s u s e v representative footprints for potential a ... · s o s e a t t l e c c a c r d swi low t...

1
Figure G.5.3-1 TM 970, CSO Control Alternatives Development The information included on this map has been compiled from a variety of sources and is subject to change without notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a survey product. King County shall not be liable for any general, special, indirect, incidential, or consequential damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on this map. Any sale of this map or information on this map is prohibited except by written permission of King County. File Name: Data Source: ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( Elliott Bay Interceptor Modifications to S Michigan St Regulator Station Elliott Bay Interceptor S Michigan St Trunk Approximate Boundary for Alternate Location of Wet-Weather Treatment Facility The consolidated wet-weather treatment facility for this alternative could be located anywhere between the Brandon St Regulator Station and S Michigan St Regulator Station (dashed boundary). Conveyance would need to be re-evaluated if wet-weather treatment facility moves from assumed location (solid boundary). S Michigan St CSO Outfall Convey to WWTF site 42" Pipe Modifications to Brandon St Regulator Station Approximate Boundary for Assumed Location of Wet-Weather Treatment Facility Wet-weather treatment facility has been assumed to be located within or adjacent to the solid boundary shown for cost estimating purposes. Approximate boundary is intended for planning purposes only and does not represent all potential site locations. Further study and evaluation will be completed prior to selection of a preferred site for this consolidated alternative. See TM 970, CSO Control Alternatives Development for criteria and assumptions used in establishing the approximate boundary. I-5 Fwy 18th Ave SW 16th Ave SW SR 509 Airport Way S 4th Ave S 17th Ave SW 1st Ave S 6th Ave S East Marginal Way S S Orcas St West Marginal Way SW Ellis Ave S Corson Ave S Flora Ave S 15th Ave S S River St Unnamed 18th Ave S S Michigan St S Albro Pl S Myrtle St Carleton Ave S Swift Ave S 13th Ave S SW Myrtle St Corgiat Dr S 5th Ave S 12th Ave SW Fox Ave S Utah Ave S Highland Park Way SW 2nd Ave SW S Garden St Detroit Ave SW Ohio Ave S S Bailey St S Warsaw St 14th Ave SW 13th Ave SW Perimeter Rd S SeaTac AcRd S Eddy St SW Michigan St 5th Pl S 20th Ave S S Hardy St SW Orchard St Ursula Pl S So Seattle CC AcRd S Willow St 3rd Ave S S Elizabeth St 15th Ave SW SW Holly St SW Morgan St SW Graham St SW Front St SW Holly St S Willow St 1st Ave S I-5 Fwy SW Myrtle St Detroit Ave SW SR 509 600 0 600 300 Feet Ü S Michigan St and Brandon St - DSN039/041-WWT-1 (KC) (New Conveyance) Potential Site Boundary and Representative Footprints ! ( KC Manholes SPU Maintenance Hole 5-ft Contour 20-ft Contour Proposed Conveyance KC-WTD Conveyance SPU Drainage Mainline SPU Sanitary Mainline SPU Combined Mainline Representative Footprint Connected Area with High GSI Potential Connected to Combined Sewer System DSN039/041-WWT-1 (KC) Ballasted Sedimentation Total Footprint = ~1.98 Acres Total Flow = ~66.0 MGD Total Volume = ~0.89 MG CSO Treatment (with Influent Pumping), Typ Equalization Basin, Typ Potential GSI Opportunities in S Michigan St and Brandon CSO Basins Representative Footprints for Potential Siting Within or Adjacent to Boundary Approximate Boundary 0 13,000 26,000 6,500 Feet S Michigan St CSO Basin Boundary DSN039/041-WWT-1 (KC) CEPT w/ Lamella Plates Total Footprint = ~2.26 Acres Total Flow = ~68.0 MGD Total Volume = ~0.72 MG Brandon St CSO Basin Boundary ~29% S Michigan St Basin Area and ~26% Brandon St Basin Area Likely Feasible for GSI Total S Michigan St CSO Basin: ~1,886 acres Total Brandon St CSO Basin: ~376 acres

Upload: others

Post on 19-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: S U S e v Representative Footprints for Potential A ... · S o S e a t t l e C C A c R d SWi low t 3 d A v e S Elizab th St 1 5 t h v S W W Holly St W Morgan St SW Gr ah m t S W F

Figure G.5.3-1

TM 970, CSO Control Alternatives Development

The information included on this map has been compiled from a variety of sources and issubject to change without notice. King County makes no representations or warranties,express or implied, as to accuracy, completeness, timeliness, or rights to the use of suchinformation. This document is not intended for use as a survey product. King County shallnot be liable for any general, special, indirect, incidential, or consequential damages including,but not limited to, lost revenues or lost profits resulting from the use or misuse of the informationcontained on this map. Any sale of this map or information on this map is prohibited except bywritten permission of King County.File Name:Data Source:

!(!(!(!(

!(

!( !(!(

!(

!(

!( !(

!(

!( !(!(

!(

!(!( !(!(

!(!(

!(

!(!(

!(!(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(

!(!(!(

!(!(!(

!(

!(

!(

!(

!(

!(!(

!(!(!(

!(

!(

!(!(!(!(!( !(!( !(

!(

!( !(!(

!(!(

!(!( !(

!(

!(!(

!(

!( !(!(!(!(

!(

!(

!(

Elliott Bay Interceptor

Modifications to S Michigan St Regulator Station

Elliott Bay Interceptor

S Michigan St Trunk

Approximate Boundary for Alternate Location ofWet-Weather Treatment FacilityThe consolidated wet-weather treatment facility for this alternative could be located anywhere between the Brandon St Regulator Station and S Michigan St Regulator Station (dashed boundary). Conveyance would need to bere-evaluated if wet-weather treatment facility moves fromassumed location (solid boundary).

S Michigan StCSO Outfall

Convey to WWTF site

42" Pipe

Modifications to Brandon St Regulator Station

Approximate Boundary for Assumed Location ofWet-Weather Treatment FacilityWet-weather treatment facility has been assumed to be locatedwithin or adjacent to the solid boundary shown for cost estimatingpurposes. Approximate boundary is intended for planning purposes only and does not represent all potential site locations. Further study and evaluation will be completed prior to selection of a preferred site for this consolidated alternative.See TM 970, CSO Control Alternatives Development for criteria andassumptions used in establishing the approximate boundary.

I-5 Fwy18

th Av

e SW

16th

Ave S

W

SR 50

9

Airport Way S

4th Ave S

17th

Ave S

W

1st A

ve S

6th Av

e S

East Marginal Way S

S Orcas St

West Marginal Way SWEll

is Av

e SCorso

n Ave

S

Flora

Ave S

15th Ave S

S River St

Unna

med

18th

Ave SS Michigan St

S Albro Pl

S Myrtle St

Carle

ton Av

e S

Swift Ave S

13th

Ave S

SW Myrtle St

Corgiat Dr S

5th Av

e S

12th

Ave S

W

Fox Ave S

Utah Ave S

Highland Park Way SW

2nd A

ve SW

S Garden St

Detroit Ave SW

Ohio

Ave S

S Bailey St

S Warsaw St

14th

Ave S

W

13th

Ave S

W

Perimeter Rd S

SeaTac AcRd

S Eddy St

SW Michigan St

5th P

l S

20th

Ave S

S Hardy St

SW Orchard St

Ursula Pl S

So S

eattle

CC

AcRd

S Willow St

3rd Av

e S

S Elizabeth St

15th

Ave S

W SW Holly St

SW Morgan St

SW Graham St

SW Front St

SW Holly St

S Willow St1s

t Ave

S

I-5 Fwy

SW Myrtle St

Detroit Ave SW

SR 50

9

600 0 600300Feet

Ü

S Michigan St and Brandon St - DSN039/041-WWT-1 (KC) (New Conveyance)Potential Site Boundary and Representative Footprints

!( KC Manholes

SPU Maintenance Hole

5-ft Contour

20-ft Contour

Proposed Conveyance

KC-WTD Conveyance

SPU Drainage Mainline

SPU Sanitary Mainline

SPU Combined Mainline

Representative Footprint

Connected Area with High GSI Potential

Connected to Combined Sewer System

DSN039/041-WWT-1 (KC)Ballasted SedimentationTotal Footprint = ~1.98 AcresTotal Flow = ~66.0 MGDTotal Volume = ~0.89 MG

CSO Treatment (with Influent Pumping), Typ

Equalization Basin, Typ

Potential GSI Opportunities in S Michigan St and Brandon CSO Basins

Representative Footprints for Potential Siting Within or Adjacent to Boundary

Approximate Boundary

0 13,000 26,0006,500Feet

S Michigan St CSOBasin Boundary

DSN039/041-WWT-1 (KC)CEPT w/ Lamella PlatesTotal Footprint = ~2.26 AcresTotal Flow = ~68.0 MGDTotal Volume = ~0.72 MG

Brandon St CSOBasin Boundary

~29% S Michigan St Basin Areaand ~26% Brandon St Basin Area Likely Feasible for GSI

Total S Michigan St CSO Basin: ~1,886 acresTotal Brandon St CSO Basin: ~376 acres