s69_haynesville shale exploration and production -- infrastructure challenges_ltc2013

Upload: walaywan

Post on 03-Apr-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    1/98

    Welcome

    Oil & Gas Explorers

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    2/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    3/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    4/98

    Overlay Data since FY 96-97Fiscal Year Estimated Dollar Amount Bid Dollar Amount Final Dollar Amount Miles Overlaid Percent of

    Non-

    PCCP

    Miles

    Final Dollars per

    Mile

    96-97 24,056,981.00 22,429,508.00 22,767,359.00 97.46 5.27% 233,607.2197-98 16,046,030.00 16,495,546.00 16,557,738.00 83.20 4.49% 199,011.2798-99 22,281,089.00 22,010,040.00 22,852,243.00 99.01 5.35% 230,807.4299-00 15,785,483.00 14,990,909.00 14,962,007.00 72.66 3.93% 205,918.0700-01 13,720,730.00 13,004,269.00 12,742,233.00 52.15 2.82% 244,338.1201-02 16,049,709.00 15,730,930.00 15,360,861.00 66.93 3.62% 229,506.3602-03 11,542,343.00 12,442,890.00 12,020,378.00 48.55 2.62% 247,587.6003-04 12,968,749.00 13,181,968.00 13,011,778.00 58.09 3.14% 223,993.4204-05 15,461,167.00 16,893,192.00 17,425,193.00 71.78 3.88% 242,758.3305-06 14,418,393.00 16,276,103.00 16,233,719.00 69.52 3.76% 233,511.4906-07 16,650,298.00 16,619,969.00 16,727,772.00 53.12 2.87% 314,905.3507-08 39,965,137.00 38,652,694.00 39,535,593.00 78.24 4.23% 505,311.7708-09 28,342,782.00 26,712,907.00 24,700,732.00 73.34 3.96% 336,797.5509-10 19,959,077.00 20,071,360.00 Incomplete 63.74 3.44%

    Totals 247,288,891.00 245,440,925.00 244,897,606.00 987.79 53.37% 265,026.36

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    5/98

    District 04 Roadway Information

    Total Control Section Mileage in the District = 2069 miles

    Total Non-concrete surfaced Control Section Mileage = 1851 miles

    Breakdown of mileage by Parish

    PARISH TOTAL C.S.L.M.MILEAGE NON-CONCRETE SURFACEDMILEAGE

    Bienville 342 (16.5%) 325 (17.5%)Claiborne 287 (14.0%) 286 (15.5%)Webster 244 (12.0%) 221 (12.0%)Bossier 287 (14.0%) 232 (12.5%)Caddo 407 (19.5%) 312 (17.0%)Desoto 323 (15.5%) 296 (16.0%)Red River 179 ( 8.5%) 179 ( 9.5%)Totals >> 2069 1851

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    6/98

    Challenges

    Haynesville Shale

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    7/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    8/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    9/98

    Increase in Highway Permits

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    10/98

    Bridge Age Chart

    On-System Bridges (Year Built vs Number Built)

    215

    44 42

    121

    272

    253

    222

    96

    51

    0

    50

    100

    150

    200

    250

    300

    1910-1919 1920-1929 1930-1939 1940-1949 1950-1959 1960-1969 1970-1979 1980-1989 1990-1999 2000-2009

    Year Built

    NumberBuilt

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    11/98

    District Bridge Information

    Of the 1115 on-system bridges: 134 (12%) Structurally Deficient

    153 (14%) Functionally Obsolete

    18 (2%) Weight Restrictions Posted

    120 (11%) Sufficiency Rating less then 50

    289 (26%) Sufficiency Rating greater then 50 but less

    then 80

    224 (20%) have timber pile substructures with anaverage age of 45 years

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    12/98

    Timber Pile Substructures

    Our greatest

    concern is the 58

    bridges with timber

    pile substructures.

    We are exceeding

    the life expectancy

    of these piles.

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    13/98

    LA 518 Bridge over Bear Creek in

    Claiborne Parish (April 15, 2010)

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    14/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    15/98

    Salt water Disposal Facility

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    16/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    17/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    18/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    19/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    20/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    21/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    22/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    23/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    24/98

    * 2005 and 2008 counts are bi-directional ADT, ~ 0.25

    0.5mi. from intersection** 2010 counts are single direction at intersection that have been doubled

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    25/98

    * 2005 and 2008 counts are bi-directional ADT, ~ 0.25

    0.5mi. from intersection** 2010 counts are single direction at intersection that have been doubled

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    26/98

    Desoto Parish Traffic Volume Increases

    d h ff l

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    27/98

    Red River Parish Traffic Volume Increases

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    28/98

    48 Hour Count

    NB Ct = 2436 /

    day21.9% Trucks

    ----------------------

    SB Ct = 2461 /day

    20.9% Trucks

    Peak HourIntersection Count

    4:30pm 5:30pm

    Traffic Ct = 1068

    8.3% Trucks

    Peak HourIntersection Count

    3:30pm 4:45pm

    Traffic Ct = 1523

    13.7% Trucks

    Peak Hour

    Intersection Count

    3:30pm 4:45pm

    Traffic Ct = 1655

    13.3% TrucksPeak Hour

    Intersection Count

    4:30pm 5:30pm

    Traffic Ct = 939

    15.8% Trucks

    Estimation of Truck Percentages from Intersection Counts

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    29/98

    Current Rule and Regulations

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    30/98

    Mud & Gravel on Highways

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    31/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    32/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    33/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    34/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    35/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    36/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    37/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    38/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    39/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    40/98

    Unauthorized Parking on Shoulders at Pipeline Crossings

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    41/98

    Traffic Control for the Construction of Pipelines

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    42/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    43/98

    Roadway and Shoulder Damage at Pipeline Crossing

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    44/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    45/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    46/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    47/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    48/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    49/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    50/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    51/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    52/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    53/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    54/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    55/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    56/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    57/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    58/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    59/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    60/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    61/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    62/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    63/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    64/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    65/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    66/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    67/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    68/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    69/98

    Complaint Record

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    70/98

    Complaint Record

    Daily Work Report

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    71/98

    Daily Work Report

    Accident Report

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    72/98

    Accident Report

    Letter From Complainant

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    73/98

    Letter From Complainant

    Hospital Bill

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    74/98

    Hospital Bill

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    75/98

    Hwy 513 Road Deterioration Video

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    76/98

    Hwy 346 Road Deterioration Video

    District Policy on Driveways

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    77/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    78/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    79/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    80/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    81/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    82/98

    T C S d

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    83/98

    Texas Case Study

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    84/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    85/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    86/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    87/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    88/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    89/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    90/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    91/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    92/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    93/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    94/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    95/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    96/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    97/98

  • 7/29/2019 S69_Haynesville Shale Exploration and Production -- Infrastructure Challenges_LTC2013

    98/98

    Questions