New Orleans Rail Gateway Program EISJefferson and Orleans Parishes
State Project No. H.005168
New Orleans Rail Gateway Program
Partnering for Regional Economic Vitality
Christopher G. Gesing, P.E.
(724) 495-4276
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
2/24
Partnering for Progress
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
3/24
New Orleans Rail Gateway (Existing)
4th largest US Rail Gateway
6 of 7 Class 1 Railroads
Rail yards and intermodal facilities
Port of New Orleans
Needs major improvement
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
4/24
Why are Improvements Needed?
Antiquated control systems and switches slow travel times
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
5/24
Why are Improvements Needed?
Antiquated control systems and switches slow travel times
Flood gates limit emergency responsiveness
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
6/24
Why are Improvements Needed?
Antiquated control systems and switches slow travel times
Flood gates limit emergency responsiveness
Almonaster Bridge requires frequent unscheduled maintenance
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
7/24
Why are Improvements Needed?
Antiquated control systems and switches slow travel times
Flood gates limit emergency responsiveness
Almonaster Bridge requires frequent unscheduled maintenance
Freight demand routinely impacts both rail and road traffic
Cumulative delays on average per day:
29.7 hours of delays for all Trains
112.4 hours of delays for all Vehicles
12.1 hours of delays for all Trucks
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
8/24
Traffic Delays
Cumulative delays on average per day:
112.4 hours of delays for all Vehicles
12.1 hours of delays for all Trucks
0.00
5.00
10.00
15.00
20.00
25.00
30.00
Total Daily Auto Delay (Hours)
Total Daily Truck Delay (Hours)
Source: Feasibility Analysis, 2007
H
o
u
rs
D
a
ily
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
9/24
Why are Improvements Needed?
Antiquated control systems and switches slow travel times
Flood gates limit emergency responsiveness
Almonaster Bridge requires frequent unscheduled maintenance
Freight demand routinely impacts both rail and road traffic
Cumulative delays on average per day:
29.7 hours of delays for all Trains
112.4 hours of delays for all Vehicles
12.1 hours of delays for all Trucks
Future freight demand will increase negative communityimpacts and decrease regional economic competitiveness
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
10/24
Freight Demand
Annual Tons of Rail Freight (2010)13.1 million tons Chemicals or Allied Products
Hazardous Materials
Misc Mixed ShipmentsFood or Kindred Products
Farm Products
Transportation Equipment
Petroleum or Coal Products
Pulp,paper or Allied Products
Primary Metal Products
Clay,concrete,glass or Stone
Lumber or Wood Products
Waste or Scrap MaterialsNonmetallic Minerals
Shipping Containers
Rubber or Misc Plastics
Forest Products
Electrical Equipment
Textile Mill Products
Apparel or Related Products
Misc Freight Shipments
Furniture or Fixtures
Metallic Ores
Fabricated Metal Products
Misc Manufacturing Products
Fresh Fish or Marine Products
Instrum, Photo Equipment, Optical Eq
Machinery
Shipper Association Traffic
Leather or Leather Products
Freight Forwarder Traffic
Commodity
Annual Tons of Rail Freight (2038)19.5 million tons
Source: TranSearch and Surface Transportation Board data compiled by IHS Global Insight
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
11/24
Route Alternatives
Route Alternatives NEPA requires evaluating a broad range of alternatives
No-Build baseline for comparison
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
12/24
Route Alternatives
Route Alternatives NEPA requires evaluating a broad range of alternatives
No-Build baseline for comparison Back Belt
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
13/24
Route Alternatives
Route Alternatives NEPA requires evaluating a broad range of alternatives
No-Build baseline for comparison Back Belt
Middle Belt
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
14/24
Route Alternatives
Route Alternatives NEPA requires evaluating a broad range of alternatives
No-Build baseline for comparison
Back Belt
Middle Belt
Front Belt
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
15/24
Route Alternatives
Route Alternatives NEPA requires evaluating a broad range of alternatives
No-Build baseline for comparison
Back Belt
Middle Belt
Front Belt
Couplet
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
16/24
Projects A Chinese Menu Approach
Program of Projects Close, improve or grade-separate crossings
Add, remove, or reconfigure trackage Upgrade structures & improve drainage
Eliminate flood gates & I-10 Dip
Improve signal systems
Incorporate Centralized Train Control
Future Passenger Rail Considerations Amtrak New Orleans Union Passenger Terminal
Commuter Rail Downtown to Airport
Passenger Rail New Orleans to Baton Rouge
Off-setting Mitigation
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
17/24
Minority Populations
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
18/24
Median Household Income
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
19/24
Neighborhoods
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
20/24
Limited English Proficiency
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
21/24
Next Steps
Milestone Target Date
Alternatives Development & Reviews Winter 2013
Field Studies Winter 2013
Mitigation & Enhancement Coordination Spring 2013
Alternatives Outreach Meetings Summer 2013
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
22/24
Get on Board!
http://www.dotd.la.gov/administration/public_info/projects/norg/
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
23/24
Subconsultant Partners
Burk-Kleinpeter, Inc.
Purpose & Need
Environmental Studies - Community Impact Assessment
Digital Engineering and Imaging, Inc.
Preliminary Engineering and Traffic Studies
The Hawthorne Agency, Inc.
Inter-Agency Coordination and Public Outreach
URS Corporation
Rail Traffic Controller (RTC) Modeling
-
7/29/2019 S38_New Orleans Rail Gateway Program_LTC2013
24/24
New Orleans Rail Gateway Program EISJefferson and Orleans Parishes
State Project No. H.005168
New Orleans Rail Gateway Program
Partnering for Regional Economic Vitality
Christopher G. Gesing, P.E.
(724) 495-4276