated costs on the new construction.”
16 Tree planting is restricted in theeasement. Each Operator can give advice.Any approval will be subject to the PipelineOperator retaining the right to remove alltrees and shrubs which, in his opinion, mightbecome a danger to the pipeline and, inconsequence, a potential hazard topersonal safety, or prevent access formaintenance purposes. Many gardenshrubs are acceptable, but conifers are notacceptable.
17 High voltage electric cable crossingsmay require special consideration.
18 Attention is drawn to the fact that thepipeline is cathodically protected. Thiscan corrode metal structures in the vicinityand it is the Promoter's responsibility toprotect their constructions against this.
Revision No. 19.11 9
The conditions mentioned previouslyare common to most works but are notexhaustive. Other conditions may beimposed depending on the nature ofthe work.
Prior to any work commencing the followingapplies:
a) The location of the pipe must be verifiedand marked on site by the PipelineOperator's representative and witnessed bya representative of the Promoter orcontractor.
b) On receipt of written approval of theproposed works, and subject to theapproval, if required, of the Secretary ofState and the landowner, the Promoter orcontractor shall give not less than 3 workingdays notice to the respective PipelineOperator or his Agent of intention tocommence the works and access for themwill be afforded at all times. Please noteNational Grid will require seven days notice.
c) The Pipeline Operator may require thePromoter to mark out the easement with apaling fence or similar if this is consideredto be in the best interest of a safe operation.Where access over the easement isrequired then protection to the pipelinemust be considered.
d) Any work involving a naked flame or likelyto cause a spark within 3m (10 ft) of anexposed section of a pipeline will only bepermitted subject to approval of themethods by, and presence of, therepresentative of the Pipeline Operator. ThePipeline Operator reserves the right for hisrepresentative to check the availability of fireextinguishers on site to reduce the risk tothe pipeline should the plant or equipmentcatch fire, and to prohibit any work until theyare reasonably satisfied.
e) Cathodic protection of the pipelines isprovided by an impressed current systemand/or sacrificial anodes which couldadversely affect any ferrous structure orservice that crosses or runs parallel to thepipeline for any distance. It isrecommended that test leads be installed atthe point of intersection of the two tofacilitate interference testing, according toBS EN 12954:2001, BS EN 13509:2003,BS EN13636:2004 and BSEN50162:2004.
The fitting of the test lead to the pipeline willbe carried out by a representative of thePipeline Operator and the two leads takento a Cathodic Protection Test Post,generally supplied by them, installed at thenearest convenient point. Any workrequired will be at the expense of thePromoter. The Pipeline Operator does notaccept responsibility for any damage to thenew service by virtue of electric corrosionprotection systems applied to thepipeline(s).
Alternatively, any third party works must notdetrimentally affect the Pipeline protectioneither.
10 Revision No. 19.11
special requirements for
in close proximity to high pressure pipelinessafe working
BPA Operatedpipelines
BPA OperatedPipeline
IN AN EMERGENCYCONTACT
01827 63 708
Stanlow
Kingsbury
BactonNorthWalsham
Uttoxeter
Northampton
HeathrowWalton
Colnbrook
Thames
Gatwick
Buncefield
Contact for enquiries and general information:
In an emergency contact: 01827 63 708
Agent:
• Lands DepartmentBPA5-7 Alexandra RoadHEMEL HEMPSTEADHertfordshire HP2 5BS
Tel: 01442 218 911Email: [email protected]
BPA Operated
Revision No. 19.11 11
special requirements forsafe working
CLH Pipeline Systempipelines
CLH PS
IN AN EMERGENCYCONTACT
ALDERMASTON0118 971 2021
Backford
Stourport
in close proximity to high pressure pipelines
Killingholme
Tattershall
LincolnMisterton
Plumley
Ellesmere Port
Sandy
Fairford
Carterton
Purton
Calne
AldermastonBerwick Wood/Avonmouth/Hallen
Portishead
Satchell Lane/Hamble
Walton
Rawcliffe
Isle of Grain
CLH Pipeline System
Contact for enquiries and general information:
In an emergency contact:
Aldermaston Control: 0118 971 2021
• CLH Pipeline SystemPO Box 7273Ashby de la ZouchLE65 2UZ
Tel: 0845 070 1245Fax: 0845 070 1250Email: [email protected]
Thetford
Barton Mills
St Neots
Swaffham
Shouldham
SaffronWalden
ThamesStansted
12 Revision No. 19.11
ConocoPhillipspipelines
Conoco PipelineTheddlethorpe
Conoco PipelineTeesside
special requirements for
in close proximity to high pressure pipelinessafe working
Theddlethorpe
HOR
IN AN EMERGENCYCONTACT
01642 541 222
IN AN EMERGENCYCONTACT
01507 473 553
Contact for enquiries and general information:
In an emergency contact:01507 473 553
• ConocoPhillips TheddlethorpeTheddlethorpe Gas TerminalTheddlethorpe St. HelenMablethorpeLincolnshire LN12 1NQ
Tel: 01507 475 665 / 475 575Fax: 01507 475 431
Contact for enquiries and general information:
In an emergency contact:01642 541222
• ConocoPhillips (UK) Teesside Operator LtdNorsea House, EvolutionWynyard Business ParkWynyard TS22 5TB
Tel: 01642 546411Fax: 01642 546096Emergency Tel: 01642 541222
ConocoPhillips
Email: [email protected]
Teesside
Revision No. 19.11 13
E-ON Pipelines
special requirements for
in close proximity to high pressure pipelinessafe working
E-ONpipelines
Winnington Pipeline
Castleford
E-ON
Winnington Pipeline• E.ON UK CHP LtdWinnington LaneNorthwichCheshire CW8 4GX
General enquiries telephone: 01606 723700Email: [email protected]
Castleford Pipeline• E.ON UK Cogeneration Ltd
Castleford Power stationWheldon RoadCastlefordWest Yorkshire WF10 2SD
General enquiries telephone: 01977 554725Email: [email protected]
Contact for enquiries and general information:
In an emergency contact:01606 77 508
Contact for enquiries and general information:
In an emergency contact:01977 555 653
14 Revision No. 19.11
EP Langage Ltd & Marchwood Powerpipelines
EP LangagePipeline
MarchwoodPower
IN AN EMERGENCYCONTACT
0800 328 60 30
IN AN EMERGENCYCONTACT
0800 371 726
special requirements for
in close proximity to high pressure pipelinessafe working
ChoakfordLangage
Lockerley
Marchwood
Contact for enquiries and general information:
In an emergency contact:0800 328 60 30
Marchwood Power
• Marchwood Power LimitedOceanic WayMarchwood Industrial ParkMarchwood Hampshire SO40 4BD
Tel: 02380 527 999Fax: 02380 527 998
Contact for enquiries and general information:
In an emergency contact:0800 371 726
EP Langage Ltd
• EP Langage Ltdc/o FisherGerman LLPThe Estates OfficeNorman CourtAshby de la ZouchLeicestershire LE65 2UZ
Tel: 01530 412 821Email: [email protected]
Revision No. 19.11 15
special requirements for
in close proximity to high pressure pipelinessafe working
Esso Petroleum Company Limitedpipelines
ESSOPipeline
IN AN EMERGENCYCONTACT
0800 136 812
BirminghamAirport
Birmingham Seisdon
Fawley
Avonmouth
West London/Heathrow Purfleet
Gatwick
Alton
Astwood
Contact for enquiries and general information:
In an emergency contact: 0800 136 812
Esso Petroleum Company LimitedAgent:
• Fisher German LLPFirn House61 Church StreetHungerfordBerkshire RG17 0JH
Tel: 0800 136 812Email: [email protected]
16 Revision No. 19.11
Essar Oil (UK) & CATSpipelines
Essar Pipelines
special requirements for
in close proximity to high pressure pipelinessafe working
Teesside
Stanlow
TranmereCarringtonIN AN
EMERGENCYCONTACT
0800 389 9607
IN AN EMERGENCYCONTACT
01642 546404
Contact for enquiries and general information:
In an emergency contact:24hour freephone 0800 389 9607
Essar Oil (UK)
• Essar Oil (UK) Ltdc/o Penspen, Unit 2, Kirkby Lonsdale Business Park,Kirkby Lonsdale, Cumbria LA6 2HH
Tel: 01539 624 197Email: [email protected]
Contact for enquiries and general information:
In an emergency contact:24hour 01642 546404
CATS
• CATS Kellas Midstream LtdCATS TerminalSeal Sands RoadMiddlesbrough TS2 1UB
Tel: 01642 546404Email: [email protected]
CATS Pipelines
GrangemouthGrangemouth
Revision No. 19.11 17
Humbly Grove Energypipelines
special requirements for
in close proximity to high pressure pipelinessafe working
IN AN EMERGENCYCONTACT
01256 381 625
Humbly Grove Energy
Contact for enquiries and general information:
In an emergency contact:01256 381 625
• Humbly Grove Energy Ltd The Avenue Lasham Hampshire GU34 5SY
Tel: 01256 381 621 Email: [email protected]
Humbly Grove
Barton Stacey
18 Revision No. 19.11
IGas & Oikos Storagepipelines
IGas
Oikos
special requirements for
in close proximity to high pressure pipelinessafe working
IN AN EMERGENCYCONTACT
01522 754 524
IN AN EMERGENCYCONTACT
01268 682206
Welton
Gainsborough
Palmers Wood
Canvey Island
Contact for enquiries and general information:
In an emergency contact:01522 754 524
Contact for enquiries and general information:
In an emergency contact:01268 682206
• Welton Gathering Centre Barfield Lane, Off Wragby Road Sudbrooke, Lincoln LN2 2QU
Tel: 020 3435 5230
Email: [email protected]
• Oikos Storage Ltd Haven Road, Canvey Island Essex SS8 0NR
Tel: 01268 682206 Fax: 01268 510095 Email: [email protected]
IGas
OIKOS
Revision No. 19.11 19
INEOS O&Ppipelines
INEOS O&PPipeline
IN AN EMERGENCYCONTACT
0800 374 185
special requirements for
in close proximity to high pressure pipelinessafe working
Wilton
Saltend
Grangemouth
INEOS O&P
Contact for enquiries and general information:
Includes WGEP (North)
In an emergency contact:
0800 374 185
• INEOS O&P Pipeline TeamPO Box 211 Inchyra roadGrangemouthFK3 9XB
Tel: 0800 374 185
Email: [email protected]: www.ineos.com
20 Revision No. 19.11
special requirements for
in close proximity to high pressure pipelinessafe working
Mainlinepipelines
MainlinePipelines Ltd
IN AN EMERGENCYCONTACT
01646 649 999
Manchester
Nottingham
KingsburySeisdon
MilfordHaven
Waterston
Pembroke
Contact for enquiries and general information:
In an emergency contact: 01646 649 999
MainlineAgent:
• Mainline Pipelines LtdPO Box 9856Ashby de la ZouchLeics LE65 9BZ
Tel: 0800 756 0804Email: [email protected]
MAINLINEPIPELINESLIMITED
Revision No. 19.11 21
Manchester Jetline Limitedpipelines
ManchesterJetline Limited
IN AN EMERGENCYCONTACT
01244 665 989
special requirements for
in close proximity to high pressure pipelinessafe working
ManchesterAirport
Stanlow
Backford
Plumley
Contact for enquiries and general information:
In an emergency contact:01244 665 989
Manchester Jetline Limited
• Penspen2 Verity CourtPochin WayMiddlewichCheshire CW10 0GW
Tel: 01606 833 805Fax: 01606 835 557Email: [email protected]
22 Revision No. 19.11
Petroineospipelines
IN AN EMERGENCYCONTACT
0800 374 185
PETROINEOSO&P Pipeline
special requirements for
in close proximity to high pressure pipelinessafe working
GrangemouthFinnart Ocean Terminal
Petroineos
Contact for enquiries and general information:
In an emergency contact:
0800 374 185
• Petroineos Pipeline TeamPetroineos Manufacturing Scotland LtdPO Box 21, Bo'ness RoadGrangemouthStirlingshireFK3 9XH
Tel: 0800 374 185
Email: [email protected]: www.ineos.com
Revision No. 19.11 23
SABICpipelines
SABIC Pipeline
IN AN EMERGENCYCONTACT
0800 318 105
special requirements for
in close proximity to high pressure pipelinessafe working
Runcorn
Wilton
Grangemouth
SABIC
Contact for enquiries and general information:
In an emergency contact:
0800 318 105
• SABIC UK Petrochemicals LtdOlefins OfficesWilton InternationalRedcarTS10 4RF
TPEP (East), WGEP and TSEPOffice Tel: 01642 834 [email protected] (West)Office Tel:01928 512 [email protected]
24 Revision No. 19.11
National Grid (Gas Transmission)pipelines
National GridPipelines
IN AN EMERGENCYCONTACT
0800 111 999
special requirements for
in close proximity to high pressure pipelinessafe working
National Grid (Gas Transmission)
In an emergency contact:24 hourNational Gas Emergency Number:0800 111 999
• Plant Protection TeamNational GridBlock 1, Floor 1Brick Kiln Street, HinckleyLeicestershire LE10 0NATel: 0800 688 588Email: [email protected]
Contact for enquiries and general information:
in close proximity to high pressure pipelines
special requirements forsafe working
Revision No. 19.11 25
Totalpipelines
Finaline
Colwick
IN AN EMERGENCYCONTACT
01159 615 785
Buncefield
Colwick
LOR(Killingholme)
IN AN EMERGENCYCONTACT
0800 592 246
Contact for enquiries and general information:
In an emergency contact:
Finaline:0800 592 246
Colwick:01159 615 785
Total
Agent:
Finaline Pipelines
• Lands Department BPA5-7 Alexandra RoadHEMEL HEMPSTEADHertfordshire HP2 5BS
Tel: 07887 745 004Email: [email protected]
Total Colwick
• Total LOR, Nottingham TerminalPrivate Road 3, Colwick Industrial EstateColwickNottingham NG4 2JSTel: 01159 615 785Fax: 01159 612 334
26 Revision No. 19.11
UNIPER
special requirements for
in close proximity to high pressure pipelinessafe working
Uniperpipelines
Theddlethorpe
Killingholme
Enfield Pipeline
Isle of Grain
Holford LinkConnah’s QuayPipeline
CottamPipeline
UniperContact for enquiries and general information:
In an emergency contact:Cottam and Killingholme0800 389 4795
Enfield 0800 783 0140
Isle of Grain 02476 198 550
Connahs Quay 01244 894 050
Holford 01606 841 223
• Engineering & Maintenance Dept. (Pipelines)Chase Hill RoadNorth KillingholmeNorth Lincolnshire DN40 3LU
For general enquiries:Telephone: 01469 504010Email: [email protected]
IN AN EMERGENCYCONTACT
Numbers below
Appendix I
Typical sectional drawing and specification for temporary protection of Pipelines under carriage ways.
MAINLINEPIPELINESLIMITED
LINEWATCH WEBSITE
www.linewatch.org.uk
EMERGENCY NUMBERS
01827 63 708
01256 381625
0800 389 9607 0800 136 812
AldermastonControl:
0118 971 2021
01522 754 524 0800 374 185
Winnington01606 77 508
Castleford01977 555 653 01646 649 999
01268 68220601244 665 989 0800 328 60 30 0800 111 999
0800 374 185 0800 318 105 Total Finaline:0800 592 246
Colwick: 01159 615 785
01642 546404 Theddlethorpe 01507 473 553
Teesside 01642 541 222
0800 371 726
Cottam/Killingholme0800 389 4795
Enfield 0800 783 0140Isle of Grain 02476 198 550
Connahs 01244 894 050Holford 01606 841 223